CN201137155Y - Underwater temporary support pile joint - Google Patents

Underwater temporary support pile joint Download PDF

Info

Publication number
CN201137155Y
CN201137155Y CNU2007202014894U CN200720201489U CN201137155Y CN 201137155 Y CN201137155 Y CN 201137155Y CN U2007202014894 U CNU2007202014894 U CN U2007202014894U CN 200720201489 U CN200720201489 U CN 200720201489U CN 201137155 Y CN201137155 Y CN 201137155Y
Authority
CN
China
Prior art keywords
pile foundation
pipe column
steel pipe
pile
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2007202014894U
Other languages
Chinese (zh)
Inventor
张胜林
欧阳斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUIZHOU BRIDGE ENGINEERING Co
Original Assignee
GUIZHOU BRIDGE ENGINEERING Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUIZHOU BRIDGE ENGINEERING Co filed Critical GUIZHOU BRIDGE ENGINEERING Co
Priority to CNU2007202014894U priority Critical patent/CN201137155Y/en
Application granted granted Critical
Publication of CN201137155Y publication Critical patent/CN201137155Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses an underwater temporary supporting pile joint, which comprises a reinforced concrete pile foundation (1) which is located under a river bed surface, a steel casing (3) for pouring concrete is arranged on the pile foundation (1), a steel pipe column (4) is inserted in the reinforced concrete pile foundation (1), the steel pipe column (4) extends out of the water surface, and the concrete surface of the pile foundation is parallel to the river bed surface (2). The underwater temporary supporting pile joint employs a hollow structure above the river bed, thereby just needing to treat the steel casing and the steel pipe column which supports the inner portion, and being convenient in cut. When the pile foundation is connected with the above supporting steel pipe column, the steel pipe column is inserted in the steel casing when pouring the pile foundation to be poured integrally with the reinforced concrete pile foundation. Compared with the prior art, the underwater temporary supporting pile joint is simple in structure, convenient in using, relatively easy in cut and the like, thereby being suitable to use in varieties of underwater temporary supporting piles.

Description

Interim under water supporting pile joint
Technical field
The utility model relates to a kind of interim supporting pile joint under water, belongs to aquatic building support column technical field.
Background technology
In the prior art, when heavy construction such as constructing a bridge on the water, to pour into a mould a lot of jury supporting piles usually, under the riverbed, be poured on the water surface always, be used to build operation platform and fixing main equipment etc. from the bottom.These interim supporting piles generally adopt the steel concrete cast to form, and after engineering was finished, interim supporting pile was stayed the shipping that can influence the river course in the waters, and steel concrete is difficult to cut off, and deals with very trouble.
Summary of the invention
The purpose of this utility model is: provide a kind of simple in structure, cut off more convenient interim supporting pile joint under water, to overcome the deficiencies in the prior art.
The utility model is to constitute like this: interim under water supporting pile joint, it comprises the steel bar concrete pile 1 of riverbed face with the lower part, on pile foundation 1, be provided with the steel casing 3 that fluid concrete is used, in steel bar concrete pile 1, insert steel pipe column 4, steel pipe column 4 stretches out the water surface, and the concrete surface of pile foundation 1 is concordant with riverbed face 2.
Above-mentioned interim under water supporting pile joint inserts steel pipe column 4 before steel bar concrete pile 1 solidifies, it is more accurate to locate.
The part of the utility model above the riverbed adopts hollow structure, only needs to handle the steel pipe column of steel casing and inner support, and it is comparatively convenient that cutting is got up.When pile foundation is connected with the supporting steel pipe post of top, when pile foundation is poured into a mould, steel pipe column is inserted in the steel casing, be cast for one with steel bar concrete pile and get final product.Compare with prior art, the utlity model has simple in structure, easy to use, cut off and advantage such as be easier to, be suitable for the use of various temporary support columns under water.
Description of drawings
Accompanying drawing 1 is a structural representation of the present utility model.
The specific embodiment
Embodiment of the present utility model: according to prior art casting reinforced concrete pile foundation 1, pile foundation 1 sinks in the riverbed, and steel casing 3 is installed on pile foundation 1, and steel casing 3 inserts a riverbed part, is used for isolated water.During pile foundation 1 cast, insert the steel pipe column 4 that is used to support on pile foundation 1, concrete column 2 and steel pipe column 4 are fixed together, the steel casing 3 that surpasses riverbed face 2 is fluid concrete no longer, and hollow between steel casing 3 and the steel pipe column 4 is cut convenient.
In order not influence the shipping in river course, the concrete surface of pile foundation 1 is preferably concordant with riverbed face 2, after the engineering completion, just can steel casing 3 and steel pipe column 4 be cut away from the concrete surface top of pile foundation 1, reclaims and uses, and the pile foundation 1 in the riverbed is stayed in the riverbed.

Claims (2)

1. interim under water supporting pile joint, it comprises the steel bar concrete pile (1) of riverbed face with the lower part, on pile foundation (1), be provided with the steel casing (3) that fluid concrete is used, it is characterized in that: in steel bar concrete pile (1), insert steel pipe column (4), steel pipe column (4) stretches out the water surface, and the concrete surface of pile foundation (1) is concordant with riverbed face (2).
2. interim under water supporting pile joint according to claim 1 is characterized in that: insert steel pipe column (4) before steel bar concrete pile (1) solidifies.
CNU2007202014894U 2007-11-28 2007-11-28 Underwater temporary support pile joint Expired - Lifetime CN201137155Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007202014894U CN201137155Y (en) 2007-11-28 2007-11-28 Underwater temporary support pile joint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007202014894U CN201137155Y (en) 2007-11-28 2007-11-28 Underwater temporary support pile joint

Publications (1)

Publication Number Publication Date
CN201137155Y true CN201137155Y (en) 2008-10-22

Family

ID=40037841

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007202014894U Expired - Lifetime CN201137155Y (en) 2007-11-28 2007-11-28 Underwater temporary support pile joint

Country Status (1)

Country Link
CN (1) CN201137155Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102482859A (en) * 2009-06-03 2012-05-30 钥石工程公司 Pile splice and method of forming a pile splice
CN102900091A (en) * 2012-11-06 2013-01-30 中铁大桥局集团第六工程有限公司 Pile foundation construction platform and erection method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102482859A (en) * 2009-06-03 2012-05-30 钥石工程公司 Pile splice and method of forming a pile splice
CN102900091A (en) * 2012-11-06 2013-01-30 中铁大桥局集团第六工程有限公司 Pile foundation construction platform and erection method thereof
CN102900091B (en) * 2012-11-06 2015-04-29 中铁大桥局集团第六工程有限公司 Pile foundation construction platform erection method

Similar Documents

Publication Publication Date Title
CN103741657B (en) The construction method of large-sized multifunction waterborne traffic accident
CN101691752B (en) Construction method for connecting part of PHC tubular piles
CN103374923A (en) Method for prefabricating and mounting underwater pier
CN201377141Y (en) Reinforcing steel bar positioning clamp of reinforced concrete column
CN215211876U (en) Waterproof hollow wall structure of precast concrete
CN103306532A (en) Process for integrally casting V-shaped wooden filter tank
CN204000905U (en) A kind of Double-Wall Steel Boxed Cofferdam with binder deep water bearing platform construction
CN201137155Y (en) Underwater temporary support pile joint
CN205742249U (en) A kind of prestressed concrete back cover cushion cap template
CN207048305U (en) Shear force wall piece together template bearing structure
CN213471655U (en) Concrete water pipe internal pouring device for water supply and drainage
CN210315625U (en) Anti reinforcement structure that floats of sump pit template
CN216239786U (en) Steel column grouting tool
CN202767095U (en) Set pile cap foundation
CN206815804U (en) A kind of new builder's jack girder steel built-in fitting
CN201162350Y (en) Water stop screw in underground shearing force wall
CN210737452U (en) Waterborne assembled berthing pier
CN206723622U (en) One kind is reusable to hang die worker's tool
CN106522165B (en) For the cantilever keyslot formwork structure of concrete dam joint grouting
CN206503377U (en) A kind of movable railing of steel trestle
CN205530400U (en) Batter pile test model steel reinforcement cage cushion inclines
CN201377087Y (en) Marine hydropower insert plate construction scaffold
CN204238244U (en) Deep foundation pit construction structure
CN202985769U (en) Pipeline mold with operating platform
CN220747204U (en) Pump station system with stable support

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20081022