CN209397513U - Bridge Erector hanging beam overhead crane cross traveling trolley and Bridge Erector - Google Patents
Bridge Erector hanging beam overhead crane cross traveling trolley and Bridge Erector Download PDFInfo
- Publication number
- CN209397513U CN209397513U CN201822007854.9U CN201822007854U CN209397513U CN 209397513 U CN209397513 U CN 209397513U CN 201822007854 U CN201822007854 U CN 201822007854U CN 209397513 U CN209397513 U CN 209397513U
- Authority
- CN
- China
- Prior art keywords
- bridge erector
- overhead crane
- hanging beam
- idler wheel
- traveling trolley
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)
Abstract
The utility model relates to a kind of Bridge Erector hanging beam overhead crane cross traveling trolley and Bridge Erectors.Wherein, the host arm of Bridge Erector main body is equipped with the hanging beam overhead crane that can be advanced along longitudinal direction, the bottom of hanging beam overhead crane is equipped with transversely supporting beam disposed in parallel, and two supporting beams are equipped with two opposite track grooves, and cross traveling trolley includes traversing frame, traversing driving assembly and hoist engine;Traversing driving assembly includes idler wheel and roller driving device, and idler wheel is rotatably arranged in the bottom of traversing frame, and idler wheel is for being placed in two track grooves, and roller driving device connects idler wheel, for driving idler wheel along track groove transverse shifting;Hoist engine is set on traversing frame, for hanging beam piece to be set up and beam piece to be set up being driven to go up and down.Beam piece is set up using Bridge Erector hanging beam overhead crane cross traveling trolley, it works after the unloaded whole transverse moving left and right contraposition of removal Bridge Erector can be simplified, to improve efficiency of setting a roof beam in place, and Bridge Erector entirety transverse moving left and right is fundamentally avoided, improves the safety in utilization and service life of Bridge Erector.
Description
Technical field
The utility model relates to a kind of Bridge Erector hanging beam overhead crane cross traveling trolley and include the Bridge Erector of the cross traveling trolley.
Background technique
Traditional Bridge Erector is the whole transverse moving left and right contraposition by under Bridge Erector light condition, then band beam when setting up beam piece
Piece puts off erection, and every section bridge must be transverse moving left and right contraposition 2 times, then band beam piece is put off 2 times, could complete 2 beams of every section bridge
The erection of piece.When the Bridge Erector sets up beam piece, Bridge Erector entirety transverse moving left and right is needed, is unfavorable for improving efficiency of setting a roof beam in place, safety
It is poor.
Utility model content
For the technical problems in the prior art, provide one kind can be improved set a roof beam in place efficiency and use to the utility model
The Bridge Erector hanging beam overhead crane cross traveling trolley of safety and Bridge Erector comprising the cross traveling trolley.
The technical solution that the utility model solves above-mentioned technical problem is as follows:
A kind of Bridge Erector hanging beam overhead crane cross traveling trolley, the host arm of Bridge Erector main body are equipped with and can advance along longitudinal direction
Hanging beam overhead crane, the bottom of the hanging beam overhead crane are equipped with transversely supporting beam disposed in parallel, and two supporting beams are equipped with opposite
Two track grooves, the cross traveling trolley includes traversing frame, traversing driving assembly and hoist engine;
The traversing driving assembly includes idler wheel and roller driving device, and the idler wheel is rotatably arranged in the traversing frame
The bottom of frame, the idler wheel is for being placed in two track grooves, and the roller driving device connects the idler wheel, for driving
The idler wheel is moved along the track groove transverse shifting and drives the traversing frame transverse shifting;
The hoist engine is set on the traversing frame, for hanging beam piece to be set up and driving the beam to be set up
Piece lifting.
In one of the embodiments, the Bridge Erector hanging beam overhead crane cross traveling trolley further include for bundle it is described to
The shoulder pole of the beam piece of erection, the shoulder pole connect the hoist engine by wirerope.
The idler wheel has multiple in one of the embodiments, and multiple idler wheels are set side by side along the traversing frame.
The roller driving device is driving motor in one of the embodiments,.
Frame structure is rectangle in the traversing frame entirety in one of the embodiments,.
A kind of Bridge Erector, including Bridge Erector main body, hanging beam overhead crane and Bridge Erector hanging beam overhead crane described in any of the above embodiments are used
Cross traveling trolley;The hanging beam overhead crane is set to the host arm of the Bridge Erector main body and can advance along longitudinal direction, the hanging beam overhead crane
Bottom there is transversely supporting beam disposed in parallel, two supporting beams are equipped with two opposite track grooves;The idler wheel
It is placed in two track grooves, the roller driving device drives the idler wheel along the track groove transverse shifting and drives institute
State traversing frame transverse shifting.
The beneficial effects of the utility model are:
The Bridge Erector formed after the Bridge Erector hanging beam overhead crane of the utility model is placed on hanging beam overhead crane with cross traveling trolley, frame
If the process of beam piece is readily modified as: Bridge Erector zero load first being proceeded to the middle position that 2 beam pieces of every section bridge set up position, then
To decorating position, by cross traveling trolley band beam piece transverse moving left and right, contraposition is put off 2 times band beam piece, completes 2 beam pieces of every section bridge
Erection.Beam piece is set up using Bridge Erector hanging beam overhead crane cross traveling trolley, it is horizontal that the unloaded whole left and right of removal Bridge Erector can be simplified
It works after moving contraposition, to improve efficiency of setting a roof beam in place, and fundamentally avoids Bridge Erector entirety transverse moving left and right, improve making for Bridge Erector
With safety and service life.
Detailed description of the invention
Main structure when the Bridge Erector hanging beam overhead crane cross traveling trolley and hanging beam overhead crane that Fig. 1 is an embodiment match
Schematic diagram;
Schematic cross-sectional view when the Bridge Erector hanging beam overhead crane cross traveling trolley and hanging beam overhead crane that Fig. 2 is Fig. 1 match;
The Bridge Erector hanging beam overhead crane cross traveling trolley and hanging beam overhead crane that Fig. 3 is Fig. 1 are placed in structural schematic diagram when host arm.
In attached drawing, parts list represented by the reference numerals are as follows:
10, host arm, 20, hanging beam overhead crane, 30, cross traveling trolley, 31, traversing frame, 32, idler wheel, 33, idler wheel driving dress
It sets, 34, hoist engine, 35, shoulder pole.
Specific embodiment
The principles of the present invention and feature are described below in conjunction with attached drawing, example is served only for explaining that this is practical
It is novel, it is not intended to limit the scope of the utility model.It should be noted that when an element be considered as " connection " another
Element, it can be directly to another element or may be simultaneously present centering elements.
Unless otherwise defined, all technical and scientific terms used herein are led with the technology for belonging to the utility model
The normally understood meaning of the technical staff in domain is identical.Terminology used in the description of the utility model herein only be
The purpose of description specific embodiment, it is not intended that in limitation the utility model.
As shown in Figure 1 to Figure 3, the Bridge Erector of an embodiment, including Bridge Erector main body, hanging beam overhead crane 20 and Bridge Erector are hung
Beam driving cross traveling trolley 30.
Specifically, Bridge Erector main body is equipped with host arm 10, is used to support hanging beam overhead crane 20 and sets up beam piece.
Specifically, hanging beam overhead crane 20 is set on the host arm 10 of Bridge Erector main body and can advance along longitudinal direction.Hanging beam overhead crane
20 bottom has transversely supporting beam 21 disposed in parallel, and two supporting beams 21 are equipped with two opposite track grooves, for setting
Set the cross traveling trolley 30 that can be laterally moved.
Specifically, cross traveling trolley 30 includes traversing frame 31, traversing driving assembly and hoist engine 35.Traversing driving assembly packet
Idler wheel 32 and roller driving device 33 are included, idler wheel 32 is rotatably arranged in the bottom of traversing frame 31, and idler wheel 32 is placed in two rails
In road slot, roller driving device 33 connects idler wheel 32, for driving idler wheel 32 along track groove transverse shifting and driving traversing frame
31 transverse shiftings.Hoist engine 35 is set on traversing frame 31, for hanging beam piece to be set up and driving beam piece liter to be set up
Drop.Idler wheel 32 has multiple, and multiple idler wheels 32 are set side by side along traversing frame, guarantee the stability of traversing process.
Preferably, traversing frame 31 is rectangle frame structure on the whole.Bridge Erector hanging beam overhead crane cross traveling trolley 30 is also
Including the shoulder pole 35 for bundling beam piece to be set up, shoulder pole 35 connects hoist engine 34 by wirerope.According to the size of beam piece,
The number of shoulder pole 35 is preferably 2, and 2 shoulder poles 35 are arranged in parallel, and the spacing of 2 shoulder poles 35 meets the fixed of beam piece and requires.Frame
If when beam piece, directly beam piece can be bundled on shoulder pole 35.
Preferably, roller driving device 34 is driving motor, and driving motor can connect the master controller of Bridge Erector main body,
It is operated by main controller controls.
The Bridge Erector that the Bridge Erector hanging beam overhead crane cross traveling trolley 30 of present embodiment is formed after being placed on hanging beam overhead crane 20,
The process for setting up beam piece is readily modified as: Bridge Erector zero load first being proceeded to the middle position that 2 beam pieces of every section bridge set up position, so
To decorating position, by the cross traveling trolley 30 with beam piece transverse moving left and right, contraposition is put off 2 times band beam piece, completes 2, every section bridge afterwards
The erection of beam piece.
Beam piece is set up using Bridge Erector hanging beam overhead crane cross traveling trolley 30, the unloaded whole left and right of removal Bridge Erector can be simplified
It works after traversing contraposition, to improve efficiency of setting a roof beam in place, and fundamentally avoids Bridge Erector entirety transverse moving left and right, improve Bridge Erector
Safety in utilization and service life.
Each technical characteristic of above embodiments can be combined arbitrarily, for simplicity of description, not to above-described embodiment
In each technical characteristic it is all possible combination be all described, as long as however, the combination of these technical characteristics be not present lance
Shield all should be considered as described in this specification.
The above is only the preferred embodiment of the present invention, is not intended to limit the utility model, all practical at this
Within novel spirit and principle, any modification, equivalent replacement, improvement and so on should be included in the guarantor of the utility model
Within the scope of shield.
Claims (6)
1. the host arm of a kind of Bridge Erector hanging beam overhead crane cross traveling trolley, Bridge Erector main body is hung equipped with what can be advanced along longitudinal direction
Beam driving, the bottom of the hanging beam overhead crane are equipped with transversely supporting beam disposed in parallel, and two supporting beams are equipped with opposite
Two track grooves, which is characterized in that the cross traveling trolley includes traversing frame, traversing driving assembly and hoist engine;
The traversing driving assembly includes idler wheel and roller driving device, and the idler wheel is rotatably arranged in the traversing frame
Bottom, the idler wheel is for being placed in two track grooves, and the roller driving device connects the idler wheel, for driving
Idler wheel is stated along the track groove transverse shifting and drives the traversing frame transverse shifting;
The hoist engine is set on the traversing frame, for hanging beam piece to be set up and driving the beam piece liter to be set up
Drop.
2. Bridge Erector hanging beam overhead crane cross traveling trolley according to claim 1, which is characterized in that further include for bundling
The shoulder pole of beam piece to be set up is stated, the shoulder pole connects the hoist engine by wirerope.
3. Bridge Erector hanging beam overhead crane cross traveling trolley according to claim 1 or 2, which is characterized in that the idler wheel has more
A, multiple idler wheels are set side by side along the traversing frame.
4. Bridge Erector hanging beam overhead crane cross traveling trolley according to claim 1 or 2, which is characterized in that the idler wheel driving
Device is driving motor.
5. Bridge Erector hanging beam overhead crane cross traveling trolley according to claim 1 or 2, which is characterized in that the traversing frame
It is rectangle frame structure on the whole.
6. a kind of Bridge Erector, which is characterized in that including Bridge Erector main body, hanging beam overhead crane and described in any one of claim 1 to 5
Bridge Erector hanging beam overhead crane cross traveling trolley;
The hanging beam overhead crane be set to the Bridge Erector main body host arm and being longitudinally travelled along the host arm, it is described to hang
The bottom of beam driving has transversely supporting beam disposed in parallel, and two supporting beams are equipped with two opposite track grooves;
The idler wheel is placed in two track grooves, and the roller driving device drives the idler wheel lateral along the track groove
It moves and drives the traversing frame transverse shifting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822007854.9U CN209397513U (en) | 2018-11-29 | 2018-11-29 | Bridge Erector hanging beam overhead crane cross traveling trolley and Bridge Erector |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822007854.9U CN209397513U (en) | 2018-11-29 | 2018-11-29 | Bridge Erector hanging beam overhead crane cross traveling trolley and Bridge Erector |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209397513U true CN209397513U (en) | 2019-09-17 |
Family
ID=67881589
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822007854.9U Expired - Fee Related CN209397513U (en) | 2018-11-29 | 2018-11-29 | Bridge Erector hanging beam overhead crane cross traveling trolley and Bridge Erector |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209397513U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109440658A (en) * | 2018-11-29 | 2019-03-08 | 襄阳协利成机车车辆工程设备有限公司 | Bridge Erector hanging beam overhead crane cross traveling trolley and Bridge Erector |
-
2018
- 2018-11-29 CN CN201822007854.9U patent/CN209397513U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109440658A (en) * | 2018-11-29 | 2019-03-08 | 襄阳协利成机车车辆工程设备有限公司 | Bridge Erector hanging beam overhead crane cross traveling trolley and Bridge Erector |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203530847U (en) | Bridge erecting machine capable of erecting narrow small-curvature-radius highway ramp bridges | |
CN108002229B (en) | A kind of low clearance box culvert part loop wheel machine with turn over function | |
CN209397513U (en) | Bridge Erector hanging beam overhead crane cross traveling trolley and Bridge Erector | |
CN202298476U (en) | Bridge variable cross-section box girder surface operation trolley | |
CN201052945Y (en) | Double-track suspension lifting bogie | |
CN102433835A (en) | Bridge variable cross-section box girder surface operation trolley | |
CN206859061U (en) | A kind of running gear of integration of transporting and building deck unit erection gantry | |
CN109440658A (en) | Bridge Erector hanging beam overhead crane cross traveling trolley and Bridge Erector | |
CN202429920U (en) | Multi-trolley and double-girder gantry crane | |
CN202743237U (en) | Rail transit train system | |
CN205171288U (en) | Magnetism floats section of track and moves gantry crane | |
CN207877131U (en) | Gourd double-beam bridge crane | |
CN204778464U (en) | Shield constructs gantry crane for subway | |
CN204873574U (en) | Hoist girder construction of stretching out and drawing back | |
CN107161868A (en) | Bridge crane with many suspenders | |
CN204416951U (en) | A kind of low clearance twin beam overhead bridge crane | |
CN203401895U (en) | Small rail trolley used for transporting fiber roller shutter cloth | |
CN206156620U (en) | Movable track hoisting trolley of usefulness is demolishd with temporary track to shield tunnel construction | |
CN202543807U (en) | Steel truss girder drag frame constructed by CRM crawler heavy carriers | |
CN202518943U (en) | Creeper-traveler for coating bridge location | |
CN209411621U (en) | A kind of electric underslung trolley | |
CN204778289U (en) | Cable support tower construction reinforcing bar festival section hoist | |
CN203976242U (en) | A kind of generator unit stator associating hanging apparatus | |
CN209396449U (en) | A kind of rail type mobile system traversing for arc steel lagging jack | |
CN202429915U (en) | Large-tonnage lifting hook overhead crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190917 Termination date: 20211129 |
|
CF01 | Termination of patent right due to non-payment of annual fee |