CN207700682U - A kind of regularization support of pipelines root fender pier mold - Google Patents

A kind of regularization support of pipelines root fender pier mold Download PDF

Info

Publication number
CN207700682U
CN207700682U CN201721782618.3U CN201721782618U CN207700682U CN 207700682 U CN207700682 U CN 207700682U CN 201721782618 U CN201721782618 U CN 201721782618U CN 207700682 U CN207700682 U CN 207700682U
Authority
CN
China
Prior art keywords
plate
transverse plate
transverse
front template
pipelines
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721782618.3U
Other languages
Chinese (zh)
Inventor
李翔
何毅
沈波
陈荣
张炯
吴晓峰
王昌学
徐绍辉
严福明
刘洪光
夏航
李学用
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Construction Investment Third Construction Co Ltd
Original Assignee
Yunnan Construction Investment Third Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Construction Investment Third Construction Co Ltd filed Critical Yunnan Construction Investment Third Construction Co Ltd
Priority to CN201721782618.3U priority Critical patent/CN207700682U/en
Application granted granted Critical
Publication of CN207700682U publication Critical patent/CN207700682U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a kind of regularization support of pipelines root fender pier mold, the rear pattern plate being connect respectively by left connector and right connector including front template and with front template, front template is mainly connected in sequence by transverse plate before oblique plate before transverse plate, second before oblique plate, second before transverse plate, first before first and third, rear pattern plate is mainly retreaded from transverse plate after first, first to be connected in sequence to the transverse plate after plate and third that retreads of transverse plate after plate, second, second, and front handlebar and rear handle are respectively arranged on front template and rear pattern plate.The utility model uses fixed or movable connection, front template and rear pattern plate can be completely separable after form removal, forward and backward handle can also disassemble simultaneously, and front template and rear pattern plate can be launched into smooth structure using flexible connection, facilitate stacking, it is readily transported, simple in structure simultaneously, branch form removal is fast simple, reusable, it is environmentally protective, construction cost is reduced to a certain extent.

Description

A kind of regularization support of pipelines root fender pier mold
Technical field
The utility model is related to support of pipelines technical fields, and in particular to a kind of regularization support of pipelines root fender pier mould Tool.
Background technology
The fabrication and installation of conventional pipelines holder are made using angle steel or channel steel, and installation is fixed using expansion bolt.Installation Engineering must could carry out Pipe installing in the case of condition has at the construction field (site).It is fixed easy in the installation of roof pipeline holder Waterproofing work is damaged, and support of pipelines root contacts with ground and is highly prone to soaking for ground moisture, metal component is easy to happen Corrosion and then the stressing conditions and presentation quality for influencing support of pipelines.
Under normal circumstances, the usual way of construction personnel is that scene makes fender pier according to the interim formwork of personal experience, by Differ in the experience level of construction personnel, cause make fender pier without fixed size and perception it is poor, examination may not met Specification, meanwhile, interim formwork will expend time and construction material.
Invention content
In view of the deficiencies of the prior art, the utility model provides a kind of regularization support of pipelines root fender pier mold,
The technical solution of the utility model is as follows:A kind of regularization support of pipelines root fender pier mold, including front template (1) With the rear pattern plate (4) being connect respectively by left connector (2) and right connector (3) with front template (1);Front template (1) mainly by It is horizontal before oblique plate (14) and third before transverse plate (13), second before oblique plate (12), second before transverse plate (11), first before first It is connected in sequence to plate (15), rear pattern plate (4) is mainly retreaded from transverse plate after first (41), first after plate (42), second Transverse plate (43), second transverse plate (45) after plate (44) and third that retreads are connected in sequence, front template (1) and rear pattern plate (4) front handlebar (5) and rear handle (6) are respectively arranged on.
Further, oblique plate (12) before the fixed or movable connection first in transverse plate (11) one end before described first, first Transverse plate (13) before the fixed or movable connection second of preceding oblique plate (12) other end, before second transverse plate (13) other end fix or Oblique plate (14) before flexible connection second, transverse plate before the fixed or movable connection third of oblique plate (14) other end before second (15);The fixed or movable connection in transverse plate (41) one end first is retreaded to plate (42) after described first, and first retreads to plate (42) Transverse plate (43) after the fixed or movable connection second of the other end, the fixed or movable connection of transverse plate (43) other end second after second It retreads to plate (44), second retreads the transverse plate (45) after the fixed or movable connection third of plate (44) other end.
Further, oblique plate (12) before transverse plate (11) one end flexible connection first before described first is oblique before first Transverse plate (13) before plate (12) other end flexible connection second, it is oblique before transverse plate (13) other end flexible connection second before second Plate (14), transverse plate (15) before oblique plate (14) other end flexible connection third before second;Transverse plate (41) one after described first End flexible connection first is retreaded to plate (42), and first retreads the transverse plate (43) after plate (42) other end flexible connection second, the The flexible connection of transverse plate (43) other end second is retreaded to plate (44) after two, and second retreads to plate (44) other end flexible connection the Transverse plate (45) after three.
Further, the flexible connection is connected by hinge (7).
Further, the left connector (2) is by being arranged before first preceding first circular hole (16) on transverse plate (11) With rear first circular hole (46) connection front template (1) and rear pattern plate (4) of the setting after first on transverse plate (41);The right connection Part (3) is by being arranged preceding second circular hole (17) before third on transverse plate (15) and being arranged after third on transverse plate (45) Second circular hole (47) connection front template (1) and rear pattern plate (4) afterwards.
Further, the front template (1) and rear pattern plate (4) are to be detachably connected.
Further, the front template (1) and rear pattern plate (4), which are detachably closed, connects and composes a hexagon.
Further, transverse plate (13) are arranged before second in the front handlebar (5), and the rear handle (6) is arranged second Afterwards on transverse plate (43).
Further, the front handlebar (5) removably setting before second on transverse plate (13), it is described after handle (6) Dismountable setting is after second on transverse plate (43).
Operation principle:By building pipe construction technique requirement stand base is carried out after the completion of pipeline is all constructed Pour, before pouring, first by the front template (1) of mold in the utility model and rear pattern plate (4) both ends respectively with left connection Part (2) and right connector (3) closure connect into hexagonal structure, and mold can be poured after fixing, and poured and completed to wait to mix Mold is removed after solidifying soil initial set, the front template removed (1) and rear pattern plate (4) are placed and complete to operate.
Generated advantageous effect is the utility model compared with prior art:The utility model uses fixed or movable company It connects, front template and rear pattern plate can be completely separable after form removal, while handle can also disassemble, and front template and rear pattern plate use Flexible connection can be launched into smooth structure, facilitate heap poststack, reduce and stack space, be conducive to transport.Using this practicality It is novel that reverse mould construction is carried out to same project support of pipelines root, that is, meet the requirement of protective conduit stent root while seeing Sense quality also gets a promotion, while can improve working efficiency, saves the time.The utility model is simple in structure, and branch form removal is quickly simple Easily, convenience in transport after form removal, reusable, raw material may be used the remaining steel plate in construction site or at the materials such as plate, green Environmental protection reduces construction cost to a certain extent.
Description of the drawings
Fig. 1 is the utility model overall structure diagram;
Fig. 2 is one of the overall structure diagram of the utility model embodiment 1;
Fig. 3 is the two of the overall structure diagram of the utility model embodiment 1;
Fig. 4 is one of the overall structure diagram of the utility model embodiment 2;
Fig. 5 is the two of the overall structure diagram of the utility model embodiment 2;
Wherein, it is marked in figure:1-front template, transverse plate before 11-the first;Oblique plate before 12-the first;Before 13-the second Transverse plate;Oblique plate before 14-the second;Preceding first circular hole of transverse plate 16-before 15-thirds;17-preceding second circular holes;2-left companies Fitting;3-right connectors;4-rear pattern plates;Transverse plate after 41-the first;42-the first retreads to plate;After 43-the second laterally Plate;44-the second retreads to plate;Transverse plate after 45-thirds;46-rear first circular holes;47-rear second circular holes;5-front handlebars; 6-rear handles;7-hinges.
Specific implementation mode
Below in conjunction with the accompanying drawings and specific implementation mode is described in further detail the technical solution of the utility model:
A kind of regularization support of pipelines root fender pier mold, as shown in Figure 1, respectively leading to including front template 1 and with front template 1 Cross the rear pattern plate 4 that left connector 2 and right connector 3 connect;Front template 1 is mainly by oblique plate before transverse plate 11, first before first 12, transverse plate 15 is connected in sequence before oblique plate 14 and third before transverse plate 13, second before second, and rear pattern plate 4 is mainly by Transverse plate 41 after one, first retread after plate 42, second transverse plate 43, second retread after plate 44 and third transverse plate 45 successively It is formed by connecting, front handlebar 5 and rear handle 6 is respectively arranged on front template 1 and rear pattern plate 4.
Further, oblique plate 12 before the fixed or movable connection first in 11 one end of transverse plate before first, oblique plate before first Transverse plate 13 before the fixed or movable connection second of 12 other ends, before second before the fixed or movable connection of 13 other end of transverse plate second Oblique plate 14, transverse plate 15 before the fixed or movable connection third of 14 other end of oblique plate before second;41 one end of transverse plate after first Fixed or movable connection first is retreaded to plate 42, and first retreads the transverse plate after the fixed or movable connection second of 42 other end of plate 43, after second the fixed or movable connection of 43 other end of transverse plate second retread to plate 44, second retreads fixes to 44 other end of plate Or transverse plate 45 after flexible connection third.
Further, oblique plate 12 before 11 one end of transverse plate flexible connection first before first, oblique plate 12 is another before first Transverse plate 13 before end flexible connection second, oblique plate 14 before 13 other end of transverse plate flexible connection second before second, before second tiltedly Transverse plate 15 before being flexibly connected third to 14 other end of plate;41 one end of transverse plate flexible connection first is retreaded to plate 42 after first, First retreads the transverse plate 43 after 42 other end of plate flexible connection second, after second after 43 other end of transverse plate flexible connection second Oblique plate 44, second retread to 44 other end of plate be flexibly connected third after transverse plate 45.
Further, flexible connection is connected by hinge 7.
Further, left connector 2 by the first circular hole 16 before being arranged before first on transverse plate 11 and setting the Rear first circular hole 46 connection front template 1 and rear pattern plate 4 after one on transverse plate 41, the right connector 3 is by being arranged in third Preceding second circular hole 17 on preceding transverse plate 15 connects 1 He of front template with rear second circular hole 47 being arranged after third on transverse plate 45 Rear pattern plate 4.
Further, front template 1 and rear pattern plate 4 are to be detachably connected.
Further, front template 1 and rear pattern plate 4, which are detachably closed, connects and composes a hexagon.
Further, transverse plate 13 are arranged before second in front handlebar 5, and the setting of rear handle 6 is after second on transverse plate 43.
Further, removably setting is before second on transverse plate 13 for front handlebar 5, and removably setting exists rear handle 6 After second on transverse plate 43.
A kind of regularization support of pipelines root fender pier mold of above-mentioned design structure in use can be according to the company of template Connecing mode, specifically there are two types of operational circumstances.
Embodiment 1
Fig. 2 and Fig. 3 is that the structure of the utility model the first embodiment is shown and is intended to, as shown in Figures 2 and 3, including preceding mould Plate 1 and the rear pattern plate 4 being connect respectively by left connector 2 and right connector 3 with front template 1, front template 1 is by transverse plate before first 11, before first before oblique plate 12, second before transverse plate 13, second before oblique plate 14 and third transverse plate 15 successively fixed welding and It retreads to plate 44 and third at retread transverse plate 43, second after plate 42, second of, transverse plate 41 after rear pattern plate 4 from first, first Fixation is welded transverse plate 45 successively afterwards, front template 1 second before transverse plate 13 and rear pattern plate 4 second after on transverse plate 43 It is removably provided with front handlebar 5 and rear handle 6 respectively.
A kind of mode of operation of regularization support of pipelines root fender pier mold of the first design structure is:In use, The front template 1 of mold in the utility model and 4 both ends of rear pattern plate are closed with left connector 2 and right connector 3 respectively first and are connected It is connected into hexagonal structure, mold can be poured after fixing, pour completion and remove mold after concrete initial set, will removed Front template 1 and rear pattern plate 4 stacking come place, meanwhile, if after having dismantled template when not in use for a long time, for better heap Folded and convenience in transport, can also disassemble front handlebar 5 and rear handle 6, from front template 1 and rear pattern plate 4 respectively until making Used time is assembled again.
Embodiment 2
Fig. 4 and Fig. 5 is that the structure of second of embodiment of the utility model is shown and is intended to, as shown in Figures 4 and 5, including preceding mould Plate 1 and the rear pattern plate 4 being detachably connected respectively by left connector 2 and right connector 3 with front template 1, front template 1 is by before first Transverse plate 15 is movable successively before oblique plate 14 and third before transverse plate 13, second before oblique plate 12, second before transverse plate 11, first It is formed by connecting, transverse plate 41 after rear pattern plate 4 from first, the first retread transverse plate 43, second after plate 42, second are retreaded to plate 44 It being flexibly connected successively with transverse plate after third 45, flexible connection therein is connected by hinge 7, and the second of front template 1 It is removably provided with front handlebar 5 and rear handle 6 respectively on transverse plate 43 after the second of preceding transverse plate 13 and rear pattern plate 4.
A kind of mode of operation of regularization support of pipelines root fender pier mold of second of design structure is:In use, The front template 1 of mold in the utility model and 4 both ends of rear pattern plate are closed with left connector 2 and right connector 3 respectively first and are connected It is connected into hexagonal structure, mold can be poured after fixing, pour completion and remove mold after concrete initial set, will removed Come front template 1 on front handlebar 5 and rear pattern plate 4 on rear handle 6 also disassemble respectively, first in front template 1 before laterally Transverse plate 15 passes through hinge 7 before oblique plate 14 and third before transverse plate 13, second before oblique plate 12, second before plate 11, first Activity is adjustable to be deformed into a smooth structure, meanwhile, first in rear pattern plate 4 after transverse plate 41, first retread to plate 42, second Transverse plate 43, second retread after plate 44 and third that adjustable to be deformed into one smooth by the activity of hinge 7 for transverse plate 45 afterwards Structure, front template 1 and rear pattern plate 4 are stacked, at this time, it may be necessary to stack front template 1 and rear pattern plate 4 simultaneously be a smooth knot Structure more reduces and stacks space, more conducively transports, and carrying out assembling with handle again until using is adjusted to required structure i.e. It can.
In construction, the Specific construction process of the utility model is:By building pipe construction technique requirement, pipeline is complete After the completion of portion's construction, then pouring for stand base is carried out, first step job mix concrete;Second step is hexagonal by what is made Mold separates, and 10# channel steels are concentrated, and mold fixation is reliable;Third walks casting concrete, pours full mold, then ground with iron plate It is flat.4th step waits for concrete initial set, removes mold, and stand base pours completion.
The utility model has the following advantages in a particular embodiment:Use a kind of sizing of above-mentioned design structure Change support of pipelines root fender pier mold meets the requirement of protective conduit stent root while impression quality also gets a promotion, simultaneously It can reuse for a long time, reduce economic cost.
Finally, it should be noted that the scope of protection of the utility model is not limited solely to above-described embodiment, above-mentioned implementation Example is intended merely to help explain and illustrate the utility model, rather than limits the scope of protection of the utility model.

Claims (9)

1. a kind of regularization support of pipelines root fender pier mold, it is characterised in that:Divide including front template (1) and with front template (1) The rear pattern plate (4) not connected by left connector (2) and right connector (3);Front template (1) is mainly by transverse plate before first (11), transverse plate (15) is successively before oblique plate (14) and third before transverse plate (13), second before oblique plate (12), second before first It is formed by connecting, rear pattern plate (4) is mainly retreaded transverse plate (43), after plate (42), second from transverse plate after first (41), first Two transverse plates (45) after plate (44) and third that retread are connected in sequence, and are respectively arranged on front template (1) and rear pattern plate (4) Front handlebar (5) and rear handle (6).
2. a kind of regularization support of pipelines root as described in claim 1 fender pier mold, it is characterised in that:It is horizontal before described first Oblique plate (12) before to the fixed or movable connection first in plate (11) one end, the fixed or movable company of oblique plate (12) other end before first Transverse plate (13) before connecing second, oblique plate (14) before the fixed or movable connection second of transverse plate (13) other end before second, second Transverse plate (15) before the fixed or movable connection third of preceding oblique plate (14) other end;Transverse plate (41) one end is fixed after described first Or flexible connection first is retreaded to plate (42), first retreads the transverse plate after the fixed or movable connection second of plate (42) other end (43), the fixed or movable connection of transverse plate (43) other end second is retreaded to plate (44) after second, second retread it is another to plate (44) Transverse plate (45) after the fixed or movable connection third in one end.
3. a kind of regularization support of pipelines root as claimed in claim 2 fender pier mold, it is characterised in that:It is horizontal before described first Oblique plate (12) before to plate (11) one end flexible connection first, before first before oblique plate (12) other end flexible connection second laterally Plate (13), oblique plate (14) before transverse plate (13) other end flexible connection second before second, oblique plate (14) other end before second Transverse plate (15) before flexible connection third;Transverse plate (41) one end flexible connection first is retreaded to plate (42) after described first, the One retreads the transverse plate (43) after plate (42) other end flexible connection second, transverse plate (43) other end flexible connection the after second Two retread to plate (44), second retread to plate (44) other end be flexibly connected third after transverse plate (45).
4. a kind of regularization support of pipelines root as claimed in claim 3 fender pier mold, it is characterised in that:The activity is even It connects and is connected by hinge (7).
5. a kind of regularization support of pipelines root as claimed in claim 3 fender pier mold, it is characterised in that:The left connector (2) by be arranged before first preceding first circular hole (16) on transverse plate (11) and setting after first on transverse plate (41) after First circular hole (46) connects front template (1) and rear pattern plate (4), and the right connector (3) is by being arranged before third transverse plate (15) rear second circular hole (47) the connection front template (1) of preceding second circular hole (17) and setting after third on transverse plate (45) on With rear pattern plate (4).
6. a kind of regularization support of pipelines root as described in claim 1 fender pier mold, it is characterised in that:The front template (1) and rear pattern plate (4) is to be detachably connected.
7. a kind of regularization support of pipelines root as described in claim 1 fender pier mold, it is characterised in that:The front template (1) it is detachably closed with rear pattern plate (4) and connects and composes a hexagon.
8. a kind of regularization support of pipelines root as claimed in claim 3 fender pier mold, it is characterised in that:The front handlebar (5) transverse plate (13) are set before second, it is described after handle (6) setting after second on transverse plate (43).
9. a kind of regularization support of pipelines root as claimed in claim 8 fender pier mold, it is characterised in that:The front handlebar (5) dismountable setting is before second on transverse plate (13), it is described after handle (6) transverse plate is removably set after second (43) on.
CN201721782618.3U 2017-12-19 2017-12-19 A kind of regularization support of pipelines root fender pier mold Active CN207700682U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721782618.3U CN207700682U (en) 2017-12-19 2017-12-19 A kind of regularization support of pipelines root fender pier mold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721782618.3U CN207700682U (en) 2017-12-19 2017-12-19 A kind of regularization support of pipelines root fender pier mold

Publications (1)

Publication Number Publication Date
CN207700682U true CN207700682U (en) 2018-08-07

Family

ID=63027300

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721782618.3U Active CN207700682U (en) 2017-12-19 2017-12-19 A kind of regularization support of pipelines root fender pier mold

Country Status (1)

Country Link
CN (1) CN207700682U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109877944A (en) * 2019-03-04 2019-06-14 广东联城住工装备信息科技有限公司 Ultra-high performance concrete hollowed-out board production mould and hollow out board fabrication method
CN111561152A (en) * 2020-05-15 2020-08-21 金双 Concrete preparation pouring steel formwork

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109877944A (en) * 2019-03-04 2019-06-14 广东联城住工装备信息科技有限公司 Ultra-high performance concrete hollowed-out board production mould and hollow out board fabrication method
CN111561152A (en) * 2020-05-15 2020-08-21 金双 Concrete preparation pouring steel formwork

Similar Documents

Publication Publication Date Title
CN207700682U (en) A kind of regularization support of pipelines root fender pier mold
CN206748695U (en) The prefabricated edges of boards mould of zigzag
CN104131694B (en) A kind of efficient low-consume combined formwork system and construction method thereof
CN106113230B (en) The non-type prefabricated for bench, template system and its construction method can be had enough to meet the need
CN206655470U (en) A kind of floor slab back casting band Quick Release template
CN206539024U (en) One kind exempts from formwork for placing system of perforating
CN203821454U (en) Reinforcing type inspection-well cover plate with stainless steel plate on upper portion
CN207538471U (en) A kind of funnel poured for post-cast strip
CN211850841U (en) Stair pouring mold
CN207420026U (en) Part bracing means is poured after a kind of superimposed sheet
CN207210965U (en) A kind of continuous beam pin-connected panel end head formwork
CN206220132U (en) A kind of base plate and exterior wall junction construction typified form support
CN205116720U (en) Stupefied connector of back of body
CN203795831U (en) Efficient low-consumption combined formwork system
CN211415613U (en) Concrete beam mould of convenient drawing of patterns
CN207362876U (en) Build aluminum alloy mould plate piping lane corner combined structure
CN208267393U (en) A kind of set aside pre-embedded finished product protection device of electrical spool
CN208981798U (en) A kind of aluminum alloy pattern plate Transfer pipe molding machine
CN206111205U (en) Two lining mold in tunnel build platform truck and bury waterstop installation fastening head template in with
CN206205445U (en) A kind of template connects handle
CN208803707U (en) A kind of gas column type casting side form installs structure
CN202450770U (en) Light type open web steel frame plywood formwork
CN207513144U (en) A kind of steel fixes scaffold base device
CN201850700U (en) Secondary beam of corrugated web H-shaped steel floor and supporting support rod
CN206859660U (en) A kind of beam column template system of reserved opening

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant