CN207620428U - The Sliding Structures of building - Google Patents

The Sliding Structures of building Download PDF

Info

Publication number
CN207620428U
CN207620428U CN201721390799.5U CN201721390799U CN207620428U CN 207620428 U CN207620428 U CN 207620428U CN 201721390799 U CN201721390799 U CN 201721390799U CN 207620428 U CN207620428 U CN 207620428U
Authority
CN
China
Prior art keywords
concrete joist
building
concrete
joist
sliding structures
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721390799.5U
Other languages
Chinese (zh)
Inventor
朱奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721390799.5U priority Critical patent/CN207620428U/en
Application granted granted Critical
Publication of CN207620428U publication Critical patent/CN207620428U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The utility model discloses a kind of Sliding Structures of building, it is characterized in that in building frame column following settings concrete joist, build floor is poured between building frame column, concrete joist following settings steel spin, the center of steel spin is corresponding with the axle center of the frame column on top, steel spin and pre-embedded steel slab weld connection, pre-embedded steel slab is embedded in concrete joist in advance, indwelling preformed hole among concrete joist, hauling rope is worn in concrete joist preformed hole, hauling rope couples with towing plate, and towing plate is bolted on concrete joist side.

Description

The Sliding Structures of building
Technical field
The utility model is related to a kind of Sliding Structures of building, are suitable for building field.
Background technology
The traditional construction mode of building is first constructed basement, then builds superstructure, since basement is related to soil Side is excavated, and earth excavation will be done temporary support structures and be also required to the regular hour using supporting construction as guarantee, and basement is mixed Solidifying soil curing time is also longer, therefore basement construction will take a substantial amount of time.It is applied if synchronized during building basement Work superstructure will necessarily save a large amount of engineering times.How to make building is securely and reliably that engineering staff wants in slipping The project faced.
Utility model content
The utility model is to provide a kind of Sliding Structures of building, solve in the prior art building in slipping Safe and reliable problem.
The utility model in building frame column following settings concrete joist, concrete joist height is 300~ 350mm, concrete joist width are 250~300mm, and build floor is poured between building frame column, forms horizontally-supported, concrete Joist following settings steel spin, steel ball diameters are 70~90mm, and the center of steel spin is opposite with the axle center of the frame column on top It answers, steel spin and pre-embedded steel slab weld connection, pre-embedded steel slab is embedded in concrete joist in advance, and pre-embedded steel slab thickness is 15~18mm, Indwelling preformed hole among concrete joist, preformed hole a diameter of 30~40mm wear hauling rope in concrete joist preformed hole, lead Straw line couples with towing plate, and towing plate is bolted on concrete joist side.Traditional hauling rope is fixed on concrete The bail of joist front end, concrete joist are possible to destroy because local tensile capacity is insufficient.The utility model will be drawn Rope is fixed to by towing plate on concrete joist through behind building, and traction plate suqare is much greater with respect to bail, can To alleviate concentration of local stress significantly.The power that another aspect towing plate is applied to concrete joist is pressure, and traditional bail is applied The power for being added on concrete joist is pulling force, and concrete anti-compression ability is obviously eager to excel much than tensile capacity, therefore the utility model It is survivable relative to traditional scheme.
The utility model mechanical property is good, and progress is fast.
Description of the drawings
Fig. 1 is the Sliding Structures schematic diagram of building.
1, steel spin, 2, pre-embedded steel slab, 3, concrete joist, 4, frame column, 5, floor, 6, hauling rope, 7, towing plate.
Specific implementation mode
The present embodiment is described in detail below in conjunction with attached drawing.
Embodiment
For the present embodiment in 4 following settings concrete joist 3 of building frame column, 3 height of concrete joist is 350mm, is mixed 3 width of solidifying soil joist is 300mm, build floor 5 is poured between building frame column 4, formation is horizontally-supported, below concrete joist 3 Steel spin 1 is set, and 1 a diameter of 80mm of steel spin, the center of steel spin 1 is corresponding with the axle center of frame column 4 on top, steel spin 1 is embedded in concrete joist 3 in advance with 2 weld connection of pre-embedded steel slab, pre-embedded steel slab 2, and 2 thickness of pre-embedded steel slab is 18mm, concrete support 3 intermediate indwelling preformed hole of beam, preformed hole a diameter of 35mm wear hauling rope 6 in 3 preformed hole of concrete joist, hauling rope 6 with lead Corbel back slab 7 couples, and towing plate 7 is bolted on 3 side of concrete joist.

Claims (5)

1. a kind of Sliding Structures of building, it is characterized in that in building frame column following settings concrete joist, building frame Build floor, concrete joist following settings steel spin, the axle center phase at the center of steel spin and the frame column on top are poured between trestle Corresponding, steel spin and pre-embedded steel slab weld connection, pre-embedded steel slab are embedded in concrete joist in advance, and indwelling is reserved among concrete joist Hole wears hauling rope in concrete joist preformed hole, and hauling rope couples with towing plate, and towing plate is bolted on concrete Joist side.
2. the Sliding Structures of building according to claim 1, it is characterized in that concrete joist height is 300~350mm, Concrete joist width is 250~300mm.
3. the Sliding Structures of building according to claim 1, it is characterized in that steel ball diameters are 70~90mm.
4. the Sliding Structures of building according to claim 1, it is characterized in that pre-embedded steel slab thickness is 15~18mm.
5. the Sliding Structures of building according to claim 1, it is characterized in that a diameter of 30~40mm of preformed hole.
CN201721390799.5U 2017-10-26 2017-10-26 The Sliding Structures of building Expired - Fee Related CN207620428U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721390799.5U CN207620428U (en) 2017-10-26 2017-10-26 The Sliding Structures of building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721390799.5U CN207620428U (en) 2017-10-26 2017-10-26 The Sliding Structures of building

Publications (1)

Publication Number Publication Date
CN207620428U true CN207620428U (en) 2018-07-17

Family

ID=62826549

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721390799.5U Expired - Fee Related CN207620428U (en) 2017-10-26 2017-10-26 The Sliding Structures of building

Country Status (1)

Country Link
CN (1) CN207620428U (en)

Similar Documents

Publication Publication Date Title
CN203834739U (en) End steel board connection, positioning and assembly type shear wall structure
CN106988343A (en) A kind of town road pipeline protection structure and its construction method
CN102653945A (en) Foundation reinforcing and replacing structure and construction method thereof
CN202117068U (en) Micropile plate-type composite foundation
CN204825610U (en) No expansion joint rigid frame bridge
CN204898672U (en) Discard device of pulling out of pile foundation
CN201288328Y (en) Beam-plate integrated prefabricated split mounting type tower crane fixed foundation
CN205225280U (en) A combined supporting structure that is used for steel -pipe pile bar planting tunnel composite lining of soft base
CN105714678B (en) A kind of combined type gravity anchorage
CN205501843U (en) Consolidate rigid framed arch bridge
CN207121896U (en) Precast hollow uplift pile
CN207620428U (en) The Sliding Structures of building
CN210106749U (en) Counter-force structure of soft soil foundation super large section push pipe jacking operation
CN202194152U (en) Power steel pipe tower base
CN204343166U (en) A kind of combined type gravity anchorage
CN102493436A (en) Novel manual tunneling construction method of rectangular anti-slide pile
CN202017197U (en) Multi-section H-shaped reinforced concrete plate pile welding structure
CN206616602U (en) A kind of outdoor construction elevator strengthening of foundation device
CN202830935U (en) Leveling supporting structure of pit-in-pit inside deep foundation pit
CN204530685U (en) Cement soil stiffness composite pile
CN210086328U (en) Root pile for underpinning and reinforcing existing building foundation
CN208604589U (en) A kind of novel rammer compacter for three back backfills
CN203034790U (en) Basic prefabricated concrete formwork for basement
CN210263015U (en) Prefabricated wall unit for underground continuous wall
CN202124857U (en) Splitting pile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180717

Termination date: 20181026

CF01 Termination of patent right due to non-payment of annual fee