CN207765877U - Work transmission line crossing construction device - Google Patents

Work transmission line crossing construction device Download PDF

Info

Publication number
CN207765877U
CN207765877U CN201820013017.4U CN201820013017U CN207765877U CN 207765877 U CN207765877 U CN 207765877U CN 201820013017 U CN201820013017 U CN 201820013017U CN 207765877 U CN207765877 U CN 207765877U
Authority
CN
China
Prior art keywords
block
transcapsidation
bar
telescopic rod
fixedly mounted
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820013017.4U
Other languages
Chinese (zh)
Inventor
高晶军
张超杰
胡保有
刘宇
贾林河
王俊峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201820013017.4U priority Critical patent/CN207765877U/en
Application granted granted Critical
Publication of CN207765877U publication Critical patent/CN207765877U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses work transmission line crossing construction devices, including pedestal and strop, the upper surface of the pedestal is rotatablely equipped with turntable, the upper surface of the turntable is installed with telescopic rod, the top of the telescopic rod is installed with rectangular block, it is installed with the first abutment extending between two rectangular blocks, the right surface of the rectangular block is installed with cross bar, the right end of two cross bars is installed with mounting blocks, and the second abutment extending is installed between two mounting blocks.The utility model is simple in structure, is convenient for carrying, easy to operate, time saving and energy saving, and the height of cross bar is adjusted by telescopic rod, so that cross bar is crossed over lower cross-line road by turntable, easy to operate, laying-out is assisted by guide line, using simple.

Description

Work transmission line crossing construction device
Technical field
The utility model is related to transmission line construction equipment technical field, specially work transmission line crossing construction fills It sets.
Background technology
During the erection construction of power circuit overhead line, the power circuit of high voltage is generally required across low-voltage Power overhead network, communication line, lightguide cable link and other barriers, and when across occur when, it usually needs build temporarily across More frame, the device of current general distribution line crossing construction, frequently with processing method lower cross-line road pine to ground is waited for After the completion of main body construction under recovery cross-line road, construction is complicated, and construction takes, it is more to expend;Thus it is proposed that transmission line of electricity work Journey crossing construction device.
Utility model content
The purpose of this utility model is to provide work transmission line crossing construction devices, to solve in above-mentioned background technology The problem of proposition.
To achieve the above object, the utility model provides the following technical solutions:Work transmission line crossing construction device, packet Include pedestal and strop, the upper surface of the pedestal is rotatablely equipped with turntable, and the upper surface of the turntable is installed with flexible Bar, and telescopic rod has two, the top of the telescopic rod is installed with rectangular block, and peace is fixed between two rectangular blocks Equipped with the first abutment extending, first abutment extending includes the first fixed link, the first transcapsidation and first bearing, a left side for first fixed link Right both ends are fixedly mounted on the surface of rectangular block, and the both ends side surface of first fixed link is socketed with first bearing, two institutes The outer surface for stating first bearing is socketed with the first transcapsidation, and the right surface of the rectangular block is installed with cross bar, described in two The right end of cross bar is installed with mounting blocks, and the second abutment extending is installed between two mounting blocks, and described second takes Bar includes the second fixed link, the second transcapsidation and second bearing, and the left and right ends of second fixed link are fixedly mounted on mounting blocks Surface, the both ends side surface of second fixed link is socketed with second bearing, the outer surface socket of two second bearings There are the second transcapsidation, the upper surface of the mounting blocks to offer mounting groove, slided in the mounting groove and be connected with pillar, the peace The bottom surface of tankage is installed with electromagnetic coil, and the lower surface of the pillar is installed with one end of spring, the spring The other end is fixedly mounted on the upper surface of electromagnetic coil, and compression bar, the pressure are installed between the top of two pillars The lower surface middle of bar is installed with link block, and the lower end of the link block is installed with pressing plate, the strop around The upper surface of the first transcapsidation and the second transcapsidation is crossed, and the right end of strop is installed with clump weight;
The telescopic rod includes upper boom, middle bar and lower beam, and the bottom end of the upper boom is fixedly mounted on the lower surface of rectangular block, The lower end of the lower beam is fixedly mounted on the upper surface of turntable, and the upper surface of the lower beam offers the first slot, the lower beam Upper end be rotatablely equipped with the first switch block, the upper surface of first switch block offers the first threaded hole, the appearance of the middle bar Face is provided with screw thread, and the middle bar is screwed onto in the first threaded hole, and the lower end of middle bar is plugged in the first slot, the middle bar Upper surface offer the second slot, the upper end of the middle bar is rotatablely equipped with the second switch block, the upper surface of second switch block The second threaded hole is offered, the outer surface of the upper boom is provided with screw thread, and the upper boom is screwed onto in the second threaded hole, and upper boom Lower end be plugged in the second slot.
Preferably, the side surface of first switch block and the second switch block is both provided with antiskid thread.
Preferably, the front and rear surfaces of the pedestal are installed with handle.
Compared with prior art, the utility model has the beneficial effects that:The utility model is simple in structure, is convenient for carrying, behaviour Facilitate, it is time saving and energy saving, the height of cross bar is adjusted by telescopic rod, so that cross bar is crossed over lower cross-line road by turntable, it is easy to operate, Laying-out is assisted by guide line, using simple.
Description of the drawings
Fig. 1 is the utility model dimensional structure diagram;
Fig. 2 is the utility model rectangular block and the first abutment extending structural schematic diagram;
Fig. 3 is the utility model mounting blocks block and the second abutment extending structural schematic diagram;
Fig. 4 is the utility model Telescopic rod structure schematic diagram.
In figure:1, pedestal, 101, handle, 2, turntable, 3, telescopic rod, 31, upper boom, 32, middle bar, the 321, second slot, 322, the second switch block, the 3221, second threaded hole, 33, lower beam, the 331, first slot, the 332, first switch block, the 3321, first screw thread Hole, 4, rectangular block, the 5, first abutment extending, the 51, first fixed link, the 52, first transcapsidation, 53, first bearing, 6, cross bar, 7, mounting blocks, 71, mounting groove, 72, electromagnetic coil, 73, spring, the 8, second abutment extending, the 81, second fixed link, the 82, second transcapsidation, the 83, second axis Hold, 9, compression bar, 91, pillar, 92, link block, 93, pressing plate, 10, strop, 11, clump weight.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
- 4 are please referred to Fig.1, the utility model provides a kind of technical solution:Work transmission line crossing construction device, including The upper surface of pedestal 1 and strop 10, the pedestal 1 is rotatablely equipped with turntable 2, and the upper surface of the turntable 2 is installed with Telescopic rod 3, and telescopic rod 3 has two, the top of the telescopic rod 3 is installed with rectangular block 4, is adjusted by telescopic rod 3 The height of rectangular block 4, the first abutment extending 5 is installed between two rectangular blocks 4, and first abutment extending 5 includes first solid The left and right ends of fixed pole 51, the first transcapsidation 52 and first bearing 53, first fixed link 51 are fixedly mounted on the table of rectangular block 4 The both ends side surface in face, first fixed link 51 is socketed with first bearing 53, the appearance surface cover of two first bearings 53 It is connected to the first transcapsidation 52, the first transcapsidation 52 can rotate in the first fixed link 51, the fixed peace in right surface of the rectangular block 4 Equipped with cross bar 6, the right end of two cross bars 6 is installed with mounting blocks 7, is fixedly mounted between two mounting blocks 7 It includes the second fixed link 81, the second transcapsidation 82 and second bearing 83 to have the second abutment extending 8, second abutment extending 8, and described second fixes The left and right ends of bar 81 are fixedly mounted on the surface of mounting blocks 7, and the both ends side surface of second fixed link 81 is socketed with second The outer surface of bearing 83, two second bearings 83 is socketed with the second transcapsidation 82, and the upper surface of the mounting blocks 7 offers Mounting groove 71, the interior sliding of the mounting groove 71 are connected with pillar 91, and the bottom surface of the mounting groove 71 is installed with electromagnetic coil 72, electromagnetic coil 72 is circumscribed with power supply, and power supply is accumulator, is fixed on pedestal 1, and peace is fixed in the lower surface of the pillar 91 One end equipped with spring 73, the other end of the spring 73 are fixedly mounted on the upper surface of electromagnetic coil 72, two pillars Compression bar 9 is installed between 91 top, the lower surface middle of the compression bar 9 is installed with link block 92, the company The lower end for connecing block 92 is installed with pressing plate 93, and spring 73 makes pillar 91 bounce, and when electromagnetic coil 72 is powered, pillar 91 is downward Mobile, pillar 91 makes pressing plate 93 push, and the strop 10 bypasses the upper surface of the first transcapsidation 52 and the second transcapsidation 82, and guides The right end of rope 10 is installed with clump weight 11, the circuit laid is needed in the left end connection of strop 10, when pressing plate 93 pushes Strop 10 is pushed down;
The telescopic rod 3 includes upper boom 31, middle bar 32 and lower beam 33, and the bottom end of the upper boom 31 is fixedly mounted on rectangular block 4 lower surface, the lower end of the lower beam 33 are fixedly mounted on the upper surface of turntable 2, and the upper surface of the lower beam 33 offers The upper end of one slot 331, the lower beam 33 is rotatablely equipped with the first switch block 332, and the upper surface of first switch block 332 offers The outer surface of first threaded hole 3321, the middle bar 32 is provided with screw thread, and the middle bar 32 is screwed onto in the first threaded hole 3321, And the lower end of middle bar 32 is plugged in the first slot 331, the upper surface of the middle bar 32 offers the second slot 321, in described The upper end of bar 32 is rotatablely equipped with the second switch block 322, and the upper surface of second switch block 322 offers the second threaded hole 3221, The outer surface of the upper boom 31 is provided with screw thread, and the upper boom 31 is screwed onto in the second threaded hole 3221, and the lower end of upper boom 31 It is plugged in the second slot 321, the first switch block 332 of rotation can be such that middle bar 32 moves up and down, and the second switch block 322 of rotation can make Upper boom 31 moves up and down.
Specifically, the side surface of first switch block, 332 and second switch block 322 is both provided with antiskid thread, it is convenient to turn Dynamic first switch block 332 and the second switch block 322.
Specifically, the front and rear surfaces of the pedestal 1 are installed with handle 101, it is moved easily.
Operation principle:In use, electromagnetic coil 72 is made to be powered, pillar 91 moves down, and pillar 91 makes pressing plate 93 push, will The right end of strop 10 is pushed down, and rotating the first switch block 332 and the second switch block 322 makes upper boom 31 and middle bar 32 move up, and makes to stretch Contracting bar 3 stretches, and cross bar 6 is made to exceed lower cross-line road, rotates turntable 2, makes cross bar 6 across lower cross-line road, by laying-out with draw The left end of conductor rope 10 links together, and control electromagnetic coil 72 powers off, and spring 73 makes pillar 91 move up, and pressing plate 93 is made to lift It rises, clump weight 11 makes the right end of strop 10 drop to ground, makes laying-out across lower cross-line road by strop 10.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is appreciated that can these embodiments be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (3)

1. work transmission line crossing construction device, including pedestal(1)And strop(10), it is characterised in that:The pedestal(1) Upper surface be rotatablely equipped with turntable(2), the turntable(2)Upper surface be installed with telescopic rod(3), and telescopic rod(3) There are two, the telescopic rod(3)Top be installed with rectangular block(4), two rectangular blocks(4)Between be fixedly mounted There is the first abutment extending(5), first abutment extending(5)Including the first fixed link(51), the first transcapsidation(52)And first bearing(53), institute State the first fixed link(51)Left and right ends be fixedly mounted on rectangular block(4)Surface, first fixed link(51)Both ends Side surface is socketed with first bearing(53), two first bearings(53)Outer surface be socketed with the first transcapsidation(52), described Rectangular block(4)Right surface be installed with cross bar(6), two cross bars(6)Right end be installed with mounting blocks (7), two mounting blocks(7)Between be installed with the second abutment extending(8), second abutment extending(8)Including the second fixed link (81), the second transcapsidation(82)And second bearing(83), second fixed link(81)Left and right ends be fixedly mounted on mounting blocks (7)Surface, second fixed link(81)Both ends side surface be socketed with second bearing(83), two second bearings (83)Outer surface be socketed with the second transcapsidation(82), the mounting blocks(7)Upper surface offer mounting groove(71), the peace Tankage(71)Interior sliding is connected with pillar(91), the mounting groove(71)Bottom surface be installed with electromagnetic coil(72), described Pillar(91)Lower surface be installed with spring(73)One end, the spring(73)The other end be fixedly mounted on electromagnetic wire Circle(72)Upper surface, two pillars(91)Top between be installed with compression bar(9), the compression bar(9)Following table Face middle is installed with link block(92), the link block(92)Lower end be installed with pressing plate(93), the guiding Rope(10)Around the first transcapsidation(52)With the second transcapsidation(82)Upper surface, and strop(10)Right end be installed with counterweight Block(11);
The telescopic rod(3)Including upper boom(31), middle bar(32)And lower beam(33), the upper boom(31)Bottom end be fixedly mounted on Rectangular block(4)Lower surface, the lower beam(33)Lower end be fixedly mounted on turntable(2)Upper surface, the lower beam(33)'s Upper surface offers the first slot(331), the lower beam(33)Upper end be rotatablely equipped with the first switch block(332), described first Switch block(332)Upper surface offer the first threaded hole(3321), the middle bar(32)Outer surface be provided with screw thread, in described Bar(32)It is screwed onto the first threaded hole(3321)It is interior, and middle bar(32)Lower end be plugged on the first slot(331)It is interior, the middle bar (32)Upper surface offer the second slot(321), the middle bar(32)Upper end be rotatablely equipped with the second switch block(322), institute State the second switch block(322)Upper surface offer the second threaded hole(3221), the upper boom(31)Outer surface be provided with screw thread, The upper boom(31)It is screwed onto the second threaded hole(3221)It is interior, and upper boom(31)Lower end be plugged on the second slot(321)It is interior.
2. work transmission line crossing construction device according to claim 1, it is characterised in that:First switch block (332)With the second switch block(322)Side surface be both provided with antiskid thread.
3. work transmission line crossing construction device according to claim 1, it is characterised in that:The pedestal(1)Before Rear surface is installed with handle(101).
CN201820013017.4U 2018-01-04 2018-01-04 Work transmission line crossing construction device Expired - Fee Related CN207765877U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820013017.4U CN207765877U (en) 2018-01-04 2018-01-04 Work transmission line crossing construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820013017.4U CN207765877U (en) 2018-01-04 2018-01-04 Work transmission line crossing construction device

Publications (1)

Publication Number Publication Date
CN207765877U true CN207765877U (en) 2018-08-24

Family

ID=63183363

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820013017.4U Expired - Fee Related CN207765877U (en) 2018-01-04 2018-01-04 Work transmission line crossing construction device

Country Status (1)

Country Link
CN (1) CN207765877U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111525443A (en) * 2020-05-27 2020-08-11 国网山东省电力公司龙口市供电公司 Highway crossing structure for power grid construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111525443A (en) * 2020-05-27 2020-08-11 国网山东省电力公司龙口市供电公司 Highway crossing structure for power grid construction

Similar Documents

Publication Publication Date Title
CN109335854A (en) A kind of rolling-up mechanism and power cable winding device
CN206976873U (en) A kind of fixed installation structure of high-tension switch cabinet
CN207765877U (en) Work transmission line crossing construction device
CN205943953U (en) Pin non -deformable's relay
CN103048759B (en) Paying-off robot and application thereof on erecting optical cables on 110kV circuit
CN209943901U (en) Device convenient for moving computer host
CN212982039U (en) Portable pay-off of rural power grids fortune dimension
CN214455905U (en) Cable device of convenient transportation
CN207994349U (en) One kind preventing switch cabinet electrified earthing or grounding means
CN209233240U (en) A kind of 110 with elevating function kilovolt high-tension distribution box
CN211920492U (en) Cable coiling mechanism for electrical engineering
CN211377405U (en) Laying tool for high-voltage cable
CN207021589U (en) A kind of power Transmission frame easy to maintenance
CN216999642U (en) Tamping device for electric power construction
CN205978835U (en) Empty strutting arrangement of line cable frame
CN216889492U (en) Winder with leveling function for producing polyester fiber ropes
CN218715216U (en) Concrete placement construction prevents discrete device
CN210517552U (en) Prefabricated substation convenient to remove
CN220449437U (en) Take tension adjusting function's electric wire to receive and release equipment
CN209948503U (en) Assembling frame for low-voltage reactive power compensation cabinet
CN215830420U (en) Ladder stand for storehouse-side walking device
CN217711976U (en) Electric power iron tower convenient to fixed object
CN211530584U (en) Wiring device for electronic communication
CN213584830U (en) Prefabricated substation
CN107546686A (en) The stringing support frame and its method of work of a kind of stable performance

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180824