CN207701296U - Tower fragment connection structure - Google Patents

Tower fragment connection structure Download PDF

Info

Publication number
CN207701296U
CN207701296U CN201721523437.9U CN201721523437U CN207701296U CN 207701296 U CN207701296 U CN 207701296U CN 201721523437 U CN201721523437 U CN 201721523437U CN 207701296 U CN207701296 U CN 207701296U
Authority
CN
China
Prior art keywords
tower
longitudinal flange
type groove
connector
groove steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721523437.9U
Other languages
Chinese (zh)
Inventor
范晓刚
刘俊
唐宗尧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Envision Energy Co Ltd
Original Assignee
Envision Energy Jiangsu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Envision Energy Jiangsu Co Ltd filed Critical Envision Energy Jiangsu Co Ltd
Priority to CN201721523437.9U priority Critical patent/CN207701296U/en
Application granted granted Critical
Publication of CN207701296U publication Critical patent/CN207701296U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/728Onshore wind turbines

Landscapes

  • Wind Motors (AREA)

Abstract

The utility model is related to a kind of tower fragment connection structures, including several tower fragments, and tower fragment segmentation portion is welded with longitudinal flange, is fixedly connected with connector with bolt between the longitudinal flange on two tower fragments, combines integral tower segments.The connector is U-type groove steel, and connection through-hole is respectively equipped on the both sides of the U-type groove steel.Longitudinal flange on two tower fragments passes through the connection through-hole on the both sides of U-type groove steel by bolt respectively, and nut check is used in combination to fix.The influence that longitudinal flange is welded in cutting when reducing flame of the utility model improves junction shear strength;Connector uses the connection structure with micro-elastic, low to longitudinal flange flatness requirement;Connector and side bolt are pre-installed in factory on longitudinal flange, are only needed to install other side bolt at wind field scene, are convenient for wind field in-site installation.

Description

Tower fragment connection structure
Technical field
The utility model is related to a kind of tower of wind power generating set, especially a kind of tower fragment connection structure belongs to Fragment tower combination technique field.
Background technology
The tower of wind power generating set is made of the axially stacking connection of multiple tower segments, the diameter and height of each tower segments Huge, transport is more difficult.In order to solve the problems, such as transport difficult, there are combined type tower segments, i.e., each tower segments are by multiple Tower sheet body forms.Tower sheet body can be transported to wind field when construction, assembles tower segments in wind field, avoid tower segments transport not Just the problem of.Interconnecting piece need to be arranged in the position connected between tower sheet body, to by the interconnection of interconnecting piece by tower piece Body is assembled into tower segments.Tower is generally divided to 3 along longitudinal direction, fragment is connected integral tower segments by blending bolt.It is existing There are mainly three types of connection types, the first uses the connection type of flange positioning anchor, as shown in Figure 1, disadvantage:Prior art needs It improves, tower manufacturing process need to be planned again, and need hydraulic press that junction is shaped to straight section;And tower wall thickness Different along longitudinal direction, plank baseline disunity is relatively difficult to achieve on packaging technology.The third adds the connection type of angle steel using flange, As shown in Fig. 2, disadvantage:Asymmetric connection is not easy to implement welding procedure, and tower manufacturing process need to be planned again.The third is used Flange adds the connection type of rigid gasket, a kind of wind turbine tower as disclosed in patent publication No. CN1759242B, the fragment of tower It is welded with flange on junction, rigid gasket is placed in the interval between two flanges, with one flange of screw bolt passes Connecting hole, rigid gasket through-hole, the connecting hole of another flange, as shown in Figure 3.This requires the intervals between two flanges Distance and the thickness of rigid gasket must be consistent, and the connection hole site on two flanges must be consistent, this just gives welding Very high requirement is proposed with Assembling technique.In addition, since there are errors for the circularity of the fragment of tower itself, using rigidity It is difficult that the connecting hole on two flanges is made to be aligned when gasket splices, between the fragment of tower.Therefore, it welds with packaging technology very Difference.
Invention content
The utility model proposes a kind of tower fragment connection structures, are designed using new Joining Structure, solve existing combination The technical problem of the manufacture of formula tower and packaging technology difference.
To achieve the above object, the technical solution adopted in the utility model is:A kind of tower fragment connection structure, if including A tower fragment, tower fragment segmentation portion are welded with longitudinal flange, are connected with elasticity between the longitudinal flange on two tower fragments Fitting is fixedly connected with bolt, combines integral tower segments.
The spacing between longitudinal flange on described two tower fragments is adapted with the width of flexible connector.
The flexible connector is U-type groove steel, and connection through-hole is respectively equipped on the both sides of the U-type groove steel.
Longitudinal flange on described two tower fragments passes through the connection on the both sides of U-type groove steel logical by bolt respectively It is used in combination nut check to fix in hole, wherein U-type groove steel and side bolt are pre-installed in factory on longitudinal flange, U-type groove steel With other side bolt in wind field in-site installation.
The utility model has the beneficial effects that:
1. increasing longitudinal flange spacing, the influence welded to longitudinal flange is cut when reducing flame;
2. at fragment docking, longitudinal shear intensity at docking is improved;
3. connector belongs to local elasticity's connection structure, low to longitudinal flange flatness requirement.
4. flexible connector and side bolt are pre-installed in factory on longitudinal flange, only need to install at wind field scene Other side bolt is convenient for wind field in-site installation.
Description of the drawings
Fig. 1 is the existing connected mode schematic diagram using flange positioning anchor;
Fig. 2 is the existing connected mode schematic diagram for adding angle steel using flange;
Fig. 3 is the existing connected mode schematic diagram for adding rigid gasket using flange;
Fig. 4 is the tower fragment attachment structure schematic diagram of the utility model;
Fig. 5 is the whole tower sectional view using the tower fragment connection structure of the utility model;
Fig. 6 is flexible connector and side bolt in the advance scheme of installation of factory.
Specific implementation mode
The utility model is described in further detail with embodiment below in conjunction with the accompanying drawings.
Such as Fig. 4, shown in 5, a kind of tower fragment connection structure, including first to third tower fragment 1,2,3, elastic connection Part 4, bolt 5, longitudinal flange 6.Each tower fragment segmentation portion is welded with longitudinal flange 6, the longitudinal flange 6 on two tower fragments Between be fixedly connected with bolt 5 with flexible connector 4, combine integral tower segments.
The spacing between longitudinal flange 6 on two tower fragments is adapted with the width of connector 4.Connector 4 is U-shaped Channel steel is respectively equipped with connection through-hole on the both sides of U-type groove steel.Longitudinal flange 6 on two tower fragments is worn by bolt 5 respectively The connection through-hole on the both sides of U-type groove steel is crossed, nut check is used in combination to fix.As shown in fig. 6, connector 4 and side bolt 5 are in work Factory is pre-installed on longitudinal flange 6, only needs to install other side bolt 5 at wind field scene, pacify convenient for wind field scene It fills, the arrow B in wherein Fig. 6 indicates installation direction.
The utility model adds connecting-piece structure as a result of longitudinal flange, increases longitudinal flange spacing, to reduce fire The influence welded to longitudinal flange is cut when flame;It is low to longitudinal flange flatness requirement;It is easier in bolt hole pair, is convenient for wind field Field-installed requirement;Meet the manufacturing process requirement of high-volume combined type tower.

Claims (4)

1. a kind of tower fragment connection structure, including several tower fragments, it is characterised in that:The tower fragment segmentation portion weldering It is connected to longitudinal flange, is fixedly connected with connector with bolt between the longitudinal flange on two tower fragments, combines integral tower Cylinder section.
2. tower fragment connection structure according to claim 1, it is characterised in that:Longitudinal direction on described two tower fragments Spacing between flange is adapted with the thickness of connector.
3. tower fragment connection structure according to claim 1, it is characterised in that:The connector is U-type groove steel, described Connection through-hole is respectively equipped on the both sides of U-type groove steel.
4. tower fragment connection structure according to claim 3, it is characterised in that:Longitudinal direction on described two tower fragments Flange respectively by bolt pass through U-type groove steel both sides on connection through-hole, be used in combination nut check to fix, wherein U-type groove steel and Side bolt is pre-installed in factory on longitudinal flange, and U-type groove steel and other side bolt are in wind field in-site installation.
CN201721523437.9U 2017-11-15 2017-11-15 Tower fragment connection structure Active CN207701296U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721523437.9U CN207701296U (en) 2017-11-15 2017-11-15 Tower fragment connection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721523437.9U CN207701296U (en) 2017-11-15 2017-11-15 Tower fragment connection structure

Publications (1)

Publication Number Publication Date
CN207701296U true CN207701296U (en) 2018-08-07

Family

ID=63022670

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721523437.9U Active CN207701296U (en) 2017-11-15 2017-11-15 Tower fragment connection structure

Country Status (1)

Country Link
CN (1) CN207701296U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109139386A (en) * 2018-09-30 2019-01-04 北京金风科创风电设备有限公司 Tower section, tower, segmentation method and wind generating set
CN112045356A (en) * 2020-09-21 2020-12-08 湖南恒岳重钢钢结构工程有限公司 Auxiliary device for welding wind power tower cylinder

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109139386A (en) * 2018-09-30 2019-01-04 北京金风科创风电设备有限公司 Tower section, tower, segmentation method and wind generating set
CN109139386B (en) * 2018-09-30 2019-08-23 北京金风科创风电设备有限公司 Tower section, tower, segmentation method and wind generating set
US11473562B2 (en) 2018-09-30 2022-10-18 Beijing Goldwind Science & Creation Windpower Equipment Co., Ltd. Tower segment, tower segmentation method, and wind turbine
CN112045356A (en) * 2020-09-21 2020-12-08 湖南恒岳重钢钢结构工程有限公司 Auxiliary device for welding wind power tower cylinder

Similar Documents

Publication Publication Date Title
CN102359180B (en) Truss combined beam and upper and layer connected light steel structure and construction method thereof
CN207701296U (en) Tower fragment connection structure
CN103161224A (en) Rectangular concrete filled steel tubular column - steel beam connection node and construction methods thereof
JP4417296B2 (en) Beam reinforcement bracket and beam reinforcement structure
CN102587506A (en) Method for realizing butt joint of steel pipes by aid of axial cross plug board and butt joint part
CN103485483A (en) Assembly type honeycombed web composite beam
CN207672743U (en) A kind of I-shaped assembling type node
CN207211369U (en) A kind of modified quadrate steel pipe column is connected steel construction with steel I-beam
CN104863269A (en) Primary and secondary beam rigid connection joint for wave web steel structure
CN104790537A (en) Rigid connection joint for spatial oblique insertion of H-shaped steel structure component and round steel pipe column
CN204081255U (en) End plate type connects key structure
CN216842550U (en) Assembled bearing support and hanger connecting structure and support and hanger system
CN207211373U (en) A kind of simple steel I-beam column connected node
CN203497966U (en) Compound adhesion rod of tower crane
CN104060755B (en) A kind of architecture interlayer combined wall board
CN203499018U (en) Hinge connection structure for wind-resisting column and roof beam
CN206655317U (en) Rectangular steel pipe primary-secondary beam is articulated and connected assembling type node
CN107120126B (en) A kind of shield prefabricated pipe section connection structure
CN202745884U (en) Tunnel section steel arching segment connecting structure
CN203834686U (en) Corrugated web H-shaped steel beam and column connecting structure
CN204591580U (en) H type blade of vertical axis wind turbine and support connection structure
CN105620766B (en) A kind of truss-like starts owner's erection joint
CN208533568U (en) Steel construction piping lane corner part connection structure
CN209958519U (en) Cross connection structure for circular steel tubes
KR101506481B1 (en) Prefab building square pipe with firmess and simple assembling means

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 "change of name, title or address"

Address after: Shen Gang street of Jiangyin city in Jiangsu province 214443 Wuxi city Shen Zhuang Road No. 3

Patentee after: Vision Energy Co.,Ltd.

Address before: 8, B, building 200051, block SOHO, Zhongshan square, 1065 West Zhongshan Road, Shanghai, Changning District

Patentee before: Envision Energy (Denmark) APS

CP03 "change of name, title or address"