CN207659979U - A kind of middle weathering geology contrary sequence method concrete filled steel tube stand column pile - Google Patents

A kind of middle weathering geology contrary sequence method concrete filled steel tube stand column pile Download PDF

Info

Publication number
CN207659979U
CN207659979U CN201721767027.9U CN201721767027U CN207659979U CN 207659979 U CN207659979 U CN 207659979U CN 201721767027 U CN201721767027 U CN 201721767027U CN 207659979 U CN207659979 U CN 207659979U
Authority
CN
China
Prior art keywords
stake
steel pipe
pipe post
stand column
geology
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721767027.9U
Other languages
Chinese (zh)
Inventor
汪俊波
杜旭峰
杜霁锋
宋乐本
荆元进
刘洋
韩春磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yanjian Group Co Ltd
Original Assignee
Yanjian Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yanjian Group Co Ltd filed Critical Yanjian Group Co Ltd
Priority to CN201721767027.9U priority Critical patent/CN207659979U/en
Application granted granted Critical
Publication of CN207659979U publication Critical patent/CN207659979U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses a kind of middle weathering geology contrary sequence method concrete filled steel tube stand column pile comprising stake holes(1), stake holes(1)It is interior to be equipped with steel pipe post stake(2), it is characterised in that steel pipe post stake(2)Concrete column is inside poured(3), steel pipe post stake(2)Wrap up plastic film layers in outside(4), stake holes(1)Aperture ratio steel pipe post stake(2)The big 400mm of diameter, stake holes(1)With steel pipe post stake(2)Between gap be filled with the supple buffer layer that is made of microlith of 30 50mm grain sizes(5), the utility model construction is simple, it is convenient that material obtains, and saves the duration, and securely and reliably, construction quality is easily guaranteed that, can effectively avoid catalase opposition stanchion and has an adverse effect, ensures the smooth implementation of engineering.

Description

A kind of middle weathering geology contrary sequence method concrete filled steel tube stand column pile
Technical field:
The utility model is related to a kind of middle weathering geology contrary sequence method stand column pile more particularly to a kind of inverse works of middle weathering geology Method concrete filled steel tube stand column pile.
Background technology:
When carrying out reverse construction in middle weathering geology, steel pipe post stake serves not only as vertical branch when reverse construction Support, and as the supporting member of basement, the steel pipe post stake used when reverse construction at present is being cut the earth especially When carrying out catalase, static(al) explosion or mechanical shock fractured rock no matter are used, opposition stanchion is all easy and causes to disturb, pole Big there are the risks that stand column pile is destroyed, and cause stand column pile depression of bearing force.
Utility model content:
A kind of construction is simple is provided the purpose of the utility model is to overcome the deficiency of above-mentioned prior art, material obtains It is convenient, the duration is saved, securely and reliably, construction quality is easily guaranteed that, be can effectively avoid catalase opposition stanchion and is generated unfavorable shadow It rings, ensures the middle weathering geology contrary sequence method concrete filled steel tube stand column pile of engineering smoothly implemented.
The purpose of this utility model can be reached by following measure:A kind of middle weathering geology contrary sequence method steel tube concrete Native stand column pile comprising stake holes, stake holes is interior to be equipped with steel pipe post stake, it is characterised in that has poured concrete in steel pipe post stake Plastic film layers, the big 400mm of diameter of the aperture ratio steel pipe post stake of stake holes, stake holes and steel are wrapped up in column, steel pipe post stake outside Gap between tube column stake is filled with the supple buffer layer being made of microlith of 30-50mm grain sizes.
In order to further realize the purpose of this utility model, the steel pipe post stake outside is in raft foundation bottom elevation line The above package plastic film layers, the gap between stake holes and steel pipe post stake is filled with to be made of microlith of 30-50mm grain sizes Supple buffer layer, the gap between the steel pipe post stake below of raft foundation bottom elevation line and stake holes has poured concrete Layer.
The utility model can generate following good effect compared with the prior art:The utility model is a kind of band flexible buffer The concrete filled steel tube stand column pile of construction, wraps up plastic film on the outside of steel pipe post stake, at the same steel pipe post stake and stake holes it Between filled with 30-50mm grain sizes microliths, form the flexible buffer construction of steel pipe post stake, it is ensured that apply carrying out contrary sequence method When work catalase, disturbance is not generated to concrete filled steel tube stand column pile and destroyed, ensure that of concrete filled steel tube stand column pile itself Quality and bearing capacity protect steel pipe post stake.The utility model construction is simple, it is convenient that material obtains, and saves the duration, peace It is complete reliable, while construction quality is easily guaranteed that, can effectively avoid catalase opposition stanchion and has an adverse effect, ensures engineering Smoothly implement.
Description of the drawings:
Fig. 1 is a kind of structural schematic diagram of embodiment of the utility model;
Fig. 2 is the vertical view of Fig. 1;
Fig. 3 is the structural schematic diagram of the another embodiment of the utility model.
Specific implementation mode:It elaborates below in conjunction with the accompanying drawings to the preferred forms of the utility model:
Embodiment 1:A kind of middle weathering geology contrary sequence method concrete filled steel tube stand column pile(Referring to Fig. 1, Fig. 2)Comprising stake Hole 1, stake holes 1 is interior to be equipped with steel pipe post stake 2, and concrete column 3,2 outside package of steel pipe post stake have been poured in steel pipe post stake 2 Plastic film layers 4, the big 400mm of diameter of the aperture ratio steel pipe post stake 2 of stake holes 1, the sky between stake holes 1 and steel pipe post stake 2 Gap is filled with the supple buffer layer 5 being made of microlith of 30-50mm grain sizes.
Its construction method is as follows:Plastic film 4 is wrapped up in 2 outside of steel pipe post stake, coagulation is poured in steel pipe post stake 2 Soil fills out 30-50mm grain sizes microlith in 2 outside gap of steel pipe post stake, flexible buffer construction is formed, when ensureing fragmented rock body Vibrations steel pipe post stake is not affected greatly.
Embodiment 2:A kind of middle weathering geology contrary sequence method concrete filled steel tube stand column pile(Referring to Fig. 3)Comprising stake holes 1, It is equipped with steel pipe post stake 2 in stake holes 1, concrete column 3, the aperture ratio steel pipe post stake 2 of stake holes 1 have been poured in steel pipe post stake 2 The big 400mm of diameter, plastic film layers 4, stake holes 1 and steel are wrapped up in the outside of steel pipe post stake 2 of 6 or more raft foundation bottom elevation line Gap between tube column stake 2 is filled with the supple buffer layer 5 being made of microlith of 30-50mm grain sizes, raft foundation bottom mark Gap between the 6 steel pipe post stake 2 below of high line and stake holes 1 has poured concrete layer 7.
Its construction method is as follows:The casting concrete inside and outside steel pipe post stake 2, casting concrete height is in raft plate base Plinth bottom elevation line 6 hereinafter, after the concrete initial set poured under raft foundation bottom elevation line 6, at raft foundation bottom elevation line 6 with On the outside of steel pipe post stake 2 wrap up plastic film 4, casting concrete in steel pipe post stake 2 is empty in 2 outside of steel pipe post stake Gap fills out 30-50mm grain sizes microlith, flexible buffer construction is formed, to ensure that vibrations when fragmented rock body do not make steel pipe post stake At larger impact.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is appreciated that can these embodiments be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (2)

1. a kind of middle weathering geology contrary sequence method concrete filled steel tube stand column pile comprising stake holes(1), stake holes(1)It is interior to be equipped with steel pipe Stand column pile(2), it is characterised in that steel pipe post stake(2)Concrete column is inside poured(3), steel pipe post stake(2)Outside package modeling Expect film layer(4), stake holes(1)Aperture ratio steel pipe post stake(2)The big 400mm of diameter, stake holes(1)With steel pipe post stake(2) Between gap be filled with the supple buffer layer that is made of microlith of 30-50mm grain sizes(5).
2. a kind of middle weathering geology contrary sequence method concrete filled steel tube stand column pile according to claim 1, it is characterised in that institute The steel pipe post stake stated(2)Outside is in raft foundation bottom elevation line(6)The above package plastic film layers(4), stake holes(1)And steel pipe Stand column pile(2)Between gap be filled with the supple buffer layer that is made of microlith of 30-50mm grain sizes(5), in raft foundation Bottom elevation line(6)Steel pipe post stake below(2)And stake holes(1)Between gap poured concrete layer(7).
CN201721767027.9U 2017-12-18 2017-12-18 A kind of middle weathering geology contrary sequence method concrete filled steel tube stand column pile Active CN207659979U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721767027.9U CN207659979U (en) 2017-12-18 2017-12-18 A kind of middle weathering geology contrary sequence method concrete filled steel tube stand column pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721767027.9U CN207659979U (en) 2017-12-18 2017-12-18 A kind of middle weathering geology contrary sequence method concrete filled steel tube stand column pile

Publications (1)

Publication Number Publication Date
CN207659979U true CN207659979U (en) 2018-07-27

Family

ID=62941561

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721767027.9U Active CN207659979U (en) 2017-12-18 2017-12-18 A kind of middle weathering geology contrary sequence method concrete filled steel tube stand column pile

Country Status (1)

Country Link
CN (1) CN207659979U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109306704A (en) * 2018-11-19 2019-02-05 中铁隧道局集团有限公司 A kind of aquatic measurement platform multilayer damping stake
CN113502806A (en) * 2021-07-15 2021-10-15 江苏天力建设集团有限公司 Concrete-filled steel tube stand column for weathered geological reverse construction method and construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109306704A (en) * 2018-11-19 2019-02-05 中铁隧道局集团有限公司 A kind of aquatic measurement platform multilayer damping stake
CN109306704B (en) * 2018-11-19 2023-12-26 中铁隧道局集团有限公司 Multilayer shock absorption pile for water measurement platform
CN113502806A (en) * 2021-07-15 2021-10-15 江苏天力建设集团有限公司 Concrete-filled steel tube stand column for weathered geological reverse construction method and construction method

Similar Documents

Publication Publication Date Title
CN207659979U (en) A kind of middle weathering geology contrary sequence method concrete filled steel tube stand column pile
CN110042828A (en) A kind of positioning device for filling pile reinforcement cage and its application method
CN106400784B (en) The construction method of bored concrete pile is made of filling pile cage of reinforcement
CN106400783B (en) The construction method of bored concrete pile is made of expansion steel reinforcement cage
US10100486B2 (en) Method for installing overhead transmission line supports on permafrost soils
CN107938675A (en) A kind of Vertical spots concrete placings technique and device
CN104652408B (en) The stake of bar shaped sand pocket and construction method thereof
CN207331709U (en) The netted retaining structure of deep welding with filler wire
JP2007170099A (en) Method for preventing differential settlement by reducing liquefaction of existing building foundation
CN108677970A (en) The method of the narrow foundation pit backfill construction of ultra-deep
CN205990617U (en) A kind of expansion steel reinforcement cage
CN108487660B (en) Traditional residential green brick wall righting method
CN207277333U (en) Detachable counter-force anchor rod component
RU2556589C1 (en) Arrangement method of supports of overhead power transmission lines on permanently frozen soils
FR2837509A1 (en) Structural foundation with active anchorage of a block set in the ground for wind turbine masts, uses small concrete block strapped in place in ground by anchor cables set deep into the ground below the block
CN208473331U (en) A kind of anti-falling object from high altitude strike Simple protecting of artificial digging pile
JP2018003327A (en) Building foundation
JP2009275448A (en) Foot protection method for foundation concrete pile
CN216103487U (en) Building material storage bin
CN209635749U (en) A kind of pipeline handling apparatus
CN109629550A (en) A kind of permeable built pile of high polymer rubble and its construction method
CN213629474U (en) Original pipeline normal position protection device in underground
CN108675196B (en) Prefabricated box culvert goes out to transport jacking apparatus and its application method
CN104110031B (en) High-bearing capacity foundation pile and its processing method with basis
CN211547701U (en) Building pile foundation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant