CN207738250U - A kind of chippy hoist gets control device ready - Google Patents

A kind of chippy hoist gets control device ready Download PDF

Info

Publication number
CN207738250U
CN207738250U CN201820049426.XU CN201820049426U CN207738250U CN 207738250 U CN207738250 U CN 207738250U CN 201820049426 U CN201820049426 U CN 201820049426U CN 207738250 U CN207738250 U CN 207738250U
Authority
CN
China
Prior art keywords
well head
long material
control cabinet
shaft bottom
signal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820049426.XU
Other languages
Chinese (zh)
Inventor
李飞
王贵峰
吴玮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Normal University
Original Assignee
Jiangsu Normal University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Normal University filed Critical Jiangsu Normal University
Priority to CN201820049426.XU priority Critical patent/CN207738250U/en
Application granted granted Critical
Publication of CN207738250U publication Critical patent/CN207738250U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Indicating And Signalling Devices For Elevators (AREA)

Abstract

The utility model provides a kind of chippy hoist and gets control device ready, including the elevator in mine auxiliary shaft and auxiliary shaft, well head PLC control cabinet is arranged in the pithead position of the auxiliary shaft, and well head PLC control cabinet is outer to connect setting master control WTC control systems, the long material control box of well head, shaft machine operation control cabinet by signal wire;The master control WTC control systems connect the elevator, the lifting of the sending dotter signal control elevator for being sent out according to the well head PLC control cabinet;Shaft bottom PLC control cabinet is arranged in the bottom hole location of the auxiliary shaft, and shaft bottom PLC control cabinet is outer to connect the long material control box in setting shaft bottom, shaft bottom behaviour's vehicle control cabinet by signal wire;The well head PLC control cabinet is connected with the well head PLC control cabinet by PROFINET connections.The chippy hoist of the utility model gets control device ready, solves security risk existing for behaviour's vehicle at present and signal system, further increases security of system, and simplify operating process when the long material of auxiliary shaft is promoted, improves production efficiency.

Description

A kind of chippy hoist gets control device ready
Technical field
The utility model is related to the long material transport fields in mine auxiliary shaft, and in particular to a kind of chippy hoist gets control ready Device.
Background technology
Elevator is the throat link of mining production, especially chippy hoist, not only undertakes people between ground and shaft bottom The transport task of member, also undertakes the transport task of material between ground and shaft bottom, this results in chippy hoist electric-control system work Condition is more complicated, and also to electric-control system, more stringent requirements are proposed.Common problem is that coal production is necessarily required at present Long material material, and domestic at present mating signal, man of behaviour depot are not equipped with complete long material operation mode, be primarily present with The problem of lower two aspects:1) contradiction between long material operation and behaviour's vehicle safety interlocking.Carrying out long material material loading or unloading Shi Bixu maintains corresponding safety door to be in an open state, according to the requirement of behaviour's vehicle and signals security specification, grasp at this time vehicle be it is non-just Not-ready status also means that signal system can not send out sending dotter signal.Application No. is 201611123341.3 Chinese patents, public A kind of auxiliary well head promotion signal locking system is opened, including signal allows button, the signal that button is allowed to be installed on above and below The single, double tank of well head goes out vehicle side comprising following steps flow:(1), when behaviour's vehicle locking recovery, cage chair, safety door, car puller, resistance At normal position, cager beats after arc manipulation part carries out safety verification scene and carries out step (2) vehicle device;(2) signal is pressed to permit Perhaps button, switching value seal in signal circuit as input point, and PLC receives high level signal, and signal circuit logical condition meets, Signalman carries out getting operation ready on auxiliary well head signal holding tramcar system at this time;(3) when behaviour vehicle locking restore, cage chair, safety door, Not at normal position, the dangerous progress step (4) of arc manipulation part is beaten at scene for car puller, car arrester;(4) cager does not press really Recognize button, then signalman can not send out signal, and promotion signal hair is not gone out, it is ensured that lifting system safety.Using such operation It is small that behaviour's vehicle is got into inspecting state when carrying out long material transport when system, also mean that the locking letter for shielding all behaviour's vehicles Number, car puller and cage chair can be made in the long former conation of material operation, it is clear that there are great security risks for this mode.2) Contradiction between long material operation and raising efficiency.For the purpose of safety, signal operation case is generally mounted to the position far from derrick It sets, so under present mode, it is necessary to there is an operative employee carrying out parking position judgement in well head, an operative employee beats Then point operation generates specification according to signal, i.e. shaft bottom main points, well head can just be transmitted to main control PLC after confirming, by the department of hoist house Machine is driven according to sending dotter signal.It could be completed at least through the operation of 3-4 people among this, any one link goes wrong Operation will be influenced, so raising efficiency is relatively low, and the serious control for influencing stopping accuracy.
Utility model content
To solve the above problems, the utility model, which provides a kind of chippy hoist, gets control device ready.The utility model Chippy hoist get control device ready, solve at present behaviour's vehicle and security risk existing for signal system, further increase and be System safety, and simplify operating process when the long material of auxiliary shaft is promoted, improve production efficiency.
For the realization technical purpose, the technical solution of the utility model is:A kind of chippy hoist gets control device ready, Including the elevator in mine auxiliary shaft and auxiliary shaft,
Well head PLC control cabinet is arranged in the pithead position of the auxiliary shaft, and outer connected by signal wire of well head PLC control cabinet is arranged The long material control box of master control WTC control systems, well head, shaft machine operation control cabinet;The master control WTC control systems connect the promotion Machine, the lifting of the sending dotter signal control elevator for being sent out according to the well head PLC control cabinets;
Shaft bottom PLC control cabinet is arranged in the bottom hole location of the auxiliary shaft, and PLC control cabinet outer connected by signal wire in shaft bottom is arranged Vehicle control cabinet is grasped in the long material control box in shaft bottom, shaft bottom;
The well head PLC control cabinet is connected with the well head PLC control cabinet by PROFINET connections.
Further,
Signal wire between the long material control box of well head and the well head PLC control cabinet includes:The long material selection letter of well head Upper signal wire, the long material of well head descend signal wire slowly slowly for number line, the long material of well head, when well head needs to carry out, long material operates, respectively to well Mouth PLC control cabinet sends the long material selection signal of well head, the long material of well head, and upper signal, the long material of well head descend signal slowly slowly;
Signal wire between the long material control box in shaft bottom and the shaft bottom PLC control cabinet includes:The long material selection letter in shaft bottom Upper signal wire, the long material in shaft bottom descend signal wire slowly slowly for number line, the long material in shaft bottom, when shaft bottom needs to carry out long material to operate, respectively to well After bottom PLC control cabinet sends the long material selection signal in shaft bottom, the long material in shaft bottom upper signal, the long material in shaft bottom descend signal slowly slowly, by described By the long material selection signal in shaft bottom, the long material in shaft bottom, upper signal, the long material in shaft bottom descend signal to be forwarded to well head to PROFINET connections slowly slowly PLC control cabinet.
Further, the signal wire between the well head PLC control cabinet and the master control WTC control systems includes:Crawl is slow Upper signal wire, crawl descend signal wire slowly;
The well head PLC control cabinet according to the long material of well head, beat slowly for upper signal or the long material in shaft bottom slowly by upper 4 points or 5 points of signal generation Point signal, and by crawl, upper signal wire or crawl descend signal wire to be transmitted to master control WTC control systems slowly slowly, control the promotion Under machine crawl is slow upper or slow.
Further, the setting long material operation phonetic warning case of well head is electrically connected outside the well head PLC control cabinet;The shaft bottom The setting long material operation phonetic warning case in shaft bottom is electrically connected outside PLC control cabinet.
Further, vehicle is grasped in the signal wire between the shaft machine operation control cabinet and the well head PLC control cabinet and shaft bottom Signal wire between control cabinet and the shaft bottom PLC control cabinet includes:Main safety door closes sensor signal lines, secondary safety door is closed and passed Sensor signal line, cage chair play resistance sensor signal lines, emergent stop signal before sensor signal lines, tank internal resistance sensor signal lines, tank Line, ready selection signal line, behaviour's vehicle overhauling selection signal line.
The beneficial effects of the utility model are:
1) shaft bottom of the utility model or the ready detecting step of shaft machine operation, can during carrying out long material operation, Automatically the switch detection for skipping secondary safety door solves long material operation and grasps the contradiction between vehicle safety interlocking, improves system Safety;
2) crawl above and below the elevator of the utility model, it then follows well head PLC forwarding mechanisms are either carrying out well head still When the long material operation in shaft bottom, elevator enormously simplifies long material operation by the master control WTC control systems of well head and control Operating process, and improve running efficiency of system.
To sum up, the chippy hoist of the utility model gets control device ready, solves behaviour's vehicle at present and exists with signal system Security risk, further increase security of system, and simplify operating process when the long material of auxiliary shaft is promoted, improve production efficiency.
Description of the drawings
Fig. 1 is that the chippy hoist of the utility model gets control device overall structure diagram ready;
Fig. 2 is the shaft bottom or the ready detecting step flow chart of shaft machine operation of the utility model:
Fig. 3 is that the chippy hoist of the utility model gets control method flow chart ready.
Specific implementation mode
The technical solution of the utility model will be clearly and completely described below.
As shown in Figure 1, a kind of chippy hoist gets the elevator in control device, including mine auxiliary shaft and auxiliary shaft ready,
The pithead position setting well head PLC control cabinet 1 of the auxiliary shaft, well head PLC control cabinet 1 is outer to be connected by signal wire Master control WTC control systems 2, the long material control box 3 of well head, shaft machine operation control cabinet 4 are set;The master control WTC control systems connection The elevator, the lifting of the sending dotter signal control elevator for being sent out according to the well head PLC control cabinet;
Shaft bottom PLC control cabinet 7 is arranged in the bottom hole location of the auxiliary shaft, and shaft bottom PLC control cabinet 7 is outer to be connected by signal wire The long material control box 8 in shaft bottom, shaft bottom behaviour's vehicle control cabinet 10 are set;
The well head PLC control cabinet 1 and the well head PLC control cabinet 7 are connected by PROFINET connections 8.
Further, the signal wire between the long material control box 3 of the well head and the well head PLC control cabinet 1 includes:Well head is long Upper signal wire, the long material of well head descend signal wire slowly slowly for material selection signal line, the long material of well head, when well head needs progress, the operation of long material, Sending the long material selection signal of well head, the long material of well head to well head PLC control cabinet respectively, upper signal, the long material of well head descend signal slowly slowly; That is when pithead position needs to carry out long material operation, the long material control box of well head 3 can be to 1 input well of well head PLC control cabinet Upper signal wire, the long material of well head descend signal wire slowly slowly for the long material selection signal line of mouth, the long material of well head, wherein either having selected well head long Slowly upper signal wire or the long material of well head descend signal wire, the long material control box 3 of well head long to the output well head of well head PLC control cabinet 1 to material slowly Material selection signal, well head PLC control cabinet 1 can identify the region of operated long material.
Signal wire between the long material control box in shaft bottom and the shaft bottom PLC control cabinet includes:The long material selection letter in shaft bottom Upper signal wire, the long material in shaft bottom descend signal wire slowly slowly for number line, the long material in shaft bottom, when shaft bottom needs to carry out long material to operate, respectively to well After bottom PLC control cabinet sends the long material selection signal in shaft bottom, the long material in shaft bottom upper signal, the long material in shaft bottom descend signal slowly slowly, by described By the long material selection signal in shaft bottom, the long material in shaft bottom, upper signal, the long material in shaft bottom descend signal to be forwarded to well head to PROFINET connections slowly slowly PLC control cabinet 1.That is, the device for dotting of the utility model is to be based on the long material crawl automatically dotting control of well head forwarding mechanism System:Signal system will send out signal and on the one hand must comply with well head forwarding mechanism, i.e., letter must be carried out between well head and shaft bottom Number communication confirms that shaft bottom PLC first provides the ready instruction of crawl signal according to logic blocking condition, and then well head PLC is according to it It is transmitted to master control system after the confirmation of latching logic condition is errorless;Another aspect signal system will send out sending dotter signal and must be based on grasping The ready premise of vehicle.
Further, the signal wire between the well head PLC control cabinet and the master control WTC control systems includes:Crawl is slow Upper signal wire, crawl descend signal wire slowly;
The well head PLC control cabinet according to the long material of well head, beat slowly for upper signal or the long material in shaft bottom slowly by upper 4 points or 5 points of signal generation Point signal, and by crawl, upper signal wire or crawl descend signal wire to be transmitted to master control WTC control systems slowly slowly, control the promotion Under machine crawl is slow upper or slow.Also it just says, only well head PLC control cabinet 1, which can export, gets control device ready to master control WTC systems, Under crawl to control elevator is gone up or is slow slowly.
Further, the long material operation phonetic warning case of setting well head 5 is electrically connected outside the well head PLC control cabinet;The shaft bottom The long material operation phonetic warning case in setting shaft bottom 9 is electrically connected outside PLC control cabinet.That is, the utility model bottom hole location into When row long material transport, the long material operation phonetic warning case in shaft bottom 9 can carry out phonetic warning, and carry out long material transport in pithead position When, the long material operation phonetic warning case of well head 5 can carry out phonetic warning.
Further, vehicle is grasped in the signal wire between the shaft machine operation control cabinet and the well head PLC control cabinet and shaft bottom Signal wire between control cabinet and the shaft bottom PLC control cabinet includes:Main safety door closes sensor signal lines, secondary safety door is closed and passed Sensor signal line, cage chair play resistance sensor signal lines, emergent stop signal before sensor signal lines, tank internal resistance sensor signal lines, tank Line, ready selection signal line, behaviour's vehicle overhauling selection signal line.
As shown in figure 3, the chippy hoist of the utility model, which gets a kind of corresponding chippy hoist of control ready, gets control ready Method includes the following steps:
S1:As needed, the long material operation in selection shaft bottom or the long material operation of well head, if the long material operation in selection shaft bottom, carries out Otherwise step S2 carries out step S5;
S2:By controlling the long material control box in shaft bottom, selects and generate the long material in shaft bottom upper signal or the long material in shaft bottom lower letter slowly slowly Number, while the long material selection signal in shaft bottom is generated to shaft bottom PLC control cabinet;
S3:Shaft bottom PLC control cabinet carries out shaft bottom and grasps the ready detection of vehicle, and well head PLC control cabinet carries out the ready inspection of shaft machine operation It surveys, and generates behaviour's vehicle ready signal, if detecting behaviour's vehicle ready signal, carry out step S4;
S4:Shaft bottom PLC control cabinet is by PROFINET connections, by the long material selection letter in the shaft bottom of the long material control box in shaft bottom Number, upper signal or the long material in shaft bottom carry out step S7 after lower letter is transmitted to well head PLC control cabinet slowly to the long material in shaft bottom slowly;
S5:By controlling the long material control box of well head, selects and generate the long material of well head upper signal or the long material of well head lower letter slowly slowly Number, while the long material selection signal of well head is generated to well head PLC control cabinet;
S6:Shaft bottom PLC control cabinet carries out shaft bottom and grasps the ready detection of vehicle, and well head PLC control cabinet carries out the ready inspection of shaft machine operation It surveys, and generates behaviour's vehicle ready signal, if detecting behaviour's vehicle ready signal, carry out step S7;
S7:Well head PLC control cabinet generates or 5 sending dotter signals at 4 points, and passes through crawl upper signal wire or crawl lower letter slowly slowly Number line is transmitted to master control WTC control systems, control the elevator crawl it is upper or slow slowly under.That is, the utility model Device for dotting is controlled based on the long material crawl automatically dotting of well head forwarding mechanism:It is on the one hand necessary that signal system will send out signal Well head forwarding mechanism is followed, i.e., must carry out signal communication confirmation between well head and shaft bottom, shaft bottom PLC first is closed according to logic Bolt part provides the ready instruction of crawl signal, then well head PLC according to its latching logic condition confirm it is errorless after be transmitted to master control WTC systems, crawl is upper slowly, crawl descends signal behavior to be uniformly processed by well head PLC control cabinet 1 slowly, either well head or shaft bottom Slowly upper, crawl descend signal to selection crawl slowly, finally can all be converted to master control it is slow go up " 4 points ", slowly under " 5 points " signal, and with The signaling interface of master control is all responsible for by well head PLC, so it is most reasonable that the part logic is placed on well head PLC, and after can simplifying Continuous logical program.
As a kind of preferred embodiment of the utility model, it is based on the above, unlike, in step s3, If behaviour's vehicle is ready, the long material operation phonetic warning case work in shaft bottom PLC control cabinet control shaft bottom;
In step s 5, if behaviour's vehicle is ready, the well head PLC control cabinet controls the long material operation phonetic warning of well head Case works.
Further, in the step S3 or step S6, the shaft bottom PLC control cabinet carries out the ready detection of shaft bottom behaviour's vehicle or well Mouthful PLC control cabinet carries out the step of shaft machine operation ready detection and includes:
T1:Judge that main safety door closes sensor signal, cage chair hinders before playing sensor signal, tank internal resistance sensor signal, tank Sensor signal and whether it is provided simultaneously with without emergent stop signal, step T2 is carried out if being provided simultaneously with;
T2:When shaft bottom PLC control cabinet carries out shaft bottom behaviour's vehicle control, the long material selection signal in shaft bottom is determined whether, if with if Behaviour's vehicle ready signal is generated, if carrying out step T3 without if, when well head PLC control cabinet carries out shaft machine operation control, is judged Whether there is or not the long material selection signals of well head, if generating behaviour's vehicle ready signal with if, if without step T3 is carried out;
T3:Judge whether that there is secondary safety door to close sensor signal, is generated if closing sensor signal with secondary safety door Grasp vehicle ready signal.
In other words, the latching logic that well head and behaviour's vehicle ready signal at top bottom generate is independent by well head and shaft bottom PLC respectively It completes, rudimentary algorithm logic is:Latching logic program is all written using "AND" logic in all behaviour's vehicle block signals, uses well head Or the long material selection signal short circuit pair safety door in shaft bottom closes sensor signal, with all behaviour's vehicle locking letters of behaviour's vehicle overhauling signal short circuit Number, program circuit is as shown in Figure 2.Wherein, behaviour's vehicle overhauling signal is provided by behaviour's vehicle itself;The long material selection signal in well head or shaft bottom It is generated by the long material control box of the long material control box 3 of well head and shaft bottom 9.It solves long material operation by above step to close safely with behaviour's vehicle Contradiction between lock improves system safety.
Further, before carrying out step T1, the shaft bottom PLC control cabinet or well head PLC control cabinet judge whether there is behaviour Vehicle overhauling selection signal directly generates behaviour's vehicle ready signal if with behaviour's vehicle overhauling selection signal.
For those of ordinary skill in the art, without departing from the concept of the present invention, may be used also To make several modifications and improvements, these belong to the scope of protection of the utility model.

Claims (5)

1. a kind of chippy hoist gets the elevator in control device, including mine auxiliary shaft and auxiliary shaft ready, which is characterized in that
Well head PLC control cabinet is arranged in the pithead position of the auxiliary shaft, and well head PLC control cabinet is outer to connect setting master control by signal wire The long material control box of WTC control systems, well head, shaft machine operation control cabinet;The master control WTC control systems connect the elevator, The lifting of sending dotter signal control elevator for being sent out according to the well head PLC control cabinet;
Shaft bottom PLC control cabinet is arranged in the bottom hole location of the auxiliary shaft, and shaft bottom PLC control cabinet is outer to connect setting shaft bottom by signal wire Vehicle control cabinet is grasped in long material control box, shaft bottom;
The well head PLC control cabinet is connected with the well head PLC control cabinet by PROFINET connections.
2. a kind of chippy hoist according to claim 1 gets control device ready, which is characterized in that
Signal wire between the long material control box of well head and the well head PLC control cabinet includes:The long material selection signal line of well head, Slowly upper signal wire, the long material of well head descend signal wire to the long material of well head slowly, when well head needs progress, the operation of long material, respectively to well head PLC Control cabinet sends the long material selection signal of well head, the long material of well head, and upper signal, the long material of well head descend signal slowly slowly;
Signal wire between the long material control box in shaft bottom and the shaft bottom PLC control cabinet includes:The long material selection signal line in shaft bottom, Slowly upper signal wire, the long material in shaft bottom descend signal wire to the long material in shaft bottom slowly, when shaft bottom needs to carry out long material operation, respectively to shaft bottom PLC After control cabinet sends the long material selection signal in shaft bottom, the long material in shaft bottom upper signal, the long material in shaft bottom descend signal slowly slowly, by the PROFINET By the long material selection signal in shaft bottom, the long material in shaft bottom, upper signal, the long material in shaft bottom descend signal to be forwarded to well head PLC controls to connection slowly slowly Case.
3. a kind of chippy hoist according to claim 2 gets control device ready, which is characterized in that
Signal wire between the well head PLC control cabinet and the master control WTC control systems includes:Crawl goes up signal wire, point slowly Dynamic signal wire lower slowly;
According to the long material of well head, letter is got in upper 4 points or 5 points of signal generation ready to the well head PLC control cabinet slowly for upper signal or the long material in shaft bottom slowly Number, and by crawl, upper signal wire or crawl descend signal wire to be transmitted to master control WTC control systems slowly slowly, control the elevator point It moves on slow or under slow.
4. a kind of chippy hoist according to claim 1 gets control device ready, which is characterized in that the well head PLC controls The setting long material operation phonetic warning case of well head is electrically connected outside case processed;The setting long material in shaft bottom is electrically connected outside the shaft bottom PLC control cabinet Operation phonetic warning case.
5. a kind of chippy hoist according to claim 1 gets control device ready, which is characterized in that
Signal wire and shaft bottom behaviour's vehicle control cabinet between the shaft machine operation control cabinet and the well head PLC control cabinet and institute The signal wire stated between the PLC control cabinet of shaft bottom includes:Main safety door closes sensor signal lines, secondary safety door closes sensor signal Line, cage chair play resistance sensor signal lines, emergent stop signal line, ready choosing before sensor signal lines, tank internal resistance sensor signal lines, tank Select signal wire, behaviour's vehicle overhauling selection signal line.
CN201820049426.XU 2018-01-11 2018-01-11 A kind of chippy hoist gets control device ready Expired - Fee Related CN207738250U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820049426.XU CN207738250U (en) 2018-01-11 2018-01-11 A kind of chippy hoist gets control device ready

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820049426.XU CN207738250U (en) 2018-01-11 2018-01-11 A kind of chippy hoist gets control device ready

Publications (1)

Publication Number Publication Date
CN207738250U true CN207738250U (en) 2018-08-17

Family

ID=63123064

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820049426.XU Expired - Fee Related CN207738250U (en) 2018-01-11 2018-01-11 A kind of chippy hoist gets control device ready

Country Status (1)

Country Link
CN (1) CN207738250U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108059045A (en) * 2018-01-11 2018-05-22 江苏师范大学 A kind of chippy hoist gets control device and control method ready
CN115535816A (en) * 2022-09-14 2022-12-30 新疆钢铁雅满苏矿业有限责任公司 Automatic control system for mine hoist

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108059045A (en) * 2018-01-11 2018-05-22 江苏师范大学 A kind of chippy hoist gets control device and control method ready
CN115535816A (en) * 2022-09-14 2022-12-30 新疆钢铁雅满苏矿业有限责任公司 Automatic control system for mine hoist

Similar Documents

Publication Publication Date Title
CN207738250U (en) A kind of chippy hoist gets control device ready
CN106744201B (en) For elevator door, the shunting device of gate and method
CN105712144B (en) A kind of elevator hall's car door lock detection means
CN104098001B (en) The cage operating panel setting device of elevator
CN106274926B (en) A kind of control method and control device of rail vehicle door closing
CN106829742A (en) A kind of anti-detecting system and method for slinging based on laser
CN108059045A (en) A kind of chippy hoist gets control device and control method ready
CN108025887A (en) Apparatus and method for the service mode for monitoring lift facility
CN108240153B (en) Train door control method and system
CN207404671U (en) A kind of shaft machine operation and signal block device
CN208361067U (en) A kind of compartment removable garbage truck intelligence control system
CN206901519U (en) A kind of overhauling elevator device
CN210313072U (en) Intelligent people-placing elevator with door signal malfunction detection device
WO2023051481A1 (en) Locomotive and mechanical delay safety interlock system
CN110107248A (en) A kind of spray arrester control device and its method of controlling security
CN206494894U (en) A kind of dry coke quenching carrier loader rotary coke tank normal interlocking control system
CN115535816A (en) Automatic control system for mine hoist
CN110316628A (en) Elevator safety system
CN206705428U (en) A kind of elevator safety loop detects circuit
CN113844968A (en) Elevator hand power door calls controlling means outward
CN106429664A (en) Vice-well well mouth hoisting signal latching system
CN208307938U (en) A kind of safety control of coke tank truck and elevator
CN210001353U (en) elevator system
CN207467976U (en) A kind of cargo lift door anti-collision early warning suggestion device
CN113467364A (en) PEDC emergency device for subway platform door

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180817

Termination date: 20210111

CF01 Termination of patent right due to non-payment of annual fee