CN113148396A - Pipeline transportation support and pipeline transportation method - Google Patents

Pipeline transportation support and pipeline transportation method Download PDF

Info

Publication number
CN113148396A
CN113148396A CN202110347605.8A CN202110347605A CN113148396A CN 113148396 A CN113148396 A CN 113148396A CN 202110347605 A CN202110347605 A CN 202110347605A CN 113148396 A CN113148396 A CN 113148396A
Authority
CN
China
Prior art keywords
pipeline
transported
support
pipe
clamp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110347605.8A
Other languages
Chinese (zh)
Inventor
刘猛
马铭旺
朱思行
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN202110347605.8A priority Critical patent/CN113148396A/en
Publication of CN113148396A publication Critical patent/CN113148396A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D25/00Details of other kinds or types of rigid or semi-rigid containers
    • B65D25/02Internal fittings
    • B65D25/10Devices to locate articles in containers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D25/00Details of other kinds or types of rigid or semi-rigid containers
    • B65D25/20External fittings
    • B65D25/22External fittings for facilitating lifting or suspending of containers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D7/00Containers having bodies formed by interconnecting or uniting two or more rigid, or substantially rigid, components made wholly or mainly of metal
    • B65D7/12Containers having bodies formed by interconnecting or uniting two or more rigid, or substantially rigid, components made wholly or mainly of metal characterised by wall construction or by connections between walls
    • B65D7/14Containers having bodies formed by interconnecting or uniting two or more rigid, or substantially rigid, components made wholly or mainly of metal characterised by wall construction or by connections between walls of skeleton or like apertured construction, e.g. baskets or carriers formed of wire mesh, of interconnected bands, bars, or rods, or of perforated sheet metal
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D85/00Containers, packaging elements or packages, specially adapted for particular articles or materials
    • B65D85/20Containers, packaging elements or packages, specially adapted for particular articles or materials for incompressible or rigid rod-shaped or tubular articles

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Supports For Pipes And Cables (AREA)

Abstract

The invention provides a pipeline transportation bracket and a pipeline transportation method. This pipeline transportation support, this pipeline transportation support includes: a base; the bracket comprises at least one bracket body, wherein the bracket bodies are arranged side by side along the width direction of the base, at least one pair of pipe clamps which are arranged oppositely are arranged on each bracket body, and each pair of pipe clamps is used for clamping two ends of a pipeline to be transported so as to fix the pipeline to be transported. The invention uses at least one pair of pipe clamps on the bracket body, the pipe clamps clamp the end of the pipeline to be transported respectively, so as to realize the clamping of one pipeline to be transported through each pair of pipe clamps respectively; realize the fixed of stake body through the base to realize fixing between the stake body, and then realize the whole transportation and the hoist and mount of waiting the pipeline that sets up on each stake body.

Description

Pipeline transportation support and pipeline transportation method
Technical Field
The invention relates to the technical field of metallurgical engineering, in particular to a pipeline transportation support and a pipeline transportation method.
Background
Along with economic development, adjustment of industrial structures and environmental protection factors in recent years, a large amount of old industrial factories need to be dismantled and rebuilt, so that resources are greatly wasted, along with the needs of people for economic development, a large amount of old factories need to be reformed and adjusted in planning in new cities, and meanwhile, in order to be continuously lower than the culture and spirit of buildings, the development idea mainly of reforming and recycling is continuously strengthened. Building recycling has raised a hot tide for industrial building recycling in the construction industry.
At present, in pipeline demolishs and the transportation, each section pipeline is placed together and is transported simultaneously, leads to the pipeline to probably appear damaging in the transportation, need distinguish the connection order and the mounted position of each pipeline again when recycling, needs a large amount of manpowers and material resources, still leads to the efficiency of construction low simultaneously.
Disclosure of Invention
In view of the above, the invention provides a pipeline transportation bracket and a pipeline transportation method, and aims to solve the problems that the pipeline appearance is damaged by the existing pipeline dismantling and transportation, and the installation sequence and the installation position need to be identified again for reutilization, so that the construction efficiency is low.
In one aspect, the present invention provides a pipe transportation rack, including: a base; the bracket comprises at least one bracket body, wherein the bracket bodies are arranged side by side along the width direction of the base, at least one pair of pipe clamps which are arranged oppositely are arranged on each bracket body, and each pair of pipe clamps is used for clamping two ends of a pipeline to be transported so as to fix the pipeline to be transported.
Further, the pipe clamp of the pipe transportation bracket comprises: a first clamp body and a second clamp body; the first clamp body and the second clamp body are detachably connected, clamping grooves are formed in the first clamp body and the second clamp body, and when the first clamp body and the second clamp body are in butt joint, the clamping grooves in the first clamp body and the second clamp body are encircled to form clamping holes for clamping the pipeline to be transported.
Further, the first clamp body and the second clamp body of the pipeline transportation support are detachably connected through bolts.
Further, above-mentioned pipeline transportation support, the base includes: the two support rods are arranged side by side and at intervals and used for supporting the bracket body; at least one connecting rod, at least one the connecting rod all sets up two between the bracing piece, and, each the both ends of connecting rod are equallyd divide and are connected respectively on two the bracing piece, the connecting rod is used for connecting and strengthening two the joint strength of bracing piece.
Further, in the pipeline transportation support, each connecting rod is perpendicular to the supporting rod.
Further, in the pipeline transportation support, the support body is of a door-shaped support structure, and a reinforcing structure is arranged on the door-shaped support structure; the bracket body is also provided with a lifting lug structure for hoisting the bracket body.
Further, in the pipe transportation support, at least one pair of the pipe clamps are arranged side by side and at intervals along the height direction of the support body, two of each pair of the pipe clamps are respectively arranged at two ends of the support body along the length direction of the support body, and each pipe clamp is used for clamping two ends of the pipe to be transported.
Further, the support body and the base are detachably connected with each other; the pipe clamp is detachably connected with the bracket body.
The pipeline transportation bracket provided by the invention has the advantages that the pipe clamps clamp the end parts of the pipeline to be transported respectively through at least one pair of pipe clamps on the bracket body, so that the pipe clamps of each pair of pipe clamps are used for clamping the pipeline to be transported respectively; realize the fixed of stake body through the base to realize fixing between the stake body, and then realize the whole transportation and the hoist and mount of waiting the pipeline that sets up on each stake body. The pipeline transportation bracket can realize the clamping of pipelines to be transported, particularly can be fixed according to the sequence and the serial number, cannot avoid the damage of the appearance of the pipelines to be transported, is convenient for the identification of each pipeline to be transported for subsequent use, can realize the installation sequence and the installation position of the pipelines to be transported, can save a large amount of manpower and material resources, and further improve the construction efficiency; meanwhile, the pipeline transportation support can also realize integral hoisting of a plurality of pipelines to be transported so as to improve hoisting efficiency.
On the other hand, the invention also provides a pipeline transportation method, which comprises the following steps: a support determining step, namely determining the size of a support body for supporting the pipeline to be transported and the arrangement distance of pipe clamps arranged on the support body according to the sectional position and the area of the pipeline to be transported on a construction site; the pipe clamp is used for clamping a pipeline to be transported; a stress analysis step of performing stress analysis on the stent body according to the size of the stent body determined in the stent determination step to determine the stability of the stent body; a bracket mounting step, namely manufacturing and mounting the bracket body qualified in stress analysis in the stress analysis step on a base; a pipe clamp fixing step, namely determining the arrangement interval of the pipe clamps according to the support determining step, and installing the pipe clamps detached from the construction site according to the arrangement interval to form a pipeline transportation support in a combined manner; a pipeline installation step, numbering the pipelines to be transported according to the dismantling sequence of the pipelines to be transported on the construction site, and sequentially clamping the pipelines to be transported on the pipe clamps according to the numbers; and a pipeline transportation step, namely transporting the pipeline to be transported which is dismantled on site by hoisting the pipeline transportation support.
Further, in the pipeline transportation method, in the pipeline installation step, pipelines to be transported, which are dismantled in the same area, are installed on the same support body.
The pipeline transportation method provided by the invention determines the size of a bracket body for supporting the pipeline to be transported and the arrangement interval of pipe clamps arranged on the bracket body according to the sectional position and the area of the pipeline to be transported at a construction site so as to install and fix the bracket body and the pipe clamps, and the bracket body is installed on a base to integrally form the pipeline transportation bracket; the pipeline to be transported is numbered and sequentially installed to the pipeline transportation bracket according to the serial number, so that the hoisting transportation and the secondary utilization of the pipeline to be transported are realized through the integral hoisting and transportation of the pipeline transportation bracket; meanwhile, the pipeline transportation support can also realize integral hoisting of a plurality of pipelines to be transported so as to improve hoisting efficiency.
Drawings
Various other advantages and benefits will become apparent to those of ordinary skill in the art upon reading the following detailed description of the preferred embodiments. The drawings are only for purposes of illustrating the preferred embodiments and are not to be construed as limiting the invention. Also, like reference numerals are used to refer to like parts throughout the drawings. In the drawings:
FIG. 1 is a schematic structural diagram of a pipeline transportation support provided by an embodiment of the invention;
FIG. 2 is a front view of a pipeline transport carrier provided by an embodiment of the present invention;
FIG. 3 is a side view of a pipe transportation stand according to an embodiment of the present invention;
FIG. 4 is a top view of a pipeline transport rack provided by an embodiment of the present invention;
fig. 5 is a schematic structural diagram of a pipe clamp according to an embodiment of the present invention.
Detailed Description
Exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. While exemplary embodiments of the present disclosure are shown in the drawings, it should be understood that the present disclosure may be embodied in various forms and should not be limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the scope of the disclosure to those skilled in the art. It should be noted that the embodiments and features of the embodiments may be combined with each other without conflict. The present invention will be described in detail below with reference to the embodiments with reference to the attached drawings.
Support embodiment:
referring to fig. 1 to 4, there are shown preferred structures of the pipe transportation stand according to the embodiment of the present invention. As shown, the pipe transportation stand includes: the device comprises a base 1, a bracket body 2 and a pipe clamp 3; wherein the content of the first and second substances,
at least one support body 2 is arranged side by side along the width direction (vertical direction shown in fig. 4) of the base 1, at least one pair of pipe clamps 3 which are arranged oppositely is arranged on each support body 2, each pair of pipe clamps 3 are arranged side by side and at intervals along the height direction of the support body 2, and each pair of pipe clamps 3 is used for clamping two ends of a pipeline 4 to be transported so as to fix the pipeline 4 to be transported. Specifically, base 1 can be plane frame construction to play the connecting action between supporting role and each stake body 2, make this pipeline transportation support can wholly hoist, improve pipeline transportation's efficiency. The number of the support bodies 2 can be one or more, and the number of the pipelines 4 to be transported can be increased by clamping the plurality of support bodies 2, so that the transportation efficiency is further improved; the plurality of support bodies 2 can be arranged side by side along the width direction of the base 1 at intervals so as to improve the neatness of the pipelines 4 to be transported, and meanwhile, the interference between the pipelines 4 to be transported arranged on two adjacent support bodies 2 can be avoided; each support body 2 can be connected to the base 1 in a detachable connection mode, so that a proper amount of support bodies 2 can be installed according to actual requirements, the pipeline transportation efficiency is further ensured, and meanwhile, the phenomenon that the hoisting weight is increased and manpower and material resources are wasted due to the empty support bodies 2 during hoisting can be avoided; in addition, the hoisting of the single bracket body 2 can also be realized. The pipe clamps 3 are arranged in pairs, and two of each pair of pipe clamps 3 can be oppositely arranged so as to clamp two ends of the pipeline to be transported, so that the pipeline 4 to be transported is fixed; two of each pair of pipe clamps 3 may be respectively disposed at both ends (left and right ends as shown in fig. 2) of the bracket body 2 in a length direction (horizontal direction as shown in fig. 2) of the bracket body 2 to clamp the end of the pipe 4 to be transported. At least a pair of pipe clamp 3 can be along the direction of height of stake body 2 side by side and the interval sets up to respectively the clamping each treats conveying pipeline 4, makes each treat conveying pipeline 4 along the direction of height of stake body 2 side by side and the interval sets up, and the interval sets up can avoid treating the interference between conveying pipeline 4, and then further avoids treating the damage of conveying pipeline 4 appearance. In order to improve the utilization rate of the support body 2, preferably, at least one pair of pipe clamps 3 may be disposed on both sides (left and right sides as shown in fig. 3) of the support body 2, so that the pipeline 4 to be transported can be clamped and fixed on both sides of the support body 2, thereby further improving the transportation and hoisting efficiency of the pipeline 4 to be transported, and saving the transportation space. In the embodiment, the pipe clamp 3 is detachably connected with the bracket body 2, so that the pipe clamp 3 can be conveniently disassembled and reused; the pipe clamps 3 can also be fixed on the support body 2 by welding, of course, the pipe clamps 3 can also be connected on the support body 2 along the height direction in a position-adjustable manner, and further the distance between the pipe clamps 3 is adjusted according to the relevant information such as the diameter of the pipeline 4 to be transported, so that the interference between the pipelines 4 to be transported which are clamped and fixed on the pipe clamps 3 is avoided; preferably, the collet 3 is slidably attached to the body 2. In this embodiment, the pipeline 4 to be transported may be a demolished pipeline for secondary use of the demolished pipeline.
With continued reference to fig. 1 and 4, the base 1 includes: two support bars 11 and at least one connecting bar 12; wherein, the two support rods 11 are arranged side by side and at intervals and used for supporting the bracket body 2; at least one connecting rod 12 all sets up between two bracing pieces 11 to, the both ends of each connecting rod 11 are equallyd divide and are connected respectively on two bracing pieces 11, and connecting rod 12 is used for connecting and strengthens the joint strength of two bracing pieces 12. Specifically, the two support rods 11 are arranged side by side and at intervals to support the two vertical rods 21 of the bracket body 2, respectively. At least one connecting rod 12 is disposed between the two support rods 11 side by side to realize the connection between the two support rods 11, and of course, the connecting rods 12 may also be disposed in a crossing manner, which is not limited in this embodiment. The two ends of each connecting rod 12 can be respectively connected to the two support rods 11, so as to avoid waste or interference of other parts caused by overlong length of the connecting rod 12. The stability of this base 1 can be ensured in the setting of a plurality of connecting rods 12, and then ensures the steadiness of this pipeline transportation support. Wherein, the connecting rod 12 can be vertically arranged with the supporting rod 11 to further ensure the connection stability between the two.
With continued reference to fig. 1, the support body 2 may be a door-shaped support structure that includes: two vertical rods 21 and a cross rod 22, the cross rod 22 is arranged between the two vertical rods 21, and two ends of the cross rod 22 can be respectively connected to the two vertical rods 21 to form a door-shaped support structure. Specifically, two montant 21 intervals set up, and the both ends of horizontal pole 22 can be connected respectively on the top of two montants 21, and this stake body 2 accessible two their montants 21 set up on base 1, and two montants 21 can be connected respectively on two bracing pieces 11 promptly, realize this stake body 2's support and fixed. In order to improve the stability of the bracket body 2, preferably, the n-shaped bracket structure may be provided with a reinforcing structure 23 for reinforcing the bracket body 2, the reinforcing structure 23 may be disposed below the cross bar 22, and both ends of the reinforcing structure are respectively connected to the two vertical bars 21; in order to facilitate transportation of the pipeline transportation support, the support body 2 is further provided with a lifting lug structure 24 for hoisting the support body 2, so that not only can hoisting of a single support body 2 be realized, but also hoisting of the whole pipeline transportation support can be realized, and field installation can be facilitated.
Referring to fig. 5, a schematic structural diagram of a pipe clamp according to an embodiment of the present invention is provided. As shown, the pipe clamp 3 includes: a first clip body 31 and a second clip body 32; the first clamp body 31 and the second clamp body 32 are detachably connected, clamping grooves are formed in the first clamp body 31 and the second clamp body 32, and when the first clamp body 31 and the second clamp body 32 are in butt joint, the clamping grooves in the first clamp body 31 and the second clamp body 32 are surrounded to form a clamping hole 33 for clamping the pipeline 4 to be transported. Specifically, the first clip body 31 and the second clip body 32 are arranged oppositely, and the wall surfaces of the first clip body 31 and the second clip body 32 which are arranged oppositely are provided with clamping grooves, so that when the first clip body 31 and the second clip body 32 are butted, the clamping grooves on the first clip body 31 and the second clip body 32 can be buckled to form a closed clamping hole, so as to clamp the pipeline 4 to be transported. Preferably, the first clamp body 31 and the second clamp body 32 are detachably connected by a bolt 34 to facilitate the detachment between the first clamp body 31 and the second clamp body 32. In this embodiment, the pipe clamp 3 may be a pipe clamp which is originally installed and fixedly used for removing a pipe, so as to perform secondary utilization on the pipe clamp 3.
In summary, in the pipe transportation support provided by this embodiment, the pipe clamps 3 respectively clamp the end portions of the pipes 4 to be transported through the at least one pair of pipe clamps 3 on the support body 2, so as to respectively clamp one pipe 4 to be transported through each pair of pipe clamps 3; realize the fixed of stake body 2 through base 1 to realize the fixed between the stake body 2, and then realize treating the bulk transport and the hoist and mount of pipeline 4 that sets up on each stake body 2. The pipeline transportation bracket can realize the clamping of the pipelines 4 to be transported, particularly can be fixed according to the sequence and the serial number, cannot avoid the damage of the appearance of the pipelines 4 to be transported, is convenient for the identification of each pipeline 4 to be transported for subsequent use, can realize the installation sequence and the installation position of the pipelines 4 to be transported, can save a large amount of manpower and material resources, and further improves the construction efficiency; meanwhile, the pipeline transportation support can also realize integral hoisting of a plurality of pipelines to be transported 4 so as to improve hoisting efficiency.
The method comprises the following steps:
the invention also provides a pipeline transportation method, which can adopt the pipeline transportation bracket to transport pipelines and comprises the following steps:
a support determining step S1, wherein the size of the pipeline to be transported and the arrangement distance of pipe clamps arranged on a support body are determined according to the sectional position and the area of the pipeline to be transported on the construction site; the pipe clamp is used for clamping a pipeline to be transported. Specifically, on the construction site, the pipelines in different areas are removed and used as pipelines 4 to be transported for transportation and reuse. In order to ensure the stability of the pipeline 4 to be transported, firstly, the size of the support body 2 for supporting the pipeline 4 to be transported is determined according to the sectional position and the area of the pipeline 4 to be transported on a construction site, namely, the relevant size of the support body 2 is ensured, so that the damage caused by insufficient supporting force of the support body 2 in the clamping and supporting processes is avoided; then, the arrangement distance of the pipe clamps 3 arranged on the support body 2 is determined according to the sectional position and the area of the pipeline 4 to be transported on the construction site, so that the interference and collision between the pipelines to be transported are avoided when the pipeline 4 to be transported is clamped and transported.
And a stress analysis step S2, wherein the stress analysis is carried out on the bracket body according to the size of the bracket body determined in the bracket determination step so as to determine the stability of the bracket body. Specifically, according to the size of the stent body 2 determined in the stent determining step S1, the stent body 2 determined in the stent determining step S1 is subjected to mechanical analysis to verify the stability of the stent body 2, and to verify whether the stent body 2 is acceptable or not, and if not, the stent body 2 is optimized until the stent body 2 is acceptable.
And a support mounting step S3, wherein the support body qualified in the stress analysis step is manufactured and mounted on the base. Specifically, the qualified support body 2 is manufactured, the base 1 is manufactured according to the support body 2, and finally, the support body 2 is mounted on the base 1.
And a pipe clamp fixing step S4, wherein the arrangement distance of the pipe clamps is determined according to the support determining step, and the pipe clamps detached from the construction site are installed according to the arrangement distance to form the pipe transportation support in a combined mode. Specifically, when the pipeline is removed, the pipe clamps of the original fixed pipeline are removed at the same time, the pipe clamps 3 detached from the construction site are installed according to the arrangement intervals of the pipe clamps 3 determined in the step S1 of determining the support, and a plurality of pairs of pipe clamps 3 can be arranged on two sides of the support body 2 according to the arrangement intervals, so that the pipe clamps 3, the support body 2 and the base 1 are combined to form the pipeline transportation support.
And a pipeline mounting step S5, numbering the pipelines to be transported according to the dismantling sequence of the pipelines to be transported on the construction site, and sequentially clamping the pipelines to be transported on the pipe clamps according to the numbers. Specifically, when the pipeline is dismantled, the pipeline is numbered according to the dismantling sequence of the pipeline to be transported in the construction site, and the pipeline 4 to be transported is clamped on the pipe clamp 3 according to the number; in order to facilitate the subsequent installation of the pipelines 4 to be transported, preferably, the pipelines 4 to be transported, which are dismantled in the same area, are installed on the same support body 2, so that the hoisting of a single support body 2 can be performed subsequently, and the respective installation in different areas can be performed.
And a pipeline transportation step S6, wherein the transportation of the pipeline to be transported which is dismantled on site is realized by hoisting the pipeline transportation bracket. Specifically, the hoisting lug structure 24 on the hoisting support body 2 is used for hoisting and transporting the pipeline transportation support and the pipeline 4 to be transported clamped on the pipeline transportation support integrally, so that the pipeline 4 to be transported is convenient to install and utilize for the second time.
In summary, the pipeline transportation method provided by the embodiment determines the size of the bracket body 2 for supporting the pipeline to be transported and the arrangement interval of the pipe clamps 3 provided on the bracket body 2 according to the sectional position and area of the pipeline to be transported at the construction site, so as to perform the installation and fixation of the bracket body 2 and the pipe clamps 3 accordingly, and integrally forms the pipeline transportation bracket by installing the bracket body 2 on the base 1; the pipelines 4 to be transported are numbered and sequentially installed to the pipeline transportation bracket according to the numbers, so that hoisting transportation and reutilization of the pipelines 4 to be transported are realized through hoisting and transportation of the whole pipeline transportation bracket, the pipeline transportation bracket can be used for clamping the pipelines 4 to be transported, particularly fixing the pipelines 4 to be transported according to the sequence and the numbers, damage to the appearance of the pipelines 4 to be transported cannot be avoided, identification of each pipeline 4 to be transported for subsequent use can be facilitated, the installation sequence and the installation position of the pipelines 4 to be transported can be realized, a large amount of manpower and material resources can be saved, and the construction efficiency is improved; meanwhile, the pipeline transportation support can also realize integral hoisting of a plurality of pipelines to be transported 4 so as to improve hoisting efficiency.
It should be noted that in the description of the present invention, the terms of direction or positional relationship indicated by the terms "upper", "lower", "left", "right", "inner", "outer", etc. are based on the directions or positional relationships shown in the drawings, which are only for convenience of description, and do not indicate or imply that the device or element must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention.
Furthermore, it should be noted that, in the description of the present invention, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood by those skilled in the art according to specific situations.
It will be apparent to those skilled in the art that various changes and modifications may be made in the present invention without departing from the spirit and scope of the invention. Thus, if such modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include such modifications and variations.

Claims (10)

1. A pipeline transport support, comprising:
a base;
the bracket comprises at least one bracket body, wherein the bracket bodies are arranged side by side along the width direction of the base, at least one pair of pipe clamps which are arranged oppositely are arranged on each bracket body, and each pair of pipe clamps is used for clamping two ends of a pipeline to be transported so as to fix the pipeline to be transported.
2. The pipe transportation stand of claim 1, wherein the pipe clamp comprises: a first clamp body and a second clamp body; wherein the content of the first and second substances,
the first clamp body and the second clamp body are detachably connected, clamping grooves are formed in the first clamp body and the second clamp body, and when the first clamp body and the second clamp body are in butt joint, clamping holes are formed in the first clamp body and the second clamp body in an encircling mode and used for clamping the pipeline to be transported.
3. The pipe transport rack of claim 2, wherein the first clamp body and the second clamp body are removably connected by a bolt.
4. The pipe transportation rack of any one of claims 1 to 3, wherein the base comprises:
the two support rods are arranged side by side and at intervals and used for supporting the bracket body;
at least one connecting rod, at least one the connecting rod all sets up two between the bracing piece, and, each the both ends of connecting rod are equallyd divide and are connected respectively on two the bracing piece, the connecting rod is used for connecting and strengthening two the joint strength of bracing piece.
5. The pipe transportation rack of claim 4, wherein each of the tie bars is disposed perpendicular to the support bar.
6. The pipe transportation rack of any one of claims 1 to 3,
the support body is of a door-shaped support structure, and a reinforcing structure is arranged on the door-shaped support structure;
the bracket body is also provided with a lifting lug structure for hoisting the bracket body.
7. The pipe transportation rack of any one of claims 1 to 3,
the pipe clamps are arranged side by side and at intervals along the height direction of the support body, two of each pair of pipe clamps are respectively arranged at two ends of the support body along the length direction of the support body, and each pipe clamp is used for clamping two ends of the pipeline to be transported.
8. The pipe transportation rack of any one of claims 1 to 3,
the bracket body is detachably connected with the base;
the pipe clamp is detachably connected with the bracket body.
9. A method of pipeline transportation, comprising the steps of:
a support determining step, namely determining the size of a support body for supporting the pipeline to be transported and the arrangement distance of pipe clamps arranged on the support body according to the sectional position and the area of the pipeline to be transported on a construction site; the pipe clamp is used for clamping a pipeline to be transported;
a stress analysis step of performing stress analysis on the stent body according to the size of the stent body determined in the stent determination step to determine the stability of the stent body;
a bracket mounting step, namely manufacturing and mounting the bracket body qualified in stress analysis in the stress analysis step on a base;
a pipe clamp fixing step, namely determining the arrangement interval of the pipe clamps according to the support determining step, and installing the pipe clamps detached from the construction site according to the arrangement interval to form a pipeline transportation support in a combined manner;
a pipeline installation step, numbering the pipelines to be transported according to the dismantling sequence of the pipelines to be transported on the construction site, and sequentially clamping the pipelines to be transported on the pipe clamps according to the numbers;
and a pipeline transportation step, namely transporting the pipeline to be transported which is dismantled on site by hoisting the pipeline transportation support.
10. The pipeline transportation method according to claim 9,
in the pipeline installation step, pipelines to be transported, which are dismantled in the same area, are installed on the same support body.
CN202110347605.8A 2021-03-31 2021-03-31 Pipeline transportation support and pipeline transportation method Pending CN113148396A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110347605.8A CN113148396A (en) 2021-03-31 2021-03-31 Pipeline transportation support and pipeline transportation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110347605.8A CN113148396A (en) 2021-03-31 2021-03-31 Pipeline transportation support and pipeline transportation method

Publications (1)

Publication Number Publication Date
CN113148396A true CN113148396A (en) 2021-07-23

Family

ID=76886106

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110347605.8A Pending CN113148396A (en) 2021-03-31 2021-03-31 Pipeline transportation support and pipeline transportation method

Country Status (1)

Country Link
CN (1) CN113148396A (en)

Similar Documents

Publication Publication Date Title
CN109552552B (en) Manufacturing method of duplex stainless steel intermediate assembling plate frame of chemical tanker
CN202430994U (en) Template limiting clamp
CN112049439B (en) Method for integrally lifting and mounting steel platform in limited space
CN113148396A (en) Pipeline transportation support and pipeline transportation method
CN214730839U (en) Modularized transportation support for machine body piping pipelines
CN214302829U (en) Scaffold wall connecting piece structure of high-impermeability shear wall
CN205669326U (en) A kind of architectural engineering modular guard canopy
CN214658788U (en) Retractable's concrete floor formwork structure
CN112573344B (en) Use method of hoisting and turning-over device for super-large concrete prefabricated stand plate
CN218523153U (en) Hanging bracket for factory building ceiling pipeline
CN210238920U (en) Hollow concrete precast slab
JPH07112807A (en) Rack construction method and jig for automatic store
CN212150108U (en) Pin-connected panel reinforcing bar waste material pond
CN217629413U (en) Hanging rack for double-width steel box girder bridge
CN220372527U (en) High-efficient welding platform of stiffening stirrup
CN216587615U (en) Installation operation support of wall body top decorative cover layer
CN217897271U (en) A concrete placement template for two wall positions
CN214997670U (en) Small-section tunnel operation splicing rack
CN212926978U (en) Formwork device for ultrahigh hollow frame beam
CN212792823U (en) Shear force wall framework of steel reinforcement is whole prefabricated device
CN214153825U (en) Multilayer cable testing bridge auxiliary fixtures
CN219313499U (en) Box girder end template self-stabilization storage device
CN210763952U (en) Pump hanger
CN217996466U (en) Special lifting appliance for prefabricated building
CN216641468U (en) Jig frame for integrated wallboard

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination