CN207648949U - Tuyere structure and air-conditioning - Google Patents

Tuyere structure and air-conditioning Download PDF

Info

Publication number
CN207648949U
CN207648949U CN201721811992.1U CN201721811992U CN207648949U CN 207648949 U CN207648949 U CN 207648949U CN 201721811992 U CN201721811992 U CN 201721811992U CN 207648949 U CN207648949 U CN 207648949U
Authority
CN
China
Prior art keywords
air port
installation frame
port component
connect
side wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721811992.1U
Other languages
Chinese (zh)
Inventor
池晓龙
朱江程
邓勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201721811992.1U priority Critical patent/CN207648949U/en
Application granted granted Critical
Publication of CN207648949U publication Critical patent/CN207648949U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model is related to air conditioner technical field, more particularly to a kind of tuyere structure and air-conditioning.Tuyere structure provided by the utility model, it includes air port component, also, it further includes installation frame, installation frame connect with air port component and is used to connect with the side wall of the construction opening in installing matrix, so that air port component is connected by the side wall of installation frame and construction opening.In the present invention, air port component is connect by installation frame with the side wall of the construction opening in installing matrix, and installation difficulty is relatively low.

Description

Tuyere structure and air-conditioning
Technical field
The utility model is related to air conditioner technical field, more particularly to a kind of tuyere structure and air-conditioning.
Background technology
In order to solve the problems, such as that vertical air conditioner occupies ground space or wall-hanging air conditioner destroys metope, occurs hanging at present Formula air-conditioning, air port component are installed in the installing matrixes such as furred ceiling, to save space, and prevent from causing metope permanently broken It is bad.In the prior art, air port component is directly connect with the upper surface of the installing matrixes such as furred ceiling, and it is inconvenient to there is installation, installation effect It is bad, the problems such as installation strength is not high.Also, air port component is directly contacted with installing matrixes such as furred ceilings, is also easy to noise occur Phenomena such as abnormal.
Utility model content
A technical problem to be solved in the utility model is:Reduce peace of the air port component in the installing matrixes such as furred ceiling Fill difficulty.
In order to solve the above-mentioned technical problem, the utility model first aspect provides a kind of tuyere structure comprising air port Component, also, it further includes installation frame, and installation frame connect with air port component and is used for and the construction opening in installing matrix Side wall connection so that air port component pass through the side wall of installation frame and construction opening connect.
Optionally, installation frame includes at least two mounting bars being oppositely arranged, air port component and be oppositely arranged two Mounting bar connects.
Optionally, installation frame includes four mounting bars, and four mounting bars are opposite two-by-two and are respectively used to and construction opening The connection of surrounding side wall, be connected to each other between adjacent mounting bar.
Optionally, installation frame at least partly be used for be bonded with the side wall of construction opening.
Optionally, the part of installation frame being connect with air port component be located at the upper surface of installing matrix top and/or Lower section positioned at the lower surface of installing matrix.
Optionally, the side wall of air port component is connect with installation frame.
Optionally, it is correspondingly provided with the first connecting hole and the second connecting hole respectively on air port component and installation frame, first connects It is slotted hole to connect one in hole and the second connecting hole, and tuyere structure further includes connector, and connector is inserted into the first connecting hole In the second connecting hole, the connection of air port component and installation frame is realized.
Optionally, the length direction of slotted hole along air port component length direction.
Optionally, the second connecting hole is slotted hole.
Optionally, the connector being inserted into the first connecting hole and the second connecting hole is parallel with the upper surface of installing matrix.
The utility model second aspect additionally provides a kind of air-conditioning comprising the tuyere structure of the utility model.
In the present invention, air port component is connect by installation frame with the side wall of the construction opening in installing matrix, Installation difficulty is relatively low.
By the way that the exemplary embodiment of the utility model is described in detail referring to the drawings, the utility model its Its feature and its advantage will become apparent.
Description of the drawings
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is some embodiments of the utility model, for those of ordinary skill in the art, before not making the creative labor property It puts, other drawings may also be obtained based on these drawings.
Fig. 1 shows scheme of installation of the tuyere structure of one embodiment of the utility model on furred ceiling.
In figure:
1, air port component;2, installation frame;3, connector;F, furred ceiling;21, mounting bar.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.It is illustrative to the description only actually of at least one exemplary embodiment below, is never used as to this practicality Novel and its application or any restrictions used.Based on the embodiments of the present invention, those of ordinary skill in the art are not having There is the every other embodiment carried out and obtained under the premise of creative work, shall fall within the protection scope of the present invention.
Technology, method and apparatus known to person of ordinary skill in the relevant may be not discussed in detail, but suitable In the case of, the technology, method and apparatus should be considered as authorizing part of specification.
In the description of the present invention, it should be understood that the noun of locality such as " front, rear, top, and bottom, left and right ", " laterally, Vertically, vertically, it is horizontal " and " pushing up, bottom " etc. indicated by orientation or positional relationship be normally based on orientation or position shown in the drawings Relationship is set, is merely for convenience of describing the present invention and simplifying the description, in the absence of explanation to the contrary, these nouns of locality Do not indicate that and imply that signified device or element must have a particular orientation or with specific azimuth configuration and operation, because This should not be understood as the limitation to scope of protection of the utility model;The noun of locality " inside and outside " refers to the wheel relative to each component itself Wide is inside and outside.
In the description of the present invention, it should be understood that limiting zero using the words such as " first ", " second " Part, it is only for convenient for being distinguished to corresponding parts, there is no Stated otherwise such as, above-mentioned word there is no particular meaning, Therefore it should not be understood as the limitation to scope of protection of the utility model.
Fig. 1 shows one embodiment of the utility model.Referring to Fig.1, tuyere structure provided by the utility model, Including air port component 1, also, it further includes installation frame 2, and installation frame 2 connect with air port component 1 and is used for and installing matrix On construction opening side wall connection so that air port component 1 is connect by installation frame 2 with the side wall of construction opening.
In the present invention, installing matrix can be furred ceiling F, and the case where some are not arranged with furred ceiling F, it can also For the other structures form such as ceiling or supporting rack.
In the present invention, air port component 1 is connected by the side wall of the construction opening on installation frame 2 and installing matrix It connects, due to the case where being connect with installing matrix upper surface relative to air port component 1, air port component 1 is connect with construction opening side wall When, therefore more convenient operation advantageously reduces installation difficulty of the air port component 1 in installing matrix.Also, due to air port portion Part 1 is no longer directly contacted with installing matrix, therefore, advantageously reduces the risk that noise abnormal phenomenon occurs.
The installation frame 2 of the utility model, shape can be adapted setting with the shape of construction opening.For example, for The case where common construction opening is rectangle, installation frame 2 could be provided as rectangular shape.For another example if construction opening is arranged For the other shapes such as circle when, installation frame 2 may be set to be other round equal corresponding shapes.
As a kind of embodiment of installation frame 2, installation frame 2 may include at least two mounting bars being oppositely arranged 21.In this case, two mounting bars 21 connection that air port component 1 is preferably arranged to and is oppositely arranged.Relative to only with one The case where mounting bar 21 is connected or connect with two neighboring mounting bar 21, air port component 1 and two mounting bars being oppositely arranged When 21 connection, installation is more secured, and mounting stability is more preferable.
In addition, the installation frame 2 of the utility model, can at least partly be used to be bonded with the side wall of construction opening, that is, Installation frame 2 can be integrally bonded with the side wall of construction opening, alternatively, installation frame 2 can part and construction opening Side wall is bonded.The advantages of this arrangement are as follows installation frame 2 is less to the occupancy of construction opening inner space, on the one hand will not Interfere normally the picking and placeing in construction opening of air port component 1, it is easy to disassemble, on the other hand may be installation frame 2 and installation More operating spaces are reserved in the connection of matrix and installation frame 2 and the connection of air port component 1, so as to further decrease Installation difficulty;Moreover, because installation frame 2 can more closely be connect with construction opening side wall, and therefore, bonding strength higher, Stable connection is more preferable, is conducive to air port component 1 being more firmly installed in installing matrix, more efficiently prevents from air port component 1 falls off;Also, since installation frame 2 and the contact area of installing matrix are relatively large, can more fully distractive load, because This, also helps the stress of whole system after improving tuyere structure installation.
In the present invention, the part of installation frame 2 being connect with air port component 1 can be above and below installing matrix Between surface, at this point, when connection air port component 1 is with installation frame 2, it usually needs while installing matrix is connected, especially installing The thinner thickness of frame 2 and when using connections such as screw or pins, screw or pin etc. usually require to enter across installation frame 2 In the side wall of construction opening, drift bolt resistance is larger, when installation fee and laborious.Therefore, in order to further decrease the peace of air port component 1 Difficulty is filled, in the present invention, the part of installation frame 2 being connect with air port component 1 is preferably arranged to be located at installing matrix Upper surface top and/or lower section positioned at the lower surface of installing matrix.Due to this so that installation frame 2 with air port component The part of 1 connection is no longer between the upper and lower surface of installing matrix, therefore, when connecting air port component 1 with installation frame 2, Air port component 1 and installation frame 2 only need to be connected, without connecting installing matrix simultaneously again, therefore, connects resistance smaller, The installation difficulty of air port component 1 is lower.
In addition, the air port component 1 of the utility model, can be connect by its side wall with installation frame 2.Based on this, wind Mouthpiece 1 is installed using side mounting means, be more convenient for and the cooperation of installation frame 2 that connect of construction opening side wall, and Convenient for arranging more tie points, more effectively distractive load, improves stress, reduces deformation.
In the present invention, clamping, threaded connection and pin connection may be used between air port component 1 and installation frame 2 Etc. a variety of connection types.As one such, the first connection can be correspondingly provided on air port component 1 and installation frame 2 respectively Hole and the second connecting hole, and tuyere structure further includes connector 3, connector 3 is inserted into the first connecting hole and the second connecting hole, real The connection of existing air port component 1 and installation frame 2.This connection type, structure is relatively simple, and connection is more convenient.
Wherein, the structure types such as pin may be used in connector 3.Furthermore it is preferred that the first connecting hole and the second connecting hole In one could be provided as slotted hole.Since slotted hole can be that air port component 1 and the change of 2 relative position of installation frame are pre- Certain surplus is stayed, therefore, on the one hand, when connection, the first connecting hole and the second connecting hole no longer need to strictly be aligned, not only can be with The requirement to the first connecting hole and the second connecting hole machining accuracy is reduced, while air port component 1 and peace can also be further decreased Frame up the connection difficulty of frame 2;On the other hand, expanding with heat and contract with cold for air port component 1 is also more adapted to, air port portion can be more efficiently prevented from Between part 1 and installing matrix abnormal sound is generated because expanding with heat and contract with cold.Wherein, it is set with the first connecting hole that will be located on air port component 1 It being set to slotted hole to compare, when by being set as slotted hole positioned at the second connecting hole of installation frame 2, being more convenient the insertion of connector 3 Operation.
Carry out the utility model with reference to embodiment shown in FIG. 1 to be further described.
As shown in Figure 1, in this embodiment, tuyere structure includes air port component 1, installation frame 2 and connector 3, wherein Installation frame 2 is connect with the side wall of the construction opening on the furred ceiling F as installing matrix, and air port component 1 then passes through connector 3 It is connect with installation frame 2.
Wherein, as shown in Figure 1, installation frame 2 includes four mounting bars 21, this four mounting bars 21 are opposite two-by-two and distinguish It connect for the surrounding side wall with construction opening, and is connected to each other between adjacent mounting bar 21.Based on this, the peace of the embodiment The frame 2 that frames up is rectangular.
Also, in this embodiment, air port component 1 passes through its side wall and the phase in four mounting bars 21 of installation frame 2 To two mounting bars 21 connection.Specifically, as shown in Figure 1, air port component 1 passes through two side walls opposite in its width direction Two mounting bars 21 opposite in the width direction of installation frame 2 are connect.Due to this so that air port component 1 is installed using side Mode, and 1 opposite sides of air port component can obtain it is effectively supporting, therefore, installation more it is steady securely.Also, due to air port Opposite two side walls have longer length in 1 width direction of component, convenient for arranging that more first connect on air port component 1 Hole is connect, therefore, is advantageously implemented and more reliably connects, and helps more effectively to disperse stress, reduces deformation.
Wherein, as shown in Figure 1, in this embodiment, along length in opposite two side walls in 1 width direction of air port component Degree direction is equipped at intervals with multiple first connecting holes, then right on two opposite mounting bars 21 in the width direction of installation frame 2 Multiple second connecting holes should be equipped with, the second connecting hole is slotted hole, and the length direction of slotted hole is along the length of air port component 1 Direction is arranged.Connector 3 is inserted into the first connecting hole and the second connecting hole, realizes the connection of air port component 1 and installation frame 2. Since the second connecting hole is slotted hole, allow air port component 1 and the relative position of installation frame 2 to send out in a certain range Raw to change, so that even if air port component 1 expands with heat and contract with cold, air port component 1, which remains on, effectively to be connected with installation frame 2 It connects, to be advantageously implemented, air port component 1 is more stable and reliable on furred ceiling F to be installed.And the length direction of slotted hole is along wind The length direction of mouthpiece 1 can then better adapt to the characteristics of component 1 easy length direction in air port expands with heat and contract with cold, more have Effect ground meets the actual installation demand of air port component 1.
Also, as shown in Figure 1, in this embodiment, under assembled state, the center of the first connecting hole and the second connecting hole Center is located at identical height and position, this makes the connector 3 being inserted into the first connecting hole and the second connecting hole will not be relative to hanging The upper surfaces F are pushed up to tilt, but, the attended operation of be not only more convenient for connector 3 parallel with the upper surfaces furred ceiling F, simultaneously as connection Component is not present in the active force that part 3 is applied, and can more fully be used to air port component 1 closely connecting with installation frame 2, because This, is also beneficial to more firmly connect between realization air port component 1 and installation frame 2.
In addition, as shown in Figure 1, the installation frame 2 of the embodiment, each mounting bar 21 is straight panel, and each mounting bar 21 Low portion be bonded with the side wall of construction opening, while the upper part of each mounting bar 21 by furred ceiling F upper table towards Upper extension.Also, the side wall of two mounting bars 21 being wherein oppositely arranged in width direction, low portion and construction opening connects It connects, upper part is then connect with air port component 1, that is, aforementioned second connecting hole is set to the upper part of the two mounting bars 21. Based on this, installation frame 2 has the low portion being fitted and connected with construction opening side wall, and on the upper surfaces furred ceiling F The upper part of side being connect with air port component 1.
On the one hand, the surface due to the part (aforementioned low portion) of installation frame 2 being located in construction opening and installation The side wall of opening is parallel, accordingly, with respect to installation frame 2 be located at construction opening in part surface relative to construction opening Sidewall slope the case where, installation frame 2 is less to the occupancy of construction opening inner space, is not only generated to air port component 1 dry The possibility related to reduces, while can also be installation frame 2 and the connection of furred ceiling F and the company of installation frame 2 and air port component 1 Reserved more operating spaces are connect, installation difficulty is further decreased, improve installation effectiveness.
On the other hand, since the part of installation frame 2 being located in construction opening is bonded with the side wall of construction opening, because This, installation frame 2 can more closely be connect with the side wall of construction opening, and stress is more preferable, bonding strength higher.
In another aspect, since installation frame 2 has the part (i.e. aforementioned upper part) higher than the upper surfaces furred ceiling F and air port Component 1 is connect with the part higher than the upper surfaces furred ceiling F of installation frame 2, therefore, air port component 1 and peace is being connected with connector 3 Frame up frame 2 when, connector 3 only needs guiding through air port component 1 and installation frame 2, without again also cross construction opening Side wall, so, it needs guiding through air port component 1 and installation frame 2 relative to connector 3 and penetrates the situation in construction opening side wall, The connection of connector 3 is more convenient, can further decrease the connection difficulty of air port component 1 and installation frame 2.Also, due to even Fitting 3 does not penetrate in construction opening side wall, and without being limited by furred ceiling F, therefore, connector 3 can be more freely oval It is moved in hole, the change of this be more convenient for air port component 1 and 2 relative position of installation frame, so as to more effectively adapt to air port Component 1 expands with heat and contract with cold.As it can be seen that setting the part of installation frame 2 connecting with air port component 1 to not to be located at the upper of furred ceiling F It between lower surface, can also coordinate with set slotted hole, more effectively adapt to expanding with heat and contract with cold for air port component 1.
When the tuyere structure based on the utility model installs air port component 1, can follow the steps below:
Installation frame 2 is connect with the side wall of the construction opening in installing matrix;
Air port component 1 is connect with installation frame 2.
By installing installation frame 2 in installing matrix in advance, can directly be connect with installing matrix to avoid air port component 1 It touches, prevents noise exception.Also, the connection of air port component 1 and construction opening side wall is realized using installation frame 2, also Conducive to the installation process of air port component 1 is simplified, installation difficulty is reduced.
Wherein, when connecting air port component 1 with installation frame 2, can air port component 1 be first put into installation from the bottom to top In opening, then utilizes connector 3 to pass through the second connecting hole on the first connecting hole and installation frame 2 on air port component 1, come Air port component 1 is fixed on installation frame 2, it is easy to connect, it is easy to operate.
The foregoing is merely the exemplary embodiments of the utility model, are not intended to limit the utility model, all in this reality Within novel spirit and principle, any modification, equivalent replacement, improvement and so on should be included in the utility model Within protection domain.

Claims (11)

1. a kind of tuyere structure, including air port component (1), which is characterized in that further include installation frame (2), the installation frame (2) it is connect with the air port component (1) and is used to connect with the side wall of the construction opening in installing matrix, so that the air port portion Part (1) is connect by the installation frame (2) with the side wall of the construction opening.
2. tuyere structure according to claim 1, which is characterized in that the installation frame (2) includes at least two opposite The mounting bar (21) of setting, the air port component (1) connect with two mounting bars (21) being oppositely arranged.
3. tuyere structure according to claim 2, which is characterized in that the installation frame (2) includes four mounting bars (21), four mounting bars (21) two-by-two with respect to and be respectively used to connect with the surrounding side wall of the construction opening, adjacent institute It states and is connected to each other between mounting bar (21).
4. tuyere structure according to claim 1, which is characterized in that the installation frame (2) at least partly be used for The side wall of the construction opening is bonded.
5. tuyere structure according to claim 1, which is characterized in that the installation frame (2) with the air port component (1) part connected is located at the top of the upper surface of the installing matrix and/or under the lower surface of the installing matrix Side.
6. tuyere structure according to claim 1, which is characterized in that the side wall of the air port component (1) and the installation Frame (2) connects.
7. according to any tuyere structures of claim 1-6, which is characterized in that the air port component (1) and the installation The first connecting hole and the second connecting hole are correspondingly provided on frame (2) respectively, in first connecting hole and second connecting hole One be slotted hole, and the tuyere structure further includes connector (3), and the connector (3) is inserted into first connecting hole In second connecting hole, the connection of the air port component (1) and the installation frame (2) is realized.
8. tuyere structure according to claim 7, which is characterized in that the length direction of the slotted hole is along the air port The length direction of component (1).
9. tuyere structure according to claim 7, which is characterized in that second connecting hole is slotted hole.
10. tuyere structure according to claim 7, which is characterized in that be inserted into first connecting hole and described second and connect The connector (3) connect in hole is parallel with the upper surface of the installing matrix.
11. a kind of air-conditioning, which is characterized in that include the tuyere structure as described in claim 1-10 is any.
CN201721811992.1U 2017-12-22 2017-12-22 Tuyere structure and air-conditioning Active CN207648949U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721811992.1U CN207648949U (en) 2017-12-22 2017-12-22 Tuyere structure and air-conditioning

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721811992.1U CN207648949U (en) 2017-12-22 2017-12-22 Tuyere structure and air-conditioning

Publications (1)

Publication Number Publication Date
CN207648949U true CN207648949U (en) 2018-07-24

Family

ID=62878061

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721811992.1U Active CN207648949U (en) 2017-12-22 2017-12-22 Tuyere structure and air-conditioning

Country Status (1)

Country Link
CN (1) CN207648949U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108151268A (en) * 2017-12-22 2018-06-12 珠海格力电器股份有限公司 Tuyere structure, air-conditioning and air port component mounting method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108151268A (en) * 2017-12-22 2018-06-12 珠海格力电器股份有限公司 Tuyere structure, air-conditioning and air port component mounting method

Similar Documents

Publication Publication Date Title
CN207648949U (en) Tuyere structure and air-conditioning
CN103940090B (en) Teat pump boiler and heat exchanger thereof
CN108151268A (en) Tuyere structure, air-conditioning and air port component mounting method
CN105464222A (en) Connection assembly for steel structure keels and house adopting connection assembly
CN204887817U (en) Circuit board support component
CN214034547U (en) Mounting structure of assembled wallboard
CN205744744U (en) Cabinet framework angle connector, cabinet framework and rack
CN210567051U (en) Landing leg leveling mechanism
CN210768878U (en) Ventilation unit for tunnel engineering
CN207553396U (en) A kind of antitorque weights-hoist component of curtain-wall stand-column
CN207812790U (en) A kind of aluminum T word pendants
CN203270873U (en) Stone curtain wall framework combined and fixed through connecting pieces
CN211666003U (en) Assembled anti-cracking wall
CN215759577U (en) Steel beam cast steel node with stable structure
CN204507024U (en) Pipe boom support before a kind of
CN207752414U (en) A kind of rack of network server
CN205402982U (en) Refrigeration plant and air condensing units thereof
CN214461397U (en) Connecting profile, combined wall and water treatment plant
CN206743325U (en) For mobile terminal and the fixed support provided with supporting bar and drawbar part
CN205330070U (en) Different limit anchor assembly
CN204781487U (en) Curtain door latch formula connected system
CN212506834U (en) Building heat insulation plate assembly for constructional engineering
CN214367226U (en) Rotatably adjustable joint
CN219300902U (en) Hanging machine support
KR101632927B1 (en) Structure construction coupling member by panel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant