CN207714263U - A kind of ecological protective measures structure - Google Patents

A kind of ecological protective measures structure Download PDF

Info

Publication number
CN207714263U
CN207714263U CN201721601867.8U CN201721601867U CN207714263U CN 207714263 U CN207714263 U CN 207714263U CN 201721601867 U CN201721601867 U CN 201721601867U CN 207714263 U CN207714263 U CN 207714263U
Authority
CN
China
Prior art keywords
spats
layer
diagonal brace
river
anchor cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721601867.8U
Other languages
Chinese (zh)
Inventor
彭荣梅
胡春涛
崔福占
杨芳
张峰矛
邢彦波
李栓国
彭超
高翔
韩立坤
翟黎青
冯艳钦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HEBEI WATER CONSERVANCY ENGINEERING BUREAU
Original Assignee
HEBEI WATER CONSERVANCY ENGINEERING BUREAU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEBEI WATER CONSERVANCY ENGINEERING BUREAU filed Critical HEBEI WATER CONSERVANCY ENGINEERING BUREAU
Priority to CN201721601867.8U priority Critical patent/CN207714263U/en
Application granted granted Critical
Publication of CN207714263U publication Critical patent/CN207714263U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model belongs to bank-protection works field, more particularly to a kind of ecological protective measures structure, slope protection works and spats engineering is arranged in river from top to bottom, and wherein slope protection works includes filtering layer, bank protection brick layer and ecology bag layer, and bank protection brick layer and ecology bag layer are arranged on filtering layer;Spats engineering includes diagonal brace double-row pile, anchor cable spats and shotcrete spats, diagonal brace double-row pile is set to the outside of rock shoulder, diagonal brace double-row pile is anchored in ground on the outside of diagonal brace double-row pile by anchor cable spats through diagonal brace double-row pile by drilling, and the rock shoulder in river or less is arranged in shotcrete spats.The beneficial effects of the utility model:Multilayer slope protection works makes the impact resistance in riverbed enhance, diagonal brace double-row pile support strength is big, and it is fixed using anchor cable spats, ensure the firm of river spats, the anchor pole of shotcrete spats increases the frictional force between joint plane and rock stratum, the anti-seepage effect for enhancing river provides solution for the antiseepage in river, the multi-functional demand of flood control.

Description

A kind of ecological protective measures structure
Technical field
The utility model belongs to bank-protection works field more particularly to a kind of ecological protective measures structure.
Background technology
With social continuous development, people's grade requirement is also higher and higher, and greening more and more becomes product with water system The key that position is promoted builds landscape impoundments, landscape reservoir etc. for the city of water resource relative shortage using city river As the indispensable component part of urban development.Therefore, it is generally required in the premise item for meeting flood passage when city river is administered It selects Rational structure to be further processed under part, needs to select adaptive deformation ability in this way under city river river channels By force, the strong structure type of erosion resistibility.
Using river, mean minimum position is divided into two parts to bank-protection works as boundary for many years, i.e., low water level is referred above to " bank protection work Journey ", low water level hereinafter referred to as " spats engineering ".The principle of slope protection works is bank protection after first spats.It, can be on slope to prevent avalanche Face is built slope protection works and is reinforced, this reduces investment outlay than cutting slope, and speed is fast.Common slope protection works has:Dry-laid rubble and mixed Solidifying earth building blocks bank protection, mortar flag stone and concrete revetment, trellis moulding bank protection, whitewashing and concrete revetment, the solid method bank protection of paving etc.. It is small in bedrock fracture, there is no the place of big avalanche, to prevent basement rock weathering off, carries out whitewashing or pneumatically placed concrete protection. If can gather materials on the spot, with can plasticine for physical spraying it is relatively inexpensive, can plasticine for physical also do the bed course whitewashed.Currently, with protection The protection method of the continuous development of engineering, more and more types is applied in Practical Project.For protection system, mainly It act as sealing and earth-retaining.In order to realize good protection effect, a variety of different requirements are proposed to protection system in engineering.
For different types of protection method, there is the respective and scope of application, while also having the deficiency of itself Place:For simple slope protection construction, in city river protection works, due to underground installation and the intensive building of surrounding In the presence of this mode is difficult to realize;Using diaphram wall, the period of construction is long and of high cost;Using inner support branch Protection structure, channel excavation is not very convenient, and live construction is relatively difficult, and cost is relatively high.
Traditional slope protection works reinforcement measure mainly uses the Grey engineerings such as stone-laying or pneumatically placed concrete, and doing so can cause Vegetation can not restore in side slope, destroy ecological environment, and influence the usage experience of people.
Utility model content
To solve the above problems, the utility model provides a kind of ecological protective measures structure.
The technical solution of the utility model:A kind of ecological protective measures structure, including slope protection works and spats engineering, it is special Sign is the low water level arrangement above slope protection works in river, the low water level spats engineering arranged below in river;
The slope protection works includes filtering layer, bank protection brick layer and ecology bag layer, and the bank protection brick layer and the setting of ecology bag layer exist On the filtering layer, the bank protection brick layer, the ecology bag layer and the shield are set gradually from Channel slope top to bottom of river channel Foot engineering;
The spats engineering includes diagonal brace double-row pile, anchor cable spats and shotcrete spats, and the diagonal brace double-row pile is set to rock The outside of shoulder, ground opens up drilling on the outside of the diagonal brace double-row pile, and the anchor cable spats passes through brill through the diagonal brace double-row pile The diagonal brace double-row pile is anchored in ground on the outside of rock shoulder by hole, and the rock shoulder portion in river or less is arranged in the shotcrete spats.
Further, the bank protection brick layer includes the revetment brick being connected with each other, and the revetment brick includes brick main body, limit Foot, locating slot, vegetation growth slot, vegetation growth area, the position-limit foot are arranged in the quadrangle of the brick main body, the vegetation growth Area is arranged in the brick main body, and the inner edge of the position-limit foot and the side wall of the brick main body form the locating slot, the brick The side wall of main body is provided with vegetation growth slot, and the shape of the position-limit foot and the locating slot matches, two position-limit foots Area be equal to the locating slot area;
The vegetation growth area is two, and the vegetation growth area is circle, and the vegetation growth slot is semicircle, described Vegetation growth area is identical with the radius of vegetation growth slot described in shape, and the vegetation growth slot of adjacent revetment brick forms circle.
Further, the ecology bag layer includes the ecology bag being connected with each other, and filled layer is arranged in the ecology bag, described Filled layer includes soil horizon and metalling, and the soil horizon is trapped among outside metalling, and the ecology bag includes exterior cover sheets, reinforces Layer, the first vegetable layer, internal application of anti-leakage layers, the exterior cover sheets, enhancement layer, the first vegetable layer, internal application of anti-leakage layers are successively by outer To interior setting.
Further, the shotcrete spats includes anchor pole and gunite concrete panel, the gunite concrete panel spray paving In rock shoulder hereinafter, being laid with bar-mat reinforcement between the gunite concrete panel and ground contact surface, the anchor pole passes through the embedded rock of drilling Internal portion.
Further, the diagonal brace double-row pile includes preceding campshed and rear campshed, it is described after campshed height higher than before described The height of campshed, the front row stake top end are equipped with preceding Guan Liang, and heel row stake top end is equipped with rear Guan Liang, and front row stake top end level is set It is equipped with the linking beam being connect with rear campshed, raker beam, the preceding campshed are equipped between the front row stake top and heel row stake top Pile body and it is described after on pile body of row pile setting perforation hole of reeving, the drilling that ground opens up on the outside of the diagonal brace double-row pile with it is described It reeves hole unicom, the anchor cable spats is through reeve hole and the drilling.
Further, the preceding campshed and the rear campshed are enclosed reinforcing area, are to reinforce in the reinforcing area The soil body.
Further, the anchor cable spats includes locking anchorage and anchor cable, and the locking anchorage setting is double in the diagonal brace Outside campshed, the anchor cable is through diagonal brace double-row pile and is anchored in the ground in the river, and the anchor cable is prestressed anchor hitch Structure, the anchor cable are made of more underrelaxation steel strand wires, and antirust coat is respectively provided with outside the more underrelaxation steel strand wires.
Further, the anchor cable is divided into free segment and anchoring section, in the boundary of the free segment and the anchoring section Only slurry sealing device, the free segment part use the smooth casing pipe protection of housing, the anchoring section to use housing radiation fins for setting Pipe protects, and slip casting casing is arranged in the smooth casing and the corrugated bushing.
Further, the only slurry sealing device uses hermetic bag, and hermetic bag both ends lashing is on anchor cable, quilt Slurry-inlet valve there are one should at least being stayed on the slip casting casing of the hermetic bag package.
Further, it is provided with isolation mount between the corrugated bushing and drilling.
The beneficial effects of the utility model:Structure setting is reasonable, and the integrated support intensity of diagonal brace double-row pile is big, and uses anchor Rope spats is fixed, and is ensured that the firm of river spats, the anchor pole of shotcrete spats increase the frictional force between joint plane and rock stratum, is enhanced rock The stability of block or rock stratum, the effect of gunite concrete panel are to reinforce country rock, prevent sillar from removing or falling, multiple using multistage Closing structure makes the impact resistance in river strong, enhances the anti-seepage effect in river, is provided for the antiseepage in river, the multi-functional demand of flood control Solution, and it is easy for construction.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the structural schematic diagram of the diagonal brace double-row pile of the utility model;
Fig. 3 is the structural schematic diagram of the anchor cable spats of the utility model;
Fig. 4 is the A-A sectional views of Fig. 3;
Fig. 5 is the B-B sectional views of Fig. 3;
Fig. 6 is that the utility model is in lattice layout drawing;
Fig. 7 is that the utility model is in single trigonometric expression layout drawing;
Fig. 8 is that the bank protection brick layer of the utility model puts schematic diagram;
Fig. 9 is the structural schematic diagram of the revetment brick of the utility model;
Figure 10 is that the ecology bag layer of the utility model puts schematic diagram;
Figure 11 is the structural schematic diagram of the ecology bag of the utility model;
Figure 12 is the sectional view of Figure 11;
In figure, 1. diagonal brace double-row piles, 2. anchor cable spats, 3. shotcrete spats, 4. rivers, 5. rock shoulders, 6. gunite concrete faces Guan Liang, 12. linking beams, 13. raker beams, 14. are reeved behind Guan Liang, 11. before campshed, 10. behind campshed, 9. before plate, 7. anchor poles, 8. Only slurry sealing fills for hole, 15. drillings, 16. soil mass consolidations, 17. locking anchorages, 18. anchor cables, 19. free segments, 20. anchoring sections, 21. Set, 22. smooth casings, 23. corrugated bushings, 24. steel strand wires, 25. slip casting casings, 26. isolation mounts, 27. low water levels, 28. filter Layer, 29. bank protection brick layer, 30. ecology bag layers, 31. spats engineerings, 32. revetment bricks, 33. brick main bodys, 34, position-limit foot, 35. positioning Slot, 36. vegetation growth slots, 37. vegetation growth areas, 38. ecology bags, 39. exterior cover sheets, 40. enhancement layers, 41. first vegetation Layer, 42. inside application of anti-leakage layers, 43. soil horizons, 44. metallings, 45. fixed structures, 46. flanks.
Specific implementation mode
It explains below in conjunction with the accompanying drawings to a kind of specific implementation mode of the utility model.
Fig. 1 is the structural schematic diagram of the utility model;The utility model is related to a kind of ecological protective measures structures.
A kind of ecological protective measures structure, including slope protection works and spats engineering, 27 arrangement above of the low water level shield in river Slope engineering, the 27 spats engineering arranged below of low water level in river;
Slope protection works includes filtering layer 28, bank protection brick layer 29 and ecology bag layer 30, and bank protection brick layer and the setting of ecology bag layer are being filtered On layer, bank protection brick layer 29, ecology bag layer 30 and spats engineering 31 are set gradually from Channel slope top to bottom of river channel;
Spats engineering 31 includes diagonal brace double-row pile 1, anchor cable spats 2 and shotcrete spats 3, and Fig. 2 is the diagonal brace of the utility model The structural schematic diagram of double-row pile;Diagonal brace double-row pile 1 is set to the outside of rock shoulder 5, is used to support the ground knot in the outside of rock shoulder 5 Structure ensures that Channel slope is firm.1 outside ground of diagonal brace double-row pile opens up drilling 15, and drilling 15 is used for the installation of anchor cable spats 2, Diagonal brace double-row pile is anchored on 5 outside ground of rock shoulder through diagonal brace double-row pile 1 by drilling 15 by anchor cable spats 2, for anchoring Diagonal brace double-row pile 1 plays booster action to spats structure, increases the firm of spats structure.
Fig. 8 is that the bank protection brick layer of the utility model puts schematic diagram;Fig. 9 is that the structure of the revetment brick of the utility model is shown It is intended to;Bank protection brick layer 29 include be connected with each other revetment brick 32, revetment brick 32 include brick main body 33, position-limit foot 34, locating slot 35, Vegetation growth slot 36, vegetation growth area 37, position-limit foot 34 are arranged in the quadrangle of brick main body 33, and vegetation growth area 37 is arranged in brick master In body 33, the inner edge of position-limit foot 34 forms locating slot 35 with the side wall of brick main body 33, and the side wall of brick main body 33 is provided with vegetation life Elongated slot 36, position-limit foot 34 and the shape of locating slot 35 match, and the area of two position-limit foots 34 is equal to the area of locating slot 35, limit Position foot 34 and locating slot 35 coordinate, and realize that the connection positioning of adjacent revetment brick 32 forms bank protection brick layer 29;
Vegetation growth area 37 is two, and vegetation growth area 37 is circle, and vegetation growth slot 36 is semicircle, vegetation growth area 37 is identical with the radius of vegetation growth slot 36, and the vegetation growth slot 36 of adjacent revetment brick is oppositely arranged to form circle, and setting is reasonable, Planning is neat, is conducive to revegetation in side slope, improves the ecological environment, and effectively afforests.
Figure 11 is the structural schematic diagram of the ecology bag of the utility model;Figure 12 is the sectional view of Figure 11;Ecology bag layer 30 wraps The ecology bag 38 of interconnection is included, filled layer is set in ecology bag 38, filled layer includes 44 soil horizon of soil horizon 43 and metalling 43 are trapped among outside metalling 44, and ecology bag includes exterior cover sheets 39, enhancement layer 40, the first vegetable layer 41, internal application of anti-leakage layers 42, outside Portion's protective layer 39, enhancement layer 40, the first vegetable layer 41, internal application of anti-leakage layers 42 are arranged from outside to inside successively;First vegetable layer 41 is Vegetable seeds, water storage agent and fertilizer mixture layer;Water storage agent and fertilizer provide good environment for plant seed germination and growth, First vegetable layer 41 can be received after engineering is built up by the biology in native country and animal, mutually coordinate with the landscape environment of surrounding.Reinforce Layer 40 uses reticular structure, and Tough structure is firm, and the mesh of reticular structure is using square or hexagon, it is easy to accomplish, mesh Lateral reinforced wire is arranged in part, improves integral strength, 3~4mm of mesh aperture, not only proof strength, but also is conducive to vegetable seeds Germination.Exterior cover sheets 39 use composite terylene geotextiles, and composite terylene geotextiles include core made of terylene and terylene core The polypropylene fibre layer of the outer surface cladding of body;Internal application of anti-leakage layers 42 uses polypropylene spunbond non-woven fabrics;
Exterior cover sheets 39 are connected with internal application of anti-leakage layers 42 using needling process, the composite terylene that exterior cover sheets 39 use Geotextiles itself have certain UV resistance;
Ecology bag integral strength is high, and nontoxic, anti-aging, acid and alkali-resistance salt corrosion, blowing-resistant drenches with rain, anti-oxidant, service life It is long, be conducive to vegetation and quickly pass through ecology bag growth, is afforested using the seed of plant.Metalling 44 is natural block stone, ovum Stone, rubble, recycled concrete aggregate mixed layer, the macadam gradating that metalling 44 uses is 2~5cm, and material can draw materials nearby, cost It is low, effectively keep integral strength.
Shotcrete spats 3 is set to 5 or less the rock shoulder in river;The integrated support intensity of diagonal brace double-row pile 1 is big, and uses anchor cable Spats 2 is fixed, and ensures that the firm of 4 safeguard structure of river, the anchor pole of shotcrete spats 3 increase the frictional force between joint plane and rock stratum, Enhance the stability of sillar or rock stratum, the effect of gunite concrete panel is to reinforce country rock, prevents sillar from removing or falling, enhances The anti-seepage effect in river, enhances the impact resistance in river, and protection system ensure that the safety of structure and the smooth construction of engineering.
5 or less the rock shoulder in river makees shotcrete spats 3.Shotcrete spats 3 includes anchor pole 7 and gunite concrete panel 6, and injection is mixed Solidifying soil panel 6 spray is layered on rock shoulder 5 hereinafter, being laid with bar-mat reinforcement between gunite concrete panel 6 and ground contact surface, and anchor pole 7 passes through brill Hole is embedded in inside rock mass, and the anchor pole 7 of shotcrete spats 3 increases the frictional force between joint plane and rock stratum, enhances the steady of sillar or rock stratum Qualitative, the effect in gunite concrete face 6 is to reinforce country rock, and bar-mat reinforcement prevents sillar from removing or falling.
Diagonal brace double-row pile 1 includes preceding campshed 8 and rear campshed 9, is arranged in 5 outside of rock shoulder, and rear campshed 9 need to enter rock 2m, carry out Inner support, it is ensured that design brace pre axial force.Preceding campshed 8 and rear campshed 9 are deposited reinforced concrete pile, and the height of rear campshed 9 is higher than The height of preceding campshed 8,8 top of preceding campshed are equipped with preceding Guan Liang 10, and 9 top of rear campshed is equipped with rear Guan Liang 11, and 8 top of preceding campshed is horizontal It is provided with the linking beam 12 being connect with rear campshed 9, raker beam 13 is equipped between 9 stake top of 8 stake top of preceding campshed and rear campshed, diagonal brace is double The hole 14 of reeving of setting perforation on the preceding campshed 8 and rear campshed 9 of campshed 1, the drilling 15 and hole of reeving that the peripheral ground in river 4 opens up 14 unicom are in a straight line, and anchor cable spats 2 can increase the stabilization of diagonal brace double-row pile cantilever segment through reeve hole 14 and the drilling 15 Property, displacement at pile top is reduced, while the reliability that stake is connect with Guan Liang can also be improved, campshed becomes bending component before making, and improves The bend-carrying capacity of preceding campshed.Hole 14 reeve using DNl60 steel pipe indwellings, thickness of steel pipe 5mm, column beam muscle should be around steel pipe, such as It cuts off to increase and helps dowel.It is stayed on wall simultaneously and sets PVC-U, DN200 drain holes.Notice that unwrapping wire positions when construction, strictly Control box out position and angle.
Preceding campshed 8 around river setting forms front-seat pile body group, the pile body formed around the rear campshed 9 of river setting Group forms reinforcing area, is soil mass consolidation 16 in reinforcing area, enhances double-row pile between front-seat pile body group and heel row pile body group Intensity is overally supported, ensures the firm of river spats structure, the landslide for preventing river is destroyed by rush of water, and is eliminated safe hidden trouble.
Fig. 6 is that the utility model is in lattice layout drawing;Fig. 7 is that the utility model is in single trigonometric expression layout drawing;
The pile body horizontal layout of preceding campshed group and rear campshed group is easy to construct, overally support in lattice or single trigonometric expression Intensity is big.
Fig. 3 is the structural schematic diagram of the anchor cable spats of the utility model;Fig. 4 is the A-A sectional views of Fig. 3;Fig. 5 is Fig. 3 B-B sectional views;Anchor cable spats includes locking anchorage 17 and anchor cable 18, and locking anchorage 17 is arranged outside diagonal brace campshed 1, and anchor cable 18 passes through It wears diagonal brace double-row pile 1 and is anchored in the ground in river 4, anchor cable 18 is prestressed anchor Cable Structure, needs tensioning and locking construction Processing, tensioning are carried out when anchoring section intensity is more than 15MPa and is not less than the 75% of design strength grade, in order to reduce neighbouring anchor The stress influence of rope, and construction speed is not influenced, using " jumping a method ", i.e., the method for drawing 1 every 2.Before formal tensioning, design should be taken The 20% of pulling force Nt takes 160kN to carry out pre- tensioning 2 times to anchor cable, keeps each location contacts close, and anchor cable is close with soil layer, generates Preliminary shearing.Hierarchical loading circulation stretch-draw is taken in formal tensioning, stablizes 3min after every grade of load, be stretched to 880kN and hold lotus 5min without After variation, it is offloaded to locking load 500kN and carries out locking operation.Anchor cable 18 is made of more underrelaxation steel strand wires 24, steel strand wires Strength standard value fptkThe design withdrawal resistance of=1860MPa, single anchor cable 18 are 800kN, the design anchor force 50kN/ of anchored end M, intensity is big, is respectively provided with antirust coat outside more underrelaxation steel strand wires, plays the role of antirust.
Anchor cable 18 divides for free segment 19 and anchoring section 20, in the boundary of free segment 19 and anchoring section 20 setting only slurry sealing Device 21, and there is good sealing performance, convenient for control segmenting slip casting, 19 part of free segment is anti-using the smooth casing 22 of housing Shield, anchoring section 20 are protected using housing corrugated bushing 23, and setting slip casting casing 25, convenient in smooth casing 22 and corrugated bushing 23 In free segment 19 and 20 slip casting of anchoring section, it is easy to accomplish, slip casting is evenly distributed.
Only slurry sealing device 21 uses hermetic bag, and has good sealing performance, and hermetic bag both ends lashing is in anchor Suo Shang, it is easily operated, it should at least be stayed there are one slurry-inlet valve on the slip casting casing 25 of hermetic bag package, facilitate control slip casting.
It is provided with isolation mount 26 between corrugated bushing 23 and drilling 15, slip casting set is also provided between corrugated bushing 23 and drilling 15 Pipe, convenient for control slip casting, isolation mount 26 ensures the relative position of corrugated bushing 25 and drilling 15 after slip casting.
26 1400~1600mm of spacing of isolation mount is arranged one, and bearing height is not less than 20mm, ensures slip casting postwave The relative position of line casing 25 and drilling 15, isolation mount 26 is welded with plain bar, simple in structure, is readily produced reality It is existing.
Underrelaxation steel strand wires 24 are 8, and intensity is big, and locking anchorage 17 uses porous strand tapered anchorage, facilitate fixed low pine Relaxation steel strand wires can be such that post-tensioning component thickness is thinned, overcome group anchor system lower prestress and excessively concentrate using it.
Work progress:Construction including bank protection brick layer 29, ecology bag layer 30 and spats engineering 31, it is specific as follows:
1. the Specific construction process of bank protection brick layer 29:
It is laid with basal layer:Original Channel slope is cleared up, is tamped and smooth, for the requirement for reaching smooth, by broken Rock layers bed course is levelling;
Filtering layer pavement 28 on basal layer, filtering layer 28 are geotextiles, and the lap of splice of Weaving type geotextile, geotextiles is 30cm (+2cm) is sewed at the scene using special equipment;
It is laid with revetment brick layer 29 on filtering layer 28, is quick construction, carries out revetment brick 32 in advance and connects, scene is by crane Disposably lifting is laid on filtering layer 28 with special extension coral, is embedded in the revetment brick that a portion connects at the top of bank protection It in soil, is anchored, the revetment brick that bottom connects is embedded in trench by bottom by way of digging trench, can also be laid in beach On face.
2. the Specific construction process of ecology bag layer 30:
It is laid with basal layer:Original Channel slope is cleared up, is tamped and smooth, the requirement to reach smooth passes through rubble Layer bed course is levelling;
Filtering layer pavement 28 on basal layer, filtering layer 28 are geotextiles, and the lap of splice of Weaving type geotextile, geotextiles is 30cm (+2cm) is sewed at the scene using special equipment;
Ecology bag 38 is filled:Ecology bag 38 is loaded in construction site, to save traffic expense.Basis and slopes processing generate simultaneously Soil or rubble can be used for filling ecology bag.Filler in bag depends on actual needs, is in general suitable for filling out for pack Filling object includes:Soil, rubble are conducive to the fertilizer of plant growth or the mixture of above-mentioned material.General envelope method is to make With plastics clasp.
3. spats engineering Specific construction process:
1) diagonal brace double-row pile 1 need to enter rock 2m, carry out inner support, it is ensured that design brace pre axial force.
2) anchor cable construction, mainly comprising the following steps that set up operation flat, --- drilling machine is in place, adjusts the angle --- drilling rope hole --- High-pressure blast washes hole of reeving, and --- anchor cable prepares and assembling, and --- anchor cable and Grouting Pipe place --- slip casting --- maintenance --- tensioning And locking.
It is as follows:
(A) operating platform is set up:Prestress anchorage cable and backfill follow-up construction operation, since retaining wall has been constructed in advance Finish, anchor cable construction should set up operating platform to ensure drilling machine operation in place.Operating platform is elongated on the outside of retaining wall to be set up, width 3m, work layer completely spread 50mm solid woods, and job platform, which leads to anchor cable construction progress, gradually to be increased.
(B) drilling machine is in place and adjusts the angle:MD-50 type drilling machines are selected to drill, adjustment drilling rod and level side before drilling To at 20 ° of angles, slowly it is inserted into the rock-soil layer at the barricade back side by campshed (column) wall preformed hole.
(C) rope hole is drilled:Boring aperture 150mm, it is desirable that anchor pole hole depth is no less than design length, does not also design preferably greater than The 1% of length.Foot of hole deflection size is not more than the 3% of length, can control boring direction with clinograph.
(D) anchor cable is prepared and is assembled:Prestress anchorage cable is made of 8 underrelaxation steel strand wires, steel strand wires strength standard value fptk The design withdrawal resistance of=1860MPa, single anchor cable are 800kN, the design anchor force 50kN/m of anchored end.To steel strand wires before making Witness sampling experiment is carried out, and carries out visual examination, could be used after qualified.Steel strand wires should make processing of rust removing, stringent by design Size blocks blanking, and per share error in length is not more than 50mm.Overall length uses F-236 type antirust agent brushings.
Anchor cable 18 divides for free segment 19 and anchoring section 20, in the boundary of free segment 19 and anchoring section 20 setting only slurry sealing Device 21, and there is good sealing performance, convenient for control segmenting slip casting, free segment 19 is protected using the smooth casing 22 of housing, Anchoring section 20 is protected using housing corrugated bushing 23, setting slip casting casing 25 in smooth casing 22 and corrugated bushing 23, it is ensured that note Slurry is evenly distributed.Slurry-inlet valve there are one should at least being stayed on the slip casting casing 25 of hermetic bag package, facilitates control slip casting.
(E) placement of anchor cable 18 and Grouting Pipe:Anchor cable 18 with high-pressure blast washes drilling before placing, and hack, eliminating impurities are done Only, anchor cable 18 is directed at drill center, is slowly inserted into design position.
(F) secondary grouting, a common pressure grouting, secondary high-pressure slip-casting are used.Anchoring section 20 is first noted when slip casting, waits for slurries initial set Reach and tensioning is carried out to anchoring section 20 after design strength, then slip casting free segment 19 again, makes anchoring section 20 and 19 boundary of free segment Clearly.
(G) tensioning and locking:Tensioning is carried out using mating jack YCQ-100, is tried tensioning equipment before tensioning It tests and demarcates;Tensioning is carried out when anchoring section intensity is more than 15MPa and is not less than the 75% of design strength grade, in order to reduce neighbour The stress influence of nearly anchor cable, and construction speed is not influenced, using " jumping a method ", i.e., the method for drawing 1 every 2.Before formal tensioning, it should take The 20% of design pulling force Nt takes 160kN to carry out pre- tensioning 2 times to anchor cable, keeps each location contacts close, and anchor cable is close with soil layer, Generate preliminary shearing.Hierarchical loading circulation stretch-draw is taken in formal tensioning, stablizes 3min after every grade of load, is stretched to 88kKN and holds lotus After 5min is unchanged, it is offloaded to locking load 500kN and carries out locking operation.
4) rock mass sets anchor pole 7 (diameter 25mm anchor poles, aperture 120mm, long 5m, quincuncial arrangement) and carries out anchor under rock shoulder Spray spats 3;
5) channel excavation and main structure construction are done segmentation and are carried out, per segment length 6~lOm, construction joint setting 1/4~ At 1/3 girder span.
Embodiment 1
A kind of ecological protective measures structure, including slope protection works and spats engineering, 27 arrangement above of the low water level shield in river Slope engineering, the 27 spats engineering arranged below of low water level in river;
Slope protection works includes filtering layer 28, bank protection brick layer 29 and ecology bag layer 30, and bank protection brick layer and the setting of ecology bag layer are being filtered On layer, bank protection brick layer 29, ecology bag layer 30 and spats engineering 31 are set gradually from Channel slope top to bottom of river channel;
Spats engineering 31 includes diagonal brace double-row pile 1, anchor cable spats 2 and shotcrete spats 3, and Fig. 2 is the diagonal brace of the utility model The structural schematic diagram of double-row pile;Diagonal brace double-row pile 1 is set to the outside of rock shoulder 5, is used to support the ground knot in the outside of rock shoulder 5 Structure ensures that Channel slope is firm.1 outside ground of diagonal brace double-row pile opens up drilling 15, and drilling 15 is used for the installation of anchor cable spats 2, Diagonal brace double-row pile is anchored on 5 outside ground of rock shoulder through diagonal brace double-row pile 1 by drilling 15 by anchor cable spats 2, for anchoring Diagonal brace double-row pile 1 plays booster action to spats structure, increases the firm of spats structure.
Fig. 8 is that the bank protection brick layer of the utility model puts schematic diagram;Fig. 9 is that the structure of the revetment brick of the utility model is shown It is intended to;Bank protection brick layer 29 include be connected with each other revetment brick 32, revetment brick 32 include brick main body 33, position-limit foot 34, locating slot 35, Vegetation growth slot 36, vegetation growth area 37, position-limit foot 34 are arranged in the quadrangle of brick main body 33, and vegetation growth area 37 is arranged in brick master In body 33, the inner edge of position-limit foot 34 forms locating slot 35 with the side wall of brick main body 33, and the side wall of brick main body 33 is provided with vegetation life Elongated slot 36, position-limit foot 34 and the shape of locating slot 35 match, and the area of two position-limit foots 34 is equal to the area of locating slot 35, limit Position foot 34 and locating slot 35 coordinate, and realize that the connection positioning of adjacent revetment brick 32 forms bank protection brick layer 29;
Vegetation growth area 37 is two, and vegetation growth area 37 is circle, and vegetation growth slot 36 is semicircle, vegetation growth area 37 is identical with the radius of vegetation growth slot 36, and the vegetation growth slot 36 of adjacent revetment brick is oppositely arranged to form circle, and setting is reasonable, Planning is neat, is conducive to revegetation in side slope, improves the ecological environment, and effectively afforests.
Figure 11 is the structural schematic diagram of the ecology bag of the utility model;Figure 12 is the sectional view of Figure 11;Ecology bag layer 30 wraps The ecology bag 38 of interconnection is included, filled layer is set in ecology bag 38, filled layer includes 44 soil horizon of soil horizon 43 and metalling It being trapped among outside metalling 44 outside 43, ecology bag includes exterior cover sheets 39, enhancement layer 40, the first vegetable layer 41, internal application of anti-leakage layers 42, Exterior cover sheets 39, enhancement layer 40, the first vegetable layer 41, internal application of anti-leakage layers 42 are arranged from outside to inside successively;First vegetable layer 41 For vegetable seeds, the mixture layer of water storage agent and fertilizer;Water storage agent and fertilizer provide good ring for plant seed germination and growth Border, the first vegetable layer 41 can be received by the biology in native country and animal after engineering is built up, mutually coordinate with the landscape environment of surrounding.Add Strong layer 40 uses reticular structure, and Tough structure is firm, and the mesh of reticular structure is using square or hexagon, it is easy to accomplish, net The lateral reinforced wire of bore portion setting, improves integral strength, 3~4mm of mesh aperture, not only proof strength, but also is conducive to plant species Son germination.Exterior cover sheets 39 use composite terylene geotextiles, and composite terylene geotextiles include core and terylene made of terylene The polypropylene fibre layer of the outer surface cladding of core;Internal application of anti-leakage layers 42 uses polypropylene spunbond non-woven fabrics;
Exterior cover sheets 39 are connected with internal application of anti-leakage layers 42 using needling process, the composite terylene that exterior cover sheets 39 use Geotextiles itself have certain UV resistance;
Ecology bag integral strength is high, and nontoxic, anti-aging, acid and alkali-resistance salt corrosion, blowing-resistant drenches with rain, anti-oxidant, service life It is long, be conducive to vegetation and quickly pass through ecology bag growth, is afforested using the seed of plant.Metalling 44 is natural block stone, ovum Stone, rubble, recycled concrete aggregate mixed layer, the macadam gradating that metalling 44 uses is 2~5cm, and material can draw materials nearby, cost It is low, effectively keep integral strength.
Shotcrete spats 3 is set to 5 or less the rock shoulder in river;The integrated support intensity of diagonal brace double-row pile 1 is big, and uses anchor cable Spats 2 is fixed, and ensures that the firm of 4 safeguard structure of river, the anchor pole of shotcrete spats 3 increase the frictional force between joint plane and rock stratum, Enhance the stability of sillar or rock stratum, the effect of gunite concrete panel is to reinforce country rock, prevents sillar from removing or falling, enhances The anti-seepage effect in river, enhances the impact resistance in river, and protection system ensure that the safety of structure and the smooth construction of engineering.
5 or less the rock shoulder in river makees shotcrete spats 3.Shotcrete spats 3 includes anchor pole 7 and gunite concrete panel 6, and injection is mixed Solidifying soil panel 6 spray is layered on rock shoulder 5 hereinafter, being laid with bar-mat reinforcement between gunite concrete panel 6 and ground contact surface, and anchor pole 7 passes through brill Hole is embedded in inside rock mass, and the anchor pole 7 of shotcrete spats 3 increases the frictional force between joint plane and rock stratum, enhances the steady of sillar or rock stratum Qualitative, the effect in gunite concrete face 6 is to reinforce country rock, and bar-mat reinforcement prevents sillar from removing or falling.
Embodiment 2
Further include following technical scheme in addition to the technical solution of embodiment 1:
Diagonal brace double-row pile 1 includes preceding campshed 8 and rear campshed 9, is arranged in 5 outside of rock shoulder, and rear campshed 9 need to enter rock 2m, carry out Inner support, it is ensured that design brace pre axial force.Preceding campshed 8 and rear campshed 9 are deposited reinforced concrete pile, and the height of rear campshed 9 is higher than The height of preceding campshed 8,8 top of preceding campshed are equipped with preceding Guan Liang 10, and 9 top of rear campshed is equipped with rear Guan Liang 11, and 8 top of preceding campshed is horizontal It is provided with the linking beam 12 being connect with rear campshed 9, raker beam 13 is equipped between 9 stake top of 8 stake top of preceding campshed and rear campshed, diagonal brace is double The hole 14 of reeving of setting perforation on the preceding campshed 8 and rear campshed 9 of campshed 1, the drilling 15 and hole of reeving that the peripheral ground in river 4 opens up 14 unicom are in a straight line, and anchor cable spats 2 can increase the stabilization of diagonal brace double-row pile cantilever segment through reeve hole 14 and the drilling 15 Property, displacement at pile top is reduced, while the reliability that stake is connect with Guan Liang can also be improved, campshed becomes bending component before making, and improves The bend-carrying capacity of preceding campshed.Hole 14 reeve using DNl60 steel pipe indwellings, thickness of steel pipe 5mm, column beam muscle should be around steel pipe, such as It cuts off to increase and helps dowel.It is stayed on wall simultaneously and sets PVC-U, DN200 drain holes.Notice that unwrapping wire positions when construction, strictly Control box out position and angle.
Preceding campshed 8 around river setting forms front-seat pile body group, and the rear campshed 9 around river setting forms heel row pile body Group forms reinforcing area, is soil mass consolidation 16 in reinforcing area, enhances double-row pile between front-seat pile body group and heel row pile body group Intensity is overally supported, ensures the firm of river spats structure, the landslide for preventing river is destroyed by rush of water, and is eliminated safe hidden trouble.
Embodiment 3
Further include following technical scheme in addition to the technical solution of embodiment 2:
Fig. 3 is the structural schematic diagram of the anchor cable spats of the utility model;Fig. 4 is the A-A sectional views of Fig. 3;Fig. 5 is Fig. 3 B-B sectional views;Anchor cable spats includes locking anchorage 17 and anchor cable 18, and locking anchorage 17 is arranged outside diagonal brace campshed 1, and anchor cable 18 passes through It wears diagonal brace double-row pile 1 and is anchored in the ground in river 4, anchor cable 18 is prestressed anchor Cable Structure, needs tensioning and locking construction Processing, tensioning are carried out when anchoring section intensity is more than 15MPa and is not less than the 75% of design strength grade, in order to reduce neighbouring anchor The stress influence of rope, and construction speed is not influenced, using " jumping a method ", i.e., the method for drawing 1 every 2.Before formal tensioning, design should be taken The 20% of pulling force Nt takes 160kN to carry out pre- tensioning 2 times to anchor cable, keeps each location contacts close, and anchor cable is close with soil layer, generates Preliminary shearing.Hierarchical loading circulation stretch-draw is taken in formal tensioning, stablizes 3min after every grade of load, be stretched to 880kN and hold lotus 5min without After variation, it is offloaded to locking load 500kN and carries out locking operation.Anchor cable 18 is made of more underrelaxation steel strand wires 24, steel strand wires Strength standard value fptkThe design withdrawal resistance of=1860MPa, single anchor cable 18 are 800kN, the design anchor force 50kN/ of anchored end M, intensity is big, is respectively provided with antirust coat outside more underrelaxation steel strand wires, plays the role of antirust.
Anchor cable 18 divides for free segment 19 and anchoring section 20, in the boundary of free segment 19 and anchoring section 20 setting only slurry sealing Device 21, and there is good sealing performance, convenient for control segmenting slip casting, free segment 19 is protected using the smooth casing 22 of housing, Anchoring section 20 is protected using housing corrugated bushing 23, and setting slip casting casing 25, conveniently exists in smooth casing 22 and corrugated bushing 23 In free segment 19 and 20 slip casting of anchoring section, it is easy to accomplish, slip casting is evenly distributed.
Only slurry sealing device 21 uses hermetic bag, and has good sealing performance, and hermetic bag both ends lashing is in anchor Suo Shang, it is easily operated, it should at least be stayed there are one slurry-inlet valve on the slip casting casing 25 of hermetic bag package, facilitate control slip casting.
It is provided with isolation mount 26 between corrugated bushing 23 and drilling 15, slip casting set is set between corrugated bushing 23 and drilling 15 Pipe, convenient for control slip casting, isolation mount 26 ensures the relative position of corrugated bushing 25 and drilling 15 after slip casting.
26 1400~1600mm of spacing of isolation mount is arranged one, and bearing height is not less than 20mm, ensures slip casting postwave The relative position of line casing 25 and drilling 15, isolation mount 26 is welded with plain bar, simple in structure, is readily produced reality It is existing.
Underrelaxation steel strand wires 24 are 8, and intensity is big, and locking anchorage 17 uses porous strand tapered anchorage, specially 8 hole OVM Anchorage facilitates fixed underrelaxation steel strand wires, post-tensioning component thickness can be made to be thinned using it, overcome group anchor system lower prestress mistake In concentration.
Compared with prior art, structure setting is reasonable, and the integrated support intensity of diagonal brace double-row pile is big, and uses anchor cable spats It is fixed, ensure that the firm of river spats, the anchor pole of shotcrete spats increase the frictional force between joint plane and rock stratum, enhances sillar or rock The stability of layer, the effect of gunite concrete panel are to reinforce country rock, prevent sillar from removing or falling, using multistage composite construction So that the impact resistance in riverbed is strong, enhance the anti-seepage effect in river, solution is provided for the antiseepage in river, the multi-functional demand of flood control Method, and it is easy for construction.
An example of the utility model is described in detail above, but content is only the preferable reality of the utility model Example is applied, should not be considered as limiting the scope of the present invention.Equalization made according to the scope of application of this utility model Variation and improvement etc., should all still belong within the patent covering scope of the utility model.

Claims (10)

1. a kind of ecological protective measures structure, including slope protection works and spats engineering, it is characterised in that more than the low water level in river Slope protection works, the low water level spats engineering arranged below in river are set;
The slope protection works includes filtering layer, bank protection brick layer and ecology bag layer, and the bank protection brick layer and ecology bag layer are arranged described On filtering layer, the bank protection brick layer, the ecology bag layer and the spats work are set gradually from Channel slope top to bottom of river channel Journey;
The spats engineering includes diagonal brace double-row pile, anchor cable spats and shotcrete spats, and the diagonal brace double-row pile is set to rock shoulder Outside, ground opens up drilling on the outside of the diagonal brace double-row pile, and the anchor cable spats passes through that drill will through the diagonal brace double-row pile The diagonal brace double-row pile is anchored in ground on the outside of rock shoulder, and the shotcrete spats is set to the rock shoulder portion in river or less.
2. a kind of ecological protective measures structure according to claim 1, it is characterised in that the bank protection brick layer includes mutual The revetment brick of connection, the revetment brick include brick main body, position-limit foot, locating slot, vegetation growth slot, vegetation growth area, the limit Position foot is arranged in the quadrangle of the brick main body, and the vegetation growth area is arranged in the brick main body, the inner edge of the position-limit foot The locating slot is formed with the side wall of the brick main body, the side wall of the brick main body is provided with vegetation growth slot, the position-limit foot Match with the shape of the locating slot, the area of two position-limit foots is equal to the area of the locating slot;
The vegetation growth area is two, and the vegetation growth area is circle, and the vegetation growth slot is semicircle, the vegetation Vitellarium is identical with the radius of the vegetation growth slot, and the vegetation growth slot of adjacent revetment brick forms circle.
3. a kind of ecological protective measures structure according to claim 1 or 2, it is characterised in that the ecology bag layer includes phase The ecology bag to connect, the ecology bag is interior to be arranged filled layer, and the filled layer includes soil horizon and metalling, the soil horizon It is trapped among outside metalling, the ecology bag includes exterior cover sheets, enhancement layer, the first vegetable layer, internal application of anti-leakage layers, the external guarantor Sheath, enhancement layer, the first vegetable layer, internal application of anti-leakage layers are arranged from outside to inside successively.
4. a kind of ecological protective measures structure according to claim 3, it is characterised in that the shotcrete spats includes anchor pole With gunite concrete panel, the gunite concrete panel spray is layered on rock shoulder hereinafter, the gunite concrete panel connects with ground Bar-mat reinforcement is laid between contacting surface, inside rock shoulder anchor pole as described below is by the embedded rock mass of drilling.
5. according to a kind of any ecological protective measures structure of claim 1,2,4, it is characterised in that the diagonal brace is double Stake includes preceding campshed and rear campshed, and the height of the rear campshed is higher than the height of the preceding campshed, and the front row stake top end is equipped with Preceding Guan Liang, heel row stake top end are equipped with rear Guan Liang, and the front row stake top end is horizontally disposed the linking beam being connect with rear campshed, described It is equipped with raker beam between front-seat stake top and heel row stake top, perforation is set on the preceding pile body of row pile and the rear pile body of row pile Hole of reeving, the drilling that ground opens up on the outside of the diagonal brace double-row pile and the hole unicom of reeving, the anchor cable spats run through institute State reeve hole and drilling.
6. a kind of ecological protective measures structure according to claim 5, it is characterised in that around multiple institutes of river setting The preceding front-seat pile body group of campshed composition is stated, multiple rear campsheds around river setting form heel row pile body group, front-seat pile body group Reinforcing area is formed between heel row pile body group, is soil mass consolidation in reinforcing area.
7. a kind of ecological protective measures structure according to claim 6, it is characterised in that the anchor cable spats includes locking Anchorage and anchor cable, the locking anchorage are arranged outside the diagonal brace double-row pile, and the anchor cable is through diagonal brace double-row pile and is anchored in In the ground in the river, the anchor cable is prestressed anchor Cable Structure, is made of more underrelaxation steel strand wires, the more low pines It is respectively provided with antirust coat outside relaxation steel strand wires.
8. a kind of ecological protective measures structure according to claim 7, it is characterised in that the anchor cable be divided into free segment and Anchoring section, in the setting of the boundary of the free segment and the anchoring section, only slurry sealing device, the free segment part use outer Smooth casing pipe protection is covered, the anchoring section is protected using housing corrugated bushing, is set in the smooth casing and the corrugated bushing Set slip casting casing.
9. a kind of ecological protective measures structure according to claim 8, it is characterised in that the only slurry sealing device uses Hermetic bag, hermetic bag both ends lashing, at least should be there are on the slip casting casing that is wrapped up by the hermetic bag on anchor cable One slurry-inlet valve.
10. a kind of ecological protective measures structure according to claim 8 or claim 9, it is characterised in that the corrugated bushing and brill Isolation mount is provided between hole.
CN201721601867.8U 2017-11-27 2017-11-27 A kind of ecological protective measures structure Expired - Fee Related CN207714263U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721601867.8U CN207714263U (en) 2017-11-27 2017-11-27 A kind of ecological protective measures structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721601867.8U CN207714263U (en) 2017-11-27 2017-11-27 A kind of ecological protective measures structure

Publications (1)

Publication Number Publication Date
CN207714263U true CN207714263U (en) 2018-08-10

Family

ID=63062232

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721601867.8U Expired - Fee Related CN207714263U (en) 2017-11-27 2017-11-27 A kind of ecological protective measures structure

Country Status (1)

Country Link
CN (1) CN207714263U (en)

Similar Documents

Publication Publication Date Title
CN102518135B (en) Horizontal jet grouting soil anchor and castinplace pile Composite Foundation Pit supporting construction engineering method
CN106638673B (en) A kind of construction method of compound retaining structure
CN107503257B (en) One kind being close to mountain high-filled subgrade stabilization and Deformation control structure and construction method
CN106498953A (en) Cut slope composite supporting construction and its construction method
CN101476466B (en) Giant heavy laver land slide pre-stress anchor cable antiskid tunnel construction method and novel prevention structure
CN205999903U (en) Environment-friendly type grass planting Concrete Highway protective slope structure
CN106968260A (en) The device and method come down for Strengthening Tunnel mountain body entrance
CN106703044B (en) One kind stream modeling shape rinse fill soft stratum slope combination supporting method
CN110374111B (en) Slope releasing and steel pipe pile anchor cooperative supporting system
CN108661069A (en) Close on the wall piled anchor composite structure and method of old Retaining Wall Reinforcement under the load of river road surface
CN103352477A (en) Vertical pres-stressed anchor rod gravity-type composite retaining wall and method for designing and constructing retaining wall
CN111980038B (en) Landslide prevention structure and construction method thereof
CN1067453C (en) Supporting and protecting method for base pit, side slope, flat anchor and spray net
CN205382507U (en) Two -way anchored retaining wall by tie rods
CN109208617A (en) A kind of red beds rock side slope flexible comprehensive supporting construction and its construction method
CN206599785U (en) A kind of campshed anchor draws cement earth pile diaphragm wall supporting construction
CN112377208A (en) Construction method for shallow-buried bias tunnel portal
CN111441372A (en) Landslide foundation treatment embankment structure and construction method
CN111173006A (en) Ecological slope protection method for reinforcing hilly soil by combining permeable retaining wall and sounding type bar planting belt
CN104895111A (en) Construction method of integrated pipe trench in soft soil
CN1127596C (en) Continuous wall foundation pit supporting method with short brad
CN212077981U (en) Combined slope supporting structure
CN107012874A (en) A kind of upper-soft lower-hard ground subway station building enclosure
CN111350200A (en) Boot-shaped root anchor anti-slide pile and construction method thereof
CN107060837B (en) A kind of Shallow-buried asymmetry formula shield arch construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Peng Rongmei

Inventor after: Han Likun

Inventor after: Zhai Liqing

Inventor after: Feng Yanqin

Inventor after: Hu Chuntao

Inventor after: Cui Fuzhan

Inventor after: Yang Fang

Inventor after: Zhang Fengmao

Inventor after: Xing Yanbo

Inventor after: Li Shuanguo

Inventor after: Peng Chao

Inventor after: Gao Xiang

Inventor before: Peng Rongmei

Inventor before: Han Likun

Inventor before: Zhai Liqing

Inventor before: Feng Yanqin

Inventor before: Hu Chuntao

Inventor before: Cui Fuzhan

Inventor before: Yang Fang

Inventor before: Zhang Fengmao

Inventor before: Xing Yanbo

Inventor before: Li Shuanguo

Inventor before: Peng Chao

Inventor before: Gao Xiang

CB03 Change of inventor or designer information
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180810

CF01 Termination of patent right due to non-payment of annual fee