CN207736492U - The telescopic health greenhouse of precast beam constructed in winter - Google Patents

The telescopic health greenhouse of precast beam constructed in winter Download PDF

Info

Publication number
CN207736492U
CN207736492U CN201721902333.9U CN201721902333U CN207736492U CN 207736492 U CN207736492 U CN 207736492U CN 201721902333 U CN201721902333 U CN 201721902333U CN 207736492 U CN207736492 U CN 207736492U
Authority
CN
China
Prior art keywords
upright bar
precast beam
connecting rod
winter
greenhouse
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721902333.9U
Other languages
Chinese (zh)
Inventor
张永圭
张凌国
钟家宏
王祥
刘帮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Bureau Fifth Construction Engineering Co Ltd
Original Assignee
China Construction Fourth Bureau Fifth Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Bureau Fifth Construction Engineering Co Ltd filed Critical China Construction Fourth Bureau Fifth Construction Engineering Co Ltd
Priority to CN201721902333.9U priority Critical patent/CN207736492U/en
Application granted granted Critical
Publication of CN207736492U publication Critical patent/CN207736492U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses the telescopic health greenhouses of precast beam constructed in winter, including upright bar, it is installed with holder at the top of the upright bar, the surface activity of the upright bar is equipped with connecting rod, and connecting rod is arranged in a crossed manner, the surface of the upright bar is socketed with sliding sleeve, and one end of the connecting rod is located at the inside of sliding sleeve, and the surface of one end and upright bar one end of the connecting rod is installed by living hinge activity.The utility model is combined into gate-type bridge by upright bar and shed top-support, it is overlapped using jury strut, it can be made more to stablize, support Design is that dome-shaped facilitates top to install canvas roof, using steam-cured heat preservation place, utilize the heat-insulating property of canvas, steam pressurization is sent in health greenhouse, the temperature and humidity of Maintenance in Winter are ensured by steam curing, it completes the maintenance of precast beam while solving the particular time that can not improve precast beam, maintenance is difficult, time-consuming, the problem of increasing maintenance cost.

Description

The telescopic health greenhouse of precast beam constructed in winter
Technical field
The utility model is related to bridge construction technology field, the specially telescopic healths of precast beam constructed in winter Greenhouse.
Background technology
As China's infrastructure construction develops rapidly, science of bridge building is using more and more extensive, and most of bridge uses Be precast beam, the working procedure set up afterwards, the quality of precast beam is the important component of science of bridge building total quality, because This is very crucial to the maintenance of precast beam, and precast beam requires humidity and temperature that can meet curing condition in maintenance, but portion It cannot be guaranteed that curing temperature reaches required value when region-by-region winter construction, concrete prefabricated beam curing time can be increased, or even stop Work reduces working efficiency, and general precast beam can not improve the particular time of precast beam in maintenance processes, and maintenance is difficult, consumes Duration increases maintenance cost.
Utility model content
The purpose of this utility model is to provide the telescopic health greenhouses of precast beam constructed in winter, and precast beam can be improved by having Particular time the advantages of, solve the particular time that can not improve precast beam, maintenance is difficult, time-consuming, increases and maintains into This problem of.
To achieve the above object, the utility model provides the following technical solutions:The telescopic health of precast beam constructed in winter is big Canopy, including upright bar are installed with holder at the top of the upright bar, and the surface activity of the upright bar is equipped with connecting rod, and connecting rod Arranged in a crossed manner, the surface of the upright bar is socketed with sliding sleeve, and one end of the connecting rod is located at the inside of sliding sleeve, the company One end of bar and the surface of upright bar one end are installed by living hinge activity, and auxiliary is movably installed between the upright bar and holder Strut.
Preferably, the bottom of the upright bar is movably installed with rotating wheel, and the quantity of rotating wheel is three.
Preferably, the surface of the holder is covered with canvas, and the cross-sectional area of canvas is more than the cross-sectional area of holder.
Preferably, the quantity of the upright bar is three, and linear arrangement.
Compared with prior art, the beneficial effects of the utility model are as follows:
1, the utility model is combined into gate-type bridge by upright bar and shed top-support, is overlapped using jury strut, It can be made more to stablize, support Design is that dome-shaped facilitates top to install canvas roof, using steam-cured heat preservation place, is utilized Steam pressurization is sent in health greenhouse, the temperature and humidity of Maintenance in Winter is ensured by steam curing by the heat-insulating property of canvas, The maintenance for completing precast beam can be collected with water vapour liquefaction later, be reused using precipitation filtering, complete cycle, Facilitate construction and operation, it can be used repeatedly and service life is permanent, can be used for other purposes such as summer rain-proof, can obtain most Big income has very wide applicability and generalization, while solving the particular time that can not improve precast beam, and maintenance is tired It is difficult, time-consuming, the problem of increasing maintenance cost.
2, the utility model increases the stability of connecting rod connection by the setting of upright bar, connecting rod and sliding sleeve, by Rotating wheel is installed in the bottom of upright bar, upright bar can be made to move freely, while sliding sleeve can slide up and down on the surface of upright bar, It can make link rotatable angle simultaneously, realize moving freely for upright bar.
Description of the drawings
Fig. 1 is the utility model link mechanism schematic diagram;
Fig. 2 is structure right view after the utility model connecting rod is shunk.
In figure:1 upright bar, 2 holders, 3 connecting rods, 4 sliding sleeves, 5 living hinges, 6 jury struts, 7 rotating wheels, 8 canvas.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
- 2 are please referred to Fig.1, the telescopic health greenhouse of precast beam constructed in winter, including upright bar 1, the bottom activity of upright bar 1 are pacified Equipped with rotating wheel 7, and the quantity of rotating wheel 7 is three, and the quantity of upright bar 1 is three, and linear arrangement, the top of upright bar 1 It is installed with holder 2, the surface of holder 2 is covered with canvas 8, and the cross-sectional area of canvas 8 is more than the cross-sectional area of holder 2, The surface activity of upright bar 1 is equipped with connecting rod 3, and connecting rod 3 is arranged in a crossed manner, and the surface of upright bar 1 is socketed with sliding sleeve 4, by vertical The setting of bar 1, connecting rod 3 and sliding sleeve 4 increases the stability that connecting rod 3 connects, by installing rotating wheel in the bottom of upright bar 1 7, upright bar 1 can be made to move freely, while sliding sleeve 4 can slide up and down on the surface of upright bar 1, while connecting rod 3 can be made Rotational angle realizes that upright bar 1 moves freely, and one end of connecting rod 3 is located at the inside of sliding sleeve 4, according to beam body physical length, Multiple health greenhouses can be spliced, certain length is reached after combination, can guarantee the precast beam for adapting to conserve various length, Precast beam health can not use health greenhouse when summer, therefore the collapsible placement storehouse of health greenhouse, can utilize and make when rainy For reinforcement shed or construction awning, place of taking shelter from rain is provided, its utility value, the table of one end and 1 one end of upright bar of connecting rod 3 are greatly improved Face is installed by 5 activity of living hinge, and jury strut 6 is movably installed between upright bar 1 and holder 2, passes through upright bar 1 and shed Top-support 2 is combined into gate-type bridge, is overlapped using jury strut 6, it can be made more to stablize, holder 2 is designed as dome-shaped side Just canvas roof is installed at top, is sent to steam pressurization foster using the heat-insulating property of canvas 8 using steam-cured heat preservation place In raw greenhouse, the temperature and humidity of Maintenance in Winter are ensured by steam curing, the maintenance of precast beam is completed, with water vapour later Liquefaction can collect, and reused using precipitation filtering, complete cycle, facilitate construction and operation, it can be used repeatedly and makes It is permanent with the time limit, other purposes such as summer rain-proof can be used for, maximum value can be obtained, there is very wide applicability and push away Wide property, while solving the particular time that can not improve precast beam, maintenance is difficult, time-consuming, the problem of increasing maintenance cost.
In use, first the pedestal for placing precast beam is measured the width and length for needing frame, according to pre- The height of beam and pedestal processed determines the height that frame needs, customized after skeleton by skeleton exterior surface area determine needed for thermal insulating material Material, can come into operation after combination, to realize that it is flexible, upright bar 1 is attached using connecting rod 3, upper end is pacified using spud pile Dress motion bar is connect with the sliding sleeve 4 at 1 lower end of another upright bar, and 3 infall of connecting rod is connected with, it is made more to stablize, Upright bar 1 can be moved freely for the bottom installation rotating wheel 7 of upright bar 1, and sliding sleeve 4 can slide up and down on the surface of upright bar 1, It can make 3 rotational angle of connecting rod, realize moving freely for upright bar 1, to complete the integral telescopic of health greenhouse, and health greenhouse Overall skeleton can install canvas 8 after installation is complete, and required sail is determined according to the surface area size and shape of health greenhouse Cloth 8, is installed, and is finally sealed, it is ensured that its heat preservation, moistening effect.
In summary:The telescopic health greenhouse of the precast beam constructed in winter, passes through upright bar 1, holder 2, connecting rod 3, sliding sleeve The cooperation of cylinder 4, living hinge 5, jury strut 6, rotating wheel 7 and canvas 8, solves the particular time that can not improve precast beam, Maintenance is difficult, time-consuming, the problem of increasing maintenance cost.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is appreciated that can these embodiments be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (4)

1. the telescopic health greenhouse of precast beam constructed in winter, including upright bar (1), it is characterised in that:The top of the upright bar (1) is solid Dingan County is equipped with holder (2), and the surface activity of the upright bar (1) is equipped with connecting rod (3), and connecting rod (3) is arranged in a crossed manner, the upright bar (1) surface is socketed with sliding sleeve (4), and one end of the connecting rod (3) is located at the inside of sliding sleeve (4), the connecting rod (3) The surface of one end and upright bar (1) one end installed by living hinge (5) activity, activity between the upright bar (1) and holder (2) Jury strut (6) is installed.
2. the telescopic health greenhouse of precast beam constructed in winter according to claim 1, it is characterised in that:The upright bar (1) Bottom be movably installed with rotating wheel (7), and the quantity of rotating wheel (7) is three.
3. the telescopic health greenhouse of precast beam constructed in winter according to claim 1, it is characterised in that:The holder (2) Surface be covered with canvas (8), and the cross-sectional area of canvas (8) is more than the cross-sectional area of holder (2).
4. the telescopic health greenhouse of precast beam constructed in winter according to claim 1, it is characterised in that:The upright bar (1) Quantity be three, and linear arrangement.
CN201721902333.9U 2017-12-30 2017-12-30 The telescopic health greenhouse of precast beam constructed in winter Expired - Fee Related CN207736492U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721902333.9U CN207736492U (en) 2017-12-30 2017-12-30 The telescopic health greenhouse of precast beam constructed in winter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721902333.9U CN207736492U (en) 2017-12-30 2017-12-30 The telescopic health greenhouse of precast beam constructed in winter

Publications (1)

Publication Number Publication Date
CN207736492U true CN207736492U (en) 2018-08-17

Family

ID=63120912

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721902333.9U Expired - Fee Related CN207736492U (en) 2017-12-30 2017-12-30 The telescopic health greenhouse of precast beam constructed in winter

Country Status (1)

Country Link
CN (1) CN207736492U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110181669A (en) * 2019-05-27 2019-08-30 中国十七冶集团有限公司 Using solar energy cyclic steam to the construction method of beam slab winter health
CN110759748A (en) * 2019-11-15 2020-02-07 河北建设集团股份有限公司 Movable beam and slab curing device and beam and slab curing process
CN112411326A (en) * 2020-10-22 2021-02-26 张佳丽 Rainproof facility used in air drying process after concrete road laying

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110181669A (en) * 2019-05-27 2019-08-30 中国十七冶集团有限公司 Using solar energy cyclic steam to the construction method of beam slab winter health
CN110759748A (en) * 2019-11-15 2020-02-07 河北建设集团股份有限公司 Movable beam and slab curing device and beam and slab curing process
CN112411326A (en) * 2020-10-22 2021-02-26 张佳丽 Rainproof facility used in air drying process after concrete road laying

Similar Documents

Publication Publication Date Title
CN207736492U (en) The telescopic health greenhouse of precast beam constructed in winter
CN206737379U (en) A kind of adjustable for height scaffold
CN203125684U (en) Maintenance shed for concrete prefabricated component
CN104815820B (en) A kind of daylight film for greenhouse dust collection method and device
CN206238626U (en) A kind of three layers of sun-proof rain-proof fishing umbrella
CN210621357U (en) Single-line small greenhouse for CRTS III plate type ballastless track winter construction
CN204282845U (en) Buildings in cold roof insulating structure
CN105507602A (en) Heat-insulation house for concrete curing in winter concrete construction
CN205939984U (en) Sunning frame for sealing member
CN208267204U (en) A kind of high-altitude long-span steel pipe truss roof
CN208518163U (en) A kind of large-span arch steel structure net rack roof
CN207522812U (en) A kind of Moveable telescopic rain-proof type conserves canopy
CN207761194U (en) Rain collector on garden layout bamboo pavilion
CN202551789U (en) Booth body support and warmhouse booth
CN206909268U (en) Save land lightweight efficient-economical solar-greenhouse
CN206698902U (en) A kind of frame structure tank component
CN102121322A (en) Kelp airing sunlight room
CN206818681U (en) A kind of field top-open type CO2Concentration and moisture control experiment gas cell device
CN211074073U (en) Box girder health preserving system
CN205476543U (en) Winter construction concrete maintenance thermal -insulation shed
CN204518662U (en) A kind of simple and easy half way up the mountain half-arc type double purpose fruit and vegetable greenhouses
CN108612183A (en) Energy-saving ecological room and its construction method
CN214996369U (en) Multifunctional winter sunlight health-preserving shed
CN220815034U (en) Changing factory building roof canopy under the condition of not stopping production
CN203188431U (en) Hemispherical curve surface roof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180817