CN207646617U - A kind of integration bridge machine - Google Patents
A kind of integration bridge machine Download PDFInfo
- Publication number
- CN207646617U CN207646617U CN201721572605.3U CN201721572605U CN207646617U CN 207646617 U CN207646617 U CN 207646617U CN 201721572605 U CN201721572605 U CN 201721572605U CN 207646617 U CN207646617 U CN 207646617U
- Authority
- CN
- China
- Prior art keywords
- girder
- types
- extension
- standard segment
- supporting leg
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 210000001331 Nose Anatomy 0.000 claims abstract description 27
- 238000010008 shearing Methods 0.000 claims abstract description 16
- 210000001364 Upper Extremity Anatomy 0.000 claims abstract description 13
- 239000004575 stone Substances 0.000 claims description 36
- 241000282326 Felis catus Species 0.000 claims description 4
- 101700027419 NS2 Proteins 0.000 description 5
- 101710017884 Segment-8 Proteins 0.000 description 5
- 101700009395 orf8 Proteins 0.000 description 5
- 238000010586 diagram Methods 0.000 description 4
- 230000004048 modification Effects 0.000 description 2
- 238000006011 modification reaction Methods 0.000 description 2
- 239000002965 rope Substances 0.000 description 2
- 230000032258 transport Effects 0.000 description 2
- 240000004808 Saccharomyces cerevisiae Species 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000005755 formation reaction Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Abstract
The utility model discloses a kind of integrated bridge machines, including girder standard segment, A type nose girder extensions and the high shearing resistance extension of Y types, the A types nose girder extension is fixedly connected with girder standard segment left end, the high shearing resistance extension of Y types is fixedly connected with girder standard segment right end, girder standard segment, it is fixedly installed upper beam on A type nose girder extensions and the high shearing resistance extension of Y types, it is bridge floor below the A types nose girder extension, the hydraulic pressure tail supporting leg is fixedly mounted on the one end of A type nose girder extensions far from girder standard segment, girder standard segment bottom is fixedly connected with front leg strut vertically, the front leg strut top with girder standard knot is intersegmental is equipped with anti-roller system, the high shearing resistance extension of Y types temporary support assembly before one end far from girder standard segment is equipped with.The integration bridge machine is simple in structure, operation is convenient, greatly improves work efficiency, the reliability of safety and work.
Description
Technical field
The utility model belongs to road and bridge construction technical field, and in particular to a kind of integration bridge machine.
Background technology
Currently, it refers to building bridge that common Bridge Erector type, which has a straddle type and two straddle types, so-called two straddle types Bridge Erector, both at home and abroad
Main beam three outrigger supports before, during and after, to formed two span continuous beam structure types, set a roof beam in place operation when, beam car will wait for
It sets a roof beam in place and is transported to bridge formation tail across trolley slings beam on girder, and row is to preceding in place across waiting for falling beam at frame aperture.According to two straddle types
The operating feature of Bridge Erector, forward and backward supporting leg spacing need to be more than holes box beam length, therefore two straddle type Bridge Erectors can not be in Chinese yeast
Line radius (such as R<It sets a roof beam in place on 1500m), it can not be close to setting a roof beam in place at tunnel face, therefore its application range is restricted.And both
The straddle type Bridge Erector having solves the problems, such as small curve radius operation, but its via operation since complete machine longitudinal size is smaller
It is all more complicated, have plenty of and carry out via using lower nose girder, has plenty of using anchorage via, and both via modes all exist
Operation is cumbersome, working efficiency is low, and has the shortcomings that certain security risk, poor to operating environment adaptability.
Invention content
The purpose of this utility model is to provide a kind of integrated bridge machines, to solve mentioned above in the background art ask
Topic.
To achieve the above object, the utility model provides the following technical solutions:A kind of integration bridge machine, including girder standard
Segment, A type nose girder extensions and the high shearing resistance extension of Y types, the A types nose girder extension is fixed with girder standard segment left end to be connected
It connects, the high shearing resistance extension of Y types is fixedly connected with girder standard segment right end, and girder standard segment, A type nose girders lengthen
It is fixedly installed upper beam on section and the high shearing resistance extension of Y types, is bridge floor below the A types nose girder extension, the A types are led
Hydraulic pressure tail supporting leg and middle supporting leg are vertically arranged between beam extension and bridge floor, the hydraulic pressure tail supporting leg is fixedly mounted on A type nose girders
The one end of extension far from girder standard segment, girder standard segment bottom is fixedly connected with front leg strut vertically, before described
Supporting leg top and girder standard knot are intersegmental to be equipped with anti-roller system, and the high shearing resistance extension of Y types is far from girder standard knot
Temporary support assembly before one end of section is equipped with, the preceding temporary support assembly bottom end is fixedly connected with interim supporting leg, described to face
When supporting leg bottom end be provided with pedestal, the Chuck top is equipped with holder.
Preferably, 80t trolleys and 90t stringers purlin vehicle, the girder mark are installed above the A types nose girder extension
140t trolleys and 160t stringers purlin vehicle are installed above quasi- segment.
Preferably, fixed pulley group, the fixed pulley group are both provided with inside the 80t trolleys and 140t trolleys
Two groups are both provided with, is correspondingly arranged on hanging beam shoulder pole running block below fixed pulley group described in two groups, hanging beam is flat described in two groups
It is additionally provided with compensating pulley between load running block.
Preferably, the front leg strut bottom end is fallen on stone column, and the stone column is provided with three groups, and stone column is put vertically described in two groups
Set, stone column described in one group lie in a horizontal plane in two groups described in stone column top, two groups vertically the stone column bottom end be provided with pedestal, it is described
Chuck top is provided with holder with stone column bottom end.
Preferably, be additionally provided with cross moving track between the hydraulic pressure tail supporting leg and bridge floor, above the interim supporting leg before face
When support assembly on be also installed with supporting leg lifting device and cat ladder and operation platform.
The technique effect and advantage of the utility model:The integration bridge machine passes through the high shearing resistance extension of Y types, girder standard
Segment and A type nose girder extension split-type designs, can be adjusted according to service condition so that and the bridge machine scope of application is wider,
The integration bridge machine is simple in structure simultaneously, operation is convenient, greatly improves work efficiency, the reliability of safety and work.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the structural schematic diagram of A-A sections in the utility model Fig. 1;
Fig. 3 is B-B cross-sectional views in the utility model Fig. 1;
Fig. 4 is C-C cross-sectional views in the utility model Fig. 1;
Fig. 5 is the 140t trolley wire rope rolls of the utility model around structural schematic diagram;
Fig. 6 is the 80t trolley wire rope rolls of the utility model around structural schematic diagram.
In figure:The high shearing resistance extension of temporary support assembly, 2Y types, 3 upper beams, 4 140t trolleys, 5 160t are vertical before 1
Supporting leg, 10A type nose girders extension, 11 hydraulic pressure tail branch in row purlin vehicle, 6 anti-idler wheel systems, 7 front leg struts, 8 girder standard segments, 9
Leg, 14 cross moving tracks, 15 80t trolleys, 16 90t stringers purlin vehicles, 17 supporting leg hoisting mechanisms, 18 cat ladders and operation platform,
19 fixed pulley groups, 20 compensating pulleys, 21 hanging beam shoulder pole running blocks, 22 pedestals, 23 holders, 24 interim supporting legs, 25 stone columns, 26 bridges
Face.
Specific implementation mode
Below with reference to the embodiments and with reference to the accompanying drawing the technical solutions of the present invention will be further described.
The utility model provides a kind of integrated bridge machine as shown in figs 1 to 6, including girder standard segment 8, A types are led
Beam extension 10 and the high shearing resistance extension 2 of Y types, the A types nose girder extension 10 are fixedly connected with 8 left end of girder standard segment,
The high shearing resistance extension of the Y types 2 is fixedly connected with 8 right end of girder standard segment, and girder standard segment 8, A type nose girders lengthen
Upper beam 3 is fixedly installed on the high shearing resistance extension of section 10 and Y types 2,10 lower section of the A types nose girder extension is bridge floor 26,
Hydraulic pressure tail supporting leg 11 and middle supporting leg 9, the hydraulic pressure tail supporting leg 11 are vertically arranged between the A types nose girder extension 10 and bridge floor 26
It is fixedly mounted on 10 one end far from girder standard segment 8 of A type nose girders extension, 8 bottom of girder standard segment is solid vertically
Surely it is connected with front leg strut 7, anti-idler wheel system 6, the Y types highly resistance are installed between 7 top of the front leg strut and girder standard segment 8
Cut extension 2 temporary support assembly 1, preceding 1 bottom of temporary support assembly before one end far from girder standard segment 8 is equipped with
End is fixedly connected with interim supporting leg 24, and 24 bottom end of interim supporting leg is provided with pedestal 22, and 22 top of the pedestal is equipped with branch
Frame 23.
Further, 10 top of the A types nose girder extension is equipped with 80t trolleys 15 and 90t stringers purlin vehicle 16, institute
It states 8 top of girder standard segment and 140t trolleys 4 and 160t stringers purlin vehicle 5 is installed.
Further, it is both provided with fixed pulley group 19 inside the 80t trolleys 15 and 140t trolleys 4, it is described
Fixed pulley group 19 is both provided with two groups, and 19 lower section of fixed pulley group described in two groups is correspondingly arranged on hanging beam shoulder pole running block 21,
It is additionally provided with compensating pulley 20 between hanging beam shoulder pole running block 21 described in two groups.
Further, 7 bottom end of the front leg strut is fallen on stone column 25, and the stone column 25 is provided with three groups, stone described in two groups
Column 25 is placed vertically, stone column 25 described in one group lie in a horizontal plane in two groups described in 25 top of stone column, two groups of 25 bottoms of the stone column vertically
End is provided with pedestal 22, and 22 top of the pedestal is provided with holder 23 with 25 bottom end of stone column.
Further, cross moving track 14, the interim supporting leg 24 are additionally provided between the hydraulic pressure tail supporting leg 11 and bridge floor 26
It is also installed with supporting leg hoisting mechanism 17 and cat ladder and operation platform 18 on the preceding temporary support assembly 1 of top.
Specifically, the integration bridge machine, assembles Bridge Erector, while being bolted and installing on the pedestal of bridge 22
Holder 23 fixes hydraulic pressure tail supporting leg 11 and middle supporting leg 9 on bridge floor 26, front leg strut 7, Bridge Erector is placed on the stone column 25 of traverse
Interim supporting leg 24 be moved to the top of pedestal 22 for needing to place stone column 25, interim supporting leg 24 is unfolded, is placed on holder 23, leads to
It crosses 140t trolleys 4,160t stringers purlin vehicle 5,80t trolleys 15 and 90t stringers purlin vehicle and transports stone column 25, stone column 25 is horizontal
It puts, when close to interim supporting leg 24, one end of stone column 25 slowly moves down, and keeps stone column 25 vertical, stone column 25 is then moved to pedestal
It on 22, is placed on pedestal 22, transports stone column 25 again, 25 traverse of stone column rotates stone column 25 when close to interim supporting leg 24
Then stone column 25 is disposed across on a upper stone column 25 by 180 degree, after the completion, interim supporting leg 24 bounces back, and Bridge Erector moves forward,
Front leg strut 7 is moved on new stone column 25, is carried out new stone column 25 and is placed.
Finally it is pointed out that above example is only the more representational example of the utility model.Obviously, this practicality is new
Type is not limited to the above embodiments, and acceptable there are many deformations.Every foundation the technical essence of the utility model is to above example
Made by any simple modification, equivalent change and modification, be considered as belonging to the scope of protection of the utility model.
Claims (5)
1. a kind of integration bridge machine, including girder standard segment (8), A type nose girder extensions (10) and the high shearing resistance extension of Y types
(2), it is characterised in that:The A types nose girder extension (10) is fixedly connected with girder standard segment (8) left end, the Y types highly resistance
It cuts extension (2) to be fixedly connected with girder standard segment (8) right end, girder standard segment (8), A type nose girder extensions
(10) and on the high shearing resistance extension (2) of Y types it is fixedly installed upper beam (3), is bridge below the A types nose girder extension (10)
Face (26) is vertically arranged with hydraulic pressure tail supporting leg (11) and middle supporting leg (9) between the A types nose girder extension (10) and bridge floor (26),
The hydraulic pressure tail supporting leg (11) is fixedly mounted on the one end of A type nose girder extensions (10) far from girder standard segment (8), the master
Beam standard segment (8) bottom is fixedly connected with front leg strut (7) vertically, between front leg strut (7) top and girder standard segment (8)
Anti- idler wheel system (6) is installed, before the high shearing resistance extension (2) of Y types is equipped in one end far from girder standard segment (8)
Temporary support assembly (1), preceding temporary support assembly (1) bottom end are fixedly connected with interim supporting leg (24), the interim supporting leg
(24) bottom end is provided with pedestal (22), and pedestal (22) top is equipped with holder (23).
2. a kind of integrated bridge machine according to claim 1, it is characterised in that:Above the A types nose girder extension (10)
80t trolleys (15) and 90t stringers purlin vehicle (16) are installed, 140t liftings are installed above girder standard segment (8)
Trolley (4) and 160t stringers purlin vehicle (5).
3. a kind of integrated bridge machine according to claim 2, it is characterised in that:The 80t trolleys (15) and 140t
It is both provided with fixed pulley group (19) inside trolley (4), the fixed pulley group (19) is both provided with two groups, is slided surely described in two groups
It is correspondingly arranged on hanging beam shoulder pole running block (21) below wheel group (19), between hanging beam shoulder pole running block (21) described in two groups also
It is provided with compensating pulley (20).
4. a kind of integrated bridge machine according to claim 1, it is characterised in that:Front leg strut (7) bottom end is fallen in stone column
(25) on, the stone column (25) is provided with three groups, and stone column (25) described in two groups is placed vertically, and stone column (25) level described in one group is put
Set stone column (25) top described in two groups, two groups vertically stone column (25) bottom end be provided with pedestal (22), the pedestal (22)
Top is provided with holder (23) with stone column (25) bottom end.
5. a kind of integrated bridge machine according to claim 1, it is characterised in that:The hydraulic pressure tail supporting leg (11) and bridge floor
(26) it is additionally provided with cross moving track (14) between, peace is also fixed on the preceding temporary support assembly (1) above the interim supporting leg (24)
Equipped with supporting leg hoisting mechanism (17) and cat ladder and operation platform (18).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721572605.3U CN207646617U (en) | 2017-11-22 | 2017-11-22 | A kind of integration bridge machine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721572605.3U CN207646617U (en) | 2017-11-22 | 2017-11-22 | A kind of integration bridge machine |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207646617U true CN207646617U (en) | 2018-07-24 |
Family
ID=62889510
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721572605.3U Active CN207646617U (en) | 2017-11-22 | 2017-11-22 | A kind of integration bridge machine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207646617U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109577204A (en) * | 2018-12-05 | 2019-04-05 | 河南省铁山起重设备有限公司 | A kind of Bridge Erector of the walking without counterweight via hole |
-
2017
- 2017-11-22 CN CN201721572605.3U patent/CN207646617U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109577204A (en) * | 2018-12-05 | 2019-04-05 | 河南省铁山起重设备有限公司 | A kind of Bridge Erector of the walking without counterweight via hole |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201053106Y (en) | Bridge detection and maintenance device | |
CN201250064Y (en) | Front launching nose type bridge girder erection machine for bridge erection | |
CN103669216A (en) | Steel box girder scattered-splicing sliding device and installation method | |
CN207932932U (en) | A kind of twin beams slope Bridge Erector | |
CN103342318A (en) | Lifting device for steel truss inspection trolley working platform and installation method thereof | |
CN107100074A (en) | A kind of lower bearing arch bridge concrete bridge deck construction method | |
CN106436573B (en) | Superelevation Sarasota large span upper beam bracket steel truss stand construction method | |
CN106522362A (en) | Construction device and construction method of steel structure beam of corridor system | |
CN202482776U (en) | Web type bridge fabrication machine for bridge constructions under conditions of heavy winds and high altitudes | |
CN106592962A (en) | Large-height-difference long-span stiff-skeleton cladding concrete formwork construction method and apparatus | |
CN207646617U (en) | A kind of integration bridge machine | |
CN204551283U (en) | In tunnel, large-tonnage is set a roof beam in place fortune frame system | |
CN107059650A (en) | A kind of main rope of suspension bridge thrustor | |
CN207567659U (en) | Double-T shaped beam bridge changes beam construction system | |
CN104110002B (en) | A kind of method for changing steel truss girder bridge floorings | |
CN206667458U (en) | The constructing device of vestibule system steel structure girder | |
CN107604828A (en) | The Bridge Erector of double-T shaped beam bridge | |
CN110158486A (en) | It is a kind of to set up the Bridge Erector and construction method for spelling wide beam | |
CN107700367A (en) | A kind of integrated bridge machine | |
CN206769343U (en) | It is a kind of to be used for the travelling bridge that guardrail is constructed that builds a bridge | |
CN107386128A (en) | Double-T shaped beam bridge changes beam construction system | |
CN207987749U (en) | Ride cable-styled erection crane | |
CN109487696A (en) | A kind of armored concrete cable-carried arch bridge unloads frame method and apparatus | |
CN201665821U (en) | Crown block used for bridge erecting machine | |
CN107401124A (en) | The Bridge Erector of T-shaped beam bridge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |