CN207700849U - Temporary construction fence combines Quick Release holder - Google Patents

Temporary construction fence combines Quick Release holder Download PDF

Info

Publication number
CN207700849U
CN207700849U CN201721872950.9U CN201721872950U CN207700849U CN 207700849 U CN207700849 U CN 207700849U CN 201721872950 U CN201721872950 U CN 201721872950U CN 207700849 U CN207700849 U CN 207700849U
Authority
CN
China
Prior art keywords
enclosing
steel pipe
pole
holder
quick release
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721872950.9U
Other languages
Chinese (zh)
Inventor
范丽君
梁宁辉
史成功
张晓军
景瑞虹
杨瑞军
武生文
贾燕玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Group Co Ltd Is Built In Shanxi Five
Original Assignee
Group Co Ltd Is Built In Shanxi Five
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Group Co Ltd Is Built In Shanxi Five filed Critical Group Co Ltd Is Built In Shanxi Five
Priority to CN201721872950.9U priority Critical patent/CN207700849U/en
Application granted granted Critical
Publication of CN207700849U publication Critical patent/CN207700849U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model is related to a kind of combination Quick Release holders of temporary construction fence, the pole grafting of steel pipe and holder diagonal brace one end is fixed in the perpendicular support middle and upper part of enclosing, the steel pipe of the perpendicular support bottom of enclosing and the pole grafting of support level bar one end, the pole grafting of the steel pipe and the holder diagonal brace other end of the support level bar other end, above-mentioned plugging position is fixed with split pin, and support level bar is fixed with ground by setscrew.The utility model solves the problems, such as that traditional enclosing is low and cannot recycle and reuse by welding manner fixed efficiency, improves peace and tears efficiency open, saves material, improve turnover rate.

Description

Temporary construction fence combines Quick Release holder
Technical field
The utility model is related to construction and building materials field, especially a kind of standardization, can volume production enclosing support Module.
Background technology
With the increasingly raising of life of farmers quality, just gradually city is poured in by rural area, accelerate the construction of urbanization Paces, in the process of construction of urbanization, corresponding auxiliary facility has also added construction dynamics.In building construction and road construction When, in order to ensure the safety of pedestrian, beautifying urban environment, separating building dust, this just needs a kind of fence that comparison is safe to set It is standby --- temporary construction fence;
The support of traditional enclosing is, per a root post is added between two panels enclosing, to add one of diagonal brace in the position of column, be used for Reinforce enclosing.The fixed form of diagonal brace generally follows closely reinforcing rod or setscrew, by diagonal brace and reinforcing rod or setscrew on road surface Welding.Another kind is exactly to be pressed on horizon bar with weights such as stone, bricks, and for fixing diagonal brace, peace is torn open and all transfer efficients are low;
When temporary construction fence is fixed, need that diagonal brace is installed in the position of column, for reinforcing enclosing, the group between general diagonal brace At and diagonal brace and column connection all using being welded to connect, it is slow that welding necessarily causes provisional enclosing to be removed, recycling compared with Difference does not have and saves material purpose in the green construction of country's promotion.
Invention content
The utility model provides a kind of temporary construction fence combination Quick Release holder, slow to solve temporary construction fence assembling, repeats profit With the problem that rate is poor.
In order to solve the above technical problems, the utility model uses following technical scheme:
A kind of temporary construction fence combination Quick Release holder includes the combination Quick Release holder of enclosing and fixed enclosing, the enclosing packet The perpendicular support of enclosing of the perpendicular support of enclosing for including enclosing baffle and being fixed on enclosing baffle both ends, adjacent two enclosings becomes placed against;It encloses The inside installation combination Quick Release holder of gear, combination Quick Release holder includes holder diagonal brace and support level bar, further includes pole, steel pipe And split pin;Each level in position of the middle and upper part of the perpendicular support of two adjacent enclosings on the inside of enclosing fix first steel pipe, Each level in position of bottom fixes second steel pipe;Two-end part in holder diagonal brace same side is respectively perpendicular surface Fix the first pole and third pole;The second circle is fixed in the vertical side on the vertical side of support level bar one end The top surface of stick, the other end is parallel to the direction fixation third steel pipe of enclosing;First pole, the second pole, third pole are right respectively It is inserted into the first steel pipe, the second steel pipe with answering, in third steel pipe, the pin hole through steel pipe and pole, pin hole is all arranged in plugging position It is interior that the connected structure is fixed across split pin;The perpendicular support of enclosing, support level bar and holder diagonal brace form right angled triangle knot Structure.
Further, the top surface of the support level bar far from enclosing one end, opens up at least two and enclosing distance vertically Different pin holes, setscrew are fixed across the pin hole with ground.
Further, the holder diagonal brace, support level bar are metal side tube.
The utility model holder keeps enclosing placement neat firm, smooth-going is connected between enclosing baffle, without gap.The dress It is flexibly convenient to set dismounting, can have enough to meet the need and be applied multiple times.Adjacent two panels enclosing saves a root post when fixing, and is opened saving cost Support effect is improved while branch.
Description of the drawings
Attached drawing herein is used for providing the further explanation to the utility model, constitutes part of this application, this practicality Novel illustrative embodiments and their description are used for explaining the utility model, not constitute improper limits to the present invention.
Fig. 1 is the stereogram of temporary construction fence combination Quick Release holder.
Fig. 2 is one group of pole and steel pipe grafting and fixed schematic diagram.
Fig. 3 is the front view of temporary construction fence combination Quick Release holder.
Fig. 4 is the side view of temporary construction fence combination Quick Release holder.
Fig. 5 is the vertical view of temporary construction fence combination Quick Release holder
In figure:1 enclosing;2- enclosing baffles;The perpendicular support of 3- enclosings;The ground 4-;5- holder diagonal braces;6- support level bars;1A- One steel pipe;The second steel pipes of 1B-;1C- third steel pipes;The first poles of 2A-;The second poles of 2B;2C- third poles;12- pin holes;13- Split pin;14- setscrews.
Specific implementation mode
In order to make those skilled in the art be better understood from the utility model, below in conjunction with refer to the attached drawing and in conjunction with the embodiments Further clear, complete explanation is made to the utility model.It should be noted that in the absence of conflict, in the application Feature in embodiment and embodiment can be combined with each other.
As shown in Figs. 1-5, the temporary construction fence combination Quick Release holder provided in a kind of preferred embodiment, including enclosing 1 With the combination Quick Release holder of fixed enclosing 1, the enclosing 1 includes enclosing baffle 2 and is fixed on enclosing for 2 left and right ends of enclosing baffle The perpendicular support 3 of gear, the enclosing of adjacent two enclosings 1 erect support 3 and become placed against;The inside installation combination Quick Release holder of enclosing 1, combination are fast It includes holder diagonal brace 5 and support level bar 6 to tear holder open, further includes pole, steel pipe and split pin 13;In the adjacent of 1 inside of enclosing The perpendicular support of two enclosings 3 middle and upper part each level in position fix a first steel pipe 1A, each level in position of bottom fixes one A second steel pipe 1B;Two-end part in 5 same side of holder diagonal brace is respectively perpendicular surface and fixes the first pole 2A and Three pole 2C;The second pole 2B, the top of the other end are fixed in the vertical side on the vertical side of described 6 one end of support level bar Third steel pipe 1C is fixed in the direction that face is parallel to enclosing 1;The outer diameter of the pole is less than the internal diameter of steel pipe, adjacent two enclosings The high settings such as the steel pipe of welding;First pole 2A, the second pole 2B, third pole 2C be respectively correspondingly inserted into the first steel pipe 1A, In second steel pipe 1B, third steel pipe 1C, the pin hole 12 through steel pipe and pole is all arranged in plugging position, and opening is passed through in pin hole 12 Pin 13 fixes the connected structure;The perpendicular support 3 of enclosing, support level bar 6 form triangular structure of right angle with holder diagonal brace 5.
According to embodiment of above, stable structure with oblique member can be formed by corresponding steel pipe and pole grafting, torn open Dress is flexibly convenient, can have enough to meet the need and be applied multiple times, and eliminate the column for fixing adjacent two panels enclosing.
In a preferred embodiment, it is stably connected with ground to realize, the support level bar 6 is far from enclosing The top surface of 1 one end, opens up at least two from enclosing 1 apart from different pin holes 12 vertically, setscrew 14 pass through the pin hole 12 with Ground 4 is fixed.
In another preferred embodiment, the holder diagonal brace 5, support level bar 6 are metal side tube, so as to In processing and manufacturing.
Pass through the holder water that can be calculated most rational temporary construction fence and combine Quick Release holder to supported enclosing size Square pipe and holder diagonal brace square tube size, set the welding position of rational steel pipe and pole, may be implemented batch Production and standardization handling, not only beautiful, but also can realize quick despatch, realization recycles, and improves turnover rate, save at This.The length of rational setting steel pipe and pole, can increase the efficiency of installing and dismounting, prevent enclosing in cargo handling process by Damage.
The technical solution of utility model and implementation are described further below by one embodiment.
As shown in Figure 3,4, the combination Quick Release holder for the temporary construction fence for supporting the enclosing is made, including is propped up made of square tube Frame diagonal brace 5, size 40*40*2.5;Support level bar 6, size 40*40*2.5;Pole size is 23;Steel pipe sizes are 30*3;Setscrew 14, size M10*100;Split pin 13, size are:ø3*50;Pole is identical as after steel pipe grafting Position opens up the pin hole 12 through steel pipe and pole, and the aperture of pin hole 12 is more than the split pin 13 across pin hole 12, split pin 13 Size select 3*50;The above unit uses mm.
Enclosing on 2 both sides of each that be constructed enclosing baffle erects in support 3, and the position of middle and upper part level altitude is horizontal It welds the first steel pipe 1A, the first steel pipe 1A and the first steel pipe 1A of perpendicular 3 welding of support of adjacent enclosing is coaxial, likewise, in enclosing 1 The position level of the 3 lower part level altitude of perpendicular support on both sides welds a second steel pipe 1B;
When two enclosings 1 are adjacent to, two neighboring steel pipe alignment setting is formed, by the first pole 2A of 5 one end of holder diagonal brace After being inserted into two groups of steel pipes up and down respectively with the second pole 2B of 6 one end of support level bar, alignment is inserted into split pin 13 Pin hole 12 fixes the steel pipe of grafting and pole;
The third pole 2C insertions of the other end of holder diagonal brace 5 are welded on one end upper table of the support level bar 6 far from enclosing 1 In the third steel pipe 1C in face, the same position after grafting opens up perforative pin hole 12, and insertion opening pin 13 is fixed;
By above setting, forms and formed and consolidated by the perpendicular support 3 of enclosing of enclosing 1, holder diagonal brace 5, support level bar 6 Triangular structure, the one end of support level bar 6 far from enclosing 1 offers at least two pin holes 12, pin hole along upper surface 12 diameter and the setscrew 14 coincide, after setscrew 14 is passed through pin hole 12, by setscrew 14 by triangle The combination Quick Release holder of shape shape is fixed on ground 4.
By above-mentioned design, the parts designed by the utility model can mass customized and production standardization, installation With dismounting is quick, surface structure is beautiful, can be recycled, to save cost.
The range of the requires of the utility model protection is not limited to the above specific implementation mode, for those skilled in the art Speech, the utility model can there are many deformation and change, it is all within the design of the utility model and principle made by any repair Change, improve and equivalent replacement should be all included within the scope of protection of this utility model.

Claims (3)

1. a kind of temporary construction fence combines Quick Release holder, it is characterised in that:Including enclosing(1)With fixed enclosing(1)Combination Quick Release Holder, the enclosing(1)Including enclosing baffle(2)Be fixed on enclosing baffle(2)The perpendicular support of the enclosing at both ends(3), adjacent two A enclosing(1)The perpendicular support of enclosing(3)It becomes placed against;
Enclosing(1)Inside installation combination Quick Release holder, combination Quick Release holder include holder diagonal brace(5)With support level bar(6), Further include pole, steel pipe and split pin(13);
In enclosing(1)The perpendicular support of two adjacent enclosings of inside(3)Each level in position of middle and upper part fix first steel pipe (1A), bottom each level in position fix second steel pipe(1B);
In the holder diagonal brace(5)The two-end part of same side is respectively perpendicular surface and fixes the first pole(2A)With third pole (2C);
In the support level bar(6)The second pole is fixed in the vertical side on the vertical side of one end(2B), the top of the other end Face is parallel to enclosing(1)Direction fix third steel pipe(1C);
First pole(2A), the second pole(2B), third pole(2C)Respectively correspondingly it is inserted into the first steel pipe(1A), the second steel pipe (1B), third steel pipe(1C), the pin hole through steel pipe and pole is all arranged in plugging position(12), pin hole(12)It is interior to pass through split pin (13)The fixed connected structure;
The perpendicular support of enclosing(3), support level bar(6)With holder diagonal brace(5)Form triangular structure of right angle.
2. a kind of temporary construction fence according to claim 1 combines Quick Release holder, which is characterized in that the support level bar (6)Far from enclosing(1)The top surface of one end, opens up at least two and enclosing vertically(1)Apart from different pin holes(12), setscrew (14)Across the pin hole(12)With ground(4)It is fixed.
3. a kind of temporary construction fence according to claim 1 or 2 combines Quick Release holder, which is characterized in that the holder is oblique Support(5), support level bar(6)It is metal side tube.
CN201721872950.9U 2017-12-28 2017-12-28 Temporary construction fence combines Quick Release holder Active CN207700849U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721872950.9U CN207700849U (en) 2017-12-28 2017-12-28 Temporary construction fence combines Quick Release holder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721872950.9U CN207700849U (en) 2017-12-28 2017-12-28 Temporary construction fence combines Quick Release holder

Publications (1)

Publication Number Publication Date
CN207700849U true CN207700849U (en) 2018-08-07

Family

ID=63029732

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721872950.9U Active CN207700849U (en) 2017-12-28 2017-12-28 Temporary construction fence combines Quick Release holder

Country Status (1)

Country Link
CN (1) CN207700849U (en)

Similar Documents

Publication Publication Date Title
CN207700849U (en) Temporary construction fence combines Quick Release holder
CN203066591U (en) Tent
CN206854557U (en) Reinforced mesh processing mold
WO2009154356A2 (en) Pole for a woven-mesh fence
CN108252569A (en) A kind of Rapid Combination enclosing and construction method
CN113148396A (en) Pipeline transportation support and pipeline transportation method
CN207800075U (en) Lamp box truss and granny rag lintel lamp box
CN208323726U (en) Contain molding die in side
CN202639733U (en) Upender used for frog welding and repairing
CN220565212U (en) Prefabricated tubular pile cap of highway pile plate type structure
CN205825387U (en) Inferior high-efficient air filter moulds frame
CN205646736U (en) Optimalarc cable support
CN216617142U (en) A enclose fender device that is used for installing fast of construction to dismantle
CN207143960U (en) The fixed structure of deep basal pit elephant trunk scaffold
CN108412191A (en) A kind of deformation joint dual-shear force wall template assembling and disassembling device and method
CN217897296U (en) Detachable unilateral formwork triangle auxiliary stand
CN213263284U (en) Material frame is assembled fast to socket joint formula
CN219528364U (en) Climbing frame adhesion enhancing device
CN208918323U (en) A kind of insertion pin type foundation pit edge protection device
CN214401817U (en) Concrete pouring structure for erecting chute by utilizing trestle lattice columns
CN116876471A (en) Prefabricated tubular pile cap of highway pile plate type structure
CN108257524A (en) Granny rag lintel lamp box
CN220203229U (en) Glass canopy structure reinforcing apparatus
CN209964768U (en) Assembled all-steel frame sunlight greenhouse
CN220550970U (en) Can install and remove assembled interim fender that encloses fast

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant