CN207730810U - A kind of three-phase electric energy meter joint termination - Google Patents

A kind of three-phase electric energy meter joint termination Download PDF

Info

Publication number
CN207730810U
CN207730810U CN201721870703.5U CN201721870703U CN207730810U CN 207730810 U CN207730810 U CN 207730810U CN 201721870703 U CN201721870703 U CN 201721870703U CN 207730810 U CN207730810 U CN 207730810U
Authority
CN
China
Prior art keywords
connector
electric energy
energy meter
slot
box body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721870703.5U
Other languages
Chinese (zh)
Inventor
徐少华
盛庆元
徐煌俊
朱丹
王栋丞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaoxing Vocational and Technical College
Original Assignee
Shaoxing Vocational and Technical College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaoxing Vocational and Technical College filed Critical Shaoxing Vocational and Technical College
Priority to CN201721870703.5U priority Critical patent/CN207730810U/en
Application granted granted Critical
Publication of CN207730810U publication Critical patent/CN207730810U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Connections Arranged To Contact A Plurality Of Conductors (AREA)

Abstract

The utility model discloses a kind of three-phase electric energy meters to combine termination, including box body, box cover, the connector being plugged in box body slot and lock screw etc..Traditional electric energy meter metering combined connection box is improved to electric energy meter and combines termination by the present apparatus, and traditional screw, which is tightened mode, is changed to connector inserted mode, avoids caused wiring error in existing measuring box maintenance process, improves working efficiency.The present apparatus is suitable for Three-fee-controlled electric energy meter, as long as sliding into the connector part alignment ammeter slot on box body when use, the cutting plane of connector is fixed using lock screw, you can fixed connector and box body.Apparatus structure is simple, easy to operation, high safety.

Description

A kind of three-phase electric energy meter joint termination
Technical field:
The utility model belongs to electric energy meter technical field, is specifically related to a kind of three-phase electric energy meter joint termination.
Background technology:
Three-phase electric energy meter combined unit is mainly used for the provide and deliver distribution transformer terminals of electricity or the electrical energy measurement of high-power user, in electricity Power user carries out needing to use electric energy metering combined wiring box in electric energy metering device installation process.Traditional electrical energy measurement joint Terminal box is to be connect with intelligent electric meter and concentrator by conducting wire and pass through screw tightening.And according to technical standard, terminal box and 2.5 squares of BV copper wire of the pressure-wire of electric energy meter, 4 squares of BV copper wire of current line, also want split-phase color (yellow, green, red, blue), connect Line number amount is more (totally 10 lines).Traditional wired mode is primarily present following defect:Since staff's ability is irregular, cause Field connection quality is multifarious, is mainly shown as:Line pressing bolt tighten it is firmly small, cause conductor compression jointing tightly be easy loosen; Line pressing bolt is tightened firmly excessive, and conducting wire is caused to break;Conducting wire group line length is too short, and line pressing bolt is caused to crimp online crust On;It is too long that conducting wire dials line length, causes at electric energy meter tail that conducting wire exposed part is long, easy tos produce accident.Three-phase electric energy shows Field installation effectiveness is low, is easy error.It at least needs to turn 40 pieces of screws when installing due to three-phase electric energy meter, along with conducting wire is shelled Skin, arrangement conducting wire etc., cause electric energy meter field installment work inefficient, and be easy wiring error, lead to metering fault, simultaneously The process needs to power off, and influences normal work and the life of people.And electric energy meter fix it is cumbersome, due to table tail conducting wire to On top power, often result in field electric energy table and turn forward, influence meter reading and beauty.It is changed within every 3 years once according to national regulation The case where table, use conventional electrical connectors so frequent lead to error connection, is innumerable, and there is metering inaccuracy or other peaces The hidden danger of the generation of full accident.
Utility model content:
For this purpose, the utility model is to overcome the shortcomings of the prior art, provide a kind of simple and reasonable, easy to use Reliable Three phase electric energy meter combines termination, enables the installation of electric energy meter correctly, safely, conveniently, beautiful, shortens dress The table time realizes fast quick change table, reduces power off time, improves working efficiency.
In order to achieve the above objectives, the technical solution of the utility model is as follows:
A kind of three-phase electric energy meter joint termination, including:
Box body, the box body include be located at box body in the middle part of apparatus main body portion, first positioned at the cassette upper end both sides Plug division and the second plug division, box cover is equipped on described device main part, and first plug division upper end and described second insert The upper end of socket part has been separately formed multiple slots, and the inside upper part of the slot is through with the first screw hole.
Connector, the connector include pedestal and take shape in the bar that patches of the base top, the bottom of the pedestal Through-hole is formed, the second screw hole is formed on the side wall of the pedestal, the pedestal of the connector is plugged in the slot, Lock screw is locked after sequentially passing through first screw hole, second screw hole.
As a preferred embodiment of the above technical solution, the connector is patched including the first connector, the second connector, third The bar radius that patches of part, first connector upper end is 4.5mm, and the bar radius that patches of second connector upper end is The bar radius that patches of 5.5mm, third connector upper end are 6mm.
As a preferred embodiment of the above technical solution, the slot includes the first slot, the second slot, third slot, and described the For one connector plugged and fixed in first slot, the second connector plugged and fixed is described in second slot Third connector plugged and fixed is in the third slot.
As a preferred embodiment of the above technical solution, the both sides of the box body form convex block, and first is formed on the convex block Mounting hole.
As a preferred embodiment of the above technical solution, described device main part is provided with voltage tester piece, testing current piece, tripping Piece and tripping contact.
As a preferred embodiment of the above technical solution, the connector is made of Hpb- aldubras, electroplate.
As a preferred embodiment of the above technical solution, the box body bottom forms multiple wiring holes.
The beneficial effects of the utility model are:Traditional electric energy meter metering combined connection box is improved to electric energy meter joint Traditional screw is tightened mode and is changed to connector inserted mode, avoids leading in existing measuring box maintenance process by termination The wiring error etc. of cause improves working efficiency.The present apparatus is suitable for Three-fee-controlled electric energy meter, as long as by connecing on box body when use Plug-in unit part alignment ammeter slot slides into, and lock screw is used to fix the cutting plane of connector, you can fixed connector and Box body.Apparatus structure is simple, easy to operation, high safety.
Description of the drawings:
The following drawings is only intended in doing schematic illustration and explanation to the utility model, does not limit the model of the utility model It encloses.Wherein:
Fig. 1 is that a kind of three-phase electric energy meter of the utility model one embodiment combines termination structural schematic diagram;
Fig. 2 is that a kind of three-phase electric energy meter of the utility model one embodiment combines the structure after the dismounting of termination box cover Schematic diagram;
Fig. 3 is that a kind of three-phase electric energy meter of the utility model one embodiment combines termination structure top view;
Fig. 4 is that a kind of three-phase electric energy meter of the utility model one embodiment combines termination structure upward view;
Fig. 5 is the first plug division structure rearview of the utility model one embodiment;
Fig. 6 is the connector structure schematic diagram of the utility model one embodiment;
Fig. 7 is the connector structure upward view of the utility model one embodiment;
Fig. 8 is the connector structure vertical view of the utility model one embodiment.
Symbol description in figure:
1- box bodys, 2- box covers, 3- connectors, 4- lock screws, 5- convex blocks, 101- apparatus main bodies portion, the first grafting of 102- Portion, the second plug divisions 103-, 105- wiring holes, 301- pedestals, 302- patch bar, 303- through-holes, the second screw holes of 304-, 305- First connector, the second connectors of 306-, 307- third connectors, the first mounting holes of 501-, 1011- voltage tester pieces, 1012- Testing current piece, 1013- tripping pieces, 1014- tripping contacts, the first slots of 1042-, the second slots of 1043-, 1044- thirds are inserted Slot.
Specific implementation mode:
As Figure 1-Figure 4, a kind of three-phase electric energy meter of the utility model combines termination, including:
Box body 1, the box body 1 include the apparatus main body portion 101 for being located at 1 middle part of box body, are located at 1 upper end both sides of the box body The first plug division 102 and the second plug division 103, box cover 2, first plug division are installed on described device main part 101 The upper end of 102 upper ends and second plug division 103 has been separately formed multiple slots, and the inside upper part of the slot is through with One screw hole;The both sides of the box body 1 form convex block 5, and the first mounting hole 501 is formed on the convex block 5, solid to screw Determine in cabinet.In the present embodiment, first plug division is respectively arranged with 10 slots on 102 and second plug division 103.
Connector 3, as shown in Figure 5-Figure 8, the connector 3 include pedestal 301 and take shape at the top of the pedestal 301 Bar 302 is patched, the bottom of the pedestal 301 forms through-hole 303, the second screw hole is formed on the side wall of the pedestal 301 304, the pedestal 301 of the connector 3 is plugged in the slot (the pedestal shape of the shape of the slot and the connector 3 Shape matches), lock screw 4 is locked after sequentially passing through first screw hole 1, second screw hole 304.This implementation In example, first screw hole 1 and second screw hole 304 are chosen for two, in the present embodiment respectively, the connector 3 It is made of Hpb60-2 aldubras, electroplate.The cross section for patching bar on the connector 3 can be cylindrical It can be D fonts, D fonts are chosen in the present embodiment.
Connector 3 can choose different size of connector, and in the present embodiment, the connector 3 includes the first connector 305, the bar radius that patches of the second connector 306, third connector 307,305 upper end of the first connector is 4.5mm, described The bar radius that patches of second connector, 306 upper end is 5.5mm, and the bar radius that patches of 307 upper end of third connector is 6mm. The slot includes the first slot 1042, the second slot 1043, third slot 1044,305 plugged and fixed of the first connector In first slot 1042, in second slot 1043, the third connects 306 plugged and fixed of the second connector 307 plugged and fixed of plug-in unit is in the third slot 1044.Connector upper end patch bar insertion table body after be screwed Smooth one side.Ensure reliable electrical connection, is not necessarily to line.
Described device main part 101 is provided with voltage tester piece 1011, testing current piece 1012, tripping piece 1013 and tripping Contact 1014.
1 bottom of the box body forms multiple wiring holes 105.It is further opened on the box body 1 for copper sheet is fixed Screw thread mouth (not shown), copper sheet are screwed on box body, and the back side of box body 1 is provided with screw hole, and conducting wire passes through Screw is fixed on box body 1.
A kind of three-phase electric energy meter described in the present embodiment combines termination, including box body, box cover, is plugged on box body slot Interior connector and lock screw etc..Traditional electric energy meter metering combined connection box is improved to electric energy meter by the present apparatus combines and connects Traditional screw is tightened mode and is changed to connector inserted mode, avoids causing in existing measuring box maintenance process by line apparatus Wiring error etc., improve working efficiency.The present apparatus is suitable for Three-fee-controlled electric energy meter, as long as by patching on box body when use Part part alignment ammeter slot slides into, and the cutting plane of connector is fixed using lock screw, you can fixed connector and box Body.Apparatus structure is simple, easy to operation, high safety.
Obviously, the above embodiments are merely examples for clarifying the description, and does not limit the embodiments.It is right For those of ordinary skill in the art, can also make on the basis of the above description it is other it is various forms of variation or It changes.There is no necessity and possibility to exhaust all the enbodiments.And it is extended from this it is obvious variation or Among the protection domain that variation is created still in the utility model.

Claims (7)

1. a kind of three-phase electric energy meter combines termination, which is characterized in that including:
Box body (1), the box body (1) include being located at the apparatus main body portion (101) in the middle part of box body (1), being located on the box body (1) The first plug division (102) and the second plug division (103) of both sides are held, box cover (2) is installed on described device main part (101), The upper end of first plug division (102) upper end and second plug division (103) has been separately formed multiple slots, the slot Inside upper part be through with the first screw hole;
Connector (3), the connector (3) include pedestal (301) and take shape at the top of the pedestal (301) and patch bar (302), the bottom of the pedestal (301) forms through-hole (303), and the second screw is formed on the side wall of the pedestal (301) The pedestal (301) in hole (304), the connector (3) is plugged in the slot, and lock screw (4) sequentially passes through described first It is locked after screw hole, second screw hole (304).
2. a kind of three-phase electric energy meter according to claim 1 combines termination, it is characterised in that:
The connector (3) include the first connector (305), the second connector (306), third connector (307), described first The bar radius that patches of connector (305) upper end is 4.5mm, and the bar radius that patches of the second connector (306) upper end is The bar radius that patches of 5.5mm, third connector (307) upper end are 6mm.
3. a kind of three-phase electric energy meter according to claim 2 combines termination, it is characterised in that:
The slot includes the first slot (1042), the second slot (1043), third slot (1044), first connector (305) plugged and fixed is in first slot (1042), and the second connector (306) plugged and fixed is in second slot (1043) in, third connector (307) plugged and fixed is in the third slot (1044).
4. a kind of three-phase electric energy meter according to claim 1 combines termination, it is characterised in that:
The both sides of the box body (1) form convex block (5), and the first mounting hole (501) is formed on the convex block (5).
5. a kind of three-phase electric energy meter according to claim 1 combines termination, it is characterised in that:
Described device main part (101) be provided with voltage tester piece (1011), testing current piece (1012), tripping piece (1013) and Trip contact (1014).
6. a kind of three-phase electric energy meter according to claim 1 combines termination, it is characterised in that:
The connector (3) is made of Hpb60-2 aldubras, electroplate.
7. a kind of three-phase electric energy meter according to claim 1 combines termination, it is characterised in that:
Box body (1) bottom forms multiple wiring holes (105).
CN201721870703.5U 2017-12-28 2017-12-28 A kind of three-phase electric energy meter joint termination Active CN207730810U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721870703.5U CN207730810U (en) 2017-12-28 2017-12-28 A kind of three-phase electric energy meter joint termination

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721870703.5U CN207730810U (en) 2017-12-28 2017-12-28 A kind of three-phase electric energy meter joint termination

Publications (1)

Publication Number Publication Date
CN207730810U true CN207730810U (en) 2018-08-14

Family

ID=63087247

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721870703.5U Active CN207730810U (en) 2017-12-28 2017-12-28 A kind of three-phase electric energy meter joint termination

Country Status (1)

Country Link
CN (1) CN207730810U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020042910A1 (en) * 2018-08-30 2020-03-05 中国电力科学研究院有限公司 Joint junction box for electric energy metering
CN113433363A (en) * 2021-06-24 2021-09-24 广东电网有限责任公司 Connecting device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020042910A1 (en) * 2018-08-30 2020-03-05 中国电力科学研究院有限公司 Joint junction box for electric energy metering
CN113433363A (en) * 2021-06-24 2021-09-24 广东电网有限责任公司 Connecting device

Similar Documents

Publication Publication Date Title
CN205248216U (en) Plug -in miniature circuit breaker
CN207730810U (en) A kind of three-phase electric energy meter joint termination
CN203204041U (en) Novel electric energy meter inserter
CN205621932U (en) Multiple type of removable formula power connector
CN204118284U (en) Plug-in can't harm binding post
CN2911699Y (en) Bundled inserting, watt-hour metering and electricity embezzling-proof device
CN204167689U (en) Compatible socket and cable export the highly reliable PDU of mid-through bus both sides distribution
CN208736908U (en) Electric energy meter support plug-in unit
CN203455380U (en) A mutual-inductor-accessed electric energy meter connector assembly
CN206211191U (en) Intelligence plugs the disconnected module that declines
CN106384921B (en) Intelligence plugs the disconnected module that declines
CN115117761A (en) Modularized arrangement and connection method for centralized multi-epitope electric meter box devices
CN205353152U (en) Electric energy meter plug connector
CN209327417U (en) A kind of three-phase electric energy meter compact does not have a power failure more changing device
CN203481157U (en) Plug-in single-phase breaker
CN210037872U (en) Plug-in type wiring device for replacing lightning arrester monitor
CN112864665A (en) Electric energy meter plug-in with bypass function
CN203911002U (en) Grounding line device
CN207181490U (en) A kind of metering secondary terminal box
CN207965584U (en) A kind of solenoid valve remote controllers
CN209911424U (en) Electric energy meter with convenient wiring terminal
CN206673381U (en) A kind of plug-in multi-epitope distribution box
CN215989537U (en) Plug-in type wiring terminal box
CN218037297U (en) On-spot check-up safety terminal box of three-phase intelligent ammeter
CN203351520U (en) Insertion type single-phase earth leakage protection switch

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: ZHEJIANG DAJIN CENTRIFUGE Co.,Ltd.

Assignor: SHAOXING VOCATIONAL & TECHNICAL College

Contract record no.: X2022330000665

Denomination of utility model: A combined wiring device for three-phase electric energy meter

Granted publication date: 20180814

License type: Common License

Record date: 20221121

Assignee: ZHEJIANG CHENXIN MACHINE EQUIPMENTS Co.,Ltd.

Assignor: SHAOXING VOCATIONAL & TECHNICAL College

Contract record no.: X2022330000664

Denomination of utility model: A combined wiring device for three-phase electric energy meter

Granted publication date: 20180814

License type: Common License

Record date: 20221121

Assignee: Shaoxing Junhe New Materials Technology Co.,Ltd.

Assignor: SHAOXING VOCATIONAL & TECHNICAL College

Contract record no.: X2022330000662

Denomination of utility model: A combined wiring device for three-phase electric energy meter

Granted publication date: 20180814

License type: Common License

Record date: 20221121

Assignee: Shaoxing Shuntai Machinery Technology Co.,Ltd.

Assignor: SHAOXING VOCATIONAL & TECHNICAL College

Contract record no.: X2022330000663

Denomination of utility model: A combined wiring device for three-phase electric energy meter

Granted publication date: 20180814

License type: Common License

Record date: 20221121

EE01 Entry into force of recordation of patent licensing contract