CN207737275U - A kind of overhead manned equipment - Google Patents

A kind of overhead manned equipment Download PDF

Info

Publication number
CN207737275U
CN207737275U CN201721899640.6U CN201721899640U CN207737275U CN 207737275 U CN207737275 U CN 207737275U CN 201721899640 U CN201721899640 U CN 201721899640U CN 207737275 U CN207737275 U CN 207737275U
Authority
CN
China
Prior art keywords
rail
rope
steel wire
wire rope
grippers
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721899640.6U
Other languages
Chinese (zh)
Inventor
高敬东
李久峰
范吉宏
孙世民
孙富兴
王传庆
李国辉
李存禄
孙玉超
徐国华
杨尊胜
孙成强
方志明
张国攀
魏兴强
董强
公维强
刘玉波
范景琪
贺洪坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Dongshan Xinyi Coal Mine Co Ltd
Original Assignee
Shandong Dongshan Xinyi Coal Mine Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Dongshan Xinyi Coal Mine Co Ltd filed Critical Shandong Dongshan Xinyi Coal Mine Co Ltd
Priority to CN201721899640.6U priority Critical patent/CN207737275U/en
Application granted granted Critical
Publication of CN207737275U publication Critical patent/CN207737275U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model belongs to coal mine operation equipment technical field more particularly to a kind of overhead manned equipment.The top of steel wire rope is equipped with U-rail I and U-rail II, U-rail I and U-rail II are parallel with steel wire rope, U-rail I and U-rail II becomes the deposit point of chair lift, worker need go into the well seating when, chair lift is pulled to going into the well for steel wire rope side to get on the bus a little, rope-grippers is skidded off from the port of U-rail I, overlap joint is on a steel cord, worker rides in chair lift and is run with steel wire rope, when operation to steel wire rope side go into the well get off when, rope-grippers is increased through uplift sector, rope-grippers is detached from steel wire rope, in the peak of uplift sector, rope-grippers is overlapped on a port of U-rail II, worker gets off chair lift, pull chair lift, chair lift is set to enter storage point, it recycles successively, accomplish that worker corresponds with chair lift.

Description

A kind of overhead manned equipment
Technical field
The utility model belongs to coal mine operation equipment technical field more particularly to a kind of overhead manned equipment.
Background technology
Overhead manned equipment is general or indispensable under current mine to multiply people's transporting equipment.It is aerial at present in the prior art to multiply People's device is divided into two kinds, and one is fixed rope clip overhead manned equipment, another kind is can rope clip capable of being picked off or hung overhead manned equipment. When worker ride it is fewer in number when, the chair lift on fixed rope clip overhead manned equipment can not be reduced according to number, often Multiple chair lift dally, waste of resource.For can rope clip capable of being picked off or hung overhead manned equipment, chair lift is taken when worker gets off It hangs on chair lift drop in beam, chair lift seating is removed when getting on the bus, when personnel concentrate seating, chair lift is transmitted or dislodging is frequent, easily causes people Member's hidden danger such as crowded, increase waiting time;And it is dislodging chair lift workload when hook personal scheduling chair lift is larger and in chair lift Reduce rope-grippers bearing service life during frequently seting out.
Utility model content
In view of the above shortcomings of the prior art, the utility model provides a kind of overhead manned equipment, both chair lift is avoided to dally, It is avoided that the inconvenience that frequent rope clip capable of being picked off or hung is brought again.Technical solution is:A kind of overhead manned equipment, including use electrodeless cycle The rope-grippers of steel wire rope and overlap joint on a steel cord positioned at tunnel both sides that mode operates, it is characterised in that:The steel wire rope Lower section be provided with the cyclic track parallel with steel wire rope, the rope-grippers is reverse V-shaped, and two sides of rope-grippers are equipped with rolling Wheel, the idler wheel are matched with cyclic track, and rope-grippers is connected with chair lift, and the chair lift is located on the outside of steel wire rope;The steel wire of side It is respectively equipped with to go into the well to get on the bus a little and go into the well on rope and get off a little, well is respectively equipped on the steel wire rope of the other side and is got on the bus a little and upper underground Che Dian;Cyclic track go into the well get on the bus point, go into the well get off point, upper well get on the bus point, uplift sector is equipped at upper underground vehicle point;In steel wire The top of rope is equipped with U-rail I and U-rail II, and the U-rail I and U-rail II are parallel with steel wire rope, U-rail I It gets on the bus a little and the rope-grippers of upper underground vehicle point for overlapping to go into the well;U-rail II goes into the well to get off and a little get on the bus a little with upper well in overlap joint Rope-grippers;When rope-grippers runs to the uplift sector of cyclic track, rope-grippers increases, and rope-grippers is detached from steel wire rope, is overlapped on U On type track I or U-rail II.
Preferably, two ports of the U-rail I are higher than the tail portion of U-rail I;Two port height of U-rail II In the tail portion of U-rail II.Chair lift is set to enter and be stored in from the port of U-rail I or U-rail II using the technical program The tail portion of U-rail I or U-rail II.
Preferably, the range of operation of steel wire rope is extended in the tail portion of U-rail I and U-rail II.Using the technical program Can avoid the chair lift of storage influences the operating of steel wire rope.
Preferably, the cyclic track bottom is fixedly connected with L-type connecting tube, and L-type connecting tube one end connects with cyclic track It connects, the other end is connect with the girder steel at the top of tunnel;L-type connecting tube is located on the inside of steel wire rope.L-type connecting tube can fix support cycle Track;L-type connecting tube is located on the inside of steel wire rope, does not influence the chair lift of process.
Preferably, the peak of the uplift sector is less than the height of steel wire rope.Uplift sector can avoid using the technical program Influence the normal operation of steel wire rope.
Compared with prior art, the utility model is equipped with U-rail I and U-rail II, U-shaped rail in the top of steel wire rope Road I and U-rail II are parallel with steel wire rope, and as the deposit point of chair lift, worker's needs, which are gone into the well, to be multiplied by U-rail I and U-rail II When seat, chair lift is pulled to going into the well for steel wire rope side and is got on the bus a little, rope-grippers is skidded off from the port of U-rail I, is overlapped on steel wire rope On, worker rides in chair lift and is run with steel wire rope, when operation to steel wire rope side go into the well get off when, rope-grippers is through protuberance Section and increases, rope-grippers disengaging steel wire rope, in the peak of uplift sector, rope-grippers is overlapped on a port of U-rail II, work People gets off chair lift, pulls chair lift, so that chair lift is entered storage point, recycle successively, has accomplished that worker corresponds with chair lift.
Description of the drawings
Fig. 1 is the side view of the utility model;
Fig. 2 is the vertical view of the utility model;
Fig. 3 is the rope-grippers and cyclic track, the combination schematic diagram of chair lift of the utility model;
Fig. 4 is the structural schematic diagram of the chair lift of the utility model;
Wherein, 1- cyclic tracks, 1.1- uplift sectors, 2-U type track I, 3- steel wire rope, 4- rope-grippers, 4.1- idler wheels, 5- are hung Go into the well go into the well the get off upper underground vehicle point of point, 8-, the upper wells of 9- of point, 7- of getting on the bus of chair, 6- is got on the bus point, 10-U type tracks II.
Specific implementation mode
The utility model is further explained below in conjunction with the accompanying drawings for the utility model in order to better understand.
As shown, a kind of overhead manned equipment, includes the steel positioned at tunnel both sides using the operating of electrodeless endless form Cord 3 and the rope-grippers 4 being overlapped on steel wire rope 3, the lower section of the steel wire rope 3 is provided with the cycle rail parallel with steel wire rope 3 Road 1, the rope-grippers 4 are reverse V-shaped, and two sides of rope-grippers 4 are equipped with idler wheel 4.1, the idler wheel 4.1 and cyclic track 1 Match, rope-grippers 4 is connected with chair lift, and the chair lift is located at 3 outside of steel wire rope;It is respectively equipped on the steel wire rope 3 of side on going into the well Vehicle point 6 and going into the well gets off a little 7, and well is respectively equipped on the steel wire rope of the other side and gets on the bus a little 9 and upper underground vehicle point 8;Cyclic track Go into the well get on the bus a little 6, go into the well get off a little 7, upper well gets on the bus a little 9, at upper underground vehicle point 8 be equipped with uplift sector 1.1;At 3 end of steel wire rope The top in portion is equipped with flat equipped with U-rail I2 and U-rail II10, the U-rail I2 and U-rail II10 and steel wire rope Row, U-rail I2 be used for overlap run to go into the well get on the bus a little 6 and upper underground vehicle point 8 rope-grippers 4;U-rail II10 is in overlap joint Run to go into the well get off a little 7 and upper well get on the bus a little 9 rope-grippers 4;When rope-grippers 4 runs to the uplift sector 1.1 of cyclic track 1 When, rope-grippers 4 is elevated, and rope-grippers 4 is detached from steel wire rope 3, is overlapped on U-rail I2 or U-rail I10.
The cyclic track 1, U-rail I2, U-rail I10 bottom be fixedly connected with L-type connecting tube, L-type connecting tube One end is connect with cyclic track 1, and the other end is connect with the girder steel at the top of tunnel, and the L-type connecting tube being connect with cyclic track 1 is located at 3 inside of steel wire rope, the L-type connecting tube being connect with U-rail 2, U-rail I10 are located at the inside of U-rail 2.Connected using L-type Take over support, fixed cycles track 1, U-rail 2, U-rail I10.
Two ports of the further U-rail I are higher than the tail portion of U-rail I;Two ports of U-rail II Higher than the tail portion of U-rail II.
Further, the range of operation of steel wire rope is extended in the tail portion of U-rail I and U-rail II.Using this technology side Case can avoid the operating of the chair lift influence steel wire rope of storage.
Further, the peak of the uplift sector 1.1 is less than the height of steel wire rope 3.
Concrete operation step:Worker go into the well need take overhead manned equipment when, pull chair lift 5,5 top of chair lift embrace rope Device 4 along U-rail 2 slide, when rope-grippers 4 slide into left side steel wire rope go into the well get on the bus a little 6 when, that is, U-rail 2 end When at mouthful, rope-grippers 4 is skidded off from the port of U-rail 2, is overlapped on the steel wire rope 3 of 2 port lower part of U-rail, rope-grippers 4 The idler wheel 4.1 of two sides falls on cyclic track 1 and is matched with cyclic track 1, and rope-grippers 4 is under the traction of steel wire rope 3(Fig. 2 Middle arrow direction is the direction of rotation of steel wire rope 3), run along cyclic track 1, worker rides in chair lift 5 with steel wire rope 3 immediately Operation;When rope-grippers 4 operation to left side steel wire rope go into the well get off a little 7 when, rope-grippers 4 increases, rope-grippers through uplift sector 1.1 4 are detached from steel wire rope 3, and in the peak of uplift sector 1.1, rope-grippers 4 is overlapped on a port of U-rail II10, and worker gets off Chair lift 5 pulls chair lift 5, and chair lift 5 is made to enter the tail portion of U-rail II10(Namely it is equivalent to storage point), complete to go into the well.
When the upper well of worker needs to take overhead manned equipment, chair lift 5 is pulled, the rope-grippers 4 on 5 top of chair lift is along U-shaped rail Road II10 is slided, when rope-grippers 4 slide into right side steel wire rope upper well get on the bus a little 9 when, that is, at the port of U-rail II10 When, rope-grippers 4 is skidded off from the port of U-rail II10, is overlapped on the steel wire rope 3 of the ports U-rail II10 lower part, rope-grippers The idler wheel 4.1 of 4 two sides falls on cyclic track 1 and is matched with cyclic track 1, and rope-grippers 4 is under the traction of steel wire rope 3, edge Cyclic track 1 is run, and worker rides in chair lift 5 and run with steel wire rope 3 immediately;When the operation of rope-grippers 4 to right side steel wire rope When upper underground vehicle point 8, rope-grippers 4 is increased through uplift sector 1.1, and rope-grippers 4 is detached from steel wire rope, in the peak of uplift sector 1.1, Rope-grippers 4 is overlapped on a port of U-rail I2, and worker gets off chair lift 5, pulls chair lift 5, chair lift 5 is made to enter storage point( It is exactly the tail portion of U-rail I2), well in completion.

Claims (5)

  1. Include steel wire rope using electrodeless endless form operating positioned at tunnel both sides and be overlapped on 1. a kind of overhead manned equipment Rope-grippers on steel wire rope, it is characterised in that:The cyclic track parallel with steel wire rope is provided with below the steel wire rope, it is described Rope-grippers is reverse V-shaped, and two sides of rope-grippers are equipped with idler wheel, and the idler wheel is matched with cyclic track, and rope-grippers, which is connected with, to be hung Chair, the chair lift are located on the outside of steel wire rope;It is respectively equipped with to go into the well to get on the bus a little and go into the well on the steel wire rope of side and get off a little, the other side Steel wire rope on be respectively equipped with well and get on the bus a little and upper underground vehicle point;Cyclic track is in point, point, the upper well of getting off of going into the well of getting on the bus of going into the well Get on the bus point, uplift sector is equipped at upper underground vehicle point;It is equipped with U-rail I and U-rail II, the U-shaped rail in the top of steel wire rope Road I and U-rail II are parallel with steel wire rope, and U-rail I gets on the bus a little and the rope-grippers of upper underground vehicle point for overlapping to go into the well;It is U-shaped Track II goes into the well in overlap joint and gets off a little and the rope-grippers got on the bus a little of upper well;When rope-grippers runs to the uplift sector of cyclic track, Rope-grippers increases, and rope-grippers is detached from steel wire rope, is overlapped on U-rail I or U-rail II.
  2. 2. overhead manned equipment according to claim 1, it is characterised in that:Two ports of the U-rail I are higher than U The tail portion of type track I;Two ports of U-rail II are higher than the tail portion of U-rail II.
  3. 3. overhead manned equipment according to claim 2, it is characterised in that:The tail portion of U-rail I and U-rail II are prolonged Stretch out the range of operation of steel wire rope.
  4. 4. overhead manned equipment according to claim 3, it is characterised in that:The cyclic track bottom is fixedly connected with L Type connecting tube, L-type connecting tube one end are connect with cyclic track, and the other end is connect with the girder steel at the top of tunnel;L-type connecting tube is located at On the inside of steel wire rope.
  5. 5. overhead manned equipment according to claim 1, it is characterised in that:The peak of the uplift sector is less than steel wire rope Height.
CN201721899640.6U 2017-12-29 2017-12-29 A kind of overhead manned equipment Active CN207737275U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721899640.6U CN207737275U (en) 2017-12-29 2017-12-29 A kind of overhead manned equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721899640.6U CN207737275U (en) 2017-12-29 2017-12-29 A kind of overhead manned equipment

Publications (1)

Publication Number Publication Date
CN207737275U true CN207737275U (en) 2018-08-17

Family

ID=63120927

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721899640.6U Active CN207737275U (en) 2017-12-29 2017-12-29 A kind of overhead manned equipment

Country Status (1)

Country Link
CN (1) CN207737275U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114132345A (en) * 2021-12-13 2022-03-04 山东东山新驿煤矿有限公司 Tail hanging seat circulating device of underground coal mine overhead man-carrying device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114132345A (en) * 2021-12-13 2022-03-04 山东东山新驿煤矿有限公司 Tail hanging seat circulating device of underground coal mine overhead man-carrying device

Similar Documents

Publication Publication Date Title
CN107954313A (en) A kind of battery case hanging apparatus
CN207737275U (en) A kind of overhead manned equipment
CN101183779A (en) Overhead rail type integral moving monorail crane
CN210566648U (en) Installation device for directional sliding of large pipeline in limited space
CN201288308Y (en) Construction device for rope-suspension bridge stiff girder
CN202348330U (en) Anti-falling chain
CN204778464U (en) Shield constructs gantry crane for subway
CN104229410B (en) A kind of material suspension conveyor system
CN201009889Y (en) Cableway tackle
CN202543807U (en) Steel truss girder drag frame constructed by CRM crawler heavy carriers
CN207956881U (en) material delivery system in tunnel
CN202518943U (en) Creeper-traveler for coating bridge location
CN209397513U (en) Bridge Erector hanging beam overhead crane cross traveling trolley and Bridge Erector
CN202358582U (en) Convenient water carrying vehicle
CN211342917U (en) Split starting pipeline bracket of shield tunneling machine
CN203005495U (en) Transport trolley for sulfur hexafluoride gas cylinder
CN109440658A (en) Bridge Erector hanging beam overhead crane cross traveling trolley and Bridge Erector
CN203889896U (en) Special magnetic lifting appliance for lifting split ladder truss
CN112678000A (en) Coal mine overhead manned device and unattended control system thereof
CN202883000U (en) Hydraulic support reloading platform
CN205971300U (en) Aerial passenger device dislodging formula seat circulation gui ji stores up device
CN207390299U (en) A kind of horizontal rail mounted transport system of heavy steel member
CN105712036A (en) Arrangement method for mine open pit mining belt conveyor
CN205737550U (en) A kind of light rail trailer system of abrupt slope stringing
CN206127787U (en) Suspension type highway track parallel system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant