CN207673022U - A kind of new type of light gauge steel composite concrete wallboard hanging apparatus - Google Patents

A kind of new type of light gauge steel composite concrete wallboard hanging apparatus Download PDF

Info

Publication number
CN207673022U
CN207673022U CN201721880820.XU CN201721880820U CN207673022U CN 207673022 U CN207673022 U CN 207673022U CN 201721880820 U CN201721880820 U CN 201721880820U CN 207673022 U CN207673022 U CN 207673022U
Authority
CN
China
Prior art keywords
supporting cell
mounting bracket
composite concrete
concrete wallboard
new type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721880820.XU
Other languages
Chinese (zh)
Inventor
李学峰
陈江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721880820.XU priority Critical patent/CN207673022U/en
Application granted granted Critical
Publication of CN207673022U publication Critical patent/CN207673022U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of new type of light gauge steel composite concrete wallboard hanging apparatus, including playing hanging piece, lift by crane mounting bracket and supporting cell guide, top at the top of the lifting mounting bracket has been provided with hanging piece, the middle position of the lifting mounting bracket bottom is symmetrically installed with supporting cell guide, the centre position of described two supporting cell guides is all provided with outer tube, and the side of supporting cell guide and outer tube is provided with the round thread hole being mutually matched, it is all evenly arranged with positioning bolt on round thread hole on the outer tube, and positioning bolt is on outer tube and the round thread hole that is fixed on supporting cell guide, the opposite side of described two outer tubes is symmetrically installed with hydraulic cylinder, the output end of the hydraulic cylinder is all provided with fixation kit.The utility model is equipped with fixation kit, and when being lifted to different size of lightgage steel joist composite concrete wallboard, fixed effect is more preferable, reduces the probability that safety accident occurs for factory.

Description

A kind of new type of light gauge steel composite concrete wallboard hanging apparatus
Technical field
The utility model is related to equipment technical field for building, specially a kind of new type of light gauge steel composite concrete wallboard Hanging apparatus.
Background technology
Lightgage steel joist is a kind of novel construction material, and with the development of China's modernization construction, lightgage steel joist is used extensively In hotel, terminal, Che Yunzhan, station, recreation ground, market, factory, office building, old building remodeling, interior decoration setting, top The places such as canopy, lightgage steel joist composite concrete wallboard is with light-weight, intensity is high, adapts to waterproof, shockproof, dust-proof, sound insulation, suction Sound, constant temperature and other effects, while also having many advantages, such as short time limit, easy construction, by the preference of people, it is well known that existing When technology carries out the architecture constructions such as building, hanging apparatus is a kind of essential mechanical equipment, and whole work greatly improved Make efficiency, to obtain extensive promotion and application, lightgage steel joist composite concrete wallboard hanging apparatus knot currently on the market Structure is relatively simple, and when being lifted to different size of keel, fixed effect is bad, and in uphill process, keel may be sent out Raw sliding is fallen, and causes some potential safety problems to constructor, while applicable effect is poor, can not be hung to irregular keel Dress, in addition when being lifted to larger keel, lifting rate is relatively low, time-consuming and laborious, seriously drags slow construction speed, in consideration of it, The designer is actively subject to research and innovation to found a kind of new type of light gauge steel composite concrete wallboard hanging apparatus, makes it With more the utility value in industry.
Utility model content
The purpose of this utility model is to provide a kind of new type of light gauge steel composite concrete wallboard hanging apparatus, to solve The problems mentioned above in the background art.
To achieve the above object, the utility model provides the following technical solutions:A kind of new type of light gauge steel composite concrete Wallboard hanging apparatus, including hanging piece, lifting mounting bracket and supporting cell guide are played, the top at the top of the lifting mounting bracket has been provided with The bottom of hanging piece, described hanging piece is provided with rigid rope rope, and the other end of the rigid rope rope is fixedly mounted on lifting mounting bracket, institute The middle position for stating lifting mounting bracket bottom is symmetrically installed with supporting cell guide, and the centre position of described two supporting cell guides is all set Outer tube is equipped with, and the side of supporting cell guide and outer tube is provided with the round thread hole being mutually matched, on the outer tube Positioning bolt is all evenly arranged on round thread hole, and positioning bolt through outer tube and is fixed on the circle on supporting cell guide On threaded hole, the opposite side of described two outer tubes is symmetrically installed with hydraulic cylinder, and the output end of the hydraulic cylinder is all provided with Fixation kit, the fixation kit include fixed plate, pneumatic cylinder, upper limit plate, buffer unit, latch, lower limiting board, described Fixed plate is provided with lower limit far from being equipped with upper limit plate above hydraulic cylinder side in fixed plate below upper limit plate Plate, pneumatic cylinder is equipped at the top of the upper limit plate, and the output end of the pneumatic cylinder through upper limit plate and extends to lower limit Above the plate of position, and latch is installed, the junction of the pneumatic cylinder and latch is provided with buffer unit, the lifting installation The both ends of frame bottom are symmetrically installed with Toolbox, and the bottom of the Toolbox is equipped with vacuum by reinforcing prop and inhales Disk is connected between the supporting cell guide and Toolbox by reinforcing bar, and lift by crane mounting bracket bottom two supporting cell guides it Between be provided with hook, the bottom of the supporting cell guide is all provided with the second electromagnet, and the bottom of second electromagnet is all arranged There is spring, and the other end of spring is provided with the first electromagnet, second electromagnet is identical as the first electromagnet polarity.
Preferably, the hook is detachable setting.
Preferably, it is provided with rubber pad at the top of the lower limiting board, and is evenly arranged with anti-skid chequer at the top of rubber pad.
Preferably, the buffer unit is buffer spring.
Preferably, it is evenly arranged with ribs on the Toolbox.
Preferably, the upper limit plate is identical with the size of lower limiting board.
Compared with prior art, the utility model has the beneficial effects that:The new type of light gauge steel composite concrete wallboard is hung Assembling device is equipped with fixation kit, when being lifted to different size of lightgage steel joist composite concrete wallboard, fixed effect More preferably, buffer unit plays buffer protection function to the process of being locked, and prevents lightgage steel joist from being deformed upon because stress is excessive, Ensure the aesthetics of keel, while also ensuring in uphill process and will not be fallen since keel tilt, has ensured and applied The life security of work person reduces the probability that safety accident occurs for factory, highly practical, outer tube and positioning bolt and housing The setting in round thread hole on pipe, can adjust the height of fixation kit so that lifting operation is more convenient, while being provided with the One electromagnet and the second electromagnet, and the first electromagnet and the second electromagnetism ferromagnetism are identical, repel each other effect after energization, to dress Set a upward initial velocity so that lifting efficiency greatly improves, in addition, device is provided with Toolbox, can place letter Easy lifting device is conveniently operated in construction, which promotes the use of compared to similar product practicability higher convenient for factory.
Description of the drawings
Fig. 1 is the overall structure diagram of the utility model;
Fig. 2 is the fixation kit structural schematic diagram of the utility model.
In figure:1, hanging piece is played;2, rigid rope rope;3, reinforcing bar;4, mounting bracket is lifted by crane;5, Toolbox;6, fixation kit; 601, fixed plate;602, pneumatic cylinder;603, upper limit plate;604, buffer unit;605, latch;606, lower limiting board;7, One electromagnet;8, spring;9, the second electromagnet;10, supporting cell guide;11, outer tube;12, positioning bolt;13, ribs;14、 Vacuum cup;15, hydraulic cylinder;16, it links up with.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
- 2 are please referred to Fig.1, a kind of embodiment provided by the utility model:A kind of new type of light gauge steel composite concrete wallboard Hanging apparatus, including hanging piece 1, lifting mounting bracket 4 and supporting cell guide 10 are played, the top at 4 top of lifting mounting bracket is provided with lifting Part 1, the bottom for playing hanging piece 1 are provided with rigid rope rope 2, and the other end of rigid rope rope 2 is fixedly mounted on lifting mounting bracket 4, lifting peace The middle position for shelving 4 bottoms is symmetrically installed with supporting cell guide 10, and the centre position of two supporting cell guides 10 is all provided with outside Casing 11, and supporting cell guide 10 and the side of outer tube 11 are provided with the round thread hole being mutually matched, the circle on outer tube 11 Positioning bolt 12 is all evenly arranged on shape threaded hole, and positioning bolt 12 through outer tube 11 and is fixed on supporting cell guide 10 Round thread hole on, two opposite sides of outer tube 11 are symmetrically installed with hydraulic cylinder 15, and the output end of hydraulic cylinder 15 is all set It is equipped with fixation kit 6, fixation kit 6 includes fixed plate 601, pneumatic cylinder 602, upper limit plate 603, buffer unit 604, latch 605, lower limiting board 606, fixed plate 601 above 15 side of hydraulic cylinder far from being equipped with upper limit plate 603, and fixed plate 601 The lower section of upper upper limit plate 603 is provided with lower limiting board 606, and the top of upper limit plate 603 is equipped with pneumatic cylinder 602, pneumatic cylinder 602 output end is through upper limit plate 603 and extends to 606 top of lower limiting board, and is equipped with latch 605, pneumatic cylinder 602 The junction of latch 605 is provided with buffer unit 604, the both ends of 4 bottom of lifting mounting bracket are symmetrically installed with tool storage The bottom of case 5, Toolbox 5 is equipped with vacuum cup 14 by reinforcing prop, leads between supporting cell guide 10 and Toolbox 5 The connection of reinforcing bar 3 is crossed, and hook 16, the bottom of supporting cell guide 10 are provided between two supporting cell guides 10 of 4 bottom of lifting mounting bracket Portion is all provided with the second electromagnet 9, and the bottom of the second electromagnet 9 is all provided with spring 8, and the other end of spring 8 is provided with One electromagnet 7, the second electromagnet 9 are identical as 7 polarity of the first electromagnet.
In this embodiment:Hook 16 is detachable setting, replaces, increases to it after facilitating its long-time service to wear The service life of whole device is added, the top of lower limiting board 606 is provided with rubber pad, and is evenly arranged at the top of rubber pad Anti-skid chequer prevents lightgage steel joist composite concrete wallboard when fixed, and bottom is skidded, to cause unnecessary safe thing Therefore buffer unit 604 is buffer spring, use cost is relatively low, and ribs 13 is evenly arranged on Toolbox 5, is improved The intensity of Toolbox 5, upper limit plate 603 is identical with the size of lower limiting board 606, and the effect that is fixedly clamped is more preferable.
Operation principle:The device consuming parts are powered by accumulator, in use, the height of outer tube 11 is adjusted, It is positioned using positioning bolt 12, the axial height of entire fixation kit 6 can be adjusted, open hydraulic cylinder 15, pushed entire fixed Component 6 moves horizontally, and lightgage steel joist composite concrete wallboard constantly, is placed on lower limit by the suitable position for placing wallboard to be achieved It on the plate 606 of position, opens pneumatic cylinder 602 and pushes latch 605 that wallboard is fixed, buffer unit 604 is to fixed locking process Buffer protection is carried out, prevents wallboard from deforming, boom hoisting is lifted by crane to playing a hanging piece 1, before lifting, to the first electromagnet 7 and the Two electromagnet 9 are powered, and because its polarity is identical, generate mutually exclusive active force, have given hanging piece one upward initial velocity, So that lifting lifting is more efficient, Toolbox 5 can place lifting tool, be used for constructor, and vacuum cup 14 also may be used To be lifted by crane to wallboard, 16 setting is linked up with, the wallboard of irregular shape can be lifted by crane.
Although the utility model is described in detail with reference to the foregoing embodiments, those skilled in the art is come Say, still can with technical scheme described in the above embodiments is modified, or to which part technical characteristic into Row equivalent replacement, within the spirit and principle of the utility model, any modification, equivalent replacement, improvement and so on should all It is included within the scope of protection of this utility model.

Claims (6)

1. a kind of new type of light gauge steel composite concrete wallboard hanging apparatus, including play hanging piece (1), lifting mounting bracket (4) and branch Support guide post (10), it is characterised in that:Top at the top of the lifting mounting bracket (4) has been provided with hanging piece (1), described hanging piece (1) bottom is provided with rigid rope rope (2), and the other end of the rigid rope rope (2) is fixedly mounted on lifting mounting bracket (4), described The middle position of lifting mounting bracket (4) bottom is symmetrically installed with supporting cell guide (10), in described two supporting cell guides (10) Between position be all provided with outer tube (11), and supporting cell guide (10) and the side of outer tube (11) are provided with the circle being mutually matched Threaded hole is all evenly arranged with positioning bolt (12), and positioning bolt (12) on the round thread hole on the outer tube (11) On outer tube (11) and the round thread hole that is fixed on supporting cell guide (10), described two outer tubes (11) it is opposite one Side is symmetrically installed with hydraulic cylinder (15), and the output end of the hydraulic cylinder (15) is all provided with fixation kit (6), the fixation kit (6) include fixed plate (601), pneumatic cylinder (602), upper limit plate (603), buffer unit (604), latch (605), lower limit Plate (606), the fixed plate (601) are equipped with upper limit plate (603), and fixed plate above separate hydraulic cylinder (15) side (601) lower limiting board (606) is provided with below upper limit plate (603), gas is installed at the top of the upper limit plate (603) The output end of cylinder pressure (602), the pneumatic cylinder (602) through upper limit plate (603) and extends to above lower limiting board (606), And latch (605) is installed, the pneumatic cylinder (602) and the junction of latch (605) are provided with buffer unit (604), The both ends of described lifting mounting bracket (4) bottom are symmetrically installed with Toolbox (5), and the bottom of the Toolbox (5) is logical It crosses reinforcing prop and vacuum cup (14) is installed, between the supporting cell guide (10) and Toolbox (5) even by reinforcing bar (3) It connects, and hook (16), the bottom of the supporting cell guide (10) is provided between two supporting cell guides (10) of lifting mounting bracket (4) bottom Portion is all provided with the second electromagnet (9), and the bottom of second electromagnet (9) is all provided with spring (8), and spring (8) is another One end is provided with the first electromagnet (7), and second electromagnet (9) is identical as the first electromagnet (7) polarity.
2. a kind of new type of light gauge steel composite concrete wallboard hanging apparatus according to claim 1, it is characterised in that:Institute It is detachable setting to state hook (16).
3. a kind of new type of light gauge steel composite concrete wallboard hanging apparatus according to claim 1, it is characterised in that:Institute It states and is provided with rubber pad at the top of lower limiting board (606), and be evenly arranged with anti-skid chequer at the top of rubber pad.
4. a kind of new type of light gauge steel composite concrete wallboard hanging apparatus according to claim 1, it is characterised in that:Institute It is buffer spring to state buffer unit (604).
5. a kind of new type of light gauge steel composite concrete wallboard hanging apparatus according to claim 1, it is characterised in that:Institute It states and is evenly arranged with ribs (13) on Toolbox (5).
6. a kind of new type of light gauge steel composite concrete wallboard hanging apparatus according to claim 1, it is characterised in that:Institute It is identical with the size of lower limiting board (606) to state upper limit plate (603).
CN201721880820.XU 2017-12-28 2017-12-28 A kind of new type of light gauge steel composite concrete wallboard hanging apparatus Expired - Fee Related CN207673022U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721880820.XU CN207673022U (en) 2017-12-28 2017-12-28 A kind of new type of light gauge steel composite concrete wallboard hanging apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721880820.XU CN207673022U (en) 2017-12-28 2017-12-28 A kind of new type of light gauge steel composite concrete wallboard hanging apparatus

Publications (1)

Publication Number Publication Date
CN207673022U true CN207673022U (en) 2018-07-31

Family

ID=62971977

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721880820.XU Expired - Fee Related CN207673022U (en) 2017-12-28 2017-12-28 A kind of new type of light gauge steel composite concrete wallboard hanging apparatus

Country Status (1)

Country Link
CN (1) CN207673022U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112502350A (en) * 2020-11-25 2021-03-16 湖南江南钢构工程有限公司 Fabricated building keel convenient to hoist and use method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112502350A (en) * 2020-11-25 2021-03-16 湖南江南钢构工程有限公司 Fabricated building keel convenient to hoist and use method thereof
CN112502350B (en) * 2020-11-25 2021-11-05 湖南江南钢构工程有限公司 Fabricated building keel convenient to hoist and use method thereof

Similar Documents

Publication Publication Date Title
CN206705561U (en) A kind of hanging apparatus for lifting sheet material
CN207673022U (en) A kind of new type of light gauge steel composite concrete wallboard hanging apparatus
CN208378169U (en) Battery type hydraulic vacuum suspender
CN206126699U (en) Multi -functional portable lifting machine
CN206940257U (en) Novel mechanical equipment hoisting frame
CN205733110U (en) A kind of thin-walled aluminium car aperture apparatus
CN208700400U (en) A kind of hanging apparatus of cladding glass
CN216785486U (en) Hoisting tool for precast concrete member
CN201292225Y (en) A shaped frame for crawler crane
CN205973449U (en) Jack -up handling rigging of buffering pulley
CN201062431Y (en) Lifting device for cantilever scaffold
CN204152219U (en) Side fascia stone tongs
CN209259432U (en) A kind of elevator emergency safety catch
CN203545501U (en) Auxiliary lifting device of inner crawl type tower crane in small space
CN208603613U (en) Super high-rise building electromechanical equipment masts type hanging apparatus
CN110356957A (en) A kind of assembly suspending protector for building
CN206511853U (en) A kind of graphene building tower crane
CN214834993U (en) Building installation has protector of stability
CN205616459U (en) Soil sampling restores overhead traveling crane elevating system of integrative rig
CN205187789U (en) Building hanging flower basket lifting machine structure
CN209876273U (en) Spring support and hanger convenient to fix
CN220033773U (en) Wallboard hoist device for assembled building
CN203795819U (en) Attached type lifting scaffold anti-inclination locking device
CN204369396U (en) Steel plate strip hanging apparatus
CN219950196U (en) Bracket type pipe piece transverse lifting clamp

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180731

Termination date: 20181228

CF01 Termination of patent right due to non-payment of annual fee