CN207685834U - A kind of CFG piling strtucture for also serving as slope protection pile - Google Patents

A kind of CFG piling strtucture for also serving as slope protection pile Download PDF

Info

Publication number
CN207685834U
CN207685834U CN201721583014.6U CN201721583014U CN207685834U CN 207685834 U CN207685834 U CN 207685834U CN 201721583014 U CN201721583014 U CN 201721583014U CN 207685834 U CN207685834 U CN 207685834U
Authority
CN
China
Prior art keywords
cfg
row
slope protection
guan liang
coupling beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721583014.6U
Other languages
Chinese (zh)
Inventor
刘东超
陈连武
郝宗新
赵亚军
姜峰
孙冲
周凌峰
罗金峰
李冠军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
China Construction First Group the Fifth Construction Co Ltd
Original Assignee
China Construction First Group Corp Ltd
China Construction First Group the Fifth Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, China Construction First Group the Fifth Construction Co Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN201721583014.6U priority Critical patent/CN207685834U/en
Application granted granted Critical
Publication of CN207685834U publication Critical patent/CN207685834U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model is related to the piling strtuctures that a kind of CFG also serves as slope protection pile, including:Interior row CFG, row CFG outer, coupling beam, Guan Liang, reinforced mesh between stake, steel reinforcement cage is set in interior row CFG and outer row CFG, the longitudinal reinforcement of steel reinforcement cage anchors into coupling beam and Guan Liang, coupling beam main reinforcement anchors into Guan Liang, coupling beam and Guan Liang connect into a whole force structure by interior row CFG and outer row CFG, it is laid with reinforced mesh between arranging CFG outside, concrete shield is set on the outside of reinforced mesh.The purpose of this utility model is to provide this CFG piling strtuctures for also serving as slope protection pile, interior row CFG and outer row CFG are linked into an integrated entity by coupling beam and Guan Liang, meets foundation pit slope protection requirement when foundation pit height difference depth is more than 5 meters.Compared with traditional basement process and slope protection construction are performed separately, the utility model realizes the function of basement process and side slope protection simultaneously, can effectively shorten the construction period, saves construction cost.

Description

A kind of CFG piling strtucture for also serving as slope protection pile
Technical field
The utility model is related to building foundation treatment technical field, the stake for also serving as slope protection pile more particularly to a kind of CFG Based structures.
Background technology
With the variation of increase and planning and designing requirement to building basement space requirement, the depth of building foundation pit is got over Come it is bigger, with surrounding building basis height difference it is larger, the basement process of building and the slope retaining of foundation pit are that basis is applied The heavy difficult point in work stage.Traditional engineering method is that basement process and excavation slope bank protection is individually designed and construction, the two separate real It applies, there are long construction period, the drawbacks that slope protection pile single side formwork difficulty is big, construction cost is high, and are unfavorable for the waterproof of basement Construction.
In view of the foregoing, there is an urgent need for a kind of new piling strtuctures, can realize building foundation treatment and excavation slope shield simultaneously The function on slope.
Utility model content
The utility model provides a kind of CFG piling strtucture for also serving as slope protection pile.The piling strtucture passes through coupling beam and Guan Liang Interior row CFG and outer row CFG are linked into an integrated entity, meets foundation pit slope protection requirement when foundation depth height difference is more than 5 meters, simultaneously The function of realizing basement process and side slope protection can be effective compared with traditional basement process and slope protection construction are performed separately Shorten the construction period, saves construction cost.
Technical solution is used by the utility model completes its function:A kind of CFG piling strtucture for also serving as slope protection pile, Including:Interior row CFG, row CFG outer, coupling beam, Guan Liang, reinforced mesh between stake, in described interior row CFG and outer row CFG Steel reinforcement cage is set, and the longitudinal reinforcement of steel reinforcement cage anchors into coupling beam and Guan Liang, and coupling beam main reinforcement anchors into Guan Liang, and coupling beam and Guan Liang will be interior Row CFG and outer row CFG connects into an entirety force structure, reinforced mesh is laid between row CFG outside, outside reinforced mesh Concrete shield is arranged in side.
Further, CFG stakes also serve as the piling strtucture of slope protection pile, and interior row CFG and outer row CFG, CFG is arranged By twist bit pore-forming, steel reinforcement cage is set in stake, it is 1 meter long that steel reinforcement cage longitudinal reinforcement is longer than stake.
Further, CFG stakes also serve as the piling strtucture of slope protection pile, arrange set respectively in CFG and outer row CFG stakes inside Armored concrete Guan Liang is set, CFG longitudinal reinforcements anchor into Guan Liang.
Further, CFG stakes also serve as the piling strtucture of slope protection pile, and armored concrete is arranged between two Guan Liangs and connects Beam, coupling beam main reinforcement anchor into Guan Liang, anchor into length and are not less than 1.5 times of reinforcing bar tension anchorage lengths.
Further, CFG stakes also serve as the piling strtucture of slope protection pile, reinforced mesh are arranged between arranging CFG outside, in steel Concrete shield is set on the outside of muscle mesh sheet.
The utility model has the beneficial effects that:
The utility model, by interior row CFG and the outer row CFG structures for connecting into an entirety, is expired by coupling beam and Guan Liang Foundation pit slope protection requirement when sufficient foundation depth height difference is more than 5 meters, compared with traditional basement process and foundation pit slope protection, is realized simultaneously The function of basement process and side slope protection, can effectively shorten the construction period, save construction cost.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is pile foundation skiagraph;
1, interior row CFG;2, outer row CFG;3, Guan Liang;4, reinforced concrete coupling beams;5, coupling beam main reinforcement;6, steel reinforcement cage; 7, reinforced mesh.
Specific implementation mode:
Illustrate the most preferred embodiment of the utility model below in conjunction with the accompanying drawings:
As shown in Figs. 1-2, in the utility model:A kind of CFG piling strtucture for also serving as slope protection pile, passes through Guan Liang 3 and steel Interior row CFG stakes 1 and outer row CFG stakes 2 are linked to be entirety by reinforced concrete coupling beam 4, and interior row CFG stakes 1 and outer row CFG stakes 2 pass through spiral Drilling machine pore-forming enters concrete while carrying and boring marginal not, steel reinforcement cage 6 is immediately inserted into after concreting, steel reinforcement cage longitudinal reinforcement is long It 1 meter and anchors into the Guan Liang 3 in each row CFG stakes in stake is long, reinforced concrete coupling beams 4 is set between two Guan Liangs 3, even Beam main tendon 5 anchors into Guan Liang 3, anchors into length and is not less than 1.5 times of reinforcing bar tension anchorage lengths, then casting concrete passes through Guan Liang 3, reinforced concrete coupling beams 4 link into an integrated entity interior row CFG stakes 1 and outer row CFG stakes 2, after the completion of concreting, arrange outside Reinforced mesh 7 is laid between CFG stakes 2, then the gunite concrete protective layer on the outside of reinforced mesh.

Claims (5)

1. a kind of CFG piling strtucture for also serving as slope protection pile, which is characterized in that including:Interior row CFG, row CFG outer, coupling beam, Reinforced mesh between Guan Liang, stake, described interior row CFG and outer row CFG interior setting steel reinforcement cages, the longitudinal reinforcement of steel reinforcement cage anchor into In coupling beam and Guan Liang, coupling beam main reinforcement anchors into Guan Liang, coupling beam and Guan Liang by interior row CFG and outer row CFG connect into one it is whole Body force structure is laid with reinforced mesh, concrete shield is arranged on the outside of reinforced mesh between arranging CFG outside.
2. the CFG piling strtucture for also serving as slope protection pile according to claim 1, which is characterized in that setting in row CFG with Outer row CFG, CFG, by twist bit pore-forming, are arranged steel reinforcement cage, length ratio CFG of steel reinforcement cage longitudinal reinforcement in stake It is 1 meter long.
3. the CFG piling strtucture for also serving as slope protection pile according to claim 1, which is characterized in that inside arrange CFG and outside Armored concrete Guan Liang is respectively set on row CFG, CFG longitudinal reinforcements anchor into Guan Liang.
4. the CFG piling strtucture for also serving as slope protection pile according to claim 1, which is characterized in that set between two Guan Liangs Reinforced concrete coupling beams are set, coupling beam main reinforcement anchors into Guan Liang, anchors into length and is not less than 1.5 times of reinforcing bar tension anchorage lengths.
5. the CFG piling strtucture for also serving as slope protection pile according to claim 1, which is characterized in that set between arranging CFG outside Reinforced mesh is set, concrete shield is set on the outside of reinforced mesh.
CN201721583014.6U 2017-11-23 2017-11-23 A kind of CFG piling strtucture for also serving as slope protection pile Expired - Fee Related CN207685834U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721583014.6U CN207685834U (en) 2017-11-23 2017-11-23 A kind of CFG piling strtucture for also serving as slope protection pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721583014.6U CN207685834U (en) 2017-11-23 2017-11-23 A kind of CFG piling strtucture for also serving as slope protection pile

Publications (1)

Publication Number Publication Date
CN207685834U true CN207685834U (en) 2018-08-03

Family

ID=62998526

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721583014.6U Expired - Fee Related CN207685834U (en) 2017-11-23 2017-11-23 A kind of CFG piling strtucture for also serving as slope protection pile

Country Status (1)

Country Link
CN (1) CN207685834U (en)

Similar Documents

Publication Publication Date Title
CN103510540B (en) Mortar flag stone retaining wall reinforcement construction method and structure thereof
CN104213717B (en) Multi-storey building integration transformation method of construction
CN208702421U (en) The tunnel support structure of existing pile foundation building is worn under a kind of
CN108385715A (en) A kind of assembled stake arch combination retaining wall and its construction method
CN207110083U (en) Assembled architecture system
CN202194129U (en) Composite prestress soil-blocking pile
CN106088412A (en) L-type steel beam column
CN208534081U (en) A kind of reconstruction structure of old building constructional column
CN110067401A (en) A kind of existing masonry structure is reinforced using prefabricated board wall and its construction method
CN103410144A (en) Prestressed reinforcement rock-socketed cast-in-place pile and construction method thereof
CN203603524U (en) Reinforced stone structure with through-wall steel reinforcement framework and steel wire gauze
CN102912928B (en) Structural member for restraining grouting anchoring connection by using two ends of steel bar and connection method
CN211773695U (en) New and old structure multilayer basement trades and props biography power structure
CN105201525B (en) A kind of recoverable preventing and treating pucking method
CN203603525U (en) Reinforcing structure with clamp plate girder and clamp plate column externally arranged for stone structure
CN207685834U (en) A kind of CFG piling strtucture for also serving as slope protection pile
CN109209440B (en) Vault settlement treatment method for large-span tunnel
CN103498572B (en) The construction method of the additional clamping plate beam of stone structure and clamping plate post ruggedized construction
CN103498567A (en) Method for conducting anti-seismic reinforcement through later-arranged dark ring beams in masonry panel and reinforcement structure thereof
CN206337566U (en) Foundation ditch vertical prestressing anchor pole supporting construction
CN203373753U (en) Pile anchor retaining wall concrete anchor cable top beam structure of foundation ditches
CN206529881U (en) The constructing device of cushion cap and ground girder construction
CN204919568U (en) Compound supporting construction of shallow foundation ditch
CN104675138A (en) Method and structure for reinforcing modified sound-insulation and noise-reduction slab balcony
CN114059792A (en) Connecting structure and method for newly-added beam and existing column with through beam longitudinal ribs

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180803

Termination date: 20211123