CN207633344U - Slip casting component and ground restoration equipment - Google Patents
Slip casting component and ground restoration equipment Download PDFInfo
- Publication number
- CN207633344U CN207633344U CN201721694523.6U CN201721694523U CN207633344U CN 207633344 U CN207633344 U CN 207633344U CN 201721694523 U CN201721694523 U CN 201721694523U CN 207633344 U CN207633344 U CN 207633344U
- Authority
- CN
- China
- Prior art keywords
- grouting pipe
- slip casting
- pipe
- casting component
- connector
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
The utility model provides a kind of slip casting component and ground restoration equipment, is related to the technical field of architectural engineering, including connector, at least one the first Grouting Pipe of section and the second Grouting Pipe;Connector one end is connect with the first Grouting Pipe, and the other end with pick for connecting;Second Grouting Pipe is connected to the first Grouting Pipe, and the second Grouting Pipe is provided with conehead away from first Grouting Pipe one end;Wherein:Multiple slurry outlets are both provided on the tube wall of first Grouting Pipe and the second Grouting Pipe.The purpose of this utility model is to provide a kind of slip casting component and ground restoration equipment, the slip casting that backfill is carried out using small mechanical equipment can be realized, it is simple in structure, easy to operation to realize the purpose of foundation stabilization, soil remediation, and save cost.
Description
Technical field
The utility model is related to construction engineering technical fields, more particularly, to a kind of slip casting component and ground restoration equipment.
Background technology
Since building room cubsoil backfills leakiness, or because backfill moisture content is excessive, lead to building in use
Bulk settling occurs for face and appearance part settles excessive ground cracking phenomena or construction finishes, and increases in later stage room
Add some novel devices, equipment itself higher to ground deformation requirements, the bearing capacity of backfill cannot be satisfied when requiring, due to
The interior space is limited, and large scale equipment cannot be introduced into, and directly excavates and changes that fill out cost too big.
There is the underground reparation in the business processes closing confined space of pollution there is also the above problem, big machinery is set
It is standby to cannot be introduced into, directly excavate cost height.
Therefore, how to handle the problems in above-mentioned foundation stabilization or soil remediation process be those skilled in the art urgently
It solves the problems, such as.
Utility model content
The purpose of this utility model is to provide a kind of slip casting component and ground restoration equipment, it can realize that man-hour manually hand-held is small
Type machinery electric pick or pneumatic pick head into the Grouting Pipe merogenesis vertical flooring connected in backfill, and Grouting Pipe is headed into design
It after depth, can be connected on grouting pump by high pressure rubber hose, select the grouting pressure of design, carry out the note of various slurries
It penetrates, to achieve the purpose that foundation stabilization and soil remediation, and connector is set effectively prevents electric pick and be in direct contact Grouting Pipe,
So that extrusion pour slurry pipe is destroyed.
To achieve the above object, the utility model provides following technical scheme:
In a first aspect, the utility model provides a kind of slip casting component, it is used for ground restoration, including:Connector, at least one section
First Grouting Pipe and the second Grouting Pipe;
Described connector one end is connect with first Grouting Pipe, and the other end with pick for connecting;Second slip casting
Pipe is connected to first Grouting Pipe, and second Grouting Pipe is provided with conehead away from first Grouting Pipe one end;Wherein:
It is both provided with multiple slurry outlets on the tube wall of first Grouting Pipe and second Grouting Pipe.
Further, the connector includes the head that connection is matched with pick.
Further, the head shape is hexagonal prisms.
Further, the connector uses casting and forming.
Further, the connector passes through pipe collar screwed connection with first Grouting Pipe.
Further, second Grouting Pipe passes through pipe collar screwed connection with first Grouting Pipe.
Further, first Grouting Pipe, and/or, the pulp hole number in second Grouting Pipe is not less than ten.
Further, first Grouting Pipe, and/or, the slurry outlet in second Grouting Pipe is arranged according to equilateral triangle
Row.
Further, the conehead is solid steel toe.
Second aspect, the utility model also provide a kind of ground restoration equipment, including pick, further include appointing in first aspect
Slip casting component described in one, the pick are connect with the slip casting component.
Slip casting component provided by the utility model and ground restoration equipment have the advantages that:
The utility model first aspect provides a kind of slip casting component, is used for ground restoration, including:Connector, at least one section
First Grouting Pipe and the second Grouting Pipe;Connector one end is connect with the first Grouting Pipe, and the other end with pick for connecting;Second note
Slurry pipe is connected to the first Grouting Pipe, and the second Grouting Pipe is provided with conehead away from first Grouting Pipe one end;Wherein:First Grouting Pipe
It is both provided with multiple slurry outlets on the tube wall of the second Grouting Pipe.
The slip casting component provided using the utility model first aspect, man-hour manually hand-held small-sized machine electric pick or pneumatic pick pass through
Connector is connect with Grouting Pipe, and the vertical flooring of Grouting Pipe merogenesis connected is headed into backfill, depth is headed into and regards back
Depending on filled slope, often saves the first Grouting Pipe and connected with the second Grouting Pipe, and the second Grouting Pipe is connected to the first Grouting Pipe, second
Grouting Pipe is provided with conehead away from first Grouting Pipe one end, facilitates access for backfill;Wherein:First Grouting Pipe and the second Grouting Pipe
Tube wall on be both provided with multiple slurry outlets.It, can be by high pressure rubber hose by the first note after Grouting Pipe is headed into projected depth
Slurry pipe is connected on grouting pump, is selected the grouting pressure of design, is carried out the injection of various slurries, slurries can be from the first Grouting Pipe
It is sprayed to backfill with multiple slurry outlets on the tube wall of the second Grouting Pipe, to reach the mesh of foundation stabilization and soil remediation
's.And it connector is set effectively prevents electric pick and be in direct contact Grouting Pipe, so that extrusion pour slurry pipe is destroyed.
The slip casting that small mechanical equipment carries out backfill may be used in the slip casting component that the utility model first aspect provides,
It is simple in structure, easy to operation to realize the purpose of foundation stabilization, soil remediation, and save cost.
The ground restoration equipment that the utility model second aspect provides is provided with the note of the utility model first aspect offer
Component is starched, all advantageous effects possessed by the slip casting component to be provided with the utility model first aspect.
Description of the drawings
It, below will be right in order to illustrate more clearly of specific embodiment of the present invention or technical solution in the prior art
Specific implementation mode or attached drawing needed to be used in the description of the prior art are briefly described, it should be apparent that, it is described below
In attached drawing be that some embodiments of the utility model are not paying creativeness for those of ordinary skill in the art
Under the premise of labour, other drawings may also be obtained based on these drawings.
Fig. 1 is the structural schematic diagram for the slip casting component that the utility model embodiment provides;
Fig. 2 is the structural schematic diagram of connector in the slip casting component that the utility model embodiment provides;
Fig. 3 is the vertical view of connector in the slip casting component that the utility model embodiment provides;
Fig. 4 is the structural schematic diagram of the first Grouting Pipe in the slip casting component that the utility model embodiment provides;
Fig. 5 is the structural schematic diagram of the second Grouting Pipe in the slip casting component that the utility model embodiment provides.
Icon:1- connectors;The first Grouting Pipes of 2-;The second Grouting Pipes of 3-;4- slurry outlets;5- pipe collars;11- heads;31- is bored
Head.
Specific implementation mode
The technical solution of the utility model is clearly and completely described below in conjunction with attached drawing, it is clear that described
Embodiment is the utility model a part of the embodiment, instead of all the embodiments.Based on the embodiments of the present invention, originally
The every other embodiment that field those of ordinary skill is obtained without making creative work, belongs to this practicality
Novel protected range.
It is in the description of the present invention, it should be noted that term "center", "upper", "lower", "left", "right", " perpendicular
Directly ", the orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, and is only
The utility model and simplifying describes for ease of description, do not indicate or imply the indicated device or element must have it is specific
Orientation, with specific azimuth configuration and operation, therefore should not be understood as limiting the present invention.In addition, term " the
One ", " second ", " third " are used for description purposes only, and are not understood to indicate or imply relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified
Dress ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integrally
Connection;It can be mechanical connection, can also be electrical connection;Can be directly connected, can also indirectly connected through an intermediary,
It can be the connection inside two elements.For the ordinary skill in the art, it can understand above-mentioned art with concrete condition
The concrete meaning of language in the present invention.
Specific embodiment of the present utility model is described in detail below in conjunction with attached drawing.It should be understood that herein
Described specific implementation mode is only used for describing and explaining the present invention, and is not intended to limit the utility model.
Fig. 1, Fig. 2, Fig. 3, Fig. 4 and Fig. 5 are please referred to, the slip casting provided the utility model embodiment below in conjunction with attached drawing
Component and ground restoration equipment elaborate.
Embodiment 1
The embodiment of the utility model first aspect provides a kind of slip casting component, is used for ground restoration, including:Connector
1, at least one the first Grouting Pipe 2 of section and the second Grouting Pipe 3;
1 one end of connector is connect with the first Grouting Pipe 2, and the other end with pick for connecting;Second Grouting Pipe 3 and the first note
It starches pipe 2 to be connected to, and the second Grouting Pipe 3 is provided with conehead 31 away from 2 one end of the first Grouting Pipe;Wherein:
It is both provided with multiple slurry outlets 4 on the tube wall of first Grouting Pipe 2 and the second Grouting Pipe 3.
Using the utility model first aspect embodiment provide slip casting component, man-hour manually hand-held small-sized machine electric pick or
Pneumatic pick is connect by connector 1 with Grouting Pipe, and the vertical flooring of Grouting Pipe merogenesis connected is headed into backfill, is headed into
Depth often saves the first Grouting Pipe 2 and the connection of the second Grouting Pipe 3, and the second Grouting Pipe 3 and the first slip casting depending on backfilling soil thickness
Pipe 2 is connected to, and the second Grouting Pipe 3 is provided with conehead 31 away from 2 one end of the first Grouting Pipe, facilitates access for backfill;Wherein:First note
It is both provided with multiple slurry outlets 4 on slurry pipe 2 and the tube wall of the second Grouting Pipe 3.After Grouting Pipe is headed into projected depth, it can pass through
First Grouting Pipe 2 is connected on grouting pump by high pressure rubber hose, is selected the grouting pressure of design, is carried out the injection of various slurries,
Slurries can be sprayed from multiple slurry outlets 4 on the tube wall of the first Grouting Pipe 2 and the second Grouting Pipe 3 to backfill, to reach
The purpose of foundation stabilization and soil remediation.And it connector 1 is set effectively prevents electric pick and be in direct contact Grouting Pipe, so that squeezing
Grouting Pipe is by slip casting tube damage.
The slip casting component that the embodiment of the utility model first aspect provides may be used small mechanical equipment and be backfilled
The slip casting of soil, it is simple in structure, easy to operation to realize the purpose of foundation stabilization, soil remediation, and save cost.
It elaborates below to connector 1:
In the alternative of the present embodiment, further, connector 1 includes the head 11 that connection is matched with pick.
It should be noted that the shape of head 11 in the present embodiment and pick shape adaptation, size can with but not only limit
In for matched with electric pick connection size.
In the alternative of the present embodiment, further, 11 shape of head is hexagonal prisms.
It should be noted that as shown in figure 3, the shape of head 11 in the present embodiment and pick shape adaptation, can with but
It is not limited only to the hexagonal prism shape to be docked with electric pick.Diameter can be referred to be designed using the pick of electric pick.
In the alternative of the present embodiment, further, connector 1 uses casting and forming.
It should be noted that casting and forming may be used in connector 1, specifically, 1 cylinder of connector is not less than using intensity
The steel mold casting and forming of Q235, bottom are detachably connected with the first Grouting Pipe 2.When operation construction, the bar of electric pick and connector 1
First 11 matching connection, the bottom of connector 1 are connect with the first Grouting Pipe 2, pass through connector 1 between electric pick and the first Grouting Pipe 2
Connection, effectively prevents electric pick and is in direct contact Grouting Pipe, so that extrusion pour slurry pipe is by slip casting tube damage.
In addition, if when connector 1 does not have mold working condition, for the sake of convenient, when construction, can be made, upper bar
First 11 may be used electric pick pick, and lower part can be used Grouting Pipe and be welded in round steel column use of the thickness not less than 5cm.
Electric pick is connect by connector 1 with Grouting Pipe, and after Grouting Pipe is headed into back fill course, need by connector 1 from
It is removed in Grouting Pipe, Grouting Pipe is then connect slip casting with grouting pump, clamping, spiral shell may be used in connector 1 and the first Grouting Pipe 2
Line connection etc. is detachably connected.
In the alternative of the present embodiment, further, connector 1 and the first Grouting Pipe 2 are connected by 5 screw thread of pipe collar
It connects.
It should be noted that 1 lower part of connector is solid public screw thread, the Grouting Pipe top headed into is female screw thread, and the two can
Securely to be connected, in a kind of specific implementation mode, 1 top of connector can be hollow thick walled steel tube, can hammer electric pick into shape
Head is inserted, and such mode effectively prevents electric pick and is in direct contact Grouting Pipe, is destroyed so that squeezing.Grouting Pipe is headed into
It after projected depth, is connected on grouting pump by high pressure rubber hose, selects the grouting pressure of design, carry out the note of various slurries
It penetrates, to achieve the purpose that foundation stabilization and soil remediation.
In the alternative of the present embodiment, further, the second Grouting Pipe 3 and the first Grouting Pipe 2 pass through 5 screw thread of pipe collar
Connection.
In at least one embodiment, 2 top hitch screw thread of the first Grouting Pipe is not less than 15, such as is specifically as follows 15
Road, 16,17,18,19 or 20 add mating pipe collar 5 after having covered, and connect with the public screw thread of 1 lower part of connector
It connects.Also, 2 top of the first Grouting Pipe can connect the grouting pump for slip casting by high pressure rubber hose.
In at least one embodiment, 2 lower part hitch screw thread of the first Grouting Pipe is not less than 15, such as is specifically as follows 15
Road, 16,17,18,19 or 20,3 top hitch screw thread of the second Grouting Pipe are not less than 15, such as specifically can be with
It is 15,16,17,18,19 or 20, adds mating pipe collar 5 after having covered, covered with 2 lower part of the first Grouting Pipe
The screwed connection of button.
In at least one embodiment, diameter 30cm-35cm may be used in the first Grouting Pipe 2, wall thickness 3.5mm-4.5mm's
Welded still pipe.Specifically, diameter of steel tube can be 30cm, 31cm, 32cm, 33cm, 34cm or 35cm;Wall thickness can be
3.5mm, 3.6mm, 3.7mm, 3.8mm, 3.9mm, 4mm, 4.1mm, 4.2mm, 4.3mm, 4.4mm or 4.5mm.
In the alternative of the present embodiment, further, the first Grouting Pipe 2, and/or, the pulp in the second Grouting Pipe 3
4 quantity of hole is not less than ten.
In at least one embodiment, the tube wall of the first Grouting Pipe 2 fires multiple slurry outlets 4 using electric welding, specifically goes out
Starch 4 quantity of hole be not less than ten, such as be specifically as follows 10,11,12,13,14,15,16,17,18
It is a, 19 or 20.Wherein, slurry outlet 4 can be diameter 0.5cm-1.5cm circular hole, such as be specifically as follows 0.5cm,
1cm or 1.5cm.
In at least one embodiment, adhesive tape closure, and the first slip casting may be used in circular hole in the first Grouting Pipe 2
Pipe 2 can reinforce the range of soil layer as needed, selectively carry out trepanning design.
In at least one embodiment, the tube wall of the second Grouting Pipe 3 fires multiple slurry outlets 4 using electric welding, specifically goes out
Starch 4 quantity of hole be not less than ten, such as be specifically as follows 10,11,12,13,14,15,16,17,18
It is a, 19 or 20.Wherein, slurry outlet 4 can be diameter 0.5cm-1.5cm circular hole, such as be specifically as follows 0.5cm,
1cm or 1.5cm.
In at least one embodiment, adhesive tape closure, and the second slip casting may be used in circular hole in the second Grouting Pipe 3
Pipe 3 can reinforce the range of soil layer as needed, selectively carry out trepanning design.
Putting in order for the slurry outlet 4 of first Grouting Pipe 2 or the second Grouting Pipe 3 can be various ways, such as plum blossom
Shape.
In the alternative of the present embodiment, further, the first Grouting Pipe 2, and/or, the pulp in the second Grouting Pipe 3
Hole 4 is according to triangular arranged.
In the alternative of the present embodiment, further, conehead 31 is solid steel toe.The vertical section of conehead 31 is isosceles
Triangle, and base angle is specifically as follows 60 °.The longitudinal length of conehead 31 be 14cm-16cm, be specifically as follows 14cm, 15cm or
Person 16cm.Conehead 31 is for example welded with Grouting Pipe mechanical connection, and conehead 31 can be single solid steel head, and the strength of materials is not less than
Q235.Or can tube head directly be pounded into flat processing in live process and be used as conehead 31.
In order to reduce sidewall resistance when Grouting Pipe squeezes into back fill course, one layer of profit can be smeared on the tube wall of Grouting Pipe
Lubrication prescription, such as butter.
Grouting Pipe such as the first Grouting Pipe 2 and the second Grouting Pipe 3 can arbitrarily be intercepted according to the height of the confined space, processing set
It is used after button.
Embodiment 2
The embodiment of the utility model second aspect provides a kind of ground restoration equipment, including pick, further includes first
Any slip casting component, pick are connect with slip casting component in the embodiment of aspect.
The ground restoration equipment that the embodiment of the utility model second aspect provides is provided with the utility model first aspect
Embodiment provide slip casting component, to the utility model first aspect embodiment provide slip casting component had
All advantageous effects.
In at least one embodiment, pick is connect with the head 11 of connector 1 in slip casting component, direct to avoid electric pick
Grouting Pipe is contacted, so that extrusion pour slurry pipe is by slip casting tube damage.
It to the slip casting component of the utility model and is illustrated above, still, the utility model is not limited to above-mentioned tool
The embodiment of body can carry out various deformations or change without departing from the scope of the claims.The utility model
The various modifications being included within the scope of the claims and change.
Finally it should be noted that:The above various embodiments is only to illustrate the technical solution of the utility model, rather than limits it
System;Although utility model is described in detail with reference to foregoing embodiments, those skilled in the art should manage
Solution:It still can be with technical scheme described in the above embodiments is modified, either to which part or whole skills
Art feature carries out equivalent replacement;And these modifications or replacements, it does not separate the essence of the corresponding technical solution the utility model
The range of each embodiment technical solution.
Claims (10)
1. a kind of slip casting component is used for ground restoration, which is characterized in that including:Connector (1), at least one the first Grouting Pipe of section
(2) and the second Grouting Pipe (3);
Described connector (1) one end is connect with first Grouting Pipe (2), and the other end with pick for connecting;Second note
Slurry pipe (3) is connected to first Grouting Pipe (2), and second Grouting Pipe (3) is set away from described first Grouting Pipe (2) one end
It is equipped with conehead (31);Wherein:
It is both provided with multiple slurry outlets (4) on the tube wall of first Grouting Pipe (2) and second Grouting Pipe (3).
2. slip casting component according to claim 1, which is characterized in that the connector (1) includes matching connection with pick
Head (11).
3. slip casting component according to claim 2, which is characterized in that head (11) shape is hexagonal prisms.
4. slip casting component according to claim 1, which is characterized in that the connector (1) uses casting and forming.
5. slip casting component according to claim 1, which is characterized in that the connector (1) and first Grouting Pipe (2)
Pass through pipe collar (5) screwed connection.
6. slip casting component according to claim 1, which is characterized in that second Grouting Pipe (3) and first slip casting
Pipe (2) passes through pipe collar (5) screwed connection.
7. slip casting component according to claim 1, which is characterized in that first Grouting Pipe (2), and/or, described second
Slurry outlet (4) quantity in Grouting Pipe (3) is not less than ten.
8. slip casting component according to claim 1, which is characterized in that first Grouting Pipe (2), and/or, described second
Slurry outlet (4) in Grouting Pipe (3) is according to triangular arranged.
9. slip casting component according to claim 1, which is characterized in that the conehead (31) is solid steel toe.
10. a kind of ground restoration equipment, including pick, which is characterized in that further include described in any one of claim 1 to 9
Slip casting component, the pick are connect with the slip casting component.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721694523.6U CN207633344U (en) | 2017-12-07 | 2017-12-07 | Slip casting component and ground restoration equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721694523.6U CN207633344U (en) | 2017-12-07 | 2017-12-07 | Slip casting component and ground restoration equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207633344U true CN207633344U (en) | 2018-07-20 |
Family
ID=62855940
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721694523.6U Active CN207633344U (en) | 2017-12-07 | 2017-12-07 | Slip casting component and ground restoration equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207633344U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109881668A (en) * | 2019-03-15 | 2019-06-14 | 中国十九冶集团有限公司 | Foundation construction method for soft soil layer, filling soil and sand soil layer |
CN110439258A (en) * | 2019-04-15 | 2019-11-12 | 中国建筑第四工程局有限公司 | A kind of disposal molding integration anchor pole and construction method |
CN110886309A (en) * | 2019-12-04 | 2020-03-17 | 成都轨道建设管理有限公司 | Double-slurry mixing device and construction method for treating quicksand layer by using double-slurry mixing device |
CN111535296A (en) * | 2020-05-13 | 2020-08-14 | 安徽建筑大学 | Layered grouting freezing device and layered grouting freezing method |
-
2017
- 2017-12-07 CN CN201721694523.6U patent/CN207633344U/en active Active
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109881668A (en) * | 2019-03-15 | 2019-06-14 | 中国十九冶集团有限公司 | Foundation construction method for soft soil layer, filling soil and sand soil layer |
CN110439258A (en) * | 2019-04-15 | 2019-11-12 | 中国建筑第四工程局有限公司 | A kind of disposal molding integration anchor pole and construction method |
CN110886309A (en) * | 2019-12-04 | 2020-03-17 | 成都轨道建设管理有限公司 | Double-slurry mixing device and construction method for treating quicksand layer by using double-slurry mixing device |
CN110886309B (en) * | 2019-12-04 | 2021-06-18 | 成都轨道建设管理有限公司 | Double-slurry mixing device and construction method for treating quicksand layer by using double-slurry mixing device |
CN111535296A (en) * | 2020-05-13 | 2020-08-14 | 安徽建筑大学 | Layered grouting freezing device and layered grouting freezing method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207633344U (en) | Slip casting component and ground restoration equipment | |
CN210263647U (en) | A grout sleeve for steel bar connection | |
CN107419734B (en) | Netted retaining structure of deep side slope that bankets | |
CN102808413B (en) | Reinforcement-replacing sectional-grouting pipe with inner piston and construction method thereof | |
CN205776221U (en) | The portable protective baffle plate of artificial digging pile | |
CN205422773U (en) | Novel hollow grouting anchor bolt | |
CN109881668A (en) | Foundation construction method for soft soil layer, filling soil and sand soil layer | |
CN204385727U (en) | Spiral grouting preformed pile | |
CN206448166U (en) | A kind of vertical prestressing mud jacking pipeline docking facilities | |
CN100557145C (en) | The PHC stake is interior towards interior row's auxiliary pile sinking job practices | |
CN212612452U (en) | Groutable anchor rod | |
CN211949617U (en) | Stagnant water split bolt | |
CN208899473U (en) | A kind of uplift pile pile extension connecting node | |
CN201158818Y (en) | Anti-corrosion anchor bar with centering slurry guiding tube | |
CN203905008U (en) | Diagonal brace supporting structure for superior angle of foundation pit | |
CN207452894U (en) | A kind of repeatable anchor pile utilized | |
CN212202072U (en) | Ultra-long-distance secondary grouting system for shield construction | |
CN206655191U (en) | A kind of small-sized drainage canal of hydraulic engineering | |
CN214660225U (en) | Advanced small guide pipe parallel grouting system | |
CN205976565U (en) | PVC pipe root protective sheath | |
CN216479363U (en) | Steel sleeve reinforced concrete pipe | |
CN207062933U (en) | Can consolidated subsoil prefabricated pile | |
CN104032746B (en) | A kind of supporting fill block structure of foundation ditch angle position | |
CN209779678U (en) | Adjustable core-pulling template for piping lane construction | |
CN210950211U (en) | Flexible interface pipeline buttress with bottom ridge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |