CN207650299U - The pilot system of switching 10kV shunt reactor switching overvoltage braking measures - Google Patents

The pilot system of switching 10kV shunt reactor switching overvoltage braking measures Download PDF

Info

Publication number
CN207650299U
CN207650299U CN201721784337.1U CN201721784337U CN207650299U CN 207650299 U CN207650299 U CN 207650299U CN 201721784337 U CN201721784337 U CN 201721784337U CN 207650299 U CN207650299 U CN 207650299U
Authority
CN
China
Prior art keywords
switching
signal
cable
voltage
reactor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721784337.1U
Other languages
Chinese (zh)
Inventor
刘航
谢希
邓旭东
赵晓勇
孙晓勇
谢怡
唐娟
高超
李月华
周孟戈
魏钢
熊浩
杨海龙
潘涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maintenance Branch of State Grid Chongqing Electric Power Co Ltd
Original Assignee
Maintenance Branch of State Grid Chongqing Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maintenance Branch of State Grid Chongqing Electric Power Co Ltd filed Critical Maintenance Branch of State Grid Chongqing Electric Power Co Ltd
Priority to CN201721784337.1U priority Critical patent/CN207650299U/en
Application granted granted Critical
Publication of CN207650299U publication Critical patent/CN207650299U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

The utility model discloses a kind of pilot systems of switching 10kV shunt reactors switching overvoltage braking measure, include the research of the acquisition and recording of signal and braking measure.The acquisition and recording of signal is realized by the monitoring system of sensor, coaxial cable, industrial personal computer three parts composition.The control of braking measure, then consider breaker the different inhibition form of three kinds of operating mode, arrester and rc absorber and identical inhibition form under influence of the installation site to inhibition.The utility model to transient voltage, the current signal in the operation of switching shunt reactor can not only effectively capture and be acquired, and then the changing rule of signal in transient process can be accurately analyzed, but also a more perfect testing program has been researched and proposed to the braking measure of switching shunt reactor switching overvoltage.The utility model all has important directive significance for the selection of the development test of switching shunt reactor switching overvoltage braking measure in substation and optimal inhibition scheme.

Description

The pilot system of switching 10kV shunt reactor switching overvoltage braking measures
Technical field
The utility model is related to switching shunt reactor operating operation test technical field, especially a kind of switching 10kV electricity in parallel The pilot system of anti-device switching overvoltage braking measure.
Background technology
With the development of human society production and living, power system load total amount is more and more heavy, and the fluctuation of load is also cured Hair is complicated, in order to maintain the reliability and stability of power supply, China generally to use shunt reactor conduct in substation low-voltage side The reactive-load compensation equipment of power system voltage regulating.Vacuum circuit breaker is widely used in 10kV and following system due to its excellent performance In, however during vacuum circuit breaker switching, the insulation of the equipment such as breaker explosion, reactor and station change but occurs often The accidents such as breakdown, seriously affect the normal operation of electric system.
Currently, existing patent focus primarily upon substation on-line monitoring and data acquisition, such as application No. is 201420311052.6 " a kind of 10kV shunt reactors switching operation pilot system ", should be patent disclosed that 10kV electricity in parallel The switching operation process monitoring system and monitoring method of anti-device, the system handle signal by the sensor and receiving of inverted signal Industrial personal computer two parts form, and have certain directive significance to field test.
But the comparison for not thering is corresponding patent to carry out braking measure to the switching overvoltage during field test switching Research.Therefore, a kind of pilot system of switching 10kV shunt reactors switching overvoltage braking measure is designed, switching is accurately captured The transient process of combined floodgate prebreakdown and separating brake Restriking overvoltage in the process probes into accident true cause and finds optimal inhibition side Case is significant.
Utility model content
The purpose of this utility model is the experiment system of the switching 10kV shunt reactor switching overvoltage braking measures proposed System;The system also provides a comparison of different operation measure other than the overvoltage current signal to field test is monitored acquisition Under inhibition, and generate optimal inhibition scheme.
The purpose of this utility model is achieved through the following technical solutions:
The pilot system of switching 10kV shunt reactors switching overvoltage braking measure provided by the utility model, including master Become, stand with change, current-limiting reactor, signal gathering unit, industrial personal computer and test circuit unit;
The test circuit unit includes breaker and experiment reactor;
The main transformer is connect by current-limiting reactor with 10kV busbares;The station is connected with change by cable and 10kV busbares It connects;
The experiment reactor is connect by cable with breaker;The breaker is connect with 10kV busbares;
The signal gathering unit is used to acquire the transient signal during switching shunt reactor;
The signal gathering unit is connect by coaxial cable with industrial personal computer;
The transient signal is input to by coaxial cable in industrial personal computer.
Further, the signal gathering unit includes voltage sensor and current sensor;The voltage sensor is used for Obtain voltage transient signal;The current sensor is for obtaining current temporary state signal;
The voltage transient signal includes busbar three-phase voltage, stand with become three-phase voltage, circuit breaker load side three-phase voltage, Shunt reactor three-phase voltage and shunt reactor neutral point voltage;The current temporary state signal include station with become three-phase current, The neutral point current signal of shunt reactor three-phase current and shunt reactor.
Further, the industrial personal computer includes data collecting card, data storage card and manager;The data collecting card passes through Coaxial cable is connect with signal gathering unit;The data collecting card and data storage card are connect with manager respectively;The number According to capture card for acquiring the voltage transient signal obtained by sensor and current temporary state signal;The data storage card is used for Store voltage transient signal and current temporary state signal;The manager is for handling voltage transient signal and current temporary state signal.
Further, further include the control of braking measure, the control of the braking measure includes the choosing of breaker operating mode It selects, arrester installation site and rc absorber installation site;
The selection of the breaker operating mode has breaker phase selection pattern wiring and the non-phase selection pattern wiring of breaker;
The installation site of the arrester is respectively cable head at shunt reactor, cable end piece at shunt reactor, The end stood with cable at the head end of cable at change and station change;
The installation site of the rc absorber is respectively cable head at shunt reactor, cable is last at shunt reactor End, the end stood with cable at the head end of cable at change and station change.
By adopting the above-described technical solution, the utility model has the following advantages:
The unicity that the utility model is no longer limited to busbar voltage obtains, and can acquire the voltage and current of multiple measurement points Signal, the field test data of acquisition can generate overvoltage during many aspects are to switching and carry out deeply thorough point Analysis, while breaker operating mode and installation site can also be probed into inhibition by applying different Restrain measurements Influence, the strick precaution to substation's switching shunt reactor overvoltage, have very strong engineering value.
Other advantages, target and feature of the utility model will be explained in the following description to a certain extent It states, and to a certain extent, based on will be apparent to those skilled in the art to investigating hereafter, or Person can be instructed from the practice of the utility model.The target of the utility model and other advantages can be said by following Bright book is realized and is obtained.
Description of the drawings
The description of the drawings of the utility model is as follows.
Fig. 1 is the arrangement schematic diagram of the signal measurement point of the utility model field test;
Fig. 2 is the utility model signal transmission schematic diagram;
Fig. 3 is the experiment thinking schematic diagram of the utility model field test;
Fig. 4 is the restraining device scheme of installation of the utility model field test.
Specific implementation mode
The utility model is described in further detail with reference to the accompanying drawings and examples.
Embodiment 1
As shown, the experiment system of switching 10kV shunt reactors switching overvoltage braking measure provided in this embodiment System, including main transformer, use of standing change, current-limiting reactor, signal gathering unit, industrial personal computer and test circuit unit;
The test circuit unit includes breaker and experiment reactor;The main transformer is female by current-limiting reactor and 10kV Line connects;The station is connect by cable with 10kV busbares with change;The experiment reactor is connect by cable with breaker;Institute Breaker is stated to connect with 10kV busbares;The signal gathering unit is used to acquire the transient state letter during switching shunt reactor Number;The signal gathering unit is connect by coaxial cable with industrial personal computer;The transient signal is input to work by coaxial cable In control machine.
The signal gathering unit includes voltage sensor and current sensor;The voltage sensor is for obtaining voltage Transient signal;The current sensor is for obtaining current temporary state signal;
The voltage transient signal includes bus bar side three-phase voltage, stands with change three-phase voltage, circuit breaker load side three-phase electricity Pressure, shunt reactor three-phase voltage and shunt reactor neutral point voltage;The current temporary state signal includes station change three-phase electricity The neutral point current signal of stream, shunt reactor three-phase current and shunt reactor.
The industrial personal computer includes data collecting card, data storage card and manager;The data collecting card passes through coaxial electrical Cable is connect with signal gathering unit;The data collecting card and data storage card are connect with manager respectively;The data acquisition Card is for acquiring the voltage transient signal obtained by sensor and current temporary state signal;The data storage card is for storing electricity Press transient signal and current temporary state signal;The manager is for handling voltage transient signal and current temporary state signal.
Further include the control of braking measure, the control of the braking measure includes selecting, taking shelter from the thunder for breaker operating mode The installation site of device and the installation site of rc absorber;
The breaker, voltage zero-cross avoids prebreakdown when phase control techniques can ensure to close a floodgate, current over-zero when separating brake Fracture gap is sufficiently large to be avoided restriking.
The arrester, generally in parallel with by protection equipment, a substantially nonlinear resistance, resistance value is very under normal voltage Greatly, after voltage is more than some threshold value, resistance value is just reduced rapidly, and energy is released over the ground by valve block, can effectively reduce electricity Pressure amplitude value.
The rc absorber is added circuit and changes original high frequency oscillation circuit later, and absorption resistance can add The decaying of fast overvoltage, Absorption Capacitance can reduce the frequency of oscillation of overvoltage to reduce steepness.
The selection of the breaker operating mode has breaker phase selection pattern wiring and the non-phase selection pattern wiring of breaker;
The installation site of the arrester is respectively cable head at shunt reactor, cable end piece at shunt reactor, The end stood with cable at the head end of cable at change and station change;
The installation site of the rc absorber is respectively cable head at shunt reactor, cable is last at shunt reactor End, the end stood with cable at the head end of cable at change and station change.
The voltage sensor of the present embodiment uses condenser divider, current sensor to use Rogowski coil;
Wherein, the voltage and current signals during the acquired shunt reactor switching operation of sensor pass through coaxial cable Undamped transmission, and acquired, be recorded on the data storage disk of industrial personal computer by the capture card of industrial personal computer, while is aobvious in screen Show, convenient for the transient process of observation overvoltage overcurrent in real time.
Voltage sensor measures the voltage signal of following 5 points, including bus bar side three-phase voltage, stand with become three-phase voltage, Circuit breaker load side three-phase voltage, shunt reactor three-phase voltage and shunt reactor neutral point voltage amount to 13 voltage letters Number channel;The current signal of 3 points below current sensor measurement, including station change three-phase current, shunt reactor three-phase electricity The neutral point current of stream and shunt reactor amounts to 7 channel current signals.The industrial personal computer, including data collecting card, data Storage card and manager, for recording the secondary singal converted by sensor.
The coaxial cable amounts to 20, voltage-current sensor and capture card is connected.
The control of the braking measure includes the selection of breaker operating mode, the installation site of arrester and resistance-capacitance absorption The installation site of device.The selection of the breaker operating mode has phase selection pattern and non-phase selection pattern;Under phase selection pattern, withouyt Restraining device probes into the inhibition of its overvoltage;Under non-phase selection pattern, install additional braking measure, change above-mentioned arrester and The installation site of rc absorber:Cable head at shunt reactor, is stood with cable at change at cable end piece at shunt reactor The end of cable at head end and station change, it is collected by comparative analysis to probe into influence of the different location to inhibition Transient voltage current waveform is to obtain best Restrain measurement.
The arrester, including 12/32.4 and 17,/45 two kind of VA characteristic curve, change installation site test and inhibit effect Fruit, position includes cable head at shunt reactor, cable end piece at shunt reactor, stands and is used with the head end and station of cable at change The end of cable at change.The rc absorber, installation site change is identical with arrester, does not repeat.
Embodiment 2
The pilot system of switching 10kV shunt reactors Overvoltage suppressing Study on Measures provided by the utility model in use, Need four aspects of installation for being monitored the selection of device, the selection of measurement point, the thinking of experiment and restraining device.
Monitoring device includes sensor, coaxial cable and industrial personal computer.Sensor includes current sensor and voltage sensor, Voltage sensor selects 10kV capacitive dividers, intrinsic standoff ratio 350:1, current sensor selects Rogowski coil, attenuation multiple It is divided into 10 times and 100 times.Since the frequency of oscillation occurred in field test is in 50Hz-1MHz, sensor is needed at this Frequency range has good frequency response not to be distorted.Sensor also needs to meet substation 10kV pressurized system water simultaneously Flat needs.Since the impedance of industry control machine equipment is 50 ohm, therefore the coaxial cable being attached thereto needs 50 ohm of BNC To ensure that signal is transferred to industrial personal computer from coaxial cable catadioptric does not occur for head.In addition the capture card frequency acquisition of industrial personal computer Should not be too low, the frequency acquisition of the information being otherwise easily lost inside transient-wave, field test is set as 20MHz.
Fig. 1 is signal arrangement principle in the operating operation test method of 10kV shunt reactor switchings, including voltage measurement point, electricity Flow measurement point.It specifically includes:Voltage measurement point includes busbar (#1), stands with change (#2), circuit breaker load (#3), shunt reactor (#4), shunt reactor neutral point (#5).Wherein #1-#4 is three-phase voltage signal channel, in addition the single voltage signal of #5 is logical Road amounts to 13 voltage signal channels.Current measurement point includes in station change (#6), shunt reactor (#7) and shunt reactor Property point (#8).Wherein #6, #7 are three-phase current signal channels, in addition channel current signal single #8, amounts to 7 current signals Channel.
Fig. 2 is the transmission figure of signal in this example, and capacitive divider and Rogowski coil are by the high voltage of primary side, strong Electric current is converted into low-voltage, the secondary singal of weak current.By the cooperation of coaxial cable and build-out resistor by secondary singal into one It walks and is propagated toward industrial personal computer direction, decaying probe is recycled to carry out Scaling to signal, ensure that the signal reached will not be to industry control Machine damages, and finally records data in the storage card of industrial personal computer, and manager can then call in processing storage card Data are so as to ex-post analysis.
Fig. 3 is the experiment thinking schematic diagram of this example.Breaker operating mode is chosen to be phase selection pattern first, is not added with suppression Measure processed judges whether phase selection pattern can be used as a kind of braking measure according to test data;However by breaker operating mode It is chosen to be non-phase selection pattern, unconstrained measure is carried out under the pattern, arrester is installed additional, installs the experiment of rc absorber three classes additional, The inhibition of comparative analysis arrester and rc absorber.Simultaneously it is further noted that not only to consider the classification of restraining device It influences, it is also necessary to consider the influence of restraining device installation site.
Fig. 4 is four kinds of situations of restraining device installation site, including cable head (a) at the change of station, is stood with cable at change Cable head (c) and cable end piece (d) at reactor at end (b), reactor.
To sum up, above-mentioned test method not only allows for the difference of restraining device, it is also considered that restraining device is installed after determining Influence of the difference of position to inhibition.By the comparison of different braking measure feelings, best Restrain measurement is obtained.To avoid Contingency, this example need switching operation 5-10 times for carrying out breaker, each switching operation interval under each braking measure 5-10 minutes.
Finally illustrate, above example is merely intended for describing the technical solutions of the present application, but not for limiting the present application, although ginseng The utility model is described in detail according to preferred embodiment, it will be understood by those of ordinary skill in the art that, it can be to this The technical solution of utility model is modified or replaced equivalently, should all without departing from the objective and range of the technical program Cover in the scope of protection of the utility model.

Claims (4)

1. the pilot system of switching 10kV shunt reactor switching overvoltage braking measures, it is characterised in that:Including main transformer, use of standing Change, current-limiting reactor, signal gathering unit, industrial personal computer and test circuit unit;
The test circuit unit includes breaker and experiment reactor;
The main transformer is connect by current-limiting reactor with 10kV busbares;The station is connect by cable with 10kV busbares with change;
The experiment reactor is connect by cable with breaker;The breaker is connect with 10kV busbares;
The signal gathering unit is used to acquire the transient signal during switching shunt reactor;
The signal gathering unit is connect by coaxial cable with industrial personal computer;
The transient signal is input to by coaxial cable in industrial personal computer.
2. the pilot system of switching 10kV shunt reactors switching overvoltage braking measure as described in claim 1, feature It is:The signal gathering unit includes voltage sensor and current sensor;The voltage sensor is temporary for obtaining voltage State signal;The current sensor is for obtaining current temporary state signal;
The voltage transient signal includes busbar three-phase voltage, stands with change three-phase voltage, circuit breaker load side three-phase voltage, parallel connection Reactor three-phase voltage and shunt reactor neutral point voltage;The current temporary state signal includes station change three-phase current, parallel connection The neutral point current signal of reactor three-phase current and shunt reactor.
3. the pilot system of switching 10kV shunt reactors switching overvoltage braking measure as described in claim 1, feature It is:The industrial personal computer includes data collecting card, data storage card and manager;The data collecting card by coaxial cable with Signal gathering unit connects;The data collecting card and data storage card are connect with manager respectively;The data collecting card is used The voltage transient signal and current temporary state signal obtained by sensor in acquisition;The data storage card is temporary for storing voltage State signal and current temporary state signal;The manager is for handling voltage transient signal and current temporary state signal.
4. the pilot system of switching 10kV shunt reactors switching overvoltage braking measure as described in claim 1, feature It is:The system also includes the control of braking measure, and the control of the braking measure includes selecting, taking shelter from the thunder for breaker operating mode Device installation site and rc absorber installation site;
The selection of the breaker operating mode has breaker phase selection pattern wiring and the non-phase selection pattern wiring of breaker;
The installation site of the arrester is respectively cable head at shunt reactor, cable end piece, use of standing at shunt reactor At change at the head end of cable and station change cable end;
The installation site of the rc absorber is respectively cable head at shunt reactor, cable end piece at shunt reactor, The end stood with cable at the head end of cable at change and station change.
CN201721784337.1U 2017-12-19 2017-12-19 The pilot system of switching 10kV shunt reactor switching overvoltage braking measures Expired - Fee Related CN207650299U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721784337.1U CN207650299U (en) 2017-12-19 2017-12-19 The pilot system of switching 10kV shunt reactor switching overvoltage braking measures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721784337.1U CN207650299U (en) 2017-12-19 2017-12-19 The pilot system of switching 10kV shunt reactor switching overvoltage braking measures

Publications (1)

Publication Number Publication Date
CN207650299U true CN207650299U (en) 2018-07-24

Family

ID=62877959

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721784337.1U Expired - Fee Related CN207650299U (en) 2017-12-19 2017-12-19 The pilot system of switching 10kV shunt reactor switching overvoltage braking measures

Country Status (1)

Country Link
CN (1) CN207650299U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111431158A (en) * 2020-04-23 2020-07-17 佛山科学技术学院 Overvoltage combined suppression system and device of vacuum circuit breaker
CN112345817A (en) * 2020-11-16 2021-02-09 国网吉林省电力有限公司电力科学研究院 Overvoltage test circuit and method for SF6 circuit breaker switching dry-type air-core reactor

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111431158A (en) * 2020-04-23 2020-07-17 佛山科学技术学院 Overvoltage combined suppression system and device of vacuum circuit breaker
CN111431158B (en) * 2020-04-23 2021-11-05 佛山科学技术学院 Overvoltage combined suppression system and device of vacuum circuit breaker
CN112345817A (en) * 2020-11-16 2021-02-09 国网吉林省电力有限公司电力科学研究院 Overvoltage test circuit and method for SF6 circuit breaker switching dry-type air-core reactor

Similar Documents

Publication Publication Date Title
Lin et al. Discrete wavelet transform-based triggering method for single-phase earth fault in power distribution systems
CN100386637C (en) Fault line selection method for single-phase-to-ground fault in small ground current distribution network
CN113036908A (en) Fault analysis method based on relay protection online monitoring and analysis system
CN101699301B (en) Method for measuring line parameter through induced electricity
CN105067948B (en) A kind of Small Electric Current Earthing And Routing Device and single phase earth fault detection method
CN103840437A (en) Quick diagnostic and processing method of power distribution network ferromagnetic resonance and one-phase earth faults
WO2016065959A1 (en) Diagnostic method for ferromagnetic resonance in 10 kv neutral ungrounded system
CN105137158A (en) Power system temporary overvoltage monitoring system
CN207730875U (en) Insulation fault detection device for wind driven generator winding
CN203069685U (en) Comprehensive test instrument for capacitor or inductor switching test
CN102253296A (en) Method for testing comprehensive device of transformer
CN201083800Y (en) Transformer substation insulated live-wire detector based on dummy instrument technology
DE112014001200T5 (en) Overcurrent protection device and method
CN105606955B (en) A kind of faulty line method of discrimination based on numerical differentiation and empirical mode decomposition
CN107449954A (en) Power transformer iron core earth current holography on-Line Monitor Device and method
CN103344911B (en) A kind of high-voltage direct-current switch disconnection overall process state identification method
CN102608499A (en) Low-current line selection device and control method for inhibiting unbalanced current by way of differential filtration
CN207650299U (en) The pilot system of switching 10kV shunt reactor switching overvoltage braking measures
CN204256059U (en) A kind of 10kV shunt reactor switching service test system
CN108089082B (en) High-voltage direct-current neutral bus arrester performance on-line monitoring system and method
CN205229398U (en) Partial discharge data acquisition circuit and detecting system
Zhou et al. Method of cable incipient faults detection and identification based on wavelet transform and gray correlation analysis
CN203191498U (en) Undercurrent grounding line selecting device
Gautam et al. Fault detection & classification of 3-phase transmission line
CN212180984U (en) Low-current grounding line selection system based on separable phase-switching capacitor

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant