CN207769005U - A kind of fire hydrant box of water blocking tape leak - Google Patents

A kind of fire hydrant box of water blocking tape leak Download PDF

Info

Publication number
CN207769005U
CN207769005U CN201721790827.2U CN201721790827U CN207769005U CN 207769005 U CN207769005 U CN 207769005U CN 201721790827 U CN201721790827 U CN 201721790827U CN 207769005 U CN207769005 U CN 207769005U
Authority
CN
China
Prior art keywords
intermediate plate
clamp
bolt
nut
clamping piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721790827.2U
Other languages
Chinese (zh)
Inventor
苏鋆航
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Ying Sheng Fire Technology Co Ltd
Original Assignee
Fujian Ying Sheng Fire Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Ying Sheng Fire Technology Co Ltd filed Critical Fujian Ying Sheng Fire Technology Co Ltd
Priority to CN201721790827.2U priority Critical patent/CN207769005U/en
Application granted granted Critical
Publication of CN207769005U publication Critical patent/CN207769005U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)

Abstract

The utility model proposes a kind of fire hydrant box of water blocking tape leak, fire hose mechanism includes fire hose part and leakage preventing mechanism;The fire hose part includes water band body and connector, and the connector includes junction portion and the first pontes, and the first pontes has protruding block;The leakage preventing mechanism includes leakage preventive portion and second connecting portion point, the leakage preventive portion includes the leakproof clamp and retaining mechanism being sheathed on the water band body, the leakproof clamp includes separable clamp ontology, first clamping piece component and second intermediate plate component, the clamp ontology includes the clamp first part for being set to upper end and the clamp second part for being set to lower end, the first clamping piece component and second intermediate plate component include two parallel intermediate plates, and two intermediate plates have threaded hole;The second connecting portion point includes separable connection first part and connection second part, and the second connecting portion point is with the groove together with the protruding block cutting ferrule.

Description

A kind of fire hydrant box of water blocking tape leak
Technical field
The utility model is related to field of fire fighting equipment, and in particular to a kind of fire hydrant box of water blocking tape leak.
Background technology
Fire hose is a part for fire-fighting equipment, is often often used in fire-fighting, and fire hose coordinates with fire-fighting lance, It is used as a kind of important Fire extinguisher, by long fire hose, can be adapted for putting out a fire at a distance, ensure the fire-fighting supplied water Vehicle keeps fire away, and fire fighting truck is avoided to damage, and it can flexibly be dismantled, and can also fire hydrant be coordinated to use, with easy to operate, clever The features such as living, it is widely used in various inflammable and explosive places and its fire-prone protection zone.
During fire hose, if there is fire hose breakage, in fact it could happen that the case where leak, come not to fire hose Become, and broken hole can not be repaired in time when fire generation, the situation of fire hose breakage may be needed until fire is controlled It could solve, and the flow resource of fire fighting truck is limited, may cause because of leak and estimate that water is inconsistent, improve the risk of fire extinguishing Property, if fireman's Rapid-Repair or the transience reparation in fire extinguishing procedure can be allowed, flow resource can be utilized to the greatest extent.
In consideration of it, inventor furthers investigate the above problem, there is this case generation then.
Utility model content
The purpose of this utility model is to provide a kind of water blocking tape leaks that can solve fire hose seepy question temporarily Fire hydrant box.
In order to achieve the above object, the utility model uses such technical solution:
A kind of fire hydrant box of water blocking tape leak, including babinet, the storage tank for storing foam solution, proportioner, fire-fighting Valve, pipeline and the alarm of rifle, fire hose mechanism, control conveying foam solution, the improvement is that:The fire hose Mechanism include fire hose part and can preventing water leakage leakage preventing mechanism;The fire hose part includes water band body and connector, The connector includes junction portion and the first pontes, and the first pontes has protruding block;The leakage preventing mechanism packet Leakage preventive portion and second connecting portion point are included, the leakage preventive portion includes the leakproof clamp being sheathed on the water band body and can Adjust leakproof clamp elasticity retaining mechanism, the leakproof clamp include separable clamp ontology, first clamping piece component and Second intermediate plate component, the clamp ontology include the clamp first part for being set to upper end and the clamp second for being set to lower end Part, the first clamping piece component and second intermediate plate component are set to the opposite both sides of the clamp ontology, the first clamping piece Component includes first clamping piece and second intermediate plate, and the first clamping piece and second intermediate plate edge are horizontally arranged and are mutually parallel, and institute The top that first clamping piece is set to the second intermediate plate is stated, the first clamping piece and second intermediate plate are offered and vertically corresponded to The first tapped through hole, the second intermediate plate component include third intermediate plate and the 4th intermediate plate, the third intermediate plate and the 4th folder Piece is along horizontal positioned and be mutually parallel, and the third intermediate plate is set to the top of the 4th intermediate plate, the third intermediate plate and 4th intermediate plate offers vertically corresponding second tapped through hole, the first clamping piece and third intermediate plate and the clamp the A part is connected, and the second intermediate plate and the 4th intermediate plate are connected with the clamp second part, and the retaining mechanism includes The first screw bolt locking mechanism together is screwed with first tapped through hole and is tightened on one with second tapped through hole The second screw bolt locking mechanism risen;The first pontes have for the water band body by first through hole, described the Two coupling parts include separable connection first part and connection second part, the connection first part and clamp first Split-phase connects, and the connection second part is connected with clamp second part, and the connection first part has and the protrusion The groove of block cutting ferrule together.
First screw bolt locking mechanism includes the first bolt and the first nut, and first bolt and the first threaded hole revolve Tightly together, and the screw head of first bolt is resisted against on the upper surface of the first clamping piece, first nut and first Bolt screws together, and the upper surface of first nut is resisted against the lower surface of the second intermediate plate.
First bolt includes the first extension being set to below first nut, first extension Length be more than the protruding block lower-upper length.
It is both provided with the first gasket between first bolt and first clamping piece, between the first nut and second intermediate plate.
Second screw bolt locking mechanism includes the second bolt and the second nut, and second bolt and the second threaded hole revolve Tightly together, and the screw head of second bolt is resisted against on the upper surface of the third intermediate plate, second nut and second Bolt screws together, and the upper surface of second nut is resisted against the lower surface of the 4th intermediate plate.
Second bolt includes the second extension being set to below second nut, second extension Length be more than the protruding block lower-upper length.
It is both provided with the second gasket between second bolt and third intermediate plate, between the second nut and the 4th intermediate plate.
After adopting the above technical scheme, the fire hydrant box of the water blocking tape leak of the utility model, when fire hose leak, The first nut and the second nut are unscrewed, leakage preventing mechanism is moved to leakage area, and screws the first nut and the second nut to folder Body first part and clamp second part push against water band body, and loophole is plugged at this time, and seepy question is addressed;Work as fire-fighting At the end of, the first nut and the second nut are unscrewed again, leakage preventing mechanism is moved at the first pontes, ensure groove alignment Protruding block screws the first nut and the second nut again, and the first pontes and second connecting portion point is made to be snapped together, i.e., anti- Leakage mechanism is fixed, and can smoothly withdraw water band body at this time, avoids leakage preventing mechanism from being not fixed caused constant;With the prior art It compares, the seepy question of fire hose can be solved in time by simple operations, opposite fire-fighting has great effect, structure Simply, easy to carry, highly practical.
Description of the drawings
Fig. 1 is the main structure diagram of the fire hose mechanism of the utility model;
Fig. 2 is the right side structural representation of the fire hose mechanism of the utility model.
In figure:
1- fire hoses part 11- water band bodies
The junction portions 12- connector 121-
122- the first pontes 1221- protruding blocks
2- leakage preventing mechanism 21- leakage preventive portions
211- leakproof clamp 2111- clamp ontologies
21111- clamps first part 21112- clamp second parts
2112- first clamping piece component 21121- first clamping pieces
21122- second intermediate plate 2113- second intermediate plate components
The 4th intermediate plates of 21131- third intermediate plates 21132-
212- retaining mechanisms the first screw bolt locking mechanisms of 2121-
21211- the first bolt the first nuts of 21212-
2122- the second screw bolt locking mechanism the second bolts of 21221-
The second nuts of 21222-
22- second connecting portions divide 221- connections first part
222- connection second parts
The first washers of 10-
20- second packing rings.
Specific implementation mode
In order to which the technical solution of the utility model is explained further, it is described in detail below by specific embodiment.
A kind of fire hydrant box of water blocking tape leak of the utility model, including babinet, the storage tank for storing foam solution, ratio Valve, pipeline and the alarm of mixer, Fire branch, fire hose mechanism, control conveying foam solution, the improvement is that: The fire hose mechanism include fire hose part 1 and can preventing water leakage leakage preventing mechanism 2;Fire hose part 1 includes water band Ontology 11 and connector 12, connector 12 include junction portion 121 and the first pontes 122, and the first pontes 122 has protrusion Block 1221;Leakage preventing mechanism 2 includes leakage preventive portion 21 and second connecting portion point 22, and leakage preventive portion 21 includes being sheathed on water band body 11 On leakproof clamp 211 and adjustable 211 elasticity of leakproof clamp retaining mechanism 212, leakproof clamp 211 includes separable Clamp ontology 2111, first clamping piece component 2112 and second intermediate plate component 2113, clamp ontology 2111 include be set to upper end Clamp first part 21111 and be set to the clamp second part 21112 of lower end, first clamping piece component 2112 and second presss from both sides Piece component 2113 is set to the opposite both sides of clamp ontology 2111, and first clamping piece component 2112 includes 21121 He of first clamping piece Second intermediate plate 21122, first clamping piece 21121 and second intermediate plate 21122 are along horizontal positioned and be mutually parallel, and first clamping piece 21121 are set to the top of second intermediate plate 21122, and it is vertically right that first clamping piece 21121 and second intermediate plate 21122 offer The first tapped through hole answered, second intermediate plate component 2113 include third intermediate plate 21131 and the 4th intermediate plate 21132, third intermediate plate 21131 and the 4th intermediate plate 21132 along horizontal positioned and be mutually parallel, and third intermediate plate 21131 is set to the 4th intermediate plate 21132 Top, third intermediate plate 21131 and the 4th intermediate plate 21132 offer vertically corresponding second tapped through hole, first clamping piece 21121 and third intermediate plate 21131 be connected with clamp first part 21111, second intermediate plate 21122 and the 4th intermediate plate 21132 with Clamp second part 21112 is connected, and retaining mechanism 212 includes that the first bolt screwed together with the first tapped through hole is locked Mechanism 2121 and screw the second screw bolt locking mechanism 2122 together with the second tapped through hole;The first pontes 122 has Have water supply band body 11 by first through hole, second connecting portion points 22 includes separable connection first part 221 and connects Second part 222, connection first part 221 are connected with clamp first part 21111, connect second part 222 and clamp the Two parts 21112 are connected, and connection first part 21111 has the groove together with 1221 cutting ferrule of protruding block.Using above-mentioned After technical solution, the fire hydrant box of the water blocking tape leak of the utility model unscrews the first nut when fire hose leak 21212 and second nut 21222, leakage preventing mechanism 2 is moved to leakage area, and screw the first nut 21212 and the second nut 21222 push against water band body 11 to clamp first part 21111 and clamp second part 21112, and loophole is plugged at this time, leakage Water problems is addressed;At the end of fire-fighting, the first nut 21212 and the second nut 21222 are unscrewed again, by leakage preventing mechanism 2 It is moved at the first pontes 122, ensures groove alignment bumps block 1221, screw the first nut 21212 and the second spiral shell again Mother 21222 makes the first pontes 21111 and second connecting portion point 21112 be snapped together, i.e., leakage preventing mechanism 2 is fixed, this When can smoothly withdraw water band body 11, avoid leakage preventing mechanism 2 be not fixed caused by it is constant.
Preferably, the first screw bolt locking mechanism 2121 includes the first bolt 21211 and the first nut 21212, the first bolt 21211 screwed with the first threaded hole together with, and the screw head of the first bolt 21211 is resisted against the upper surface of first clamping piece 21121 On, together with the first nut 21212 is screwed with the first bolt 21211, and the upper surface of the first nut 21212 is resisted against the second folder The lower surface of piece 21122.Realize that first clamping piece 21121 and second is pressed from both sides by the first nut 21212 and the cooperation of the first bolt 21211 The adjusting of 21122 elasticity of piece.
Preferably, the first bolt 21211 includes the first extension for being set to 21212 lower section of the first nut, and first stretches The length for going out part is more than the lower-upper length of protruding block 1221.Ensure that mobile connection first part 221 is complete to protruding block 1221 When being detached from groove, the first bolt 21211 and the first nut 21212 are still spun together, with Anti-fall.
It causes to wear when in order to prevent long-term, it is preferable that between the first bolt 21211 and first clamping piece 21121, first The first gasket 10 is both provided between nut 21212 and second intermediate plate 21122.
Preferably, the second screw bolt locking mechanism 2122 includes the second bolt 21221 and the second nut 21222, the second bolt 21221 screwed with the second threaded hole together with, and the screw head of the second bolt 21221 is resisted against the upper surface of third intermediate plate 21131 On, together with the second nut 21222 is screwed with the second bolt 21221, and the upper surface of the second nut 21222 is resisted against the 4th folder The lower surface of piece 21132.Third intermediate plate 21131 and the 4th folder are realized by the second nut 21222 and the cooperation of the second bolt 21221 The adjusting of 21132 elasticity of piece.
Preferably, the second bolt 21221 includes the second extension for being set to 21222 lower section of the second nut, and second stretches The length for going out part is more than the lower-upper length of protruding block 1221.Ensure that mobile connection first part 221 is complete to protruding block 1221 When being detached from groove, the second bolt 21221 and the second nut 21222 are still spun together, with Anti-fall.
It causes to wear when in order to prevent long-term, it is preferable that between the second bolt 21221 and third intermediate plate 21131, second The second gasket 20 is both provided between nut 21222 and the 4th intermediate plate 21132.
The concrete form of the fire hydrant box of the water blocking tape leak of the utility model, central through hole can be carried out according to actual requirement Adjustment and design;The concrete form of water band body can be adjusted and design according to actual requirement;The concrete form of protruding block It can be adjusted and design according to actual requirement;The concrete form of first groove can be carried out according to the concrete form of protruding block Adjustment and design;The concrete form of clamp ontology can be adjusted and design according to actual requirement;The specific shape of first clamping piece Formula can be adjusted and design according to actual requirement;The concrete form of second intermediate plate can be adjusted and set according to actual requirement Meter;The concrete form of third intermediate plate can be adjusted and design according to actual requirement;The concrete form of 4th intermediate plate can be according to reality Border requires to be adjusted and design;The concrete form of first threaded hole can be adjusted and design according to actual requirement;First spiral shell The concrete form of bolt can be adjusted and design according to the concrete form of the first threaded hole;The concrete form of first nut can be with It is adjusted and designs according to the concrete form of the first threaded hole;The concrete form of first washer can be according to the tool of the first bolt Body form is adjusted and designs;The concrete form of second threaded hole can be adjusted and design according to actual requirement;Second spiral shell The concrete form of bolt can be adjusted and design according to the concrete form of the second threaded hole;The concrete form of second nut can be with It is adjusted and designs according to the concrete form of the second threaded hole;The concrete form of second packing ring can be according to the tool of the second bolt Body form is adjusted and designs.
The product form of the utility model is not limited to this case diagram and embodiment, anyone carries out it similar thinking Appropriate changes or modifications all should be regarded as the patent category for not departing from the utility model.

Claims (7)

1. a kind of fire hydrant box of water blocking tape leak, including babinet, the storage tank for storing foam solution, proportioner, Fire branch, Valve, pipeline and the alarm of fire hose mechanism, control conveying foam solution, it is characterised in that:Fire hose mechanism packet Include fire hose part and can preventing water leakage leakage preventing mechanism;The fire hose part includes water band body and connector, described to connect Head includes junction portion and the first pontes, and the first pontes has protruding block;The leakage preventing mechanism includes leakproof Part and second connecting portion point, the leakage preventive portion include the leakproof clamp being sheathed on the water band body and are adjusted anti- The retaining mechanism of clamp elasticity is leaked, the leakproof clamp includes separable clamp ontology, first clamping piece component and the second folder Piece component, the clamp ontology include the clamp first part for being set to upper end and the clamp second part for being set to lower end, institute It states first clamping piece component and second intermediate plate component is set to the opposite both sides of the clamp ontology, the first clamping piece component wraps First clamping piece and second intermediate plate are included, the first clamping piece and second intermediate plate edge are horizontally arranged and are mutually parallel, and first folder Piece is set to the top of the second intermediate plate, and the first clamping piece and second intermediate plate offer vertically corresponding first spiral shell Line through-hole, the second intermediate plate component include third intermediate plate and the 4th intermediate plate, and the third intermediate plate and the 4th intermediate plate are along horizontal It places and is mutually parallel, and the third intermediate plate is set to the top of the 4th intermediate plate, the third intermediate plate and the 4th intermediate plate Offer vertically corresponding second tapped through hole, the first clamping piece and third intermediate plate and clamp first part phase Connection, the second intermediate plate and the 4th intermediate plate be connected with the clamp second part, and the retaining mechanism includes and described the One tapped through hole screw the first screw bolt locking mechanism together and with second tapped through hole screw together second Screw bolt locking mechanism;The first pontes have for the water band body by first through hole, the second connecting portion It includes separable connection first part and connection second part to divide, and the connection first part is connected with clamp first part It connects, the connection second part is connected with clamp second part, and the connection first part has and the protruding block cutting ferrule Groove together.
2. a kind of fire hydrant box of water blocking tape leak according to claim 1, it is characterised in that:The first bolt locking Mechanism includes the first bolt and the first nut, and first bolt and the first threaded hole screw together, and first bolt Screw head be resisted against on the upper surface of the first clamping piece, first nut and the first bolt screw together, and described The upper surface of one nut is resisted against the lower surface of the second intermediate plate.
3. a kind of fire hydrant box of water blocking tape leak according to claim 2, it is characterised in that:First bolt includes The length of the first extension being set to below first nut, first extension is more than the upper of the protruding block Lower length.
4. a kind of fire hydrant box of water blocking tape leak according to claim 3, it is characterised in that:First bolt and It is both provided with the first gasket between one intermediate plate, between the first nut and second intermediate plate.
5. a kind of fire hydrant box of water blocking tape leak according to claim 1, it is characterised in that:The second bolt locking Mechanism includes the second bolt and the second nut, and second bolt and the second threaded hole screw together, and second bolt Screw head be resisted against on the upper surface of the third intermediate plate, second nut and the second bolt screw together, and described The upper surface of two nuts is resisted against the lower surface of the 4th intermediate plate.
6. a kind of fire hydrant box of water blocking tape leak according to claim 4, it is characterised in that:Second bolt includes The length of the second extension being set to below second nut, second extension is more than the upper of the protruding block Lower length.
7. a kind of fire hydrant box of water blocking tape leak according to claim 6, it is characterised in that:Second bolt and It is both provided with the second gasket between three intermediate plates, between the second nut and the 4th intermediate plate.
CN201721790827.2U 2017-12-20 2017-12-20 A kind of fire hydrant box of water blocking tape leak Expired - Fee Related CN207769005U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721790827.2U CN207769005U (en) 2017-12-20 2017-12-20 A kind of fire hydrant box of water blocking tape leak

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721790827.2U CN207769005U (en) 2017-12-20 2017-12-20 A kind of fire hydrant box of water blocking tape leak

Publications (1)

Publication Number Publication Date
CN207769005U true CN207769005U (en) 2018-08-28

Family

ID=63226712

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721790827.2U Expired - Fee Related CN207769005U (en) 2017-12-20 2017-12-20 A kind of fire hydrant box of water blocking tape leak

Country Status (1)

Country Link
CN (1) CN207769005U (en)

Similar Documents

Publication Publication Date Title
CN201426931Y (en) Fixed fire-fighting cooling water spraying device
CN204261240U (en) A kind of injection gun for fire fighting
MXNL03000035A (en) Method and device for extinguishing fires in liquid fuel storage tanks.
CN207769005U (en) A kind of fire hydrant box of water blocking tape leak
CN205048037U (en) Explosion stack connects
CN203442482U (en) Safety device for gasholder
WO2023055745A3 (en) Devices, systems, and methods for application of fire retardant
RU140898U1 (en) FIRE FIGHTING PLANT
CN208018808U (en) A kind of spraying equipment using hydraulic pressure carbon dioxide as solvent
CN201823647U (en) Novel fast and airtight spraying device
CN211215109U (en) Fire engine loaded with three-phase jet fire extinguishing device
CN209286556U (en) A kind of fire-hose laying protective device
CN208785652U (en) Spray to a kind of Pop-up
CN205073569U (en) Mobile fire extinguishing device
RU181444U1 (en) FIRE FIGHTING DEVICE
CN201799040U (en) Pressure regulating automatic drainage type outdoor fire hose reel device
CN215136241U (en) High-pressure water mist fire extinguishing equipment
CN215410824U (en) Fire extinguishing auxiliary device for natural gas pressure regulating station
RU198025U1 (en) FIRE HOSE INSERT
CN220070583U (en) Automatic proportioning and spraying device for stopping agent for coal mine fire prevention and extinguishment
CN216798549U (en) Foam fire monitor system of multi-terminal direct current converter station connecting transformer
CN213597110U (en) Novel pressure-reducing and pressure-stabilizing type ground fire hydrant
CN211751989U (en) Spraying fire-extinguishing pipeline arrangement structure of transformer
CN109603056A (en) Shower water auto feed structure and chlor-alkali production workshop spraying system of fire fighting
CN212998105U (en) Fire water monitor supporting base convenient for butt joint of fire fighting pipes

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180828