For water drilling translation and the fluting counter-force holder device of Slope angle adjustment
Technical field
The utility model is related to bridge and the realm of building construction, and in particular to a kind of for water drilling translation and Slope angle adjustment
Fluting counter-force holder device.
Background technology
With the fast development of economic technology, capital construction facility is more and more, due to design, construction or other reasons, warp
It often needs to carry out slot treatment obliquely to existing structure, such as:Be embedded in the replacement of suspension cable or sunpender anchor head in beams of concrete,
Drain hole fluting, fluting check the constructions such as steel strand wires situation in beam.However, will be generated to the stress of structure to main structure fluting
Larger impact, entail dangers to structure itself and the safety of driving or pedestrian when serious, thus need to accurately be slotted to structure, to the greatest extent
Amount reduces influence of the fluting to structure.
Traditional technique is slotted to structure with hand water drill or using high-pressure water jet construction technology.Hand-held water
Boring fluting can not be ensured by construction personnel with the position and included angle, construction quality for feeling control fluting;High-pressure water jet exists
Can form more dense water mist when cutting concrete, construction personnel can not observe the concrete condition in slot, construction precision and
Quality is unable to control.
Utility model content
Utility model aims to solve shortcomings and deficiencies existing for above-mentioned background technology, provide a kind of flat for water drilling
The fluting counter-force holder device of shifting and Slope angle adjustment.
The purpose of this utility model is achieved through the following technical solutions:
It is a kind of for water drilling translation and the fluting counter-force holder device of Slope angle adjustment, including load fixing device, two are vertical
To moving track, two transverse shifting tracks, pedestals.
The load fixing device mainly by two load channel steels and is welded on the anchor plates of load channel steel both sides and forms.
On the load channel steel small range be provided with for screw rod by slot, to fixed and fine tuning longitudinal movement track.The anchoring
It is provided with bolt hole on plate, load fixing device is fixed on by beams of concrete bottom by anchor bolt, is provided for fluting counter-force holder
Counter-force fulcrum.Preferably, multiple stiffeners are welded to enhance the bending stiffness of load channel steel in the bottom of the load channel steel.
The longitudinal movement track is U-steel, be provided on the U-steel for screw rod by slot, both ends are provided with spiral shell
Keyhole is simultaneously furnished with long rails positioning bolt accordingly.Made by the way that long rails positioning bolt to be fixed at load channel steel slot
Longitudinal movement track is connected with load channel steel.Two longitudinal movement tracks are located between two load channel steels.The longitudinal movement
The slot of track for transverse shifting track by cross track positioning bolt along vertical bridge to translation, fluting position is realized with this
The longitudinal movement set.
The transverse shifting track is U-steel, be provided on the U-steel for screw rod by slot, both ends are provided with spiral shell
Keyhole is simultaneously furnished with cross track positioning bolt accordingly.By passing through longitudinal movement track slot to make cross track positioning bolt
Transverse shifting track is connected with longitudinal movement track.Two transverse shifting tracks are located between two longitudinal movement tracks.It is mobile
When, transverse shifting track drives cross track positioning bolt to be translated along the slot of longitudinal movement track.It is described laterally to move
The slot in dynamic rail road is moved by foundation bolt along direction across bridge for pedestal.
The pedestal is mainly made of the pedestal bottom plate, the water drilling working plate that are connected with each other.The pedestal bottom plate four corners
It is provided with bolt hole and is furnished with foundation bolt accordingly, pedestal bottom plate passes through the slot of transverse shifting track to make base by foundation bolt
Seat is connected with transverse shifting track;The water drilling working plate is for connecting water drilling.Preferably, both sides below the pedestal bottom plate
Equipped with semicircle angle control panel with a scale.The water drilling pedestal installation bolt of fixed water drilling is provided on the water drilling working plate
Hole;The two sides of the water drilling working plate both side plate is equipped with double nut angle adjustable bolt;One end of the water drilling working plate
Equipped with axis pin.On the pedestal bottom plate rectangular opening for accommodating axis pin, pedestal bottom plate are provided among two semicircle angle control panels
It is connected by axis pin with water drilling working plate.By translating laterally walking track, pedestal, and fine tuning longitudinal movement track, energy
Enough spatial position positioning for realizing fluting.When construction, water drilling working plate is adjusted by semicircle angle control panel with a scale
With the angle of pedestal bottom plate, two nuts of double nut angle adjustable bolt is recycled to be fastened with semicircle angle control panel, from
And realize the adjustment and fixation of water drilling included angle obliquely.
In use, first being drilled on beams of concrete according to the bolt hole position of load fixing device anchor plate, then pass through
Load channel steel is fixed on beams of concrete bottom by anchor bolt;The longitudinal walking track of installation, by long rails positioning bolt with
Load channel steel is fixed together, fine-tuning when necessary;Laterally walking track is installed again, it will by cross track positioning bolt
Laterally walking track links together with longitudinal walking track;Last installation pedestal, by foundation bolt by pedestal and lateral line
It walks track to link together, the angle that water drilling drills obliquely is adjusted by double nut angle adjustable bolt;Wait for that angle is adjusted
Water drilling is installed again later, you can concrete of slotting obliquely.When dismounting, pedestal is first removed, then removes laterally walking track, then
Longitudinal walking track is removed, finally removes load fixing device, the workpiece of dismounting is in case use next time.
The utility model has the following advantages that and advantageous effect:
(1) the utility model structure adaptability is wide, reasonable for structure, easy to use, cheap, safe and reliable, can be applicable in
In the construction operation that beam bottom is slotted obliquely.
(2) the utility model is assembled with channel steel, and the assembly and dismounting of reaction frame can manually be rapidly completed, have
Preferable operability.
(2) the utility model is provided reliable anti-by the way that reaction frame and beams of concrete are linked as entirety for water drilling construction
Power supports, mechanical structure reasonable design.
(3) angle that the utility model is drilled obliquely by the hinge-type construction adjustment water drilling of pedestal, a set of equipment are
Can complete different location, different angle slot grooving obliquely, ensure that the precision of drilling, improve the weight of counter-force holder device
Multiple utilization rate, has preferable economic results in society.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model;
Structural schematic diagram when Fig. 2 is the utility model non-installation pedestal;
Fig. 3 is the structural schematic diagram of the utility model pedestal;
Fig. 4 is the structural schematic diagram of the pedestal bottom plate of the utility model pedestal;
Fig. 5 is the structural schematic diagram of the water drilling working plate of the utility model pedestal;
Fig. 6 is the structural schematic diagram of the double nut angle adjustable bolt of the utility model pedestal;
Wherein:1-load channel steel;2-longitudinal movement tracks;3-transverse shifting tracks;4-pedestals;5-load channel steels
Anchor plate;6-anchor bolts;7-slots;8-reinforcing plates;9-long rails positioning bolts;10-cross tracks position spiral shell
Bolt;11-pedestal bottom plates;12-water drilling working plates;13-double nut angle adjustable bolts;14-axis pins;15-semicircle angles
Spend control panel;16-foundation bolts;17-water drilling pedestal installation bolt holes;L-beams of concrete;Z-water drilling.
Specific implementation mode
With reference to embodiment and attached drawing, the utility model is described in further detail, but the implementation of the utility model
Mode is without being limited thereto.
Embodiment 1
Referring to Fig. 1-6, it is a kind of for water drilling translation and Slope angle adjustment fluting counter-force holder device, including load fix dress
It sets, two longitudinal movement tracks 2, two transverse shifting tracks 3, pedestals 4.
Load fixing device mainly by two load channel steels 1 and is welded on the anchor plates 5 of 1 both sides of load channel steel and forms.
Multiple stiffeners 8 are welded to enhance the bending stiffness of load channel steel 1 in 1 bottom of load channel steel.Small range is provided with confession on load channel steel 1
Screw rod by slot, to fixed and fine tuning longitudinal movement track 2.It is provided with bolt hole on anchor plate 5, passes through anchor bolt 6
Load fixing device is fixed on beams of concrete bottom, counter-force fulcrum is provided for fluting counter-force holder.
Longitudinal movement track 2 is U-steel, be provided on U-steel for screw rod by slot, U-steel both ends are provided with bolt
Simultaneously it is furnished with long rails positioning bolt 9 accordingly in hole.By the way that long rails positioning bolt 9 is fixed at 1 slot of load channel steel
Longitudinal movement track 2 is set to be connected with load channel steel 1.Two longitudinal movement tracks 2 are located between two load channel steels 1.It is longitudinal to move
The slot in dynamic rail road 2 for transverse shifting track 3 by cross track positioning bolt 10 along vertical bridge to translation, realized with this
The longitudinal movement of slotting position.
Transverse shifting track 3 is U-steel, be provided on U-steel for screw rod by slot, U-steel both ends are provided with bolt
Simultaneously it is furnished with cross track positioning bolt 10 accordingly in hole.By the way that cross track positioning bolt 10 is passed through longitudinal movement 2 slot of track
Hole makes transverse shifting track 3 be connected with longitudinal movement track 2.Two transverse shifting tracks 3 be located at two longitudinal movement tracks 2 it
Between.When mobile, transverse shifting track 3 drives cross track positioning bolt 10 to be translated along the slot of longitudinal movement track 2.
The slot of transverse shifting track 3 is moved by foundation bolt 16 along direction across bridge for pedestal 4.
Pedestal 4 is mainly made of pedestal bottom plate 11, water drilling working plate 12.11 four corners of pedestal bottom plate are provided with bolt hole simultaneously
It is furnished with foundation bolt 16 accordingly;11 lower section both sides of pedestal bottom plate are equipped with semicircle angle control panel 15 with a scale.Water drilling work
Make the water drilling pedestal installation bolt hole 17 that fixed water drilling is provided on bottom plate 12;The two sides of 12 both side plate of water drilling working plate is equipped with double
Nut angle adjustable bolt 13;One end of water drilling working plate 12 is equipped with axis pin 14.Two semicircle angles on pedestal bottom plate 11
The rectangular opening for accommodating axis pin 14 is provided among control panel 15, pedestal bottom plate 11 and water drilling working plate 12 are connected by axis pin 14.
By translating laterally walking track 3, pedestal 4, and fine tuning longitudinal movement track 2, the spatial position positioning of fluting can be realized.
When construction, the angle of water drilling working plate 12 and pedestal bottom plate 11 is adjusted by semicircle angle control panel 15 with a scale, then
It is fastened using two nuts and semicircle angle control panel 15 of double nut angle adjustable bolt 13, to realize water drilling obliquely
The adjustment and fixation of included angle.
In use, first being drilled on beams of concrete according to the bolt hole position of load fixing device anchor plate 5, then pass through
Load channel steel 1 is fixed on beams of concrete bottom by anchor bolt 6 (expansion bolt);The longitudinal walking track 2 of installation, passes through longitudinal rail
Road positioning bolt 9 is fixed together with load channel steel 1, fine-tuning when necessary;Laterally walking track 3 is installed again, passes through cross
Laterally walking track 3 and longitudinal walking track 2 are linked together to tracks positioned bolt 10;Last installation pedestal 4, passes through base
Seat bolt 16 links together pedestal 4 and laterally walking track 3, and it is oblique to adjust water drilling by double nut angle adjustable bolt 13
The angle of upper drilling;Wait for that angle installs water drilling again after adjusting, you can concrete of slotting obliquely.When dismounting, base is first removed
Seat 4, then laterally walking track 3 is removed, longitudinal walking track 2 is then removed, load fixing device, the workpiece of dismounting are finally removed
In case next time uses.
The utility model is simple in structure, easy for installation, easy to operate, and dismounting manually can be realized;And it can reduce artificially not
Controllable factor ensures that precision and construction quality that beam bottom is slotted obliquely, the workpiece used can reuse, has saved a large amount of
Material, have great promotional value.
The above embodiment is a preferred embodiment of the present invention, but embodiments of the present invention are not by above-described embodiment
Limitation, it is other it is any without departing from the spirit and principles of the present invention made by changes, modifications, substitutions, combinations, simplifications,
Equivalent substitute mode is should be, is included within the scope of the present invention.