CN207714353U - A kind of foundation pile of civil engineering - Google Patents
A kind of foundation pile of civil engineering Download PDFInfo
- Publication number
- CN207714353U CN207714353U CN201820033253.2U CN201820033253U CN207714353U CN 207714353 U CN207714353 U CN 207714353U CN 201820033253 U CN201820033253 U CN 201820033253U CN 207714353 U CN207714353 U CN 207714353U
- Authority
- CN
- China
- Prior art keywords
- foundation pile
- concrete
- slot
- pilum
- baffle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model discloses a kind of foundation piles of civil engineering, including foundation pile chassis body and open up on the ground pour slot, the foundation pile chassis body, which is mounted on, to be poured in slot and extends to the outside for pouring slot, the foundation pile chassis body includes that foundation pile consolidates disk, main pilum and circumferential muscle, the foundation pile consolidates disk and is arranged in the bottom interior wall for pouring slot, the main pilum is fixedly welded on the top that foundation pile consolidates disk, the main pilum is equipped with multiple, and multiple main pilum annulars are uniformly arranged, the circumferential direction muscle is equipped with multiple, and vertically equidistant intervals are fixedly welded on main pilum multiple circumferential muscle, the both sides for the foundation pile chassis body resting on the ground are equipped with the concrete baffle being movably arranged on ground.The utility model of simple structure and strong practicability, during casting concrete, concrete baffle will not be crooked to both sides so that aftershaping effect is good pouring for foundation pile, ensure that the quality of engineering, meets the use demand of people.
Description
Technical field
The utility model is related to field of civil engineering more particularly to a kind of foundation piles of civil engineering.
Background technology
Foundation pile by stake and is connected to the basis that the cushion cap of stake top collectively constitutes.If pile body is all embedded in soil, cushion cap bottom surface
It is contacted with the soil body, then referred to as embedded footing on piles, low capped pile foundation;If pile body top is basseted and cushion cap bottom is located at ground or more, referred to as Gao Cheng
Platform pile foundation.Building pile foundation is usually embedded footing on piles, low capped pile foundation plinth.
Field of civil engineering can all use foundation pile, and elevated footing on piles is during molding pours, it occur frequently that coagulation
Native baffle relies on built on the sand with foundation pile frame, during casting concrete, due to being acted on by concrete gravity, mixes
Solidifying soil baffle is easy crooked to both sides, and easily leading to foundation pile, aftershaping effect is bad pouring, and the quality of engineering cannot be guaranteed.
Utility model content
Purpose of the utility model is to solve disadvantages existing in the prior art, and a kind of civil engineering proposed is used
Foundation pile.
To achieve the goals above, the utility model uses following technical solution:
A kind of foundation pile of civil engineering, including foundation pile chassis body and the slot that pours on the ground is opened up, the foundation pile
Chassis body, which is mounted on, pours in slot and extends to the outside for pouring slot, and the foundation pile chassis body includes that foundation pile consolidates disk, master
Pilum and circumferential muscle, the foundation pile consolidate disk and are arranged in the bottom interior wall for pouring slot, and the main pilum is fixedly welded on foundation pile
The top of firm disk, the main pilum are equipped with multiple, and multiple main pilum annulars are uniformly arranged, the circumferential direction muscle be equipped with it is multiple,
And vertically equidistant intervals are fixedly welded on main pilum multiple circumferential muscle, the foundation pile chassis body resting on the ground
Both sides are equipped with the concrete baffle being movably arranged on ground, two concrete baffles side close to each other with foundation pile frame
Frame body is in contact, and two concrete baffles are arcuate structure, and two concrete baffle docking constitute an annular retaining ring,
The side that two concrete baffles are located remotely from each other is equipped with the fixed seat being fixedly mounted on the ground, and the top of the fixed seat is solid
Dingan County is equipped with fixed block, offers placed cavity on the fixed block, on side inner wall of the placed cavity far from concrete baffle
It is installed with clamping cylinder, the output end for clamping cylinder is installed with portable pillar, and the portable pillar is close to concrete
One end activity of baffle extends to the outside of fixed block and is installed with gripping block, and the concrete baffle is close to gripping block
Side offers clamping slot, and gripping block is movably arranged in clamping slot, and the fixed block is pushed up close to the side of concrete baffle
Portion is installed with holder, and the bottom of the holder is installed with positioning cylinder, and the lower section of the positioning cylinder, which is equipped with, to be opened up
The output end of locating groove in portable pillar, the positioning cylinder is installed with positioning card column, and positions the bottom end of card column
Active card is in locating groove.
Preferably, the placed cavity offers through-hole on the side inner wall of concrete baffle, and portable pillar activity is passed through
Reach through hole and the outside for extending to through-hole.
Preferably, it is fixedly welded with mounting plate on the clamping cylinder, and mounting plate is mounted by means of bolts on placement
On side inner wall of the chamber far from concrete baffle.
Preferably, the top of the output end of the positioning cylinder and positioning card column is installed with flange, and positions gas
Cylinder is installed by flange with positioning card column and is fixed.
Preferably, the gripping block is arc shape structure, and the clamping slot is arc groove, and gripping block and clamping slot is interior
Wall is in contact.
Compared with prior art, the utility model has the beneficial effects that:
In the utility model, when in use, portable pillar movement, portable pillar is pushed to be driven when moving by clamping cylinder
Gripping block is moved and is installed in clamping slot into clamping slot, then is worked by positioning cylinder, and positioning cylinder pushes positioning card column
It moves down and is installed in locating groove, finally so that concrete baffle is closely abutted with foundation pile chassis body, and rely on
It is firm, concrete baffle will not be crooked to both sides during casting concrete, to finally so that foundation pile is after pouring
Good forming effect, appearance is clean and tidy, ensure that the quality of engineering, the utility model of simple structure and strong practicability, in casting concrete
During, concrete baffle will not be crooked to both sides so that aftershaping effect is good pouring for foundation pile, ensure that the matter of engineering
Amount, meets the use demand of people.
Description of the drawings
Fig. 1 be the utility model proposes a kind of civil engineering foundation pile structural schematic diagram;
Fig. 2 be the utility model proposes a kind of civil engineering foundation pile in foundation pile chassis body structural schematic diagram;
The structural schematic diagram that part A is amplified in Fig. 3 Fig. 1.
In figure:1 foundation pile consolidate disk, 2 main pilums, 3 circumferential muscle, 4 concrete baffles, 5 fixed seats, 6 fixed blocks, 7 placed cavities,
8 clamp cylinders, 9 portable pillars, 10 gripping blocks, 11 clamping slots, 12 locating grooves, 13 positioning card columns, 14 holders, 15 positioning cylinders,
16 through-holes.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.
Referring to Fig.1-3, a kind of foundation pile of civil engineering, including foundation pile chassis body and open up pouring on the ground
Slot, foundation pile chassis body, which is mounted on, pours in slot and extends to the outside for pouring slot, and foundation pile chassis body includes that foundation pile consolidates disk
1, main pilum 2 and circumferential muscle 3, foundation pile consolidate disk 1 and are arranged in the bottom interior wall for pouring slot, and main pilum 2 is fixedly welded on foundation pile
The top of firm disk 1, main pilum 2 are equipped with multiple, and multiple 2 annulars of main pilum are uniformly arranged, and circumferential muscle 3 is equipped with multiple and more
Vertically equidistant intervals are fixedly welded on main pilum 2 a circumferential direction muscle 3, and the two of the foundation pile chassis body resting on the ground
Side is equipped with the concrete baffle 4 being movably arranged on ground, two concrete baffles 4 side close to each other with foundation pile frame
Frame body is in contact, and two concrete baffles 4 are arcuate structure, and two docking of concrete baffle 4 constitute an annular gear
Circle, the side that two concrete baffles 4 are located remotely from each other are equipped with the fixed seat 5 being fixedly mounted on the ground, the top of fixed seat 5
It is installed with fixed block 6, placed cavity 7 is offered on fixed block 6, is consolidated on side inner wall of the placed cavity 7 far from concrete baffle 4
Dingan County is equipped with cylinder 8 is clamped, and the output end for clamping cylinder 8 is installed with portable pillar 9, and portable pillar 9 is close to concrete baffle 4
One end activity extends to the outside of fixed block 6 and is installed with gripping block 10, and concrete baffle 4 is close to the side of gripping block 10
Clamping slot 11 is offered, and gripping block 10 is movably arranged in clamping slot 11, fixed block 6 is pushed up close to the side of concrete baffle 4
Portion is installed with holder 14, and the bottom of holder 14 is installed with positioning cylinder 15, and the lower section of positioning cylinder 15, which is equipped with, to be opened up
The output end of locating groove 12 in portable pillar 9, positioning cylinder 15 is installed with positioning card column 13, and positions card column 13
For bottom end active card in locating groove 12, the utility model of simple structure and strong practicability, concrete baffle 4 is pouring coagulation
It will not be crooked to both sides in the process of soil so that aftershaping effect is good pouring for foundation pile, ensure that the quality of engineering, meets people
Use demand.
Placed cavity 7 offers through-hole 16 on the side inner wall of concrete baffle 4, and 9 activity of portable pillar runs through through-hole
16 and the outside of through-hole 16 is extended to, clamps and be fixedly welded with mounting plate on cylinder 8, and mounting plate is mounted by means of bolts on
On side inner wall of the placed cavity 7 far from concrete baffle 4, the output end of positioning cylinder 15 and the top of positioning card column 13 are fixed
Flange is installed, and positioning cylinder 15 is installed by flange with positioning card column 13 and fixed, gripping block 10 is arc shape structure, is clamped
Slot 11 is arc groove, and gripping block 10 is in contact with the inner wall of clamping slot 11, the utility model of simple structure and strong practicability, is mixed
Solidifying soil baffle 4 will not be crooked to both sides during casting concrete so that foundation pile ensure that pour aftershaping effect good
The quality of engineering meets the use demand of people.
In the utility model, when in use, by clamping the movement of 8 Work Promote portable pillar 9 of cylinder, when portable pillar 9 moves
It drives gripping block 10 to move and be installed in clamping slot 11 into clamping slot 11, is then turned off and clamps cylinder 8, then by positioning gas
Cylinder 15 works, and positioning cylinder 15 pushes 13 bottom end of positioning card column to move down and be installed in locating groove 12, final so that mixed
Solidifying soil baffle 4 is closely abutted with foundation pile chassis body, and what is relied on consolidates, in this way during casting concrete, coagulation
Native baffle 4 will not because of concrete gravity it is crooked outward, to finally so that foundation pile is in good, the appearance that pours aftershaping effect
Neatly, the quality that ensure that engineering meets the use demand of people.
The preferable specific implementation mode of the above, only the utility model, but the scope of protection of the utility model is not
Be confined to this, any one skilled in the art within the technical scope disclosed by the utility model, according to this practicality
Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model
Within enclosing.
Claims (5)
1. a kind of foundation pile of civil engineering, including foundation pile chassis body and the slot that pours on the ground is opened up, the foundation pile frame
Frame body, which is mounted on, pours in slot and extends to the outside for pouring slot, and the foundation pile chassis body includes that foundation pile consolidates disk (1), master
Pilum (2) and circumferential muscle (3), which is characterized in that the foundation pile consolidates disk (1) and is arranged in the bottom interior wall for pouring slot, described
Main pilum (2) is fixedly welded on the top that foundation pile consolidates disk (1), and the main pilum (2) is equipped with multiple, and multiple main pilums (2)
Annular is uniformly arranged, and the circumferential direction muscle (3) is equipped with multiple, and vertically equidistant intervals fix weldering to multiple circumferential muscle (3)
It is connected on main pilum (2), the both sides for the foundation pile chassis body resting on the ground are equipped with the concrete being movably arranged on ground
Baffle (4), two concrete baffle (4) sides close to each other are in contact with foundation pile chassis body, and two concrete gears
Plate (4) is arcuate structure, and two concrete baffle (4) docking constitute an annular retaining ring, and two concrete baffles (4) are mutual
Separate side is equipped with the fixed seat (5) being fixedly mounted on the ground, and fixation is installed at the top of the fixed seat (5)
Block (6) offers placed cavity (7), side inner wall of the placed cavity (7) far from concrete baffle (4) on the fixed block (6)
On be installed with clamp cylinder (8), it is described clamp cylinder (8) output end be installed with portable pillar (9), the portable pillar
(9) it extends to the outside of fixed block (6) close to one end activity of concrete baffle (4) and is installed with gripping block (10), institute
It states concrete baffle (4) and offers clamping slot (11) close to the side of gripping block (10), and gripping block (10) is movably arranged on folder
In tight slot (11), the fixed block (6) is installed with holder (14), the branch close to a side roof part of concrete baffle (4)
The bottom of frame (14) is installed with positioning cylinder (15), and the lower section of the positioning cylinder (15), which is equipped with, is opened in portable pillar (9)
On locating groove (12), the output end of the positioning cylinder (15) is installed with positioning card column (13), and positions card column
(13) bottom end active card is in locating groove (12).
2. a kind of foundation pile of civil engineering according to claim 1, which is characterized in that the placed cavity (7) is close to mixed
Through-hole (16) is offered on the side inner wall of solidifying soil baffle (4), and portable pillar (9) activity through through-hole (16) and extends to logical
The outside in hole (16).
3. a kind of foundation pile of civil engineering according to claim 1, which is characterized in that solid on the clamping cylinder (8)
Surely it is welded with mounting plate, and mounting plate is mounted by means of bolts on side inner wall of the placed cavity (7) far from concrete baffle (4)
On.
4. a kind of foundation pile of civil engineering according to claim 1, which is characterized in that the positioning cylinder (15) it is defeated
The top of outlet and positioning card column (13) is installed with flange, and positioning cylinder (15) passes through flange with positioning card column (13)
Installation is fixed.
5. a kind of foundation pile of civil engineering according to claim 1, which is characterized in that the gripping block (10) is arc
Structure, the clamping slot (11) is arc groove, and gripping block (10) is in contact with the inner wall of clamping slot (11).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820033253.2U CN207714353U (en) | 2018-01-09 | 2018-01-09 | A kind of foundation pile of civil engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820033253.2U CN207714353U (en) | 2018-01-09 | 2018-01-09 | A kind of foundation pile of civil engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207714353U true CN207714353U (en) | 2018-08-10 |
Family
ID=63055130
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820033253.2U Expired - Fee Related CN207714353U (en) | 2018-01-09 | 2018-01-09 | A kind of foundation pile of civil engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207714353U (en) |
-
2018
- 2018-01-09 CN CN201820033253.2U patent/CN207714353U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206625234U (en) | The adaptability connecting node of concrete assembled shaped steel mixing purlin and fender post | |
CN207714353U (en) | A kind of foundation pile of civil engineering | |
CN205224075U (en) | High -speed railway road bed contact net stand basis is buried bolt positioning disk in advance | |
CN203626055U (en) | Super-high-rise large-section half-embedded type intensive anchor bar steel column base locating support | |
CN201605533U (en) | Continuous beam temporary support | |
CN205669210U (en) | Steel building concrete cup-shaped foundation inner bore die carrier | |
CN201151914Y (en) | Large-sized equipment foundation pre-buried bolt structure | |
CN105064217A (en) | Mortar leakage preventing device for bridge cap beam bottom mold | |
GB1037564A (en) | Method and machine for moulding pipes | |
CN205077480U (en) | Double cannula bored concrete pile structure | |
CN202081437U (en) | Cup-shaped line plummet | |
CN208344044U (en) | A kind of clamping grass-hopper suitable for cement prefabricated component | |
CN206097696U (en) | Base is debug to machinery of circulated use | |
CN207331733U (en) | A kind of concrete column leg structure | |
CN206186053U (en) | Arch prefabricated mould | |
CN201137155Y (en) | Underwater temporary support pile joint | |
CN111794055B (en) | Construction method for cast-in-place road shoulder of movable chute trolley | |
CN211257109U (en) | Well lid is restoreed in high strength integration resistance to compression | |
CN212927070U (en) | Trolley for concrete pouring | |
CN211816848U (en) | Pipe trench well lid and town road integral structure | |
CN215471893U (en) | Pouring production mold for drainable concrete curb | |
CN215484103U (en) | Building engineering floor thickness controller | |
CN219451298U (en) | Steel fast-assembling formula blast pipe formula beautifies antenna basis | |
CN202012080U (en) | Full-rotating amplitude-variable piling rack | |
CN214091036U (en) | Concrete placement device for civil engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180810 Termination date: 20190109 |
|
CF01 | Termination of patent right due to non-payment of annual fee |