CN207760407U - A kind of secondary aluminium pre-processing device - Google Patents

A kind of secondary aluminium pre-processing device Download PDF

Info

Publication number
CN207760407U
CN207760407U CN201721914846.1U CN201721914846U CN207760407U CN 207760407 U CN207760407 U CN 207760407U CN 201721914846 U CN201721914846 U CN 201721914846U CN 207760407 U CN207760407 U CN 207760407U
Authority
CN
China
Prior art keywords
chamber
wall
demarcation strip
rotation door
conveyer belt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721914846.1U
Other languages
Chinese (zh)
Inventor
张羽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Jin Yuan Rui Sheng Technology Co Ltd
Original Assignee
Tianjin Jin Yuan Rui Sheng Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Jin Yuan Rui Sheng Technology Co Ltd filed Critical Tianjin Jin Yuan Rui Sheng Technology Co Ltd
Priority to CN201721914846.1U priority Critical patent/CN207760407U/en
Application granted granted Critical
Publication of CN207760407U publication Critical patent/CN207760407U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/20Recycling

Landscapes

  • Processing Of Solid Wastes (AREA)

Abstract

The utility model discloses a kind of secondary aluminium pre-processing devices,Including body,The body is by first chamber,Second chamber and third chamber composition,And disposal box is provided with above body,The disposal box is made of outer container and dust-removal cloth-bag,And aspiration pump is provided on the right side of disposal box,The first rotation door is provided on the left of the first chamber,Feed inlet is offered on the first rotation door,The first limit flitch is provided in the feed inlet,All components are all assembled into an individual by the equipment,It can both carry out waste material air-drying or sieving paint removal,User is simple and convenient time saving and energy saving when using,And it all components are all set as an individual will not occupy very large space,Workers operating space is larger,Injured probability is smaller,Its safety is larger,And problem once has occurred and is only overhauled with the component to equipment,Without spending more funds to overhaul whole equipment,Its high financial profit is highly practical.

Description

A kind of secondary aluminium pre-processing device
Technical field
The utility model belongs to secondary aluminium equipment technical field, and in particular to a kind of secondary aluminium pre-processing device.
Background technology
The supply of aluminium includes three parts:The primary aluminum of domestic production, the aluminium and aluminium alloy of secondary aluminium and net importation.Secondary aluminium It is rising industry, there is larger development space.Aluminium is a kind of recyclable resource, and secondary aluminium accounts for world's primary aluminum year at present 1/3 or more of yield.Secondary aluminium is identical as primary aluminum performance, can use Regenerated Aluminium Ingot remelting, refining and purification, adjusted chemical composition Various cast aluminium alloy golds and wrought aluminium alloy is made, and then is processed into aluminium casting or plastic processing aluminium.Carrying out secondary aluminium life When production operation, a most importantly step pretreatment operation.
It is all more single in pre-processing device common currently on the market, if any can only carry out briquetting, what is had can only be into Row screening, user is time-consuming and laborious when operating, and also easily occupied space so that workers operating space is small to multiple devices, Gong Renshou Hinder probability increase, and when problem occurs, maintenance cost is also very big, the low practicability of economic benefit is not strong;And it is most of Equipment siphons away the sundries such as iron commonly using electromagnet when being sieved, and is adsorbed with a large amount of iron content on electromagnet when operated User needs to clear up a part of sundries sundries at this time, and waste material can directly fall to workbench if user directly closes power supply Or conveyer belt makes raw material be secondary polluted, and a large amount of manpower and materials is caused to be wasted, and it is too slow to carry out its working efficiency manually, And the low practicability of cumbersome its complicated economic benefit is not strong;And most of equipment are that bulk is mixed with disintegrating slag in last feeding , easily cause end product quality low into impurity in melting, if finally can to operate again in primary sieve of progress It is not strong that the cumbersome complexity of person wastes the time of the worker low practicability of its economic benefit.
Utility model content
The purpose of this utility model is to provide a kind of secondary aluminium pre-processing devices, to solve to propose in above-mentioned background technology It is all more single in pre-processing device common currently on the market, if any can only carry out briquetting, what is had can only be sieved, User is time-consuming and laborious when operating, and also easily occupied space so that workers operating space is small to multiple devices, worker injuries' probability Increase, and when problem occurs, maintenance cost is also very big, the low practicability of economic benefit is not strong;And most of equipment exist The sundries such as iron are siphoned away commonly using electromagnet when being sieved, be adsorbed on electromagnet when operated a large amount of iron content sundries this When user need to clear up a part of sundries, waste material can directly fall to workbench or conveying if user directly closes power supply Band causes a large amount of manpower and materials to be wasted so that raw material is secondary polluted, and it is too slow to carry out its working efficiency manually, and operates The low practicability of its economic benefit of very complicated is not strong;And most of equipment are that bulk is mixed with disintegrating slag in last feeding, Easily entering impurity in melting causes end product quality low, if finally operator can be made to operate again in the primary screening of progress Very complicated wastes the not strong problem of the time of the worker low practicability of its economic benefit.
To achieve the above object, the utility model provides the following technical solutions:A kind of secondary aluminium pre-processing device, including machine Body, the body is made of first chamber, second chamber and third chamber, and disposal box is provided with above body, the collection Dirt case is made of outer container and dust-removal cloth-bag, and aspiration pump is provided on the right side of disposal box, is provided on the left of the first chamber First rotates door, feed inlet is offered on the first rotation door, and the first rotation door is rotatablely connected with body by rotation axis, It is provided with the first limit flitch in the feed inlet, the upper inner wall of the first chamber is equipped with electromagnet, and first chamber Inner wall is provided with sliding groove in the lower zone of electromagnet, and the inner wall of the body is provided in the lower zone of sliding groove to be turned Tin, conveyer belt is installed on the rotating cylinder, and rotary electric machine is installed below rotating cylinder, the lower section inner wall peace of the first chamber Equipped with placement plate, blowing dry motor is installed above the placement plate, is arranged between the first chamber and second chamber There is the first demarcation strip, be provided with the second demarcation strip between the second chamber and third chamber, in the lower section of the third chamber Wall is also equipped with placement plate, and air blast motor is equipped with above placement plate, and second turn is equipped on the right side of the third chamber Dynamic door offers discharge port on the second rotation door, and the second rotation door is rotatablely connected with body by rotation axis, it is described go out It is provided with the second limit flitch in material mouth, support leg is provided with below the body, and the front outer wall of body is equipped with control Switch, the side of the support leg is provided with power interface, and loading plate is equipped with below support leg, the loading plate it is upper Square outer right wall offers fixing groove, and material storing box is equipped in the fixing groove, movable plate is provided on the right side of the material storing box, The movable plate is fixedly connected with material storing box by screw, and pulley, the aspiration pump, electromagnetism are equipped with below the loading plate Iron, rotary electric machine, the dry motor of blowing and air blast motor are electrically connected with control switch, and the control switch is connect by power supply Mouth is electrically connected with extraneous power supply.
Preferably, the inner wall of the second chamber offers fixing groove, is equipped with heat block in the fixing groove, and described It is equipped with interlayer between one demarcation strip and the inner wall and outer wall of the second demarcation strip, heat block is installed in the interlayer.
Preferably, the conveyer belt is made of roller bearing and conveyer belt, and straight slot is offered on the conveyer belt.
Preferably, intensive through-hole is offered on the second limit flitch, and the length value of the second limit flitch is equal to The groove width numerical value of material mouth.
Preferably, the side wall of first demarcation strip offers straight slot with conveyer belt corresponding position, and described second separates The side wall of plate and the first demarcation strip corresponding position also offer straight slot.
Compared with prior art, the utility model has the beneficial effects that:The device structure is scientific and reasonable safe and convenient to use, And all components are all assembled into an individual by the equipment, can both carry out air-drying or sieving paint removal, user to waste material It is simple and convenient time saving and energy saving when use, and all components are all set as an individual will not occupy very large space, Gong Rencao Make that space is larger, injured probability is smaller, and safety is larger, and problem once has occurred and is only examined with the component to equipment It repaiies, without spending more funds to overhaul whole equipment, high financial profit is highly practical;And the equipment is provided with cunning Dynamic slot, when equipment needs, by the waste material removing part on electromagnet, sliding can be installed directly in sliding groove in operation Baffle, later can drop to the waste material on electromagnet on baffle, then can remove it is clean, it is easy to operate it is time saving and energy saving not It can make raw material secondary pollution, and working efficiency is highly practical soon;And the equipment conveyer belt and limit flitch on be provided with straight slot or Through-hole at work can screen out smaller raw material so that and final product quality will not be caused to reduce into raw material easily when melting, Its is easy to operate time saving and energy saving, and high financial profit is highly practical, and the equipment is provided with pulley, all very in movement or transport It is convenient and efficient, and the equipment is provided with the storage tank of adjustable length, it can be according to practical feelings when the raw material volume having is larger Condition adjusts its length, avoids raw material from dropping to ground and is secondary polluted, the strong high financial profit of the practicality.
Description of the drawings
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the outside drawing of the utility model;
Fig. 3 is the left view sectional view of the utility model;
Fig. 4 is the sectional view of installation baffle in the utility model body sliding groove;
Fig. 5 is the material storing box vertical view of the utility model;
Fig. 6 is the conveyer belt side view of the utility model.
In figure:1- bodies, 2- first chambers, 3- second chambers, 4- thirds chamber, 5- outer containers, 6- disposal boxes, 7- dust removing cloths Bag, 8- aspiration pumps, 9- first rotation door, 10- first limit flitch, 11- feed inlets, 12- electromagnet, 13- sliding grooves, 14- rotating cylinders, 15- rotary electric machines, 16- conveyer belts, 17- placement plates, the dry motor of 18- blowings, 19- support legs, 20- air blast motors, 21- second Rotate door, 22- discharge ports, 23- second limit flitch, 24- material storing box, 25- movable plates, 26- loading plates, the first demarcation strips of 27-, The second demarcation strips of 28-.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
- 6 are please referred to Fig.1, the utility model provides a kind of technical solution:A kind of secondary aluminium pre-processing device, including body 1, body 1 is made of first chamber 2, second chamber 3 and third chamber 4, and the top of body 1 is provided with disposal box 6, disposal box 6 are made of outer container 5 and dust-removal cloth-bag 7, and the right side of disposal box 6 is provided with aspiration pump 8, and the left side of first chamber 2 is provided with One rotates door 9, feed inlet 11 is offered on the first rotation door 9, and the first rotation door 9 is rotatablely connected with body 1 by rotation axis, It is provided with the first limit flitch 10 in feed inlet 11, the upper inner wall of first chamber 2 is equipped with electromagnet 12, and first chamber 2 Inner wall is provided with sliding groove 13 in the lower zone of electromagnet 12, and the inner wall of body 1 is provided in the lower zone of sliding groove 13 Rotating cylinder 14 is equipped with conveyer belt 16 on rotating cylinder 14, and the lower section of rotating cylinder 14 is equipped with rotary electric machine 15, the lower section of first chamber 2 Inner wall is equipped with placement plate 17, and the top of placement plate 17 is equipped with the dry motor 18 of blowing, first chamber 2 and second chamber 3 it Between be provided with the first demarcation strip 27, the second demarcation strip 28 is provided between second chamber 3 and third chamber 4, under third chamber 4 Square inner wall is also equipped with placement plate 17, and the top of placement plate 17 is equipped with air blast motor 20, and the right side of third chamber 4 is equipped with Second rotates door 21, discharge port 22 is offered on the second rotation door 21, and the second rotation door 21 is rotated with body 1 by rotation axis It connects, is provided with the second limit flitch 23 in discharge port 22, the lower section of body 1 is provided with support leg 19, and the front outer wall of body 1 Control switch is installed, the side of support leg 19 is provided with power interface, and the lower section of support leg 19 is equipped with loading plate 26, holds The upper right outer wall of support plate 26 offers fixing groove, and material storing box 24 is equipped in fixing groove, and the right side of material storing box 24 is provided with Movable plate 25, movable plate 25 are fixedly connected with material storing box 24 by screw, and the lower section of loading plate 26 is equipped with pulley, aspiration pump 8, Electromagnet 12, rotary electric machine 15, the dry motor 18 of blowing and air blast motor 20 are electrically connected with control switch, and control switch is logical Power interface is crossed to be electrically connected with extraneous power supply.
In the present embodiment, it is preferred that the inner wall of second chamber 3 offers fixing groove, and heat block is equipped in fixing groove, the It is equipped with interlayer between one demarcation strip 27 and the inner wall and outer wall of the second demarcation strip 28, heat block is installed in interlayer, is in order to logical It crosses heat block and high-temperature process is carried out to the paint on raw material, make its oxidation, do not have more impurity when fused raw material later and exist, And first the right side of left side and the second demarcation strip 28 of demarcation strip 27 be both provided with thermal insulation board, prevent temperature excessively high so that electromagnet 12 and motor be affected so that equipment is not normally functioning, electromagnet 12 be switched on generate electromagnetism a kind of device.In iron core Be externally wrapped with the conductive winding to match with its power, this coil to alive has magnetism as magnet.
In the present embodiment, it is preferred that conveyer belt 16 is made of roller bearing and conveyer belt, and straight slot is offered on conveyer belt, be for The conveyer belt 6 is set to reduce its frictional force by roller bearing so that it can smoothly skid off when transporting large volume of raw material, and Can carry out screening by straight slot when conveying more broken raw material makes smaller raw material fall, and is convenient for the regrading of user.
In the present embodiment, it is preferred that offer intensive through-hole, and the length of the second limit flitch 23 on the second limit flitch 23 Numerical value is equal to the groove width numerical value of discharge port 22, is to allow raw material to pass through last time when by the second limit flitch 23 Screening so that finally stored raw material does not have impurity presence.
In the present embodiment, it is preferred that the side wall of the first demarcation strip 27 offers straight slot with 16 corresponding position of conveyer belt, the The side wall of two compartment plate 28 and 27 corresponding position of the first demarcation strip also offer straight slot, be for the ease of by raw material by first Straight slot on demarcation strip 27 is transported to second chamber 3 so that raw material is by high-temperature process, and the paint on raw material surface can be eliminated, it It is discharged afterwards by the straight slot on the second demarcation strip 28.
Operation principle:When the utility model is used, user is electrically connected by power interface and extraneous power supply first, it User can close the first rotation door 9 and second rotation door 21 afterwards, and user can open pumping by controlling to switch later Pump 8, electromagnet 12, rotary electric machine 15, the dry motor 18 of blowing and air blast motor 20, are then again thrown raw material by feed inlet 11 Enter body 1, raw material is slided by the first limit flitch 10 on conveyer belt 6, and conveyer belt 6 can when transporting large volume of raw material later To reduce its frictional force by roller bearing so that it can which it is not in clogging smoothly to skid off, and can when conveying more broken raw material So that smaller raw material is fallen to carry out screening by straight slot, is convenient for the regrading of user, while electromagnet 12 will produce pole Impurity containing iron in raw material is sucked out big telluric magnetic force, and dry motor 18 of drying can carry out raw material to air-dry so that in raw material Dust and moisture are blown out, and aspiration pump 8 at this time can extract the air of body 1 out, to the dust and moisture process in air The absorption of dust-removal cloth-bag 7 is discharged, and raw material is transported to second chamber 3 so that raw material by the straight slot on the first demarcation strip 27 later By high-temperature process, the paint on raw material surface can be eliminated, and be discharged by the straight slot on the second demarcation strip 28 later Three chambers 4, later raw material by second limit flitch 23 when can be Jing Guo last time screening so that finally stored raw material is not Impurity presence is had, is finally fallen in material storing box 24, which is provided with pulley, all very convenient fast in movement or transport It is prompt.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is appreciated that can these embodiments be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of secondary aluminium pre-processing device, including body(1), it is characterised in that:The body(1)By first chamber(2), Two chambers(3)With third chamber(4)Composition, and body(1)Top be provided with disposal box(6), the disposal box(6)By outer container (5)And dust-removal cloth-bag(7)Composition, and disposal box(6)Right side be provided with aspiration pump(8), the first chamber(2)Left side set It is equipped with the first rotation door(9), the first rotation door(9)On offer feed inlet(11), and the first rotation door(9)With body (1)It is rotatablely connected by rotation axis, the feed inlet(11)Inside it is provided with the first limit flitch(10), the first chamber(2)'s Upper inner wall is equipped with electromagnet(12), and first chamber(2)Inner wall in electromagnet(12)Lower zone be provided with sliding Slot(13), the body(1)Inner wall in sliding groove(13)Lower zone be provided with rotating cylinder(14), the rotating cylinder(14)Upper peace Equipped with conveyer belt(16), and rotating cylinder(14)Lower section rotary electric machine is installed(15), the first chamber(2)Lower section inner wall peace Equipped with placement plate(17), the placement plate(17)Top the dry motor of blowing is installed(18), the first chamber(2)With Two chambers(3)Between be provided with the first demarcation strip(27), the second chamber(3)With third chamber(4)Between be provided with second Demarcation strip(28), the third chamber(4)Lower section inner wall be also equipped with placement plate(17), and placement plate(17)Top installation There is air blast motor(20), the third chamber(4)Right side the second rotation door is installed(21), the second rotation door(21)On Offer discharge port(22), and the second rotation door(21)With body(1)It is rotatablely connected by rotation axis, the discharge port(22)It is interior It is provided with the second limit flitch(23), the body(1)Lower section be provided with support leg(19), and body(1)Front outer wall peace It is switched equipped with control, the support leg(19)Side be provided with power interface, and support leg(19)Lower section carrying is installed Plate(26), the loading plate(26)Upper right outer wall offer fixing groove, material storing box is installed in the fixing groove(24), The material storing box(24)Right side be provided with movable plate(25), the movable plate(25)With material storing box(24)It is fixed and is connected by screw It connects, the loading plate(26)Lower section pulley, the aspiration pump are installed(8), electromagnet(12), rotary electric machine(15), blowing Dry motor(18)And air blast motor(20)It switchs and is electrically connected with control, the control switch passes through power interface and the external world Power supply is electrically connected.
2. a kind of secondary aluminium pre-processing device according to claim 1, it is characterised in that:The second chamber(3)It is interior Wall offers fixing groove, and heat block, first demarcation strip are equipped in the fixing groove(27)With the second demarcation strip(28)'s It is equipped with interlayer between inner wall and outer wall, heat block is installed in the interlayer.
3. a kind of secondary aluminium pre-processing device according to claim 1, it is characterised in that:The conveyer belt(16)By roller bearing It is formed with conveyer belt, straight slot is offered on the conveyer belt.
4. a kind of secondary aluminium pre-processing device according to claim 1, it is characterised in that:The second limit flitch(23)On Offer intensive through-hole, and the second limit flitch(23)Length value be equal to discharge port(22)Groove width numerical value.
5. a kind of secondary aluminium pre-processing device according to claim 1, it is characterised in that:First demarcation strip(27)'s Side wall and conveyer belt(16)Corresponding position offers straight slot, second demarcation strip(28)Side wall and the first demarcation strip(27) Corresponding position also offers straight slot.
CN201721914846.1U 2017-12-31 2017-12-31 A kind of secondary aluminium pre-processing device Expired - Fee Related CN207760407U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721914846.1U CN207760407U (en) 2017-12-31 2017-12-31 A kind of secondary aluminium pre-processing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721914846.1U CN207760407U (en) 2017-12-31 2017-12-31 A kind of secondary aluminium pre-processing device

Publications (1)

Publication Number Publication Date
CN207760407U true CN207760407U (en) 2018-08-24

Family

ID=63186381

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721914846.1U Expired - Fee Related CN207760407U (en) 2017-12-31 2017-12-31 A kind of secondary aluminium pre-processing device

Country Status (1)

Country Link
CN (1) CN207760407U (en)

Similar Documents

Publication Publication Date Title
CN207371677U (en) Processing equipment is torn up in a kind of waste lithium cell recycling
CN208742654U (en) A kind of construction waste crushing recyclable device
CN107671287A (en) The one-stop Powder Recovery of metal 3D printing and purifying processing device and method
CN207655913U (en) The one-stop Powder Recovery of metal 3D printing and purifying processing device
CN108479924A (en) A kind of solid waste resource is recycled device
CN109225434A (en) A kind of building waste disintegrating screening machine
CN109967494A (en) A kind of process and system handling building waste
CN208032680U (en) A kind of waste magnetic separator sorting unit
CN207760407U (en) A kind of secondary aluminium pre-processing device
CN205966074U (en) Solid waste classification device
CN117139329A (en) Intelligent recycling device and method for processing building waste wood
CN217856619U (en) High-efficient dust removal mineral processing equipment
CN202921398U (en) Energy-saving and environment-friendly vertical mill crushing system
CN206868313U (en) A kind of lead zinc mud dissolving, stirring, filtering integral equipment
CN212328513U (en) Waste collecting and processing device for fireproof suit production
CN214440858U (en) Vertical vibration ore separator
CN204154074U (en) Scoot drying device
CN113368953A (en) Building rubbish sorting device and building rubbish disposal system
CN105256142A (en) Recycling technology of copper metal in waste circuit board
CN210935142U (en) Waste recovery device for building block processing
CN105537187B (en) A kind of silica flour production line water circulation use and crushing system
CN109894183A (en) A kind of rice processing equipment
CN213493965U (en) Scrap iron retrieves and uses sorting device
CN214599612U (en) Recovery unit for building waste with separation function
CN218308211U (en) Raw materials edulcoration device is used in copper product processing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180824

Termination date: 20201231