CN207775844U - 一种导流洞混凝土堵头结构 - Google Patents
一种导流洞混凝土堵头结构 Download PDFInfo
- Publication number
- CN207775844U CN207775844U CN201721735114.6U CN201721735114U CN207775844U CN 207775844 U CN207775844 U CN 207775844U CN 201721735114 U CN201721735114 U CN 201721735114U CN 207775844 U CN207775844 U CN 207775844U
- Authority
- CN
- China
- Prior art keywords
- diversion tunnel
- plug
- basement rock
- stopper structure
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Abstract
本实用新型提供了一种导流洞混凝土堵头结构,包括导流洞和基岩;所述导流洞内设有混凝土拱形堵头,在堵头的两侧均设有止水梗;所述堵头的两端与导流洞的侧壁基岩相连,止水梗与基岩相邻。本实用新型在导流洞内部施工拱形堵头,可以有效快速封堵导流洞,减少封堵混凝土工程量,简化施工过程,节约了施工工期及工程投资。
Description
技术领域
本实用新型涉及一种导流洞混凝土堵头结构,属于水利水电工程中的水工建筑物结构技术领域。
背景技术
在水利水电工程建设过程中,大多数水电站、水库等工程,均涉及到导流洞封堵施工问题,导流洞封堵通常采用进口闸门下闸或临时封堵,洞内施工截锥形、短钉形或柱形混凝土永久堵头,此种堵头较好的满足了工程需要,但施工时段较长、断面较大时一般须分层浇筑并设置温控措施,且需要布置灌浆管路,施工过程较繁琐,往往影响水电站提前蓄水发电、水库提前供水灌溉。
如何选择导流洞混凝土堵头结构形式,越来越引起人们的重视,如何采取最有效的结构形式既可以满足工程需要,确保工程质量,又可以加快施工进度,节约工程投资,变被动为主动,是设计人员重点考虑的问题之一。
实用新型内容
为解决上述技术问题,本实用新型提供了一种导流洞混凝土堵头结构,该导流洞混凝土堵头结构提供了一种快速方便同时又节约工程投资及缩短工期的措施,能确保工程质量,降低工程施工困难,同时,也变被动为主动,及时解决流洞封堵问题,适用于水电站、水库等涉及导流洞封堵施工的水电或水利工程。
本实用新型通过以下技术方案得以实现。
本实用新型提供的一种导流洞混凝土堵头结构,包括导流洞和基岩;所述导流洞内设有混凝土拱形堵头,在堵头的两侧均设有止水梗;所述堵头的两端分别与导流洞的两侧侧壁基岩相连,止水梗与基岩相邻。
所述堵头的形状为扇形。
所述扇形的内弧面的切线与基岩等高线的夹角不小于30°
所述基岩的两侧侧壁上设有槽,堵头的两端分别设于槽内。
所述堵头、基岩的接触面处设有灌浆管路。
本实用新型的有益效果在于:在导流洞内部施工拱形堵头,可以有效快速封堵导流洞,减少封堵混凝土工程量,简化施工过程,节约了施工工期及工程投资。
附图说明
图1是本实用新型的结构示意图;
图2是本实用新型的纵剖面图;
图中:1-堵头,2-止水梗,3-基岩。
具体实施方式
下面进一步描述本实用新型的技术方案,但要求保护的范围并不局限于所述。
如图1和图2所示,一种导流洞混凝土堵头结构,包括导流洞和基岩3;所述导流洞内设有混凝土拱形堵头1,在堵头1的两侧均设有止水梗2,进行防渗,可以在短时间内,形成导流洞封堵结构,确保导流洞快速有效封堵,减少封堵混凝土工程量,节约工程投资;所述堵头1的两端分别与导流洞的两侧侧壁基岩3相连,止水梗2与基岩3相邻,对基岩3的岩体承压及防渗要求较高,主要用于岩体坚固、防渗性能较好的地层。
所述堵头1为扇形,堵头1主要在导流洞洞内施工,施工空间较狭小,拱厚受洞内断面尺寸影响,一般较薄,因此,堵头1的拱曲线设计采用抛物线或三心圆,借助混凝土拱形曲线,将水压力全部或部分传递给导流洞侧墙基岩3上。
所述堵头1设于封堵水头20cm以下,平衡内外压。
所述扇形的内弧面的切线与基岩3等高线的夹角不小于30°
所述基岩3的两侧侧壁上设有槽,堵头1的两端分别设于槽内。
所述堵头1、基岩3的接触面处设有灌浆管路。
所述堵头1的拱座岩石要求均匀、坚固完整、有足够的强度、透水性小、能抵抗水的侵蚀、耐风化、岸坡稳定、没有大断裂等,其拱座宽度采用抗剪强度公式进行初步确定,通过应力分析复核,拱座抗滑稳定计算方法常采用刚体极限平衡法,对于大型工程或当地基情况复杂时,可辅以结构模型试验和有限元法分析计算。
具体的,主要按照如下步骤实施:
1、施工之前,先进行混凝土拱形堵头1所受水压力计算,水压力宜选择导流洞进口校核洪水位时的计算,进而估算混凝土拱形堵头1的厚度。
2、导流洞进口下闸或临时封堵后,确保无渗水进入,同时做好洞内渗水集中和抽排,混凝土拱形堵头1与导流洞四周基岩3相接的位置,开挖成槽(导流洞开挖期完成),对槽面基岩3进行凿毛后,进行混凝土拱形堵头1浇筑,并于接触面布设灌浆管路。
3、混凝土拱形堵头1浇筑完成后,进行止水梗施工2,对开挖面进行回填,以免水流渗入。
4、混凝土拱形堵头1和止水梗2施工完成后,通过接触灌浆管路进行灌浆。
Claims (5)
1.一种导流洞混凝土堵头结构,包括导流洞和基岩(3),其特征在于:所述导流洞内设有混凝土拱形堵头(1),在堵头(1)的两侧均设有止水梗(2);所述堵头(1)的两端分别与导流洞的两侧侧壁基岩(3)相连,止水梗(2)与基岩(3)相邻。
2.如权利要求1所述的导流洞混凝土堵头结构,其特征在于:所述堵头(1)的形状为扇形。
3.如权利要求2所述的导流洞混凝土堵头结构,其特征在于:所述扇形的内弧面的切线与基岩(3)等高线的夹角不小于30°。
4.如权利要求1所述的导流洞混凝土堵头结构,其特征在于:所述基岩(3)的两侧侧壁上设有槽,堵头(1)的两端分别设于槽内。
5.如权利要求4所述的导流洞混凝土堵头结构,其特征在于:所述堵头(1)、基岩(3)的接触面处设有灌浆管路。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721735114.6U CN207775844U (zh) | 2017-12-13 | 2017-12-13 | 一种导流洞混凝土堵头结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721735114.6U CN207775844U (zh) | 2017-12-13 | 2017-12-13 | 一种导流洞混凝土堵头结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207775844U true CN207775844U (zh) | 2018-08-28 |
Family
ID=63231211
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721735114.6U Active CN207775844U (zh) | 2017-12-13 | 2017-12-13 | 一种导流洞混凝土堵头结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207775844U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112726529A (zh) * | 2020-12-29 | 2021-04-30 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种具有自锁功能的混凝土堵头 |
-
2017
- 2017-12-13 CN CN201721735114.6U patent/CN207775844U/zh active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112726529A (zh) * | 2020-12-29 | 2021-04-30 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种具有自锁功能的混凝土堵头 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204023501U (zh) | 一种用于土石坝的除险加固防渗处理结构 | |
CN104631475A (zh) | 一种下穿河流浅埋暗挖隧道的安全快速施工方法 | |
CN205636683U (zh) | 导流洞快速封堵结构 | |
CN105839604B (zh) | 用于初期蓄水的导流洞封堵结构及导流洞快速封堵方法 | |
CN107605511A (zh) | 洞室堵头周边止水结构及其施工方法 | |
CN207775844U (zh) | 一种导流洞混凝土堵头结构 | |
CN103132497A (zh) | 一种深岩溶大流量地下溶洞的处理方法 | |
CN207498908U (zh) | 一种导流隧洞直柱形堵头结构型式 | |
CN205260042U (zh) | 一种盾尾刷更换时环形冻结加固止水结构 | |
CN110499740A (zh) | 一种水电工程高水头不良地质条件下导流洞安全封堵方法 | |
CN105927271A (zh) | 竖直换热器中竖井的灌浆回填系统及方法 | |
CN203866777U (zh) | 混凝土坝横缝止水失效后的灌浆处理结构 | |
CN102900092B (zh) | 深厚覆盖层上修建面板堆石坝的人工复合地基及施工方法 | |
CN105970882B (zh) | 解决面板坝施工期坝体反渗水问题的结构及其构造方法 | |
CN202440787U (zh) | 一种河道导流装置 | |
CN101343988A (zh) | 承压水地区深层水泥土搅拌桩加注浆止水方法 | |
CN205907658U (zh) | 用于面板坝施工期坝体反渗水结构 | |
CN207159958U (zh) | 非封闭无抽排水垫塘结构 | |
CN113221204B (zh) | 展臂式排水抗滑桩及其结构计算方法 | |
CN204849791U (zh) | 一种土石围堰防渗体系的结构 | |
CN205617317U (zh) | 沥青混凝土心墙与混凝土基座的连接结构 | |
CN209323464U (zh) | 水工建筑物的分区止水结构 | |
CN210263095U (zh) | 初中期导流洞全洞段检修围堰结构 | |
CN108755594B (zh) | 一种用于砂土堤基截渗的两墙夹塑膜施工方法 | |
CN208733589U (zh) | 一种修建在陡峻边坡上的岸塔式进水口 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |