CN103132497A - 一种深岩溶大流量地下溶洞的处理方法 - Google Patents

一种深岩溶大流量地下溶洞的处理方法 Download PDF

Info

Publication number
CN103132497A
CN103132497A CN2011103845025A CN201110384502A CN103132497A CN 103132497 A CN103132497 A CN 103132497A CN 2011103845025 A CN2011103845025 A CN 2011103845025A CN 201110384502 A CN201110384502 A CN 201110384502A CN 103132497 A CN103132497 A CN 103132497A
Authority
CN
China
Prior art keywords
karst
steel pipe
large flow
processing method
pipe pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011103845025A
Other languages
English (en)
Other versions
CN103132497B (zh
Inventor
单承康
高永刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hydrochina Guiyang Engineering Corp
Original Assignee
Hydrochina Guiyang Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydrochina Guiyang Engineering Corp filed Critical Hydrochina Guiyang Engineering Corp
Priority to CN201110384502.5A priority Critical patent/CN103132497B/zh
Publication of CN103132497A publication Critical patent/CN103132497A/zh
Application granted granted Critical
Publication of CN103132497B publication Critical patent/CN103132497B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

一种深岩溶大流量地下溶洞的处理方法,其特征在于:在溶洞的下游区域钻孔,置入钢管桩形成格栅,在钢管桩格栅的上游侧打孔置入模袋并注浆,模袋上游侧回填砂石级配料或水下不分散混凝土,通过钻孔对回填区域及溶洞周边进行灌浆,形成完整的封堵体。与现有技术相比,本发明在地下溶洞的岩溶管道下游采用钢管桩结合模袋注浆对主通道进行有效封堵,再在其上游回填砂石级配料或水下不分散混凝土,可以有效解决埋深大于50m的岩溶处理问题,结合灌浆可以进一步增强封堵体的坚固性和防渗效果,该方法可以在较短时间内花费较少的投资对深岩溶大流量地下溶洞进行有效封堵。

Description

一种深岩溶大流量地下溶洞的处理方法
技术领域
本发明涉及溶洞处理技术领域,特别是涉及一种深岩溶大流量地下溶洞的处理方法。
背景技术
在岩溶地区修建水利水电工程经常会遇到各种岩溶处理问题,对于埋深较浅的溶洞均可通过清挖、回填混凝土的常规方法解决;对于埋深较深(大于50m)的溶洞,现有方法均无法在较短时间内花费较少的投资进行有效处理。
发明内容
本发明所要解决的技术问题是克服现有溶洞处理方法在处理埋深较深、溶洞空腔较大、具有一定流速时所存在的缺陷,提供一种深岩溶大流量地下溶洞的处理方法,该方法可以在较短时间内花费较少的投资对深岩溶进行有效封堵。
为了解决上述技术问题,本发明采用如下的技术方案:
本发明深岩溶大流量地下溶洞的处理方法:在对应溶洞的下游区域钻孔,置入钢管桩形成格栅,在钢管桩格栅的上游侧打孔置入模袋并灌浆,在模袋的上游侧通过钻孔回填砂石级配料或水下不分散混凝土,通过钻孔对回填区域及溶洞周边进行灌浆。在回填区域及溶洞周边灌浆可以进一步增强封堵体的坚固性以及防渗性。
在钢管桩施工完成后,需在钢管内部注入水泥砂浆将钢管内部填充密实,以提高钢管桩的强度。
上述深岩溶大流量地下溶洞的处理方法,需根据溶洞的实际埋深及水流情况在模袋灌浆完成12小时~72小时后再在其上游侧回填砂石级配料或水下不分散混凝土。
根据溶洞的发育特点通过计算确定钢管桩的间排距、钢管壁厚,一般情况钢管桩间距在0.5m~2.5m之间确定,钢管桩的排数一般为1~3排,排距0.5m~2m,钢管管径一般选取89mm~150mm,钢管壁厚不小于6mm。
前述处理方法中,模袋的大小根据溶洞大小及钢管桩可承受荷载确定,并需大于钢管桩的间距。
与现有技术相比,本发明在地下溶洞的岩溶管道下游采用钢管桩结合模袋对主通道进行有效封堵,再在其上游回填砂石级配料或水下不分散混凝土,可以有效解决埋深大于50m的岩溶处理问题,结合灌浆可以进一步增强封堵体的坚固性和防渗效果。
具体实施方式
1、根据探测的溶洞规模确定钢管桩格栅的布置参数(一般来说,间距为0.5~2.5m、排数为1~3排、排距为0.5~2m,钢管选用管径为89~150mm,钢管壁厚不小于6mm),在对应溶洞的下游区域钻孔,置入钢管桩形成格栅,并在钢管内注入水泥砂浆,将钢管内部填充密实。
2、根据确定的钢管桩的间排距,选择适当大小的模袋,模袋的大小要大于钢管桩格栅的孔距,在钢管桩格栅的上游侧打孔置入模袋并注浆。
3、在模袋注浆12~72小时后,在模袋注浆的上游侧回填砂石级配料或水下不分散混凝土,通过钻孔对回填区域及溶洞周边进行灌浆,形成完整的封堵体。

Claims (5)

1. 一种深岩溶大流量地下溶洞的处理方法,其特征在于:在对应溶洞的下游区域钻孔,置入钢管桩形成格栅,在钢管桩格栅的上游侧打孔置入模袋并灌浆,在模袋的上游侧通过钻孔回填砂石级配料或水下不分散混凝土,通过钻孔对回填区域及溶洞周边进行灌浆。
2.按照权利要求1所述深岩溶大流量地下溶洞的处理方法,其特征在于:在所述钢管桩内注入水泥砂浆将钢管内部填充密实。
3.按照权利要求1所述深岩溶大流量地下溶洞的处理方法,其特征在于:在模袋灌浆完成12~72小时后再在其上游侧回填砂石级配料或水下不分散混凝土。
4.按照权利要求1所述深岩溶大流量地下溶洞的处理方法,其特征在于:所述钢管桩格栅的间距为0.5~2.5m、排数为1~3排、排距为0.5~2m。
5.按照权利要求1、2或4任一项所述深岩溶大流量地下溶洞的处理方法,其特征在于:所述钢管桩格栅的钢管管径为89~150mm,钢管壁厚不小于6mm。
CN201110384502.5A 2011-11-28 2011-11-28 一种深岩溶大流量地下溶洞的处理方法 Active CN103132497B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110384502.5A CN103132497B (zh) 2011-11-28 2011-11-28 一种深岩溶大流量地下溶洞的处理方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110384502.5A CN103132497B (zh) 2011-11-28 2011-11-28 一种深岩溶大流量地下溶洞的处理方法

Publications (2)

Publication Number Publication Date
CN103132497A true CN103132497A (zh) 2013-06-05
CN103132497B CN103132497B (zh) 2015-02-25

Family

ID=48492904

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110384502.5A Active CN103132497B (zh) 2011-11-28 2011-11-28 一种深岩溶大流量地下溶洞的处理方法

Country Status (1)

Country Link
CN (1) CN103132497B (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103866780A (zh) * 2014-03-28 2014-06-18 中国水电顾问集团贵阳勘测设计研究院有限公司 一种在岩溶管道渗漏区进行快速防渗帷幕灌浆的施工方法
CN105201001A (zh) * 2015-10-10 2015-12-30 中国电建集团贵阳勘测设计研究院有限公司 一种岩溶地区大型溶洞的复合防渗结构及其施工方法
CN106837353A (zh) * 2017-01-22 2017-06-13 中南大学 填充性岩溶隧道施工处理方法
CN107869351A (zh) * 2017-11-15 2018-04-03 中国水利水电第十工程局有限公司 一种高狭型大型溶洞空腔处理安全防护的方法
CN109610412A (zh) * 2018-11-29 2019-04-12 云南省红河州水利水电勘察设计研究院 一种岩溶地区地下暗河封堵结构及封堵方法
CN110080779A (zh) * 2019-04-25 2019-08-02 中铁十二局集团有限公司 隧道隧底溶洞处理施工方法
CN112761174A (zh) * 2020-12-30 2021-05-07 山东正元建设工程有限责任公司 适用于大溶洞高流速动水条件下的注浆封堵方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100322719A1 (en) * 2007-04-17 2010-12-23 Smith Eric W Underground filling and sealing method
CN102155241A (zh) * 2011-05-10 2011-08-17 广州市城市规划勘测设计研究院 一种岩溶注浆加固止水施工方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100322719A1 (en) * 2007-04-17 2010-12-23 Smith Eric W Underground filling and sealing method
CN102155241A (zh) * 2011-05-10 2011-08-17 广州市城市规划勘测设计研究院 一种岩溶注浆加固止水施工方法

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103866780A (zh) * 2014-03-28 2014-06-18 中国水电顾问集团贵阳勘测设计研究院有限公司 一种在岩溶管道渗漏区进行快速防渗帷幕灌浆的施工方法
CN103866780B (zh) * 2014-03-28 2016-01-06 中国水电顾问集团贵阳勘测设计研究院有限公司 一种在岩溶管道渗漏区进行快速防渗帷幕灌浆的施工方法
CN105201001A (zh) * 2015-10-10 2015-12-30 中国电建集团贵阳勘测设计研究院有限公司 一种岩溶地区大型溶洞的复合防渗结构及其施工方法
CN106837353A (zh) * 2017-01-22 2017-06-13 中南大学 填充性岩溶隧道施工处理方法
CN107869351A (zh) * 2017-11-15 2018-04-03 中国水利水电第十工程局有限公司 一种高狭型大型溶洞空腔处理安全防护的方法
CN107869351B (zh) * 2017-11-15 2019-07-19 中国水利水电第十一工程局有限公司 一种高狭型大型溶洞空腔处理安全防护的方法
CN109610412A (zh) * 2018-11-29 2019-04-12 云南省红河州水利水电勘察设计研究院 一种岩溶地区地下暗河封堵结构及封堵方法
CN109610412B (zh) * 2018-11-29 2020-12-04 云南省红河州水利水电勘察设计研究院 一种岩溶地区地下暗河封堵结构及封堵方法
CN110080779A (zh) * 2019-04-25 2019-08-02 中铁十二局集团有限公司 隧道隧底溶洞处理施工方法
CN112761174A (zh) * 2020-12-30 2021-05-07 山东正元建设工程有限责任公司 适用于大溶洞高流速动水条件下的注浆封堵方法

Also Published As

Publication number Publication date
CN103132497B (zh) 2015-02-25

Similar Documents

Publication Publication Date Title
CN103132497A (zh) 一种深岩溶大流量地下溶洞的处理方法
CN103866780B (zh) 一种在岩溶管道渗漏区进行快速防渗帷幕灌浆的施工方法
CN104631475A (zh) 一种下穿河流浅埋暗挖隧道的安全快速施工方法
CN105887886A (zh) 一种强岩溶发育地层帷幕灌浆施工方法
CN109026020B (zh) 一种富水隧道溶洞处理与开挖方法
CN101793154A (zh) 利用隧道围岩地质参数和设置分流孔的注浆堵水方法
CN107605511A (zh) 洞室堵头周边止水结构及其施工方法
CN114109442B (zh) 隧道岩溶破碎带溜塌半断面帷幕前进式注浆加固处理方法
CN205062827U (zh) 一种岩溶地区大型溶洞的复合防渗结构
CN204099720U (zh) 土石组合地质条件下人工顶管施工方法所用的防护罩
CN203742622U (zh) 一种构建承载结构的防渗组件
CN103966981B (zh) 风化卸荷岩体上修建拱坝的传力结构及其施工方法
CN106120829A (zh) 一种深孔帷幕灌浆回浆变浓施工方法
CN203821326U (zh) 一种用于拱坝坝基处理的传力洞结构
CN104315251A (zh) 土石组合地质条件下人工顶管施工方法
CN204456024U (zh) 用于水电站输水隧洞钢衬段的接地设备
CN109778859B (zh) 一种混凝土高坝全坝无仓面固结灌浆方法和结构
CN104060964A (zh) 一种用于保护地下水环境的矿井注浆堵水方法
CN110344430B (zh) 坝基岩体内近水平分布的深埋软弱夹层处理方法
CN210238512U (zh) 一种混凝土高坝全坝无仓面固结灌浆结构
CN103711115B (zh) 一种整体浮运式取水头部的地基加固与接头及施工方法
CN109610412B (zh) 一种岩溶地区地下暗河封堵结构及封堵方法
CN104018475B (zh) 一种埋藏式压力钢管回填灌浆结构及其灌浆工艺
CN111910653A (zh) 大型深长缺陷槽快速回填大体积混凝土的防裂方法
CN205088684U (zh) 河床部位地质缺陷处临时灌浆廊道

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 550081 No. 16 Xing Qian Road, Jinyang New District, Guizhou, Guiyang

Applicant after: POWERCHINA GUIYANG ENGINEERING Corp.,Ltd.

Address before: 550081 No. 16 Xing Qian Road, Jinyang New District, Guizhou, Guiyang

Applicant before: HydroChina Guiyang Engineering Corp.

Address after: 550081 No. 16 Xing Qian Road, Jinyang New District, Guizhou, Guiyang

Applicant after: POWERCHINA GUIYANG ENGINEERING CORPORATION LIMITED

Address before: 550081 No. 16 Xing Qian Road, Jinyang New District, Guizhou, Guiyang

Applicant before: POWERCHINA GUIYANG ENGINEERING Corp.,Ltd.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: GUIYANG PROSPECTION + DESIGN INST, CHINA HYDRAULIC POWER CONSULTARY GROUPTO: HYDROCHINA GUIYANG ENGINEERING CORPORATION, LTD.

Free format text: CORRECT: APPLICANT; FROM: HYDROCHINA GUIYANG ENGINEERING CORPORATION, LTD. TO: CHINA POWER GROUP GUIYANG INVESTIGATION DESIGN + RESEARCH INSTITUTE CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant