CN207741516U - Continuous tunnel furnace apparatus for baking - Google Patents
Continuous tunnel furnace apparatus for baking Download PDFInfo
- Publication number
- CN207741516U CN207741516U CN201721852525.3U CN201721852525U CN207741516U CN 207741516 U CN207741516 U CN 207741516U CN 201721852525 U CN201721852525 U CN 201721852525U CN 207741516 U CN207741516 U CN 207741516U
- Authority
- CN
- China
- Prior art keywords
- baking
- chamber
- baking box
- box
- tunnel furnace
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Furnace Details (AREA)
Abstract
The utility model is related to apparatus for baking technical fields, provide a kind of continuous tunnel furnace apparatus for baking, including master control set, multiple heat blowing devices, material hanging device and baking box.Partition board is equipped in baking box, partition board is arranged along the length direction of baking box and baking box is separated to form the first baking chamber and the second baking chamber, first baking chamber is connected with the second baking chamber, material hanging device is set to the inside top of baking box and each target workpiece circle transmission between the first baking chamber and the second baking chamber, each heat blowing device can be driven to be set to the bottom outside of baking box and be connected with the first baking chamber.Baking box is divided into two baking chambers using partition board, and heat temperature raising only is carried out to the first baking chamber, since space greatly reduces, the environment temperature of first baking chamber can be quickly ramped up to preset temperature, meanwhile heat spreader speed is greatly reduced, in this way, the baking requirement of target workpiece can be reached, shorten baking time.
Description
Technical field
The utility model is related to apparatus for baking technical fields, especially provide a kind of continuous tunnel furnace apparatus for baking.
Background technology
The baking box of traditional continuous tunnel furnace apparatus for baking is in cuboid, also, heating zone is arranged in baking box
Inside top.Target workpiece is transmitted in baking box on one side, baking of being heated on one side is completed to dry when leaving baking box
Roasting process.But baking box entire length is longer, and in such a way that heating zone is arranged in top, cause in baking box
Temperature level is unevenly distributed weighing apparatus, in this way, extending the baking time of target workpiece, reduces baking efficiency.
Utility model content
The purpose of this utility model is to provide a kind of continuous tunnel furnace apparatus for baking, it is intended to solve continuous tunnel furnace in the prior art
The inside heating temperature of barbecue apparatus is unevenly distributed the technical problem of the target workpiece baking time length caused by weighing apparatus.
To achieve the above object, the technical solution adopted in the utility model is:A kind of continuous tunnel furnace apparatus for baking, including master control
Device, multiple heat blowing devices, material hanging device and baking box, the baking box is interior to be equipped with partition board, the partition board edge
The length direction of the baking box is arranged and the baking box is separated to form the first baking chamber and the second baking chamber, institute
It states the first baking chamber with the second baking chamber to be connected, the material hanging device is set to the inside top and energy of the baking box
Enough drive each target workpiece circle transmission between the first baking chamber and the second baking chamber, each heat blowing dress
It is arranged in the bottom outside of the baking box and is connected with the first baking chamber, each heat blowing device and institute
Material hanging device is stated to be electrically connected with the master control set.
Specifically, the material hanging device includes driving wheel, driven wheel, transmission chain and multiple bridging hooks, the driving wheel
It is articulated in along the length direction arranged for interval of the baking box and the inside top of the baking box with the driven wheel,
The partition board is set between the driving wheel and the driven wheel, and the transmission chain is wound in the driving wheel and the driven wheel
Above and in the first baking intracavitary and the second baking cavity circulation transmission, each bridging hook is equidistantly set to the biography
On dynamic chain.
Specifically, the heat blowing device includes heater and air blower, and the heater is set to the baking box
The bottom of body and with it is described first baking chamber be connected, the air blower is connected by conduit with the heater.
Specifically, multiple air inlet holes, each air inlet hole and each heating are offered on the bottom of the baking box
Device corresponds, and web plate is additionally provided at the air inlet hole.
Preferably, the quantity of the heat blowing device is two, and the two heat blowing devices are along the baking box
Length direction be arranged side by side.
Further, the continuous tunnel furnace apparatus for baking further includes air interchanger, and the air interchanger is set to the baking box
The top outer of body and it is connected with the first baking chamber, the air interchanger and the master control set are electrically connected.
Specifically, the air interchanger includes air exhauster and multiple wind pipes, is opened on the top of the baking box
Equipped with multiple exhaust vents, each exhaust vent is corresponded with the wind pipe.
Preferably, each exhaust vent is staggered with each air inlet hole.
Further, the air interchanger further includes multiple gas concentration detection apparatus, each gas concentration detection dress
It is arranged in the wind pipe, also, each gas concentration detection apparatus is electrically connected with the master control set.
The beneficial effects of the utility model:The continuous tunnel furnace apparatus for baking of the utility model, using partition board by baking box
Inner cavity is separated to form the first baking chamber and the second baking chamber, then only carries out heating to the first baking chamber by heat blowing device and rise
Temperature, due to needing the space of heat temperature raising to greatly reduce, heat blowing device can rapidly rise to the temperature of the first baking chamber pre-
If temperature, moreover, heat spreader speed is greatly reduced, in such manner, it is possible to reach the baking requirement of target workpiece, when shortening baking
Between, improve baking efficiency.Since the density of hot-air is low, it is easily in the top of baking box, therefore, by each heat blowing device
Bottom outside in baking box is set, in this way, convenient for the consistency for keeping baking box bottom heated and top is heated.Most
Afterwards, each target workpiece is toasted into circle transmission between chamber and the second baking chamber first using material hanging device, in this way it can be ensured that mesh
It marks work and completes baking, meanwhile, the entire length of baking box also greatly shortens, space smaller.
Description of the drawings
It, below will be to embodiment or the prior art in order to illustrate more clearly of the technical scheme in the embodiment of the utility model
Attached drawing needed in description is briefly described, it should be apparent that, the accompanying drawings in the following description is only that this practicality is new
Some embodiments of type for those of ordinary skill in the art without having to pay creative labor, can be with
Obtain other attached drawings according to these attached drawings.
Fig. 1 is the front view for the continuous tunnel furnace apparatus for baking that the utility model embodiment provides;
Fig. 2 is the vertical view for the continuous tunnel furnace apparatus for baking that the utility model embodiment provides;
Fig. 3 is the structural schematic diagram of the material hanging device for the continuous tunnel furnace apparatus for baking that the utility model embodiment provides.
Wherein, each reference numeral in figure:
100-master control set 200-heat blowing, 300-material hanging devices of device
400-401-partition boards of baking box 402-the first toast chamber
403-the second baking chamber 301-driving wheel, 302-driven wheel
303-transmission chain 304-bridging, 201-heaters of hook
202-air blower 203-web plate, 500-air interchangers
501-air exhauster 502-wind pipe, 404-air inlet holes
405-exhaust vents.
Specific implementation mode
The embodiments of the present invention are described below in detail, examples of the embodiments are shown in the accompanying drawings, wherein from beginning
Same or similar element or element with the same or similar functions are indicated to same or similar label eventually.Below by ginseng
The embodiment for examining attached drawing description is exemplary, it is intended to for explaining the utility model, and should not be understood as to the utility model
Limitation.
In the description of the present invention, it should be understood that term " length ", " width ", "upper", "lower", " preceding ",
The orientation or positional relationship of the instructions such as " rear ", "left", "right", "vertical", "horizontal", "top", "bottom" "inner", "outside" is based on attached
Orientation or positional relationship shown in figure, is merely for convenience of describing the present invention and simplifying the description, rather than indicates or imply
Signified device or element must have a particular orientation, with specific azimuth configuration and operation, therefore should not be understood as to this
The limitation of utility model.
In addition, term " first ", " second " are used for description purposes only, it is not understood to indicate or imply relative importance
Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or
Implicitly include one or more this feature.The meaning of " plurality " is two or two in the description of the present invention,
More than, unless otherwise specifically defined.
In the present invention unless specifically defined or limited otherwise, term " installation ", " connected ", " connection ", " Gu
It is fixed " etc. terms shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integral;Can be
Mechanical connection can also be electrical connection;It can be directly connected, can also can be indirectly connected through an intermediary two
The interaction relationship of connection or two elements inside element.It for the ordinary skill in the art, can basis
Concrete condition understands the concrete meaning of above-mentioned term in the present invention.
It please refers to Fig.1 and Fig. 2, the continuous tunnel furnace apparatus for baking that the utility model embodiment provides, including master control set 100,
Multiple heat blowing devices 200, material hanging device 300 and baking box 400.Partition board 401, partition board are equipped in baking box 400
401 along baking box 400 length direction setting and by baking box 400 be separated to form the first baking chamber 402 and second dry
Roasting chamber 403, the first baking chamber 402 are connected with the second baking chamber 403, and material hanging device 300 is set in the top of baking box 400
Side and each target workpiece circle transmission, each heat blowing dress between the first baking chamber 402 and second toasts chamber 403 can be driven
It sets the bottom outside that 200 are set to baking box 400 and is connected with the first baking chamber 402, each heat blowing device 200 and extension
Expect that device 300 is electrically connected with master control set 100.
The continuous tunnel furnace apparatus for baking that the utility model embodiment provides is divided the inner cavity of baking box 400 using partition board 401
Chamber 403 is toasted every forming the first baking chamber 402 and second, then only the first baking chamber 402 is carried out by heat blowing device 200
Heat temperature raising, due to needing the space of heat temperature raising to greatly reduce, heat blowing device 200 rapidly can toast chamber 402 by first
Temperature rise to preset temperature, moreover, heat spreader speed is greatly reduced, in such manner, it is possible to which the baking for reaching target workpiece is wanted
It asks, shortens baking time, improve baking efficiency.Since the density of hot-air is low, it is easily in the top of baking box 400, therefore,
The bottom outside in baking box 400 is arranged in each heat blowing device 200, in this way, convenient for keep 400 bottom of baking box by
The consistency that heat and top are heated.Finally, each target workpiece is dried in the first baking chamber 402 and second using material hanging device 300
Circle transmission between roasting chamber 403, in this way it can be ensured that target operation completes baking, meanwhile, the entire length of baking box 400
It greatly shortens, space smaller.
Specifically, it please refers to Fig.1 to Fig. 3, in the present embodiment, material hanging device 300 includes driving wheel 301, driven wheel
302, transmission chain 303 and multiple bridging hooks 304.Driving wheel 301 and driven wheel 302 are between the length direction of baking box 400
It is articulated in every arrangement and the inside top of baking box 400, partition board 401 is set between driving wheel 301 and driven wheel 302, is passed
Dynamic chain 303 is wound on driving wheel 301 and driven wheel 302, and transmission chain 303 toasts in the first baking chamber 402 with second
Cycle transmission in chamber 403, each bridging hook 304 are equidistantly set on transmission chain 303.It is to be appreciated that transmission chain 303 be centered around every
The outside of plate 401 rotates.Since the first baking chamber 402 is connected with the second baking chamber 403, moreover, heat blowing device 200 is only
Blast heating is carried out to the first baking chamber 402, then the environment temperature in the second baking chamber 403 is less than the first baking chamber 402
Environment temperature can continue to do if target workpiece is not completely dried in the first baking chamber 402 in the second baking chamber 403
It is dry.Also, under the drive of transmission chain 303, target workpiece can repeatedly enter in alternately the first baking chamber 402 and the second baking chamber
In 403, until target workpiece is completely dried.
Specifically, referring to FIG. 1, in the present embodiment, heat blowing device 200 includes heater 201 and air blower
202.Heater 201 be set to baking box 400 bottom and with first baking chamber 402 is connected, air blower 202 by conduit with
Heater 201 is connected.It is to be appreciated that heater 201 is heat production source, air blower 202 blows the heat that heater 201 generates
Enter in the first baking chamber 402.
Specifically, it please refers to Fig.1 and Fig. 2 offers multiple air inlets in the present embodiment on the bottom of baking box 400
Hole 404, each air inlet hole 404 are corresponded with each heater 201, and web plate 203 is additionally provided at air inlet hole 404.The effect of web plate 203
It is to prevent target workpiece from falling into air inlet hole 404, heater 201 is damaged.
Preferably, referring to FIG. 1, in the present embodiment, the quantity of heat blowing device 200 is two, two heat blowings
Device 200 is arranged side by side along the length direction of baking box 400.Certainly, according to the physical length of baking box 400, Ke Yizeng
Add deduct the quantity of few heat blowing device 200.
Further, referring to FIG. 1, in the present embodiment, continuous tunnel furnace apparatus for baking further includes air interchanger 500.Ventilation
Device 500 is set to the top outer of baking box 400 and is connected with the first baking chamber 402, air interchanger 500 and master control set
100 are electrically connected.Since target workpiece can discharge gas in baking process, working environment is impacted, therefore, utilizes ventilation
Device 500 focuses on the gas being released, to create a good working environment.
Specifically, referring to FIG. 1, in the present embodiment, air interchanger 500 includes air exhauster 501 and multiple discharge pipes
Road 502, multiple exhaust vents 405 are offered on the top of baking box 400, and each exhaust vent 405 is a pair of with wind pipe 502 1
It answers.It is to be appreciated that the gas discharged in target workpiece baking process, from each exhaust vent 405 into wind pipe 502, then by
Air exhauster 501 is expelled to outside.
Preferably, referring to FIG. 1, in the present embodiment, each exhaust vent 405 is staggered with each air inlet hole 404.In this way,
It can avoid the heat that heater 201 generates directly to shed from exhaust vent 405, to improve the heat-insulating property of baking box 400.
Further, in the present embodiment, air interchanger 500 further include multiple gas concentration detection apparatus (in figure not
Show), each gas concentration detection apparatus is set in wind pipe 502, also, each gas concentration detection apparatus is and master control set
100 are electrically connected.It is to be appreciated that when the baking temperature of baking box 400 is excessively high, target workpiece fusing is caused to generate harmful
Gas, and gas concentration detection apparatus can monitor the gas concentration in baking box 400 in real time, when the gas concentration of pernicious gas
More than gas-detecting device preset value when, gas concentration detection apparatus by detect signal feed back to master control set 100, then,
Master control set 100 prompts operating personnel to have abnormal conditions appearance, to improve the safety of continuous tunnel furnace apparatus for baking.
The above is only the preferred embodiments of the present utility model only, is not intended to limit the utility model, all in this practicality
All any modification, equivalent and improvement etc., should be included in the guarantor of the utility model made by within novel spirit and principle
Within the scope of shield.
Claims (9)
1. a kind of continuous tunnel furnace apparatus for baking, it is characterised in that:Including master control set, multiple heat blowing devices, material hanging device with
And baking box, be equipped with partition board in the baking box, the partition board along the baking box length direction setting and by institute
It states baking box and is separated to form the first baking chamber and the second baking chamber, the first baking chamber is connected with the second baking chamber
Logical, the material hanging device is set to the inside top of the baking box and each target workpiece can be driven in the first baking chamber
It is described second baking chamber between circle transmission, each heat blowing device be set to the baking box bottom outside and
It is connected with the first baking chamber, each heat blowing device and the material hanging device electrically connect with the master control set
It connects.
2. continuous tunnel furnace apparatus for baking according to claim 1, it is characterised in that:The material hanging device include driving wheel, from
Driving wheel, transmission chain and multiple bridging hooks, the driving wheel and the driven wheel are along the length direction interval of the baking box
Arrangement and the inside top for being articulated in the baking box, the partition board are set between the driving wheel and the driven wheel,
The transmission chain is wound on the driving wheel and the driven wheel and in the first baking intracavitary and the second baking chamber
Interior cycle transmission, each bridging hook are equidistantly set on the transmission chain.
3. continuous tunnel furnace apparatus for baking according to claim 1, it is characterised in that:The heat blowing device includes heater
And air blower, the heater are set to the bottom of the baking box and are connected with the first baking chamber, the air blast
Machine is connected by conduit with the heater.
4. continuous tunnel furnace apparatus for baking according to claim 3, it is characterised in that:It is offered on the bottom of the baking box
Multiple air inlet holes, each air inlet hole are corresponded with each heater, and web plate is additionally provided at the air inlet hole.
5. continuous tunnel furnace apparatus for baking according to claim 3, it is characterised in that:The quantity of the heat blowing device is two
A, the two heat blowing devices are arranged side by side along the length direction of the baking box.
6. continuous tunnel furnace apparatus for baking according to claim 4, it is characterised in that:The continuous tunnel furnace apparatus for baking further includes changing
Device of air, the air interchanger is set to the top outer of the baking box and is connected with the first baking chamber, described to change
Device of air is electrically connected with the master control set.
7. continuous tunnel furnace apparatus for baking according to claim 6, it is characterised in that:The air interchanger include air exhauster and
Multiple wind pipes offer multiple exhaust vents, each exhaust vent and the wind pipe on the top of the baking box
It corresponds.
8. continuous tunnel furnace apparatus for baking according to claim 7, it is characterised in that:Each exhaust vent and each air inlet hole
It is staggered.
9. continuous tunnel furnace apparatus for baking according to claim 7, it is characterised in that:The air interchanger further includes multiple gases
Concentration detection apparatus, each gas concentration detection apparatus are set in the wind pipe, also, each gas concentration detection
Device is electrically connected with the master control set.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721852525.3U CN207741516U (en) | 2017-12-26 | 2017-12-26 | Continuous tunnel furnace apparatus for baking |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721852525.3U CN207741516U (en) | 2017-12-26 | 2017-12-26 | Continuous tunnel furnace apparatus for baking |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207741516U true CN207741516U (en) | 2018-08-17 |
Family
ID=63119815
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721852525.3U Active CN207741516U (en) | 2017-12-26 | 2017-12-26 | Continuous tunnel furnace apparatus for baking |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207741516U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109132344A (en) * | 2018-09-07 | 2019-01-04 | 东北大学 | A kind of bucket grain elevator with air blast heat exchange function |
CN111903727A (en) * | 2020-08-07 | 2020-11-10 | 江苏昱博自动化设备有限公司 | Baking line |
CN113287643A (en) * | 2021-05-31 | 2021-08-24 | 黄彬彬 | Movable baking device for producing fruit core crisp and baking method thereof |
CN114440604A (en) * | 2022-01-29 | 2022-05-06 | 广州Jfe钢板有限公司 | Baking oven and baking equipment |
-
2017
- 2017-12-26 CN CN201721852525.3U patent/CN207741516U/en active Active
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109132344A (en) * | 2018-09-07 | 2019-01-04 | 东北大学 | A kind of bucket grain elevator with air blast heat exchange function |
CN111903727A (en) * | 2020-08-07 | 2020-11-10 | 江苏昱博自动化设备有限公司 | Baking line |
CN111903727B (en) * | 2020-08-07 | 2022-03-15 | 江苏昱博自动化设备有限公司 | Baking line |
CN113287643A (en) * | 2021-05-31 | 2021-08-24 | 黄彬彬 | Movable baking device for producing fruit core crisp and baking method thereof |
CN114440604A (en) * | 2022-01-29 | 2022-05-06 | 广州Jfe钢板有限公司 | Baking oven and baking equipment |
CN114440604B (en) * | 2022-01-29 | 2023-07-21 | 广州Jfe钢板有限公司 | Baking oven and baking equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207741516U (en) | Continuous tunnel furnace apparatus for baking | |
CN103651780B (en) | A kind of energy-saving type grain drying machine | |
CN102645095A (en) | Intelligent electric heating drier | |
CN206227826U (en) | A kind of drying plant being applied on shoe production line | |
CN202254674U (en) | Electrothermal blowing dry box capable of saving energy consumption | |
CN207197130U (en) | A kind of energy-saving electrothermic air dry oven | |
CN207351174U (en) | A kind of industrial high efficiency drying device | |
CN104501540A (en) | Energy-saving drying room | |
CN104146209B (en) | A kind of energy-saving multicell rice flour dehydrator automatically controlled | |
CN207435815U (en) | Firecracker cake and fireworks paper tube dryer | |
CN108800807A (en) | A kind of drying Quick-type electric drying oven with forced convection | |
CN204421532U (en) | A kind of drying equipment of plasterboard | |
CN206755763U (en) | A kind of electric drying oven with forced convection for preparing titanium dioxide | |
CN105627727A (en) | Drying system | |
CN208205648U (en) | A kind of ceramic idiosome drying unit | |
CN107990632A (en) | A kind of high tea drier of uniformity | |
CN204574712U (en) | A kind of thermostatic drying chamber | |
CN208288386U (en) | A kind of high performance coater oven | |
CN206073629U (en) | A kind of dehydrator of magnetic material product | |
CN207600161U (en) | A kind of furnace gas forced circulation system | |
CN204047896U (en) | A kind of multicell ground rice dryer of energy-saving automatic control | |
CN206064781U (en) | A kind of thin film multisection type energy-saving drying system | |
CN206347746U (en) | A kind of heat blower | |
CN109579462A (en) | A kind of New drying device | |
CN207201853U (en) | Biscuit roasting plant |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP02 | Change in the address of a patent holder | ||
CP02 | Change in the address of a patent holder |
Address after: 518000 East and fourth floors, building A1, xinjianxing science and Technology Industrial Park, Fengxin Road, Loucun, Gongming street, Guangming District, Shenzhen City, Guangdong Province Patentee after: TANDA Technology Co., Ltd. Address before: 518000 Guangdong province Shenzhen Guangming New District Gongming Street Village Feng Xin Lu Xinjian Xing Technology Industrial Park A1 Building 1 floor, 3 floor, 4 East Building, 5 floor Patentee before: TANDA Technology Co., Ltd. |