CN207759904U - Novel flexible Lift-on/Lift-off System - Google Patents

Novel flexible Lift-on/Lift-off System Download PDF

Info

Publication number
CN207759904U
CN207759904U CN201721832576.XU CN201721832576U CN207759904U CN 207759904 U CN207759904 U CN 207759904U CN 201721832576 U CN201721832576 U CN 201721832576U CN 207759904 U CN207759904 U CN 207759904U
Authority
CN
China
Prior art keywords
lifting
cable wire
component
lift
coaster
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721832576.XU
Other languages
Chinese (zh)
Inventor
程寒松
周宗顺
李开勇
李宝山
刘威振
张超
李灿宁
张利亚
盛卓越
豆现超
方鹏
朱建洛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Province Installation Group Co Ltd
Original Assignee
Henan Province Installation Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Province Installation Group Co Ltd filed Critical Henan Province Installation Group Co Ltd
Priority to CN201721832576.XU priority Critical patent/CN207759904U/en
Application granted granted Critical
Publication of CN207759904U publication Critical patent/CN207759904U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

A kind of novel flexible Lift-on/Lift-off System includes lifting power-equipment, and lifting power-equipment includes lifting main cable;Further include thering is coaster, connection cable wire and the secondary cable wire of lifting, connection cable wire to pass through pulley to be arranged and be slidably connected with pulley.In the present invention, component fixed point is realized using coaster and lifts the flexible connection between power-equipment, while two fixing points can be provided to component using a coaster, reduce the stress of component by way of increasing fixed point.In addition, when component carries out space overturning, the secondary cable wire of lifting can be according to member stress by carrying out position adjustment in supratrochlear sliding, it thereby may be ensured that each fixed point uniform force on component, such the utility model thoroughly solve the problems, such as the existing fixed point unbalance stress of the overturning of component present in traditional hoisting technology and deformation occur.The utility model have many advantages, such as it is simple in structure, practical and convenient, structure will not be caused to destroy component.

Description

Novel flexible Lift-on/Lift-off System
Technical field
The utility model is related to engineering construction equipment technical fields, and more specifically, more particularly to a kind of novel flexible is hung Dress system.
Background technology
In the prior art, large-scale for steel tower, bridge etc., the very big component of quality, be usually all hung using vehicle, The modes such as framed bent lifting either tower crane realize lifting component.
By taking framed bent lifts by crane as an example, traditional lifting mode is:Fixed point is set on component first, then passes through fixed point A cable wire is connected, is then connected on lifting framed bent by cable wire.In this lifting mode, a fixed point is connected with one Root cable wire in order to ensure safety when component lifting and stability needs that more cable wires are arranged, correspondingly component also It needs that more fixed point is arranged.Due to be between cable wire and fixed point use fixed connection structure, in this way component need into Row angle overturning (rotated to vertical state by horizontality, or rotated to horizontality by vertical state, or with it is upper The close state of two states variation is stated to change), when angle is overturn, the stress size and Impact direction of different fixed points Very big variation will occur, thus be easy to cause member stress unevenness and deform.
Utility model content
(1) technical problem
In conclusion how to solve the problems, such as that component existing for traditional large-scale component lifting method is easily deformed, become Those skilled in the art's urgent problem to be solved.
(2) technical solution
The utility model provides a kind of novel flexible Lift-on/Lift-off System, includes lifting power-equipment, the lifting power Equipment includes lifting main cable, in being provided with suspension hook on the lifting main cable;
Further include having coaster, connection cable wire and the secondary cable wire of lifting, the coaster includes apparatus for suspension and pulley, described Pulley is rotatablely arranged on the apparatus for suspension, and in being provided with hanging ring on the apparatus for suspension, the secondary cable wire of the lifting passes through institute State hanging ring setting, the secondary cable wire of the lifting is hooked on the suspension hook, the connection cable wire across pulley setting and with institute Pulley is stated to be slidably connected.
Preferably, a lifting unit is formed by the secondary cable wire of the coaster, the connection cable wire and the lifting, it is described Lifting unit is provided with multiple.
Preferably, the apparatus for suspension is steel apparatus for suspension, and the hanging ring is steel hanging ring, and the hanging ring welding is set to institute It states on apparatus for suspension.
(3) advantageous effect
By said structure design, in novel flexible Lift-on/Lift-off System provided by the utility model, hung based on existing Dress power-equipment specifically provides coaster, connection cable wire and the secondary cable wire of lifting, coaster and is hooked into lifting by connecting cable wire again On power-equipment, the secondary cable wire of a lifting is then provided with by coaster, lifts by crane the both ends of secondary cable wire by using wire line hitch The component that fixed mode lifts needs is tied up to be fixed.In said structure design, it is solid that component is realized using coaster Flexible connection between fixed point and lifting power-equipment, moreover, two fixing points can be provided to component using a coaster, Reduce the stress of component by way of increasing fixed point.It is important that:The utility model realizes the secondary cable wire of lifting using coaster Installation on suspension hook, when component carries out space overturning, lifting by crane secondary cable wire can pass through according to member stress in supratrochlear cunning It is dynamic to carry out position adjustment, it thereby may be ensured that each fixed point uniform force, such the utility model thoroughly solve on component Component present in traditional hoisting technology overturns existing fixed point unbalance stress and the problem of deformation occurs.The utility model has Have the advantages that it is simple in structure, practical and convenient, structure will not be caused to destroy component.
Description of the drawings
Fig. 1 is the structure schematic diagram of novel flexible Lift-on/Lift-off System in the utility model embodiment;
In Fig. 1, the correspondence of component names and accompanying drawing number is:
Lift power-equipment 1, lifting main cable 2, suspension hook 3, coaster 4, connection cable wire 5, lifting pair cable wire 6.
Specific implementation mode
The embodiment of the utility model is described in further detail with reference to the accompanying drawings and examples.Following embodiment For illustrating the utility model, but cannot be used for limiting the scope of the utility model.
In the description of the present invention, unless otherwise indicated, the meaning of " plurality " is two or more;Term The orientation of the instructions such as "upper", "lower", "left", "right", "inner", "outside", " front end ", " rear end ", " head ", " tail portion " or position are closed System is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of describing the present invention and simplifying the description, rather than Indicate or imply that signified device or element must have a particular orientation, with specific azimuth configuration and operation, therefore cannot It is construed as a limitation of the present invention.In addition, term " first ", " second ", " third " etc. are used for description purposes only, and cannot It is interpreted as indicating or implying relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " phase Even ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can Can also be electrical connection to be mechanical connection;It can be directly connected, it can also be indirectly connected through an intermediary.For this For the those of ordinary skill in field, the concrete meaning of above-mentioned term in the present invention can be understood with concrete condition.
Referring to FIG. 1, Fig. 1 is the structure schematic diagram of novel flexible Lift-on/Lift-off System in the utility model embodiment.
The utility model provides a kind of novel flexible Lift-on/Lift-off System, is mainly used for realizing large-scale, large-tonnage component Lifting.
In an embodiment of the utility model, which includes lifting power-equipment 1, is hung It can be crane, framed bent tackling system or tower crane system to fill power-equipment 1.
Lifting main cable 2 is provided on lifting power-equipment 1, lifting main cable 2 realizes folding and unfolding by power-equipment. It is provided with suspension hook 3 on lifting main cable 2, suspension hook 3 is made of metal suspension hook, and suspension hook 3 is integrally formed casting.
As the improvement emphasis of the utility model, it is secondary that the utility model additionally provides coaster 4, connection cable wire 5 and lifting Cable wire 6.
Wherein, 10t coasters may be used in coaster 4, and the concrete structure of coaster 4 is:Include apparatus for suspension and pulley, pulley It is rotatablely arranged on apparatus for suspension, in being provided with hanging ring on apparatus for suspension, lifts by crane secondary cable wire 6 and be arranged across hanging ring, lift by crane secondary steel Rope 6 is hooked on suspension hook 3, and connection cable wire 5 passes through pulley to be arranged and is slidably connected with pulley.
Specifically, a lifting unit, lifting unit setting are formed by coaster 4, connection cable wire 5 and lifting pair cable wire 6 Have multiple.
It limits herein:Apparatus for suspension is steel apparatus for suspension, and hanging ring is steel hanging ring, and hanging ring welding is set on apparatus for suspension.
By said structure design, in novel flexible Lift-on/Lift-off System provided by the utility model, hung based on existing Dress power-equipment 1 specifically provides coaster 4, connection cable wire 5 and the secondary cable wire 6 of lifting, coaster 4 and is hooked by connecting cable wire 5 again Onto lifting power-equipment 1, the secondary cable wire 6 of a lifting is then provided with by coaster 4, lifts by crane the both ends of secondary cable wire 6 by adopting The component that fixed mode lifts needs is tied up with wire line hitch to be fixed.It is real using coaster 4 in said structure design Component fixed point is showed and has lifted the flexible connection between power-equipment 1, moreover, can be carried to component using a coaster 4 For two fixing points, reduce the stress of component by way of increasing fixed point.It is important that:The utility model is real using coaster Installation of the secondary cable wire 6 on suspension hook is now lifted by crane, when component carries out space overturning, lifting by crane secondary cable wire 6 can be logical according to member stress It crosses and carries out position adjustment in supratrochlear sliding, thereby may be ensured that each fixed point uniform force on component, this sample are practical Novel thoroughly solve present in traditional hoisting technology the existing fixed point unbalance stress of component overturning and occur deforming ask Topic.The utility model have many advantages, such as it is simple in structure, practical and convenient, structure will not be caused to destroy component.
The embodiments of the present invention provide for the sake of example and description, and are not exhaustively or to incite somebody to action The utility model is limited to disclosed form.Many modifications and variations are aobvious and easy for the ordinary skill in the art See.Selection and description embodiment are and to make this field to more preferably illustrate the principles of the present invention and practical application Those of ordinary skill is it will be appreciated that various embodiments with various modifications of the utility model to design suitable for special-purpose.

Claims (3)

1. a kind of novel flexible Lift-on/Lift-off System includes lifting power-equipment (1), which is characterized in that
The lifting power-equipment includes lifting main cable (2), in being provided with suspension hook (3) on the lifting main cable;
Further include having coaster (4), connection cable wire (5) and the secondary cable wire (6) of lifting, the coaster includes apparatus for suspension and cunning Wheel, the pulley is rotatablely arranged on the apparatus for suspension, in being provided with hanging ring, the lifting pair cable wire on the apparatus for suspension It is arranged across the hanging ring, the secondary cable wire of the lifting is hooked on the suspension hook, the connection cable wire is arranged across the pulley, And it is slidably connected with the pulley.
2. novel flexible Lift-on/Lift-off System according to claim 1, which is characterized in that
One lifting unit is formed by the secondary cable wire of the coaster, the connection cable wire and the lifting, the lifting unit is set It is equipped with multiple.
3. novel flexible Lift-on/Lift-off System according to claim 1, which is characterized in that
The apparatus for suspension is steel apparatus for suspension, and the hanging ring is steel hanging ring, and the hanging ring welding is set on the apparatus for suspension.
CN201721832576.XU 2017-12-25 2017-12-25 Novel flexible Lift-on/Lift-off System Expired - Fee Related CN207759904U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721832576.XU CN207759904U (en) 2017-12-25 2017-12-25 Novel flexible Lift-on/Lift-off System

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721832576.XU CN207759904U (en) 2017-12-25 2017-12-25 Novel flexible Lift-on/Lift-off System

Publications (1)

Publication Number Publication Date
CN207759904U true CN207759904U (en) 2018-08-24

Family

ID=63188180

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721832576.XU Expired - Fee Related CN207759904U (en) 2017-12-25 2017-12-25 Novel flexible Lift-on/Lift-off System

Country Status (1)

Country Link
CN (1) CN207759904U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109761139A (en) * 2019-03-21 2019-05-17 燕山大学 A kind of parallel flexible cable tune mean force suspender
CN112607581A (en) * 2021-01-25 2021-04-06 河南恒远恒山工业有限公司 Lifting appliance with multi-directional positioning function

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109761139A (en) * 2019-03-21 2019-05-17 燕山大学 A kind of parallel flexible cable tune mean force suspender
CN112607581A (en) * 2021-01-25 2021-04-06 河南恒远恒山工业有限公司 Lifting appliance with multi-directional positioning function

Similar Documents

Publication Publication Date Title
CN207759904U (en) Novel flexible Lift-on/Lift-off System
CN106081926A (en) Harbour Radix Saposhnikoviae crane with mechanical arm gripping device
CN204917648U (en) Turbine rotor lifts by crane instrument
CN202268634U (en) Sling special for breaker
CN203889893U (en) Steel plate transporting crane capable of preventing steel wire rope from twisting
CN103072888B (en) Hoisting equipment and hoisting method for generator in wind generating set
CN203382365U (en) Lifting appliance system for lifting thin, long and thin-wall equipment integrally
CN203359781U (en) Hoisting device adopting clamp ring hoisting lug to hoist tower equipment
CN205634610U (en) Self -balancing crane beam
CN203781631U (en) Sling system for integral slinging of thin-wall equipment
CN110482405A (en) A kind of hanging method
CN205061365U (en) Electric motor rotor carries frock
CN202449766U (en) Arm head hook assembly of truck-mounted crane as well as truck-mounted crane
CN212712478U (en) Dismounting device for cargo boom and balance arm of tower crane
CN208843629U (en) A kind of crane upper mechanism is from dismantling device and crane
CN201793335U (en) Device with detachable arm end
CN216638668U (en) Porcelain bushing hoisting tool
CN106374409A (en) Tension self-locking type power transmission cable suspension tool for power transmission line
CN206927467U (en) A kind of lifting pipeline instrument
CN205151615U (en) Small -size hoisting machine suitable for cable shaft well head
CN205932935U (en) I -steel is with upset hoist
CN204897138U (en) Electricity cable frame hoisting accessory
CN204342249U (en) A kind of lifting balance support beam
CN209903117U (en) Double-acting taking and hanging tool for balanced lifting appliance
CN219217243U (en) Hoisting device for prototype of wind driven generator

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Novel flexible hoist and mount system

Effective date of registration: 20190214

Granted publication date: 20180824

Pledgee: Bank of China Limited Luoyang Station Branch

Pledgor: HENAN INSTALLATION GROUP Co.,Ltd.

Registration number: 2019990000125

PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20200611

Granted publication date: 20180824

Pledgee: Bank of China Limited Luoyang Station Branch

Pledgor: HENAN INSTALLATION GROUP Co.,Ltd.

Registration number: 2019990000125

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Novel flexible hoist and mount system

Effective date of registration: 20200611

Granted publication date: 20180824

Pledgee: Bank of China Limited by Share Ltd. Luoyang branch

Pledgor: HENAN INSTALLATION GROUP Co.,Ltd.

Registration number: Y2020990000600

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20210413

Granted publication date: 20180824

Pledgee: Bank of China Limited by Share Ltd. Luoyang branch

Pledgor: HENAN INSTALLATION GROUP Co.,Ltd.

Registration number: Y2020990000600

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: New flexible hoisting system

Effective date of registration: 20210419

Granted publication date: 20180824

Pledgee: Bank of China Limited by Share Ltd. Luoyang branch

Pledgor: HENAN INSTALLATION GROUP Co.,Ltd.

Registration number: Y2021980002782

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20220907

Granted publication date: 20180824

Pledgee: Bank of China Limited by Share Ltd. Luoyang branch

Pledgor: HENAN INSTALLATION GROUP Co.,Ltd.

Registration number: Y2021980002782

PC01 Cancellation of the registration of the contract for pledge of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180824

CF01 Termination of patent right due to non-payment of annual fee