CN207634085U - A kind of mid-partition of multi-arch road tunnel protection structure - Google Patents

A kind of mid-partition of multi-arch road tunnel protection structure Download PDF

Info

Publication number
CN207634085U
CN207634085U CN201721599782.0U CN201721599782U CN207634085U CN 207634085 U CN207634085 U CN 207634085U CN 201721599782 U CN201721599782 U CN 201721599782U CN 207634085 U CN207634085 U CN 207634085U
Authority
CN
China
Prior art keywords
mid
articulamentum
board
partition
road tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721599782.0U
Other languages
Chinese (zh)
Inventor
邱明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Police Construction (group) Co Ltd
Original Assignee
Police Construction (group) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Police Construction (group) Co Ltd filed Critical Police Construction (group) Co Ltd
Priority to CN201721599782.0U priority Critical patent/CN207634085U/en
Application granted granted Critical
Publication of CN207634085U publication Critical patent/CN207634085U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of mid-partition of multi-arch road tunnel to protect structure; it is related to Highway Tunnel Construction technical field; including the articulamentum on mid-board side wall is arranged, multiple rotating members are evenly arranged on the articulamentum, the rotating member is rotatablely connected with the articulamentum.Enhance the intensity of mid-board using articulamentum, when the impact force action that explosion generates is in mid-board, rotating member is driven rotation, to convert explosion to the impact energy of mid-board the kinetic energy of rotating member, reduce the impact that mid-board is subject to, ensures the load-bearing property of mid-board.

Description

A kind of mid-partition of multi-arch road tunnel protection structure
Technical field
The utility model is related to Highway Tunnel Construction technical fields, more specifically, it relates to a kind of Road Multiple Arch Tunnel Mid-board protects structure.
Background technology
With the continuous infiltration and development of highway in China construction, the case where needing to pass through rock mass, therefore highway tunnel are frequently encountered Road engineering is increased.The monomer tunnel that framing is built is a lot of in route selection, openings position selection etc. limitation, therefore, arcading Tunnel comes into being, and this kind of tunnel is often located at the section of the complicated geologies such as Shallow-buried, country rock weakness, karst, has preferable Applicability and superiority.
Multi-arch Tunnel Construction generally uses middle drift-main tunnel method to excavate, as shown in Figure 1, a middle drift 1 is first excavated, in Mid-board 2 is poured among pilot tunnel 1 and carries out supporting, and main tunnel 3 is then excavated using blasting procedure in 1 left and right sides of middle drift.
Mid-board is the major bearing structures of multiple-arch tunnel, and blast working can cause mid-board brute force attack, to Mid-board is caused to damage, influences the load-bearing property of mid-board.
Utility model content
Problem in view of the prior art, the utility model provide a kind of mid-partition of multi-arch road tunnel protection structure, pass through Rotating member is set on mid-board side wall, converts the impact that explosion generates to the kinetic energy of rotating member, reduces explosion to mid-board Damage, ensure the load-bearing property of mid-board.
To achieve the above object, the utility model provides following technical solution:
A kind of mid-partition of multi-arch road tunnel protection structure, which is characterized in that including the company on mid-board side wall is arranged Layer is connect, multiple rotating members are evenly arranged on the articulamentum, the rotating member is rotatablely connected with the articulamentum.
Through the above technical solutions, using articulamentum enhance mid-board intensity, when explosion generate impact force action in When mid-board, rotating member is driven rotation, to convert explosion to the active force of mid-board the kinetic energy of rotating member, in reduction The impact that partition wall is subject to ensures the load-bearing property of mid-board.
Further, the rotating member includes roller, and multiple grooves are offered on the articulamentum, are fixed in the groove There are rotation axis, the roller to rotate coaxially and connect with the rotation axis.
Through the above technical solutions, when roller is impacted, roller is rotated around rotation axis, and mid-board is rushed in explosion It hits power and is converted into kinetic energy.
Further, the axial direction setting in different angles of multiple rollers.
Through the above technical solutions, since the impact force direction that explosion generates is different, the axial direction of roller is arranged in multi-angle The impact force of explosion can be ensured to maximally eliminate.
Further, the rotating member includes ball, and multiple grooves are offered on the articulamentum, are rotated in the groove It is provided with the ball.
Through the above technical solutions, since ball is spherical, it can be driven and rotate by the impact force of more direction, in The impact that each position of partition wall is subject to can be buffered, and the intensity of mid-board is further enhanced, and ensure the load-bearing property of mid-board.
Further, the rotating member is in layer structure setting, including internal layer, outer layer and the connection internal layer and outer layer Buffer layer.
Through the above technical solutions, since explosion can also bring the sundries such as slungshot to the shock of mid-board, buffer layer is utilized Enhance the impact resistant capability of rotating member, reduces the possibility that rotating member is damaged.
Further, it is connected with elastic component between the articulamentum and the mid-board side wall.
Through the above technical solutions, using elastic component as the buffering between articulamentum and mid-board, generated when explosion Impact force is larger and when articulamentum can not stop completely, impact force is changed into the elastic potential energy of elastic component using elastic component, into One step enhances the protective effect to mid-board.
Further, the articulamentum includes steel plate, the arc-shaped setting of steel plate.
Through the above technical solutions, enhance the protective effect to mid-board using steel plate, also, steel plate is arc, it can Explosive force is decomposed, avoids mid-board somewhere from concentrating stress, enhances the impact resistance of mid-board.
Further, the connection layer surface is provided with flexible pad.
Through the above technical solutions, enhancing the intensity of connection layer surface using flexible pad, avoid slungshot etc. to articulamentum table The destruction in face ensures the protective effect of articulamentum.
Compared with prior art, the utility model has the beneficial effects that:
(1) by the way that articulamentum is arranged on mid-board side wall, and rotating member is set on articulamentum, it will be quick-fried using rotating member The broken kinetic energy that rotating member is converted into the impact energy of mid-board reduces destruction of the explosion to mid-board, ensures holding for mid-board Principal characteristic energy;
(2) by the way that elastic component is arranged between articulamentum and mid-board, the impact force of explosion is converted on the bullet of elastic component Property potential energy, enhance protective effect to mid-board.
Description of the drawings
Fig. 1 is the structural schematic diagram of multiple-arch tunnel;
Fig. 2 is the overall schematic of the utility model embodiment one;
Fig. 3 is the enlarged drawing of A in Fig. 2;
Fig. 4 is the sectional view of the roller of the utility model embodiment one;
Fig. 5 is the overall schematic of the utility model embodiment two.
Reference numeral:1, middle drift;2, mid-board;3, main tunnel;4, articulamentum;5, groove;7, roller;8, rotation axis;9、 Flexible pad;10, internal layer;11, outer layer;12, buffer layer;13, elastic component.
Specific implementation mode
With reference to the accompanying drawings and examples, the utility model is described in detail.
Embodiment one
A kind of mid-partition of multi-arch road tunnel protects structure, referring to Fig. 2, including the connection that is arranged on 2 side wall of mid-board Layer 4, mid-board 2 and articulamentum 4 are in that the arc of indent is arranged, and articulamentum 4 is made of steel plate, in conjunction with Fig. 3,4 court of articulamentum Offer multiple grooves 5 on outer side wall, in groove 5 rotation be provided with rotating member, rotating member includes roller 7, along it in groove 5 Length direction is fixed with rotation axis 8, and roller 7, which rotates coaxially, to be connected in rotation axis 8 and the slot of the peripheral wall of roller 7 protrusion groove 5 Mouthful.When the impact force action that explosion generates is in articulamentum 4, roller 7 is driven rotation, converts impact force to the dynamic of roller 7 Can, reduce the destruction that mid-board 2 is subject to.
In order to enhance cushioning effect of the roller 7 to impact force, axial by multiple rollers 7 is arranged with different angle, to Roller 7 can be driven by the impact force of more direction and rotate, can be to the impact force of more direction into row buffering.
Since explosion can bring the shock to articulamentum 4 such as slungshot, as shown in Fig. 2, 4 surface of articulamentum is covered with flexible pad 9, in the present embodiment, flexible pad 9 uses rubber pad.As shown in figure 4, roller 7 is set as a layer structure, including internal layer 10, outer layer 11 And the buffer layer 12 of internal layer 10 and outer layer 11 is connected, in the present embodiment, internal layer 10 and outer layer 11 are that steel are made, buffer layer 12 are made of rubber.
As shown in Fig. 2, elastic component 13 is connected between 2 side wall of articulamentum 4 and mid-board, and in the present embodiment, elastic component 13 Using steel wire, using steel wire as the buffering between articulamentum 4 and mid-board 2, the impact force that articulamentum 4 is subject to converts For the elastic potential energy of steel wire, the impact resistance of mid-board 2 is further enhanced.
The operation principle and advantageous effect of the present embodiment are:
When the impact force action that explosion generates is in mid-board 2, articulamentum 4 is hit and compression elastic piece 13, by part Impact force is converted into the elastic potential energy of elastic component 13, meanwhile, the roller 7 on articulamentum 4 is driven rotation, by part impact energy It is converted into kinetic energy, to reduce the impact force that mid-board 2 is directly born, destruction of the explosion to mid-board 2 is reduced, ensures mid-board 2 load-bearing property.
Embodiment two
A kind of mid-partition of multi-arch road tunnel protection structure, referring to Fig. 5, difference lies in rotating member packets with embodiment one Ball 14 is included, multiple grooves 5 are offered on articulamentum 4, ball 14 is rotatably dispose in groove 5 and the outer wall of ball 14 protrusion is recessed The notch of slot 5.
The operation principle and advantageous effect of the present embodiment are:
The impact force that explosion generates drives ball 14 to rotate, and converts impact force to the kinetic energy of ball 14, realizes to impact The buffering of power.Since ball 14 is in spherical setting, is rotated so as to be driven by the impact force of more direction, ensure articulamentum 4 Each position can be effectively protected.
The above is only the preferred embodiment of the utility model, and the scope of protection of the utility model is not limited merely to Above-described embodiment, technical solution belonging to the idea of the present invention belong to the scope of protection of the utility model.It should refer to Go out, for those skilled in the art, it is without departing from the principle of the utility model it is several improvement and Retouching, these improvements and modifications also should be regarded as the scope of protection of the utility model.

Claims (8)

1. a kind of mid-partition of multi-arch road tunnel protects structure, which is characterized in that including being arranged in mid-board(2)Company on side wall Connect layer(4), the articulamentum(4)On be evenly arranged with multiple rotating members, the rotating member and the articulamentum(4)Rotation connects It connects.
2. mid-partition of multi-arch road tunnel according to claim 1 protects structure, which is characterized in that the rotating member includes Roller(7), the articulamentum(4)On offer multiple grooves(5), the groove(5)In be fixed with rotation axis(8), the rolling Column(7)With the rotation axis(8)Rotate coaxially connection.
3. mid-partition of multi-arch road tunnel according to claim 2 protects structure, which is characterized in that multiple rollers (7)Axial direction setting in different angles.
4. mid-partition of multi-arch road tunnel according to claim 1 protects structure, which is characterized in that the rotating member includes Ball(14), the articulamentum(4)On offer multiple grooves(5), the groove(5)Middle rotation is provided with the ball (14).
5. mid-partition of multi-arch road tunnel according to claim 3 or 4 protects structure, which is characterized in that the rotating member In layer structure setting, including internal layer(10), outer layer(11)And the connection internal layer(10)And outer layer(11)Buffer layer(12).
6. mid-partition of multi-arch road tunnel according to claim 1 protects structure, which is characterized in that the articulamentum(4) With the mid-board(2)Elastic component is connected between side wall(13).
7. mid-partition of multi-arch road tunnel according to claim 1 protects structure, which is characterized in that the articulamentum(4) Including steel plate, the arc-shaped setting of steel plate.
8. mid-partition of multi-arch road tunnel according to claim 7 protects structure, which is characterized in that the articulamentum(4) Surface is provided with flexible pad(9).
CN201721599782.0U 2017-11-24 2017-11-24 A kind of mid-partition of multi-arch road tunnel protection structure Expired - Fee Related CN207634085U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721599782.0U CN207634085U (en) 2017-11-24 2017-11-24 A kind of mid-partition of multi-arch road tunnel protection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721599782.0U CN207634085U (en) 2017-11-24 2017-11-24 A kind of mid-partition of multi-arch road tunnel protection structure

Publications (1)

Publication Number Publication Date
CN207634085U true CN207634085U (en) 2018-07-20

Family

ID=62854241

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721599782.0U Expired - Fee Related CN207634085U (en) 2017-11-24 2017-11-24 A kind of mid-partition of multi-arch road tunnel protection structure

Country Status (1)

Country Link
CN (1) CN207634085U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111425222A (en) * 2020-04-27 2020-07-17 中国建筑第七工程局有限公司 Method for protecting partition wall in multi-arch tunnel

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111425222A (en) * 2020-04-27 2020-07-17 中国建筑第七工程局有限公司 Method for protecting partition wall in multi-arch tunnel

Similar Documents

Publication Publication Date Title
CN102777208B (en) Method for constructing mining impact-resisting sealed wall
CN101560882B (en) Digging method for preventing strong or strong rock burst on active face
CN207634085U (en) A kind of mid-partition of multi-arch road tunnel protection structure
CN206439059U (en) It is a kind of to be used for the energy dissipating supporting construction in tunnel under large deformation wall rock condition
CN108560714B (en) Additional swinging steel frame for improving earthquake resistance of frame structure
CN212040769U (en) Novel ball mill barrel welt
CN103670268A (en) Combined type shallow hole hammer
CN203701943U (en) Full-section drilling tool and rotary-excavating drilling machine
CN203669733U (en) Combined type down-hole hammer
CN214666430U (en) Pile foundation blasting protector
CN205969537U (en) Seam device is made in rock drilling
CN112302013A (en) Grouting reinforcement anchor rod for supporting
CN104564088A (en) Construction method for heading double pilot tunnels for releasing high-ground stress rockbrust collapsing force
CN211113801U (en) Recyclable inclinometer pipe orifice protection device
CN107939134A (en) A kind of building structure of antidetonation in smart city
CN208996733U (en) A kind of stress relieving structure of tunnel rockburst risk
CN215064147U (en) On-spot enclosure for blasting engineering
CN206980876U (en) A kind of disintegrating machine alloy tup
CN210998527U (en) Multifunctional shockproof hammer for building
CN206190208U (en) Abolish brill
CN212477720U (en) Grouting reinforcement anchor rod for supporting
Peng et al. Vibration effect on the working tunnel induced by an adjacent blasting.
CN215170199U (en) Novel blast shock wave and dust protection device
CN205349233U (en) Tooth combination formula terminal surface sphere type down --hold drill bit is bored to multiple tooth shape
CN219546660U (en) High side slope anchor bolt support construction hanging basket stabilising arrangement

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180720

Termination date: 20211124

CF01 Termination of patent right due to non-payment of annual fee