CN207685789U - A kind of dam structure of dam - Google Patents

A kind of dam structure of dam Download PDF

Info

Publication number
CN207685789U
CN207685789U CN201721841494.1U CN201721841494U CN207685789U CN 207685789 U CN207685789 U CN 207685789U CN 201721841494 U CN201721841494 U CN 201721841494U CN 207685789 U CN207685789 U CN 207685789U
Authority
CN
China
Prior art keywords
dam
enrockment
bedding
area
thickness
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721841494.1U
Other languages
Chinese (zh)
Inventor
安兴
杨正彬
周俊梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
It Was Yunnan Construction Group Co Ltd
Original Assignee
It Was Yunnan Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by It Was Yunnan Construction Group Co Ltd filed Critical It Was Yunnan Construction Group Co Ltd
Priority to CN201721841494.1U priority Critical patent/CN207685789U/en
Application granted granted Critical
Publication of CN207685789U publication Critical patent/CN207685789U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/11Hard structures, e.g. dams, dykes or breakwaters

Landscapes

  • Revetment (AREA)

Abstract

The utility model belongs to water conservancy construction technical field, and in particular to a kind of dam structure of dam.A kind of dam structure of dam, dam body are trapezium structure, which is characterized in that swim over to downstream from dam and be made of successively the areas rock ballast Gai Chong, clay bedding area, bedding material, Transition Materials, main enrockment, secondary enrockment and loose stone.The utility model also has the characteristics that construction is fast, fastness is good, using the dam structure of the utility model, will not ensure that the safety of dam body there is a situation where infiltration in dam body.

Description

A kind of dam structure of dam
Technical field
The utility model belongs to water conservancy construction technical field, and in particular to a kind of dam structure of dam.
Background technology
Dam can be divided into concrete dam and earth and rockfill dam two major classes.Natural conditions of the type of dam according to dam site, Building wood The Integrated comparatives such as material, construction site, water conservancy diversion, duration, cost are selected.Concrete dam is divided into 3 type of gravity dam, arch dam and buttress dam Type.
1. gravity dam:Remain stable by the frictional force generated between dam body dead weight and basis to bear the thrust of water.Weight The advantages of power dam is simple in structure, and construction is easier to, and durability is good, is suitable for carrying out high dam building on batholith, convenient for setting Discharge structure.But gravity dam volume is big, and cement consumption is more, and the strength of materials fails to make full use of.
2. arch dam:It is for a space shell structure, domed in plane, it is convex to upstream, the effect using arch will be born Horizontal load becomes axial compressive force and reaches two sides basement rock, and two sides skewback supports dam body, keeps dam stabilization.Arch dam has higher Overload capacity.Arch dam is more demanding to ground and two sides rock, and also heavy force dam difficulty is big in construction.In two sides, batholith is hard complete Whole Narrow Valleys dam site, particularly suitable for building arch dam.Generally the ratio of dam base thickness degree T and maximum height of dam H(T/H)It is less than 0.1 referred to as thin arch dam;It is known as arch dam between 0.1~0.3;It is known as gravity-arch dam between 0.4~0.6.If T/H values When bigger, the effect of arch very little is bordering on gravity dam.
3. buttress dam:It is made of inclined capping and buttress.Buttress supports capping, and water pressure is transmitted to buttress by capping, Ground is transmitted to by buttress again.Buttress dam is one of most economical reliable dam type, compared with gravity dam have small, low cost, The advantages that ability of adaptation ground is stronger.By capping form, buttress dam can be divided mainly into 3 kinds:Capping is flat referred to as flat Plate dam;Capping is the referred to as multiple-arch dam of arch;Capping is thickeied the referred to as round-head buttress dam formed by buttress upstream end.Buttress dam is generally Concrete or reinforced concrete structure.Compare with gravity dam, buttress dam has following features:Upstream capping often make it is skewed, Water can help to stablize dam body again on capping;Buttress dam component is thin, uniform internal stress, can give full play to the intensity of material;Branch The lateral rigidity of pier is smaller, and the operating condition of buttress checks when design should be to lateral earthquake;Buttress dam is to foundation condition Requirement heavy force height of dam.
Existing concrete dam is required to be redesigned according to actual conditions in actual building construction process.
Utility model content
The utility model is in order to solve the defects of prior art, to provide a kind of suitable for dam site control runoff area 65.2km2, 2480 ten thousand stere of Average Annual Runoff, averagely storage silt is 3.58 ten thousand tons for many years, and Suspended Sediment Discharge is 2.98 ten thousand tons, the dam structure for the dam that Sediment Transport amount is 0.6 ten thousand tons.
The utility model is achieved by the following technical solution:
A kind of dam structure of dam, dam body are trapezium structure, swum over to from dam downstream be followed successively by the areas rock ballast Gai Chong, Clay bedding area, bedding material, Transition Materials, main enrockment, secondary enrockment and loose stone form, and are additionally provided in the dam body upstream bottom Special material area;The height in the special material area is 3m, and bedding material is C25 concrete face slabs, thickness 2m;The Transition Materials are M7.5 mortars, thickness 1.5-2m;Block clitter of the main enrockment by diameter less than 0.8m is built;The secondary enrockment Built by the block clitter of a diameter of 0.8-1m, the thickness of the loose stone is 0.5-0.8m, the areas rock ballast Gai Chong and The height of the laying height < level of dead waters in clay bedding area.
The anti-flood wall of " L " shape is additionally provided at the top of dam body.
The diameter that mode is stone of piling up of the main enrockment is swum over to upstream from down and is sequentially increased.
The special material area is asphalt brick.
Compared with prior art, the utility model can be suitable for dam site control runoff area 65.2km2, average diameter for many years 2480 ten thousand stere of flow, averagely storage silt is 3.58 ten thousand tons for many years, and Suspended Sediment Discharge is 2.98 ten thousand tons, Sediment Transport Amount is the dam structure of 0.6 ten thousand tons of conditions.The utility model is designed reasonably, material layout and proportioning are set all in accordance with process conditions Meter can be good at the completing to intercept water and control flood of the task.The utility model also has the characteristics that construction is fast, fastness is good, uses The dam structure of the utility model will not ensure that the safety of dam body there is a situation where infiltration in dam body.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model,
In figure:The areas 1- rock ballast Gai Chong, 2- clay beddings area, 3- bedding materials, 4- Transition Materials, 5- anti-flood walls, 6- enrockment, 7- Main enrockment, the special material areas 8-, 9- loose stones.
Specific implementation mode
The utility model is described further with reference to the accompanying drawings and examples, but the scope of protection of the utility model is not It is limited by embodiment.
Embodiment 1
A kind of dam structure of dam, dam body are trapezium structure, swum over to from dam downstream be followed successively by the areas rock ballast Gai Chong, Clay bedding area, bedding material, Transition Materials, main enrockment, secondary enrockment and loose stone form, and are additionally provided in the dam body upstream bottom Special material area;The height in the special material area is 3m, and bedding material is C25 concrete face slabs, thickness 2m;The Transition Materials are M7.5 mortars, thickness 2m;Block clitter of the main enrockment by diameter less than 0.8m is built;The secondary enrockment is by straight Diameter is that the block clitter of 1m is built, and the thickness of the loose stone is 0.8m, the areas rock ballast Gai Chong and clay bedding area It is laid with the height of height < level of dead waters.
The anti-flood wall of " L " shape is additionally provided at the top of dam body.
The diameter that mode is stone of piling up of the main enrockment is swum over to upstream from down and is sequentially increased.
The special material area is asphalt brick.
Embodiment 2
A kind of dam structure of dam, dam body are trapezium structure, swum over to from dam downstream be followed successively by the areas rock ballast Gai Chong, Clay bedding area, bedding material, Transition Materials, main enrockment, secondary enrockment and loose stone form, and are additionally provided in the dam body upstream bottom Special material area;The height in the special material area is 3m, and bedding material is C25 concrete face slabs, thickness 2m;The Transition Materials are M7.5 mortars, thickness 1.5m;Block clitter of the main enrockment by diameter less than 0.8m is built;The secondary enrockment by The block clitter of a diameter of 0.8m is built, and the thickness of the loose stone is 0.5m, the areas rock ballast Gai Chong and clay bedding The height of the laying height < level of dead waters in area.
Remaining is the same as embodiment 1.

Claims (4)

1. a kind of dam structure of dam, dam body are trapezium structure, which is characterized in that swim over to downstream from dam successively by stone The areas Zha Gaichong, clay bedding area, bedding material, Transition Materials, main enrockment, secondary enrockment and loose stone composition, the dam body upstream bottom Special material area is additionally provided in portion;The height in the special material area is 3m;The bedding material is C25 concrete face slabs, and thickness is 2m;The Transition Materials are M7.5 mortars, thickness 1.5-2m;Block clitter of the main enrockment by diameter less than 0.8m is built It forms;The secondary enrockment is built by the block clitter of a diameter of 0.8-1m, and the thickness of the loose stone is 0.5-0.8m, institute The height of the laying height < level of dead waters in the areas rock ballast Gai Chong and clay bedding area that state.
2. a kind of dam structure of dam according to claim 1, which is characterized in that be additionally provided with " L " shape at the top of dam body Anti-flood wall.
3. a kind of dam structure of dam according to claim 1, which is characterized in that the main enrockment piles up mode It swims over to upstream for the diameter of stone from down and is sequentially increased.
4. a kind of dam structure of dam according to claim 1, which is characterized in that the special material area is pitch Brick.
CN201721841494.1U 2017-12-26 2017-12-26 A kind of dam structure of dam Expired - Fee Related CN207685789U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721841494.1U CN207685789U (en) 2017-12-26 2017-12-26 A kind of dam structure of dam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721841494.1U CN207685789U (en) 2017-12-26 2017-12-26 A kind of dam structure of dam

Publications (1)

Publication Number Publication Date
CN207685789U true CN207685789U (en) 2018-08-03

Family

ID=62995775

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721841494.1U Expired - Fee Related CN207685789U (en) 2017-12-26 2017-12-26 A kind of dam structure of dam

Country Status (1)

Country Link
CN (1) CN207685789U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111197300A (en) * 2020-01-09 2020-05-26 中电建十一局工程有限公司 Earth-rock cofferdam back slope type seepage-proofing dam and reverse construction method
CN115613522A (en) * 2022-10-26 2023-01-17 中国海洋大学 Solid impermeable rockfill sea dam

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111197300A (en) * 2020-01-09 2020-05-26 中电建十一局工程有限公司 Earth-rock cofferdam back slope type seepage-proofing dam and reverse construction method
CN111197300B (en) * 2020-01-09 2022-02-18 中电建十一局工程有限公司 Earth-rock cofferdam back slope type seepage-proofing dam and reverse construction method
CN115613522A (en) * 2022-10-26 2023-01-17 中国海洋大学 Solid impermeable rockfill sea dam
CN115613522B (en) * 2022-10-26 2024-06-11 中国海洋大学 Firm anti-seepage rock-fill sea blocking dam

Similar Documents

Publication Publication Date Title
CN101935995B (en) Rock-fill concrete (RFC) and cemented sand and gravel (CSG) composite material dam as well as design and construction method thereof
CN110284516B (en) Light prefabricated concrete slab column foundation and construction method thereof
CN206706772U (en) A kind of double steel sheet pile supporting construction
CN207685789U (en) A kind of dam structure of dam
CN110939104A (en) Mixed seepage-proofing dam
CN104612142B (en) Integral abutment bridge structure based on composite flexible piles and construction method thereof
CN202187340U (en) Socketed pile with concrete-filled steel tube core column
CN109183858A (en) A kind of Novel underground float Structure and its construction method
CN209066456U (en) Squeeze into the superpower concrete tubular pile breast wall type packaged combination anti-slide pile structure of prestressing force
JP6327215B2 (en) Gravity breakwater
CN102031788B (en) Deep well precipitation waterproof construction method of waterproof design-free basement
CN201649039U (en) Embedded building block for riverbank protection slope
CN212000904U (en) Mixed seepage-proofing dam
CN210857264U (en) Highway gravity type retaining wall reinforced structure
CN106245583A (en) A kind of upright cross narrow deep thin-walled barrage
CN210122735U (en) Underground structure anti-floating system based on outward-protruding wing foot plate
CN112832287A (en) Inclined retaining wall
CN205934688U (en) Arch bridge structure
CN205046566U (en) Flood prevention wall I shape precast concrete pile base
CN206768731U (en) A kind of armoured type lightweight dock structure
CN111058368A (en) Corrugated steel reinforcing arch utilizing high-strength grouting material and building method thereof
CN107386207A (en) A kind of environmental protection brick for river levee earth-retaining bank protection
CN217150101U (en) Danger removing structure of grouted stone arch dam
CN216892509U (en) Retaining wall structure
CN204355549U (en) Defeated coal secret tunnel under a kind of ferro-concrete thin shell structure ball-type storehouse

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180803

CF01 Termination of patent right due to non-payment of annual fee