CN207620329U - A kind of construction scaffold - Google Patents

A kind of construction scaffold Download PDF

Info

Publication number
CN207620329U
CN207620329U CN201721766083.0U CN201721766083U CN207620329U CN 207620329 U CN207620329 U CN 207620329U CN 201721766083 U CN201721766083 U CN 201721766083U CN 207620329 U CN207620329 U CN 207620329U
Authority
CN
China
Prior art keywords
mounting plate
mounting
montant
cross bar
construction scaffold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721766083.0U
Other languages
Chinese (zh)
Inventor
张紫嫣
麦若婷
闫翌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Zhongxin Architectural Decoration Engineering Co Ltd
Original Assignee
Shenzhen Zhongxin Architectural Decoration Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Zhongxin Architectural Decoration Engineering Co Ltd filed Critical Shenzhen Zhongxin Architectural Decoration Engineering Co Ltd
Priority to CN201721766083.0U priority Critical patent/CN207620329U/en
Application granted granted Critical
Publication of CN207620329U publication Critical patent/CN207620329U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model is related to a kind of construction scaffolds, including:Cross bar, montant, it is set to the first mounting plate far from ground side on the montant, be set to side near the ground on the montant, there are the second mounting plates of certain interval with first mounting plate, described montant one end is provided with mounting portion on second mounting plate, and rotary type is assemblied in the fastening plates far from described montant one end on first mounting plate.When installing scaffold, gap of the cross bar across the first mounting plate and the second mounting plate, meanwhile, cross bar is connected on the first mounting plate face opposite with the second mounting plate, then, rotates fastening plates, cross bar is locked on montant;When dismantling scaffold, by stirring fastening plates so that cross bar is detached from the first mounting plate and the second mounting plate, is detached with the installation fixation of montant and dismounting to facilitate cross bar, reduces the workload of scaffold dismounting, improves the efficiency of scaffold dismounting.

Description

A kind of construction scaffold
Technical field
The utility model is related to construction technical field of tools more particularly to a kind of construction scaffolds.
Background technology
Scaffold is mainly used for worker and carries out associated construction operation to the upper zone that can not directly construct so that building is applied Work is more convenient.
Such as the Chinese patent that notification number is CN206438757U discloses a kind of building curtain wall construction scaffolding, including it is vertical To tube body, lateral tube body and connection cylinder, plate is equipped in arc groove, the other end of plate is uniformly logical equipped with several second Hole, connection cylinder are arranged with the fixing clamp with longitudinal pipe mates, fixing clamp one end close to one end of arc groove It is hinged on connection cylinder, the fixing clamp other end is uniformly equipped with several fastener holes corresponding with through-hole, in fastener hole Equipped with the matched fixing bolt of the second through-hole, the other end of fixing bolt is threaded with fixing nut.
Above-mentioned scaffold needs fixing bolt passing through fastener hole and the second through-hole, then with admittedly in fixed lateral tube body Determine nut to be fastened;However, screw bolt and nut is cumbersome when fixing and dismantling, cause in construction and construction Afterwards, it brings inconvenience to the dismounting work of lateral tube body and longitudinal tube body, the heavy workload of disassembling operations, disassembly efficiency is low.
Utility model content
In view of the deficienciess of the prior art, the purpose of this utility model is to provide a kind of construction scaffold, tool Have and dismounts convenient, the high advantage of disassembly efficiency.
The above-mentioned purpose of the utility model technical scheme is that:
A kind of construction scaffold, including:Cross bar, montant are set to first far from ground side on the montant Mounting plate, be set to side near the ground on the montant, there are certain intervals for the cross bar with first mounting plate The second accommodating mounting plate is provided with mounting portion on second mounting plate far from described montant one end, and, rotary type assembly In on first mounting plate far from described montant one end, for being clamped with will be described with the mounting portion of second mounting plate Cross bar is locked at the fastening plates on the montant.
By using above-mentioned technical proposal, when installing scaffold, cross bar pass through the first mounting plate and the second mounting plate it Between gap, meanwhile, cross bar is connected on the first mounting plate face opposite with the second mounting plate, then, is rotated fastening plates, and is made It is clamped with the mounting portion on the second mounting plate, and to make the first mounting plate and the second mounting plate push against cross bar, cross bar is locked Tightly on montant:After construction dismantle scaffold when, by stirring fastening plates so that cross bar be detached from the first mounting plate and Second mounting plate detaches with the installation fixation of montant and dismounting to facilitate cross bar, reduces the work of scaffold dismounting Amount improves the efficiency of scaffold dismounting.
Further, the first mounting groove being clamped with the mounting portion of second mounting plate is provided in the fastening plates.
By using above-mentioned technical proposal, the clamping engagement of mounting portion and the first mounting groove in fastening plates, by fastening plates It is mounted so as to more consolidate with mounting portion.
Further:Card slot, the mounting portion setting of second mounting plate are provided on the cell wall of first mounting groove There is the buckle structure coordinated with the card slot fastening plates and second mounting plate are locked or are unlocked.
By using above-mentioned technical proposal, the quick of the second mounting plate and fastening plates is realized in the cooperation of buckle structure and card slot It locks and is unlocked, be installed on dismounting to facilitate cross bar, reduce the workload of scaffold dismounting, improve scaffold Disassembly efficiency.
Further:The second mounting groove, the buckle structure are provided on the side wall of the mounting portion of second mounting plate Including:Be installed on it is in second mounting groove and can along second mounting groove open up direction sliding, with the card slot The fixture block of cooperation;And one end and fixture block fixing assembling, the other end and slot bottom fixing assembling of second mounting groove Elastic component.
By using above-mentioned technical proposal, it is mounted on fixture block in the second mounting groove and passes through elastic component and the second mounting groove Slot bottom is slidably connected, and when installing cross bar, fixture block is pushed against on the inner wall of the second mounting groove by the elastic force that elastic component provides so that Fixture block coordinates even closer, is secured with the second mounting groove, ensure that the stability of buckle structure assembly, and then effectively ensures The stability of scaffold installation.
Further:First mounting plate is both provided with and the cross bar on the end face opposite with second mounting plate The recessed portion of portion profile adaptation.
By using above-mentioned technical proposal, when installing cross bar, the recess that is arranged on the first mounting plate and the second mounting plate Portion is abutted with cross bar, avoids cross bar when mounted with mounting plate there is a phenomenon where causing installation unstable with respect to sliding, effectively It ensure that the stability of cross bar installation.
Further:The recessed portion of first mounting plate and second mounting plate is both provided with rubber layer.
By using above-mentioned technical proposal, when installing cross bar, by the way that the rubber layer in recessed portion is arranged, not only to cross bar It plays a protective role with mounting plate, and then extends the service life of mounting plate and cross bar, and since rubber layer has elasticity, It enables to cross bar to be mounted so as to mounting plate when installation even closer, enhances the stability of cross bar installation to a certain extent.
Further:First mounting plate is arranged in parallel with second mounting plate, and second mounting plate is remote The corner of side from the montant is both provided with circular arc chamfering.
By using above-mentioned technical proposal, circular arc chamfering is set in edge, avoids worker when installing scaffold It is scratched by corner.
Further:Described montant one end near the ground is provided with the disk abutted with ground.
By using above-mentioned technical proposal, disk increases the contact area on vertical pole and ground so that vertical pole is not susceptible to The case where tilting or skewing, so that scaffold is more steady in ground placement.
In conclusion the utility model has the advantages that:
First, by the way that the rubber layer in recessed portion is arranged, not only play a protective role, and then extends to cross bar and mounting plate The service life of mounting plate and cross bar, and since there is rubber layer elasticity, when installation cross bar to be enabled to be installed with mounting plate Must be even closer, the stability of cross bar installation is enhanced to a certain extent;
Second, by the way that recessed portion is arranged on the first mounting plate and the second mounting plate, avoid cross bar when mounted with peace The stability of cross bar installation has been effectively ensured there is a phenomenon where causing installation unstable with respect to sliding in loading board.
Description of the drawings
Fig. 1 is the structural schematic diagram of the construction scaffold of the utility model embodiment.
Fig. 2 is the sectional view of the construction scaffold of the utility model embodiment.
Fig. 3 is the enlarged drawing of details A in Fig. 2.
Fig. 4 is the partial sectional view of the construction scaffold of the utility model embodiment.
Reference numeral:1, cross bar;2, montant;21, disk;3, the first mounting plate;31, recessed portion;4, fastening plates;41, One mounting groove;42, card slot;5, the second mounting plate;51, mounting portion;52, the second mounting groove;53, buckle structure;531, fixture block; 532, elastic component;6, rubber layer.
Specific implementation mode
The utility model is described in further detail below in conjunction with attached drawing.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability Field technique personnel can as needed make the present embodiment the modification for not creating contribution after reading this specification, but only It all to be protected by Patent Law in the right of the utility model.
Embodiment:The present embodiment is related to a kind of construction scaffold, as shown in Figure 1, including:Cross bar 1, montant 2, first Mounting plate 3, the second mounting plate 5 and fastening plates 4.In the present embodiment, cross bar 1 and montant 2 are cylindrical, hollow steel pipe, are erected Bar 2 is used to support the weight of entire scaffold, and 2 one end near the ground of montant is provided with the disk 21 abutted with ground, and cross bar 1 is used for Carrying construction article and construction personnel.
In conjunction with shown in Fig. 2,3, the first mounting plate 3 is arranged on montant 2 far from ground side(Upside in attached drawing 2), first The lower face of mounting plate 3 is provided with recessed portion 31, and when installing cross bar 1, recessed portion 31, which matches to merge with cross bar 1, plays positioning work With occurring when mounted with the first mounting plate 3 so as to avoid cross bar 1 with respect to sliding and lead to that installation is unstable or installation is inconvenient The phenomenon that, it ensure that the installation effectiveness of scaffold and the stability of installation, rubber layer 6 be provided on the surface of recessed portion 31, Rubber layer 6 not only plays a protective role to cross bar 1 and the second mounting plate 5, and then extends the service life of mounting plate and cross bar 1, And since rubber layer 6 has elasticity, it is even closer that when installation, enables to cross bar 1 to be mounted so as to mounting plate, to a certain extent Enhance the stability of the installation of cross bar 1.In the present embodiment, the first mounting plate 3 is the steel plate with certain elasticity, and recessed portion 31 shape is arc-shaped, and in other embodiments, the first installation version other can also have certain elasticity for aluminium alloy plate etc. Metallic plate, recessed portion 31 can also be rectangular-shaped, triangle etc..
As shown in Figure 2,3, fastening plates 4 are assemblied on the first mounting plate 3 by articulated shaft rotary type far from 2 one end of montant (Front end in attached drawing 3), and for being clamped with the second mounting plate 5, to lock the first mounting plate 3 and the second mounting plate 5, at this In embodiment, fastening plates 4 are rectangular steel plates, and the first mounting groove 41 is provided in fastening plates 4, meanwhile, in the first mounting groove 41 Upper wall be provided with card slot 42.
In conjunction with shown in Fig. 2,3, side near the ground is arranged on montant 2 in the second mounting plate 5(Downside in attached drawing 2), and with One mounting plate 3 there are certain interval so that cross bar 1 is accommodating, far from 2 one end of montant on the second mounting plate 5(Front end in attached drawing 2)If It is equipped with mounting portion 51, when installing cross bar 1, mounting portion 51 and the first mounting groove 41 in fastening plates 4 of the second mounting plate 5 are inserted It connects, the upper surface of the second mounting plate 5 is provided with the recessed portion 31 being adapted to 1 portion profile of cross bar, and recessed portion 31 is for installing Cross bar 1 is blocked when cross bar 1, rubber layer 6 is provided on the surface of recessed portion 31, and rubber layer 6 not only installs cross bar 1 and second Plate 5 plays a protective role, and then extends the service life of mounting plate and cross bar 1, and since rubber layer 6 has elasticity, installation When to enable to cross bar 1 to be mounted so as to mounting plate even closer, enhance the stability of the installation of cross bar 1 to a certain extent.At this In embodiment, for convenience of the grafting of mounting portion 51 and the first mounting groove 41, mounting portion 51 is set as wedge shape, due to wedge-shaped mounting portion 51 there are tips, easily scratch worker, therefore, the tip of wedge-shaped mounting portion 51 are provided with chamfering, meanwhile, the upper end of mounting portion 51 Face is provided with the second mounting groove 52, is equipped with buckle structure 53 in the second mounting groove 52, buckle structure 53 be used for by fastening plates 4 with Second mounting plate 5 is locked or is unlocked.
Wherein, as shown in Figure 3,4, buckle structure 53 includes:Fixture block 531 and elastic component 532.Fixture block 531 is installed on It can slide in two mounting grooves 52 and along the direction that opens up of the second mounting groove 52, fixture block 531 is used to coordinate with card slot 42, to real It is fixed locking or unlocking for fastening plates 4 and the second mounting plate 5 is showed, in the present embodiment, fixture block 531 is wedge block, and wedge block On be provided with chamfering, wedge block is metal derby, and wedge block can also be with rigid plastics block in other design examples.Elastic component 532 one end and 531 fixing assembling of fixture block, the slot bottom fixing assembling of the other end and the second mounting groove 52, it is elastic in the present embodiment Part 532 is spring, and elastic component 532 can also be shrapnel or elastic block rubber in other embodiments.
The use principle of the present embodiment is approximately as stating:When installing scaffold, disk 21 is first passed through by the perpendicular of scaffold Bar 2 is placed on the ground, and cross bar 1 is plugged in the gap in 5 holder of the first mounting plate 3 and the second mounting plate on montant 2, so Rotation is hinged on the fastening plates 4 on the first mounting plate 3 afterwards so that on the first mounting groove 41 and the second mounting plate 5 in fastening plates 4 51 grafting of mounting portion, meanwhile, using the buckle structure 53 that is arranged on mounting portion 51 and the cooperation of card slot 42 by fastening plates 4 and the Two mounting plates 5 are locked, and then the first mounting plate 3 and the second mounting plate 5 are locked, and realize the installation of cross bar 1 and montant 2.It is tearing open When unloading, by stirring fastening plates 4 so that fastening plates 4 are detached with the second mounting plate 5, so that cross bar 1 is detached from the first mounting plate 3 and second mounting plate 5, it facilitates cross bar 1 and is detached with the installation fixation of montant 2 and dismounting, reduce scaffold dismounting Workload improves the efficiency of scaffold dismounting.
Although the utility model is described in detail with reference to above-described embodiment, those of ordinary skill in the art are still Can creative work not be made to according to circumstances mutual group of the feature in the utility model embodiment in the absence of conflict Other adjustment are made in conjunction, additions and deletions, to obtain other technologies scheme of the different, essence without departing from the design of the utility model, These technical solutions similarly belong to the utility model scope of the claimed.

Claims (8)

1. a kind of construction scaffold, including:Cross bar (1) and montant (2), which is characterized in that further include:
It is set to the first mounting plate (3) far from ground side on the montant (2);
Be set to side near the ground on the montant (2), there are certain intervals for the cross with first mounting plate (3) Accommodating the second mounting plate (5) of bar (1) is provided with mounting portion on second mounting plate (5) far from the montant (2) one end (51);And
Rotary type be assemblied on first mounting plate (3) far from the montant (2) one end, be used for and second mounting plate (5) mounting portion (51) is clamped so that the cross bar (1) to be locked to the fastening plates (4) on the montant (2).
2. construction scaffold according to claim 1, which is characterized in that be provided on the fastening plates (4) and institute State the first mounting groove (41) of mounting portion (51) clamping of the second mounting plate (5).
3. construction scaffold according to claim 2, which is characterized in that on the cell wall of first mounting groove (41) It is provided with card slot (42), the mounting portion (51) of second mounting plate (5), which is provided with, to be coordinated with the card slot (42) will fasten The buckle structure (53) that plate (4) is locked or is unlocked with second mounting plate (5).
4. construction scaffold according to claim 3, which is characterized in that the mounting portion of second mounting plate (5) (51) the second mounting groove (52) is provided on side wall, the buckle structure (53) includes:
Be installed on it is in second mounting groove (52) and can along second mounting groove (52) open up direction sliding, with The fixture block (531) of card slot (42) cooperation;And
One end and the fixture block (531) fixing assembling, the bullet of the other end and the slot bottom fixing assembling of second mounting groove (52) Property part (532).
5. construction scaffold according to claim 1, which is characterized in that first mounting plate (3) and described the The recessed portion (31) being adapted to the cross bar (1) portion profile is both provided on the opposite end face of two mounting plates (5).
6. construction scaffold according to claim 5, which is characterized in that first mounting plate (3) and described the The recessed portion (31) of two mounting plates (5) is both provided with rubber layer (6).
7. construction scaffold according to claim 1, which is characterized in that first mounting plate (3) and described the Two mounting plates (5) are arranged in parallel, and the corner of the side far from the montant (2) of second mounting plate (5) is both provided with Circular arc chamfering.
8. the construction scaffold according to any one of claim 1-7, which is characterized in that montant (2) near-earth Face one end is provided with the disk (21) abutted with ground.
CN201721766083.0U 2017-12-15 2017-12-15 A kind of construction scaffold Expired - Fee Related CN207620329U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721766083.0U CN207620329U (en) 2017-12-15 2017-12-15 A kind of construction scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721766083.0U CN207620329U (en) 2017-12-15 2017-12-15 A kind of construction scaffold

Publications (1)

Publication Number Publication Date
CN207620329U true CN207620329U (en) 2018-07-17

Family

ID=62821404

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721766083.0U Expired - Fee Related CN207620329U (en) 2017-12-15 2017-12-15 A kind of construction scaffold

Country Status (1)

Country Link
CN (1) CN207620329U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111028706A (en) * 2019-12-13 2020-04-17 深圳市洲明科技股份有限公司 Installation fixing device, box outer frame and display screen

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111028706A (en) * 2019-12-13 2020-04-17 深圳市洲明科技股份有限公司 Installation fixing device, box outer frame and display screen
CN111028706B (en) * 2019-12-13 2021-11-26 深圳市洲明科技股份有限公司 Installation fixing device, box outer frame and display screen

Similar Documents

Publication Publication Date Title
CN108396931B (en) Dry hanging device for building wall tile
CN108180196A (en) Fast assembling-disassembling connection buckle structure, LED display
CN102665486B (en) Computer table for a furniture
CN207420008U (en) A kind of mounting structure of building curtain wall construction scaffolding
CN207620329U (en) A kind of construction scaffold
CN212338748U (en) Supporting frame
CN101515470B (en) Device for fixing hard disk
CN112663841A (en) Assembled building curtain wall plate and mounting method thereof
CN203403637U (en) Wall board and wall face installation fixing device
CN216475782U (en) Curtain wall connecting piece
CN213087303U (en) Wallboard mounting structure and wallboard system
CN210530064U (en) Button type buckled dry-hanging stone slab curtain wall
CN104633606A (en) Flashlight and fixing structure thereof
CN210570217U (en) Quick detach formula leather rail strip
CN206537465U (en) It is easy to the local component installation structure dismounted for autonomous underwater vehicle
CN204972811U (en) Fire hydrant case convenient to fire hydrant door is installed and removed
CN206088742U (en) A lifting device for instrument board assembly
CN219219492U (en) Curtain wall connecting structure
CN209991183U (en) Information data arrangement box wall installation mechanism
CN220686595U (en) Detachable buckle strip
CN209912721U (en) Quick installing support of condenser
CN112081278A (en) Button type buckled dry-hanging stone slab curtain wall
CN217947332U (en) Hinge type lifting lock device for assisting display screen lifting
CN221095544U (en) Aluminum veneer curtain wall connecting structure
CN209874855U (en) Combined window sleeve splicing structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180717

Termination date: 20181215