CN207728083U - A kind of high-altitude steel structure mounting bracket of decoration scenery iron tower - Google Patents

A kind of high-altitude steel structure mounting bracket of decoration scenery iron tower Download PDF

Info

Publication number
CN207728083U
CN207728083U CN201721768191.1U CN201721768191U CN207728083U CN 207728083 U CN207728083 U CN 207728083U CN 201721768191 U CN201721768191 U CN 201721768191U CN 207728083 U CN207728083 U CN 207728083U
Authority
CN
China
Prior art keywords
mounting bracket
section
steel
steel pipe
iron tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721768191.1U
Other languages
Chinese (zh)
Inventor
宗秋斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU BAIGU STEEL STRUCTURE ENGINEERING Co Ltd
Original Assignee
JIANGSU BAIGU STEEL STRUCTURE ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU BAIGU STEEL STRUCTURE ENGINEERING Co Ltd filed Critical JIANGSU BAIGU STEEL STRUCTURE ENGINEERING Co Ltd
Priority to CN201721768191.1U priority Critical patent/CN207728083U/en
Application granted granted Critical
Publication of CN207728083U publication Critical patent/CN207728083U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

The utility model discloses a kind of high-altitude steel structure mounting brackets of decoration scenery iron tower, it is intended to provide a kind of facilitating decoration scenery iron tower Section five, section six, the high-altitude steel structure mounting bracket of and Section seven installation, its key points of the technical solution are that including the first mounting bracket being arranged between Section four and Section five, the second mounting bracket between Section five and Section six is set, third mounting bracket between Section six and Section seven is set, the 4th mounting bracket backwards to Section of six one end at Section seven is set, first mounting bracket, second mounting bracket, third fills holder, 4th dress holder is fixedly mounted on the ground.Facilitate the installation of decoration scenery iron tower by the way that the first mounting bracket, the second mounting bracket, third mounting bracket and the 4th mounting bracket is arranged.

Description

A kind of high-altitude steel structure mounting bracket of decoration scenery iron tower
Technical field
The utility model is related to decorate scenery iron tower to install apparatus field, more particularly to a kind of high-altitude of decoration scenery iron tower Steel Structure Installation holder.
Background technology
Scenery iron tower is decorated as a part of more and more of urban landscape construction, the installation for decorating scenery iron tower now is more Using assembling structure, first in factory steel tower is split into several parts produces, each portion that then will have been produced Partite transport is sent to construction site, is installed at the scene.Such convenient transportation, installation speed are fast.
As shown in Figure 1, a kind of existing decoration scenery iron tower, designed in quadrant arc shape, split into first segment 11, Second section 12, third section 13, Section 4 14, Section 5 15, Section 6 16 and Section 7 17, this decoration scenery iron tower height Height, extent of horizontal projection, weight weight, when mounted, the section of first segment 11, second 12, third section 13 and Section 4 14 of height are relatively low, It is easy for installation, but Section 5 15, Section 6 16, Section 7 17 height it is higher, if only installed by large-scale crane, each section It is difficult to be aligned, installation is relatively difficult.
Utility model content
The purpose of this utility model is to provide a kind of high-altitude steel structure mounting bracket of decoration scenery iron tower, and it is convenient to have The advantages of decorating Section five, Section six and Section seven installation of scenery iron tower.
The above-mentioned technical purpose of the utility model technical scheme is that:
A kind of high-altitude steel structure mounting bracket of decoration scenery iron tower, including be arranged between Section four and Section five the One mounting bracket, is arranged between Section six and Section seven the second mounting bracket being arranged between Section five and Section six The 4th mounting bracket backwards to Section of six one end at Section seven, the first mounting bracket, the second installation branch is arranged in third mounting bracket Frame, third dress holder, the 4th dress holder are fixedly mounted on the ground.
By using above-mentioned technical proposal, Section five is sling using crane, Section five of both ends pass through the first installation respectively Next holder and the support of the second mounting bracket, then install the successively by welding by Section four and Section five fixed installation Six section and Section seven, in this way it is more convenient decorate scenery iron tower installation.
Further setting:First mounting bracket, the second mounting bracket, third mounting bracket and the 4th mounting bracket phase Answer by several standard knots and it is non-standard section constitute, be bolted to connection between standard knot and standard knot, standard knot with it is non- It is bolted to connection between standard knot.
By using above-mentioned technical proposal, the first mounting bracket, the second mounting bracket, third mounting bracket and the 4th installation Holder is all removable, convenience in transport, and can be recycled.
Further setting:The standard knot includes the vertical steel pipe of four rectangular arrays setting, and vertical steel pipe is along vertical side To setting, it is connected with stull steel pipe between four vertical steel pipes in turn, four stull steel pipes are in same level, four stull steel Pipe forms stull steel pipe, and several stull steel pipes are equipped between four vertical steel pipes.
By using above-mentioned technical proposal, four vertical steel pipes are fixedly connected by several stull steel pipes, stable structure, by Power is uniform, securely and reliably.
Further setting:Diagonal brace steel pipe is equipped between two neighbouring stull steel pipes of the standard knot same side, Diagonal brace steel pipe is obliquely installed, and one end opposite with neighbouring stull steel pipe is fixedly connected respectively at diagonal brace steel pipe both ends, standard knot The diagonal brace steel pipe of two neighboring side is staggered.
By using above-mentioned technical proposal, diagonal brace steel pipe is set between the adjacent crossbrace steel pipe of standard knot side, is increased The stress intensity of strong standard knot entirety so that standard knot is whole more to be stablized.
Further setting:It is connected with diagonal steel pipe, each stull between two vertical steel pipes of same diagonal A diagonal steel pipe is equipped between steel pipe, neighbouring diagonal steel pipe intersects setting.
By using above-mentioned technical proposal, the integral strength of standard knot, enhancing are further enhanced by the way that diagonal steel pipe is arranged The stability of standard section structure.
Further setting:The both ends of the vertical steel pipe are respectively equipped with junction steel plate, correspond to junction steel plate on ground Position is equipped with pre-embedded steel slab, is bolted to connection between pre-embedded steel slab and junction steel plate.
By using above-mentioned technical proposal, pre-embedded steel slab is buried on the ground, can be reinforced standard knot in this way and be connected with ground The intensity connect so that standard knot is more stablized on the ground.
Further setting:The pre-embedded steel slab includes steel facing, and the steel facing bottom surface is equipped with several fixing glues, fixing glue L-shaped setting.
By using above-mentioned technical proposal, the bending part of fixing glue firmly grasps the soil in ground so that pre-embedded steel slab can be with Hold on to ground so that the bonding strength bigger of pre-embedded steel slab and ground.
Further setting:Each fixing glue bottom end bending place is arranged in the opposite direction.
By using above-mentioned technical proposal, fixing glue catches the soil of different directions, can increase in fixing glue and soil With the promptly intensity of soil.
Further setting:First mounting bracket, the second mounting bracket, third mounting bracket, the 4th mounting bracket point It is not equipped with several cable ropes.
By using above-mentioned technical proposal, the setting of cable rope can enhance the intensity that each mounting bracket bears wind, make Each mounting bracket is obtained more to stablize.
In conclusion the utility model has the advantages that:
1, facilitate dress by the way that the first mounting bracket, the second mounting bracket, third mounting bracket and the 4th mounting bracket is arranged Adorn the installation of scenery iron tower;
2, each mounting bracket is detachable, convenience in transport, can recycle;
3, each mounting bracket stability under loading, intensity is big, using reliable.
Description of the drawings
Fig. 1 is the structural schematic diagram for decorating scenery iron tower;
Fig. 2 is the structural schematic diagram of embodiment;
Fig. 3 is the structural schematic diagram of embodiment Plays section;
Fig. 4 is the vertical view of embodiment Plays section;
Fig. 5 is the vertical view of pre-embedded steel slab in embodiment;
Fig. 6 is the side view of pre-embedded steel slab in embodiment.
In figure, 11, first segment;12, the second section;13, third section;14, Section four;15, Section five;16, Section six;17、 Section seven,;21, the first mounting bracket;22, the second mounting bracket;23, third mounting bracket;24, the 4th mounting bracket;3, standard Section;31, vertical steel pipe;32, stull steel pipe;33, diagonal brace steel pipe;34, diagonal steel pipe;35, stull steel pipe;4, junction steel plate; 5, pre-embedded steel slab;51, steel facing;52, fixing glue;6, cable rope;7, non-standard section.
Specific implementation mode
The utility model is described in further detail below in conjunction with attached drawing.
Embodiment:A kind of high-altitude steel structure mounting bracket of decoration scenery iron tower, as illustrated in fig. 1 and 2, including setting is the Four section 14 and Section 5 15 between the first mounting bracket 21, be arranged between Section 5 15 and Section 6 16 second install prop up Frame 22, the third mounting bracket 23 being arranged between Section 6 16 and Section 7 17, setting are at Section 7 17 backwards to Section 6 16 4th mounting bracket 24 of one end, the first mounting bracket 21, the second mounting bracket 22, the installation branch of third mounting bracket 23 and the 4th Frame 24 is fixedly mounted on the ground.Section 5 15 is sling using crane, Section 5 15 of both ends pass through the first installation branch respectively Section 4 14, be then fixedly connected, next successively by frame 21 and the support of the second mounting bracket 22 by welding with Section 5 15 Section 6 16, and Section 7 17, the installation of decoration scenery iron tower more convenient in this way are installed.
As illustrated in fig. 1 and 2, the first mounting bracket 21, the second mounting bracket 22, the installation branch of third mounting bracket 23 and the 4th Frame 24 is correspondingly made of several standard knots 3 and non-standard section 7, is bolted to connection between standard knot 3 and standard knot 3, It is bolted to connection between standard knot 3 and non-standard section 7.Each mounting bracket is dismantled and assembled, convenience in transport, can be repeatedly sharp With.
As shown in Figures 3 and 4, standard knot 3 include four rectangular arrays setting vertical steel pipe 31, vertical steel pipe 31 perpendicular to Horizontal plane is arranged, and is connected with stull steel pipe 32 in turn between four vertical steel pipes 31, four stull steel pipes 32 are in same level. Four stull steel pipes 32 set that there are five stull steel pipe 35, five stulls at stull steel pipe 35 between four vertical steel pipes 31 It is mutually parallel between steel pipe 35.Four vertical steel pipes 31 are fixedly connected by stull steel pipe 35, reliable and stable.
As shown in figure 3, diagonal brace steel pipe 33 is equipped between the neighbouring two stull steel pipes 32 in 3 same side of standard knot, Diagonal brace steel pipe 33 is obliquely installed, and one end opposite with neighbouring stull steel pipe 32 is fixedly connected respectively at diagonal brace steel pipe 33 both ends, The diagonal brace steel pipe 33 of 3 two neighboring side of standard knot is staggered.The intensity of the whole structure of standard knot 3 can be enhanced in this way, The limit for improving stress, enhances the stability of each mounting bracket.
As shown in Figures 3 and 4, it is connected with diagonal steel pipe 34 between two vertical steel pipes 31 of same diagonal, often A diagonal steel pipe 34 is equipped between a stull steel pipe 35, neighbouring diagonal steel pipe 34 intersects setting.Diagonal steel Pipe 34 further strengthens the structural strength of standard knot 3.
As shown in Fig. 3,5 and 6, the both ends of vertical steel pipe 31 are fixed with junction steel plate 4 respectively, correspond to connection on ground The position of steel plate 4 is equipped with pre-embedded steel slab 5, and pre-embedded steel slab 5 is embedded in ground, passes through spiral shell between pre-embedded steel slab 5 and junction steel plate 4 Bolt is fixedly connected.Grasp of each mounting bracket for ground can be enhanced in this way so that each mounting bracket is to ground Adhesive force is stronger.
As shown in fig. 6, pre-embedded steel slab 5 includes steel facing 51 and several fixing glues 52 in 51 bottom surface of steel facing is arranged, Gu Surely 52 rings are followed closely and are located at 51 bottom surface of steel facing, 52 L-shaped setting of fixing glue, and 52 bottom end bending place of each fixing glue towards phase negative side To setting.Grasp of the pre-embedded steel slab 5 to ground can be enhanced in this way.
Non-standard section 7 is equally made of vertical steel pipe 31, diagonal brace steel pipe 33 and diagonal steel pipe 34, and connection structure is identical, erects The length of straight steel pipe 31 is depending on actual conditions.
As shown in Fig. 2, the first mounting bracket 21, the second mounting bracket 22, third mounting bracket 23, the 4th mounting bracket 24 It is equipped with several cable ropes 6 respectively.The setting of cable rope 6 can enhance the intensity that each mounting bracket bears wind so that each Mounting bracket is more stablized.
The above embodiments are only the explanation to the utility model, are not limitations of the present invention, ability Field technique personnel can as needed make the present embodiment the modification of not creative contribution after reading this specification, but As long as all being protected by Patent Law in the right of the utility model.

Claims (9)

1. a kind of high-altitude steel structure mounting bracket of decoration scenery iron tower, it is characterised in that:Including being arranged at Section four(14)With Section five,(15)Between the first mounting bracket(21), be arranged at Section five(15)With Section six(16)Between second installation branch Frame(22), be arranged at Section six(16)With Section seven(17)Between third mounting bracket(23), be arranged at Section seven(17)The back of the body To Section six(16)4th mounting bracket of one end(24), the first mounting bracket(21), the second mounting bracket(22), third dress branch Frame, the 4th dress holder are fixedly mounted on the ground.
2. a kind of high-altitude steel structure mounting bracket of decoration scenery iron tower according to claim 1, it is characterised in that:It is described First mounting bracket(21), the second mounting bracket(22), third mounting bracket(23)With the 4th mounting bracket(24)Correspondingly by Several standard knots(3)With non-standard section(7)It constitutes, standard knot(3)With standard knot(3)Between be bolted to connection, standard Section(3)With non-standard section(7)Between be bolted to connection.
3. a kind of high-altitude steel structure mounting bracket of decoration scenery iron tower according to claim 2, it is characterised in that:It is described Standard knot(3)Include the vertical steel pipe of four rectangular arrays setting(31), vertical steel pipe(31)Vertically it is arranged, four perpendicular Straight steel pipe(31)Between be connected with stull steel pipe in turn(32), four stull steel pipes(32)In same level, four stull steel Pipe group(35)At stull steel pipe(35), four vertical steel pipes(31)Between be equipped with several stull steel pipes(35).
4. a kind of high-altitude steel structure mounting bracket of decoration scenery iron tower according to claim 3, it is characterised in that:It is described Standard knot(3)Two neighbouring stull steel pipes of same side(32)Between be equipped with diagonal brace steel pipe(33), diagonal brace steel pipe(33) It is obliquely installed, diagonal brace steel pipe(33)Both ends respectively with neighbouring stull steel pipe(32)Opposite one end is fixedly connected, standard knot (3)The diagonal brace steel pipe of two neighboring side(33)It is staggered.
5. a kind of high-altitude steel structure mounting bracket of decoration scenery iron tower according to claim 4, it is characterised in that:Same Two vertical steel pipes in a pair of of linea angulata direction(31)Between be connected with diagonal steel pipe(34), each stull steel pipe(35)Between set There is a diagonal steel pipe(34), neighbouring diagonal steel pipe(34)Intersect setting.
6. a kind of high-altitude steel structure mounting bracket of decoration scenery iron tower according to claim 5, it is characterised in that:It is described Vertical steel pipe(31)Both ends be respectively equipped with junction steel plate(4), junction steel plate is corresponded on ground(4)Position be equipped with pre-buried steel Plate(5), pre-embedded steel slab(5)With junction steel plate(4)Between be bolted to connection.
7. a kind of high-altitude steel structure mounting bracket of decoration scenery iron tower according to claim 6, it is characterised in that:It is described Pre-embedded steel slab(5)Including steel facing(51), the steel facing(51)Bottom surface is equipped with several fixing glues(52), fixing glue(52)In L Shape is arranged.
8. a kind of high-altitude steel structure mounting bracket of decoration scenery iron tower according to claim 7, it is characterised in that:It is each Fixing glue(52)Bottom end bending place is arranged in the opposite direction.
9. a kind of high-altitude steel structure mounting bracket of decoration scenery iron tower according to claim 1, it is characterised in that:It is described First mounting bracket(21), the second mounting bracket(22), third mounting bracket(23), the 4th mounting bracket(24)It is equipped with respectively Several cable ropes(6).
CN201721768191.1U 2017-12-16 2017-12-16 A kind of high-altitude steel structure mounting bracket of decoration scenery iron tower Active CN207728083U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721768191.1U CN207728083U (en) 2017-12-16 2017-12-16 A kind of high-altitude steel structure mounting bracket of decoration scenery iron tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721768191.1U CN207728083U (en) 2017-12-16 2017-12-16 A kind of high-altitude steel structure mounting bracket of decoration scenery iron tower

Publications (1)

Publication Number Publication Date
CN207728083U true CN207728083U (en) 2018-08-14

Family

ID=63098718

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721768191.1U Active CN207728083U (en) 2017-12-16 2017-12-16 A kind of high-altitude steel structure mounting bracket of decoration scenery iron tower

Country Status (1)

Country Link
CN (1) CN207728083U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112962823A (en) * 2021-02-07 2021-06-15 西安理工大学 Double-steel-plate shear wall with replaceable inclined struts and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112962823A (en) * 2021-02-07 2021-06-15 西安理工大学 Double-steel-plate shear wall with replaceable inclined struts and construction method thereof
CN112962823B (en) * 2021-02-07 2023-01-31 西安理工大学 Double-steel-plate shear wall with replaceable inclined struts and construction method thereof

Similar Documents

Publication Publication Date Title
CN106013812B (en) A kind of two-way monolayer cable net structure without support high-altitude overhead cable construction method
CN109236012B (en) Method for hoisting power transmission line T-shaped guyed tower
CN102817341B (en) Construction method for segmented installation of offshore anemometer tower and combination of high-altitude manufactured parts for assembly
CN207728083U (en) A kind of high-altitude steel structure mounting bracket of decoration scenery iron tower
CN106741070B (en) A kind of cable channel cover plate transport laying vehicle
CN209081290U (en) Bailey truss pylon and distributing earth anchor CABLEWAY ERECTION SYSTEM that can be traversing
CN205423079U (en) Tower drum of wind generating set and wind generating set
CN202545137U (en) Internally-prestressed planted bar connection type concrete wind power tower
CN204277336U (en) The vertical bracing frame of herringbone bar group
CN206359109U (en) Tower hanging apparatus and tower hoisting structure
CN206379919U (en) A kind of flexible tiltedly rotatable Photovoltaic array support of single axle
CN204023319U (en) For the triangular tower of cableway of constructing
CN207846810U (en) A kind of novel ceiling applied on steel construction ceiling framework
CN203113567U (en) Stainless steel guy cable point type glass curtain wall
CN103982076A (en) Single cycle 110 kV/35 stay wire type aluminum alloy urgent repair tower
CN210396223U (en) Photovoltaic power plant shaft tower reinforcing apparatus
CN202450838U (en) Assembling type iron tower base station
CN206545219U (en) Airport roof photovoltaic bracket basis and airport roof photovoltaic support structure
CN215858925U (en) Quick-mounting type insulating crossing frame
CN206360452U (en) A kind of glass reinforced plastic pipe communication tower
CN205829059U (en) A kind of locking device and cable termination tower operating platform
CN205636701U (en) Basic steel -pipe pile welding construction platform in transmission line river
CN205153678U (en) Supplementary pole of embracing of herringbone
CN100578013C (en) Wind speed increasing mountain cave(3)
CN210483199U (en) Movable electric power tower for temporary power supply

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant