CN207634026U - For water drilling translation and the fluting counter-force holder device of Slope angle adjustment - Google Patents

For water drilling translation and the fluting counter-force holder device of Slope angle adjustment Download PDF

Info

Publication number
CN207634026U
CN207634026U CN201721538299.1U CN201721538299U CN207634026U CN 207634026 U CN207634026 U CN 207634026U CN 201721538299 U CN201721538299 U CN 201721538299U CN 207634026 U CN207634026 U CN 207634026U
Authority
CN
China
Prior art keywords
track
water drilling
bolt
pedestal
longitudinal movement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721538299.1U
Other languages
Chinese (zh)
Inventor
吴中鑫
盛海军
邱业亮
刘兴旺
陈进
许鑫
韩涛
陈国梁
韩永平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Road and Bridge Special Engineering Co Ltd
Original Assignee
CCCC Road and Bridge Special Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Road and Bridge Special Engineering Co Ltd filed Critical CCCC Road and Bridge Special Engineering Co Ltd
Priority to CN201721538299.1U priority Critical patent/CN207634026U/en
Application granted granted Critical
Publication of CN207634026U publication Critical patent/CN207634026U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses it is a kind of for water drilling translation and Slope angle adjustment fluting counter-force holder device, which includes load fixing device, two longitudinal movement tracks, two transverse shifting tracks, pedestals;It load channel steel that load fixing device is provided with slot by two and is welded on load channel steel both sides and is provided with the anchor plate of bolt hole and form;Longitudinal movement track, transverse shifting track are to be provided with slot and both ends are provided with bolt hole and the U-steel equipped with tracks positioned bolt, pedestal is made of pedestal bottom plate, the water drilling working plate being connected with each other, pedestal bottom plate four corners are provided with bolt hole and are furnished with foundation bolt, and water drilling working plate is for connecting water drilling;It is connected across slot by bolt between load channel steel, longitudinal movement track, moving track, pedestal.The utility model is simple in structure, easy for installation, easy to operate, can manually dismount, and workpiece can reuse, and ensure that precision and construction quality that beam bottom is slotted obliquely, has great promotional value.

Description

For water drilling translation and the fluting counter-force holder device of Slope angle adjustment
Technical field
The utility model is related to bridge and the realm of building construction, and in particular to a kind of for water drilling translation and Slope angle adjustment Fluting counter-force holder device.
Background technology
With the fast development of economic technology, capital construction facility is more and more, due to design, construction or other reasons, warp It often needs to carry out slot treatment obliquely to existing structure, such as:Be embedded in the replacement of suspension cable or sunpender anchor head in beams of concrete, Drain hole fluting, fluting check the constructions such as steel strand wires situation in beam.However, will be generated to the stress of structure to main structure fluting Larger impact, entail dangers to structure itself and the safety of driving or pedestrian when serious, thus need to accurately be slotted to structure, to the greatest extent Amount reduces influence of the fluting to structure.
Traditional technique is slotted to structure with hand water drill or using high-pressure water jet construction technology.Hand-held water Boring fluting can not be ensured by construction personnel with the position and included angle, construction quality for feeling control fluting;High-pressure water jet exists Can form more dense water mist when cutting concrete, construction personnel can not observe the concrete condition in slot, construction precision and Quality is unable to control.
Utility model content
Utility model aims to solve shortcomings and deficiencies existing for above-mentioned background technology, provide a kind of flat for water drilling The fluting counter-force holder device of shifting and Slope angle adjustment.
The purpose of this utility model is achieved through the following technical solutions:
It is a kind of for water drilling translation and the fluting counter-force holder device of Slope angle adjustment, including load fixing device, two are vertical To moving track, two transverse shifting tracks, pedestals.
The load fixing device mainly by two load channel steels and is welded on the anchor plates of load channel steel both sides and forms. On the load channel steel small range be provided with for screw rod by slot, to fixed and fine tuning longitudinal movement track.The anchoring It is provided with bolt hole on plate, load fixing device is fixed on by beams of concrete bottom by anchor bolt, is provided for fluting counter-force holder Counter-force fulcrum.Preferably, multiple stiffeners are welded to enhance the bending stiffness of load channel steel in the bottom of the load channel steel.
The longitudinal movement track is U-steel, be provided on the U-steel for screw rod by slot, both ends are provided with spiral shell Keyhole is simultaneously furnished with long rails positioning bolt accordingly.Made by the way that long rails positioning bolt to be fixed at load channel steel slot Longitudinal movement track is connected with load channel steel.Two longitudinal movement tracks are located between two load channel steels.The longitudinal movement The slot of track for transverse shifting track by cross track positioning bolt along vertical bridge to translation, fluting position is realized with this The longitudinal movement set.
The transverse shifting track is U-steel, be provided on the U-steel for screw rod by slot, both ends are provided with spiral shell Keyhole is simultaneously furnished with cross track positioning bolt accordingly.By passing through longitudinal movement track slot to make cross track positioning bolt Transverse shifting track is connected with longitudinal movement track.Two transverse shifting tracks are located between two longitudinal movement tracks.It is mobile When, transverse shifting track drives cross track positioning bolt to be translated along the slot of longitudinal movement track.It is described laterally to move The slot in dynamic rail road is moved by foundation bolt along direction across bridge for pedestal.
The pedestal is mainly made of the pedestal bottom plate, the water drilling working plate that are connected with each other.The pedestal bottom plate four corners It is provided with bolt hole and is furnished with foundation bolt accordingly, pedestal bottom plate passes through the slot of transverse shifting track to make base by foundation bolt Seat is connected with transverse shifting track;The water drilling working plate is for connecting water drilling.Preferably, both sides below the pedestal bottom plate Equipped with semicircle angle control panel with a scale.The water drilling pedestal installation bolt of fixed water drilling is provided on the water drilling working plate Hole;The two sides of the water drilling working plate both side plate is equipped with double nut angle adjustable bolt;One end of the water drilling working plate Equipped with axis pin.On the pedestal bottom plate rectangular opening for accommodating axis pin, pedestal bottom plate are provided among two semicircle angle control panels It is connected by axis pin with water drilling working plate.By translating laterally walking track, pedestal, and fine tuning longitudinal movement track, energy Enough spatial position positioning for realizing fluting.When construction, water drilling working plate is adjusted by semicircle angle control panel with a scale With the angle of pedestal bottom plate, two nuts of double nut angle adjustable bolt is recycled to be fastened with semicircle angle control panel, from And realize the adjustment and fixation of water drilling included angle obliquely.
In use, first being drilled on beams of concrete according to the bolt hole position of load fixing device anchor plate, then pass through Load channel steel is fixed on beams of concrete bottom by anchor bolt;The longitudinal walking track of installation, by long rails positioning bolt with Load channel steel is fixed together, fine-tuning when necessary;Laterally walking track is installed again, it will by cross track positioning bolt Laterally walking track links together with longitudinal walking track;Last installation pedestal, by foundation bolt by pedestal and lateral line It walks track to link together, the angle that water drilling drills obliquely is adjusted by double nut angle adjustable bolt;Wait for that angle is adjusted Water drilling is installed again later, you can concrete of slotting obliquely.When dismounting, pedestal is first removed, then removes laterally walking track, then Longitudinal walking track is removed, finally removes load fixing device, the workpiece of dismounting is in case use next time.
The utility model has the following advantages that and advantageous effect:
(1) the utility model structure adaptability is wide, reasonable for structure, easy to use, cheap, safe and reliable, can be applicable in In the construction operation that beam bottom is slotted obliquely.
(2) the utility model is assembled with channel steel, and the assembly and dismounting of reaction frame can manually be rapidly completed, have Preferable operability.
(2) the utility model is provided reliable anti-by the way that reaction frame and beams of concrete are linked as entirety for water drilling construction Power supports, mechanical structure reasonable design.
(3) angle that the utility model is drilled obliquely by the hinge-type construction adjustment water drilling of pedestal, a set of equipment are Can complete different location, different angle slot grooving obliquely, ensure that the precision of drilling, improve the weight of counter-force holder device Multiple utilization rate, has preferable economic results in society.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model;
Structural schematic diagram when Fig. 2 is the utility model non-installation pedestal;
Fig. 3 is the structural schematic diagram of the utility model pedestal;
Fig. 4 is the structural schematic diagram of the pedestal bottom plate of the utility model pedestal;
Fig. 5 is the structural schematic diagram of the water drilling working plate of the utility model pedestal;
Fig. 6 is the structural schematic diagram of the double nut angle adjustable bolt of the utility model pedestal;
Wherein:1-load channel steel;2-longitudinal movement tracks;3-transverse shifting tracks;4-pedestals;5-load channel steels Anchor plate;6-anchor bolts;7-slots;8-reinforcing plates;9-long rails positioning bolts;10-cross tracks position spiral shell Bolt;11-pedestal bottom plates;12-water drilling working plates;13-double nut angle adjustable bolts;14-axis pins;15-semicircle angles Spend control panel;16-foundation bolts;17-water drilling pedestal installation bolt holes;L-beams of concrete;Z-water drilling.
Specific implementation mode
With reference to embodiment and attached drawing, the utility model is described in further detail, but the implementation of the utility model Mode is without being limited thereto.
Embodiment 1
Referring to Fig. 1-6, it is a kind of for water drilling translation and Slope angle adjustment fluting counter-force holder device, including load fix dress It sets, two longitudinal movement tracks 2, two transverse shifting tracks 3, pedestals 4.
Load fixing device mainly by two load channel steels 1 and is welded on the anchor plates 5 of 1 both sides of load channel steel and forms. Multiple stiffeners 8 are welded to enhance the bending stiffness of load channel steel 1 in 1 bottom of load channel steel.Small range is provided with confession on load channel steel 1 Screw rod by slot, to fixed and fine tuning longitudinal movement track 2.It is provided with bolt hole on anchor plate 5, passes through anchor bolt 6 Load fixing device is fixed on beams of concrete bottom, counter-force fulcrum is provided for fluting counter-force holder.
Longitudinal movement track 2 is U-steel, be provided on U-steel for screw rod by slot, U-steel both ends are provided with bolt Simultaneously it is furnished with long rails positioning bolt 9 accordingly in hole.By the way that long rails positioning bolt 9 is fixed at 1 slot of load channel steel Longitudinal movement track 2 is set to be connected with load channel steel 1.Two longitudinal movement tracks 2 are located between two load channel steels 1.It is longitudinal to move The slot in dynamic rail road 2 for transverse shifting track 3 by cross track positioning bolt 10 along vertical bridge to translation, realized with this The longitudinal movement of slotting position.
Transverse shifting track 3 is U-steel, be provided on U-steel for screw rod by slot, U-steel both ends are provided with bolt Simultaneously it is furnished with cross track positioning bolt 10 accordingly in hole.By the way that cross track positioning bolt 10 is passed through longitudinal movement 2 slot of track Hole makes transverse shifting track 3 be connected with longitudinal movement track 2.Two transverse shifting tracks 3 be located at two longitudinal movement tracks 2 it Between.When mobile, transverse shifting track 3 drives cross track positioning bolt 10 to be translated along the slot of longitudinal movement track 2. The slot of transverse shifting track 3 is moved by foundation bolt 16 along direction across bridge for pedestal 4.
Pedestal 4 is mainly made of pedestal bottom plate 11, water drilling working plate 12.11 four corners of pedestal bottom plate are provided with bolt hole simultaneously It is furnished with foundation bolt 16 accordingly;11 lower section both sides of pedestal bottom plate are equipped with semicircle angle control panel 15 with a scale.Water drilling work Make the water drilling pedestal installation bolt hole 17 that fixed water drilling is provided on bottom plate 12;The two sides of 12 both side plate of water drilling working plate is equipped with double Nut angle adjustable bolt 13;One end of water drilling working plate 12 is equipped with axis pin 14.Two semicircle angles on pedestal bottom plate 11 The rectangular opening for accommodating axis pin 14 is provided among control panel 15, pedestal bottom plate 11 and water drilling working plate 12 are connected by axis pin 14. By translating laterally walking track 3, pedestal 4, and fine tuning longitudinal movement track 2, the spatial position positioning of fluting can be realized. When construction, the angle of water drilling working plate 12 and pedestal bottom plate 11 is adjusted by semicircle angle control panel 15 with a scale, then It is fastened using two nuts and semicircle angle control panel 15 of double nut angle adjustable bolt 13, to realize water drilling obliquely The adjustment and fixation of included angle.
In use, first being drilled on beams of concrete according to the bolt hole position of load fixing device anchor plate 5, then pass through Load channel steel 1 is fixed on beams of concrete bottom by anchor bolt 6 (expansion bolt);The longitudinal walking track 2 of installation, passes through longitudinal rail Road positioning bolt 9 is fixed together with load channel steel 1, fine-tuning when necessary;Laterally walking track 3 is installed again, passes through cross Laterally walking track 3 and longitudinal walking track 2 are linked together to tracks positioned bolt 10;Last installation pedestal 4, passes through base Seat bolt 16 links together pedestal 4 and laterally walking track 3, and it is oblique to adjust water drilling by double nut angle adjustable bolt 13 The angle of upper drilling;Wait for that angle installs water drilling again after adjusting, you can concrete of slotting obliquely.When dismounting, base is first removed Seat 4, then laterally walking track 3 is removed, longitudinal walking track 2 is then removed, load fixing device, the workpiece of dismounting are finally removed In case next time uses.
The utility model is simple in structure, easy for installation, easy to operate, and dismounting manually can be realized;And it can reduce artificially not Controllable factor ensures that precision and construction quality that beam bottom is slotted obliquely, the workpiece used can reuse, has saved a large amount of Material, have great promotional value.
The above embodiment is a preferred embodiment of the present invention, but embodiments of the present invention are not by above-described embodiment Limitation, it is other it is any without departing from the spirit and principles of the present invention made by changes, modifications, substitutions, combinations, simplifications, Equivalent substitute mode is should be, is included within the scope of the present invention.

Claims (5)

1. it is a kind of for water drilling translation and Slope angle adjustment fluting counter-force holder device, it is characterised in that:It fixes and fills including load It sets, two longitudinal movement tracks, two transverse shifting tracks, pedestals;
The load fixing device mainly by two load channel steels and is welded on the anchor plates of load channel steel both sides and forms;It is described Be provided on load channel steel for screw rod by slot;It is provided with bolt hole on the anchor plate;
The longitudinal movement track is U-steel, be provided on the U-steel for screw rod by slot, both ends are provided with bolt hole And it is furnished with long rails positioning bolt;Long rails positioning bolt, which is fixed at load channel steel slot, to be made longitudinal movement track and holds Power channel steel is connected;Two longitudinal movement tracks are located between two load channel steels;
The transverse shifting track is U-steel, be provided on the U-steel for screw rod by slot, both ends are provided with bolt hole And it is furnished with cross track positioning bolt;Cross track positioning bolt passes through longitudinal movement track slot to make transverse shifting track and indulge It is connected to moving track;Two transverse shifting tracks are located between two longitudinal movement tracks;
The pedestal is mainly made of the pedestal bottom plate, the water drilling working plate that are connected with each other;The pedestal bottom plate four corners are provided with Bolt hole simultaneously accordingly be furnished with foundation bolt, pedestal bottom plate by foundation bolt pass through transverse shifting track slot make pedestal with Transverse shifting track is connected.
2. fluting counter-force holder device according to claim 1, it is characterised in that:The bottom welding of the load channel steel is more A stiffener.
3. fluting counter-force holder device according to claim 1, it is characterised in that:It is provided with water on the water drilling working plate Bore pedestal installation bolt hole.
4. fluting counter-force holder device according to claim 1, it is characterised in that:Both sides are equipped with below the pedestal bottom plate The two sides of semicircle angle control panel with a scale, the water drilling working plate both side plate is equipped with double nut angle adjustable bolt.
5. fluting counter-force holder device according to claim 4, it is characterised in that:One end of the water drilling working plate is set There is axis pin;Be provided with the rectangular opening for accommodating axis pin on the pedestal bottom plate among two semicircle angle control panels, pedestal bottom plate and Water drilling working plate is connected by axis pin.
CN201721538299.1U 2017-11-17 2017-11-17 For water drilling translation and the fluting counter-force holder device of Slope angle adjustment Active CN207634026U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721538299.1U CN207634026U (en) 2017-11-17 2017-11-17 For water drilling translation and the fluting counter-force holder device of Slope angle adjustment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721538299.1U CN207634026U (en) 2017-11-17 2017-11-17 For water drilling translation and the fluting counter-force holder device of Slope angle adjustment

Publications (1)

Publication Number Publication Date
CN207634026U true CN207634026U (en) 2018-07-20

Family

ID=62856763

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721538299.1U Active CN207634026U (en) 2017-11-17 2017-11-17 For water drilling translation and the fluting counter-force holder device of Slope angle adjustment

Country Status (1)

Country Link
CN (1) CN207634026U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109295866A (en) * 2018-11-22 2019-02-01 华东交通大学 A kind of automatic slotting system of embedded reinforcement bridge

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109295866A (en) * 2018-11-22 2019-02-01 华东交通大学 A kind of automatic slotting system of embedded reinforcement bridge

Similar Documents

Publication Publication Date Title
CN207212398U (en) A kind of chute fixes diagonal-bracing type evacuation platform
CN207161110U (en) One kind construction open cut horseshoe shaped section tunnel roof self-travel type is mobile trolley used
CN207634026U (en) For water drilling translation and the fluting counter-force holder device of Slope angle adjustment
CN106758590A (en) The construction beam and construction method of railroad track are changed under the conditions of for not stopping transport
CN103527121A (en) Follow-up frame of rotary drill rig and rotary drill rig
CN202969177U (en) Combined type track framed bent for paving ballastless track
CN113235971A (en) Large-area dismantling device and process for wall structure of subway station
KR20090108810A (en) Method for raising a bridge and the raising structure there of
CN208236000U (en) New increasing steel beam and concrete column hinged joint
CN103225263A (en) Orthotropic steel box bridge deck with track steel .truss girder for railway ballastless
CN204627431U (en) A kind of cob wall water drilling punches bracing frame
CN209798454U (en) Track panel supporting device with transverse synchronous movement and ultra-high stepless adjusting mechanism
CN211967981U (en) Top auxiliary frame that punches for building
CN108274169A (en) Novel suspention is stretched bonding machine
KR101281497B1 (en) Concrete ballast perforating apparatus for rail fixation device installation
CN112627064A (en) Minimally invasive reinforcement construction equipment for transverse partition plate of inner cavity of box girder and construction method thereof
CN105880686A (en) Hole processing mechanism
CN203008390U (en) Roof truss installation device
CN208995899U (en) A kind of steel anchor plate type cable beam anchoring structure for cable-stayed bridge concrete girder
CN208121587U (en) Auxiliary leg before Large span bridging machine variable-span multi-stage expansion
CN203188069U (en) Track skeleton frame tool
CN103866662B (en) The small-sized milling device of a kind of high speed non-fragment orbit
CN207485449U (en) A kind of formwork jumbo for construction
CN216893508U (en) Combined punching angle steel for wall column positioning
CN205614097U (en) Hole processing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Wu Zhongxin

Inventor after: Han Yongping

Inventor after: Wang Guomin

Inventor after: Sheng Haijun

Inventor after: Qiu Yeliang

Inventor after: Liu Xingwang

Inventor after: Chen Jin

Inventor after: Xu Xin

Inventor after: Han Tao

Inventor after: Chen Guoliang

Inventor before: Wu Zhongxin

Inventor before: Sheng Haijun

Inventor before: Qiu Yeliang

Inventor before: Liu Xingwang

Inventor before: Chen Jin

Inventor before: Xu Xin

Inventor before: Han Tao

Inventor before: Chen Guoliang

Inventor before: Han Yongping

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: Room 2101-2104, 21 / F, unit a, block a, Hubei science and technology venture building, Xiaohongshan East District, Wuchang District, Wuhan City, Hubei Province, 430061

Patentee after: CCCC Road & Bridge Special Engineering Co.,Ltd.

Address before: 430071 20th Floor, Block A, Hubei Science and Technology Entrepreneurship Building, No. 34, Xiaohongshan East District, Wuchang District, Wuhan, Hubei Province

Patentee before: CCCC ROAD & BRIDGE SPECIAL ENGINEERING Co.,Ltd.