CN207605506U - A kind of industrial waste gas purifying processing equipment - Google Patents

A kind of industrial waste gas purifying processing equipment Download PDF

Info

Publication number
CN207605506U
CN207605506U CN201721426986.4U CN201721426986U CN207605506U CN 207605506 U CN207605506 U CN 207605506U CN 201721426986 U CN201721426986 U CN 201721426986U CN 207605506 U CN207605506 U CN 207605506U
Authority
CN
China
Prior art keywords
industrial waste
purification tower
coiled pipe
waste gas
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721426986.4U
Other languages
Chinese (zh)
Inventor
胡大苇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU FUSHENGYUAN ENVIRONMENTAL PROTECTION ENGINEERING Co Ltd
Original Assignee
GUANGZHOU FUSHENGYUAN ENVIRONMENTAL PROTECTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU FUSHENGYUAN ENVIRONMENTAL PROTECTION ENGINEERING Co Ltd filed Critical GUANGZHOU FUSHENGYUAN ENVIRONMENTAL PROTECTION ENGINEERING Co Ltd
Priority to CN201721426986.4U priority Critical patent/CN207605506U/en
Application granted granted Critical
Publication of CN207605506U publication Critical patent/CN207605506U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treating Waste Gases (AREA)

Abstract

The utility model discloses a kind of industrial waste gas purifying processing equipments, including purification tower, purification tower bottom end is equipped with cistern, aqueduct is installed inside cistern, primer pump is installed in the middle part of aqueduct, fixed block is installed inside purification tower, water jet column is connected between fixed block, water jet column upper and lower ends are equipped with water spout, purification tower is internal up and down to be equipped with coiled pipe, coiled pipe left end is connected with air inlet pipe, air inlet pipe left end is connected with flow valve, flow valve left end is connected with flue gas leading, coiled pipe right end is connected with muffler, muffler right end is connected with recoil tube, purification tower front center is connected with exhaust pipe.The utility model realizes efficiently washing away to exhaust gas, greatly reduces the soluble gas and solid particulate matter in exhaust gas, the recoil tube being equipped with simultaneously is also realized and is washed away to coiled pipe inside, the blocking of coiled pipe is avoided, reliability is high, meets the needs of industrial waste gas purifying processing.

Description

A kind of industrial waste gas purifying processing equipment
Technical field
The utility model is related to waste gas treatment equipment technical field, specifically a kind of industrial waste gas purifying processing equipment.
Background technology
Industrial waste gas refers to that generated in plant area of enterprise fuel combustion and production process various are discharged into containing for air There is the general name of contaminant gases.These exhaust gas have:Carbon dioxide, carbon disulfide, hydrogen sulfide, fluoride, nitrogen oxides, chlorine, chlorine Change hydrogen, carbon monoxide, sulfuric acid (mist) lead mercury, beryllide, flue dust and industrial dust, is discharged into air, air can be polluted.These objects Matter enters the internal of people by different approach respiratory tracts, and some directly generates harm, and some also has cumulative effect, can be tighter The health for endangering people of weight.Different material has Different Effects.
Industrial waste gas processing the active carbon adsorption of principle, Production by Catalytic Combustion Process, catalytic oxidation, acid-base neutralization method, etc. A variety of principles such as ion method.Exhaust gas treating tower absorbs and filter purification systems using five weight exhaust gas, industrial waste gas processing design is careful, Purification filtering exhaust gas layer by layer, effect are preferable.Chinese patent (notification number:CN206215026U a kind of industrial waste gas purifying) is disclosed Processing unit, although the device realizes the processing to exhaust gas to a certain extent, in actually purifying, exhaust gas enters It can be eventually resulted in gas by increasing resistance and be docked to main tower frame in the purified treatment layer of multiple dovetail groove compositions In frame, purification is cannot achieve, if improving exhaust gas pressure by force realizes purification, can also there is the danger of explosion.
Utility model content
The purpose of this utility model is to provide a kind of industrial waste gas purifying processing equipments, to solve in above-mentioned background technology The problem of proposition.
To achieve the above object, the utility model provides the following technical solutions:
A kind of industrial waste gas purifying processing equipment, including purification tower, the purification tower bottom end are equipped with cistern, water storage Aqueduct is installed inside pond, primer pump is installed in the middle part of aqueduct, fixed block, fixed block are installed inside the purification tower Between be connected with water jet column, water jet column upper and lower ends are equipped with water spout, and the purification tower is internal up and down to be equipped with coiled pipe, Coiled pipe left end is connected with air inlet pipe, and air inlet pipe left end is connected with flow valve, and flow valve left end is connected with flue gas leading, described snakelike Pipe right end is connected with muffler, and muffler right end is connected with recoil tube, and the purification tower front center is connected with exhaust pipe.
As further program of the utility model:The recoil tube left end is connected with exhaust pipe, is connected in the middle part of recoil tube There is return-air pump.
As further program of the utility model:Air intake pump is installed in the middle part of the flue gas leading.
As further program of the utility model:Bottom end is equipped with blow-off pipe on the left of the cistern.
As further program of the utility model:Coiled pipe lower end is all provided with described in coiled pipe lower end and lower end described in upper end There is gas outlet.
As the utility model further scheme:The aqueduct left end is connected to water jet column right end.
Compared with prior art, the utility model has the beneficial effects that:
A kind of industrial waste gas purifying processing equipment, it is reasonable for structure, it is novel in design, by equipped with water spout and snakelike Mutual cooperation between pipe realizes efficiently washing away to exhaust gas, greatly reduces the soluble gas and solid in exhaust gas Grain object, while the recoil tube being equipped with also is realized and is washed away to coiled pipe inside, and the blocking of coiled pipe is avoided, reliability is high, Meet the needs of industrial waste gas purifying processing.
Description of the drawings
Fig. 1 is a kind of industrial waste gas purifying processing equipment structural schematic diagram.
Fig. 2 is a kind of positive structure diagram of purification tower in industrial waste gas purifying processing equipment.
Fig. 3 is a kind of overlooking structure diagram of coiled pipe in industrial waste gas purifying processing equipment.
Specific implementation mode
It should be noted that in the absence of conflict, the feature in the embodiments of the present invention and embodiment can To be combined with each other.
In the description of the present invention, it should be understood that term "center", " longitudinal direction ", " transverse direction ", "upper", "lower", The orientation or positional relationship of the instructions such as "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside" is It is based on the orientation or positional relationship shown in the drawings, is merely for convenience of describing the present invention and simplifying the description, rather than indicate Or imply that signified device or element must have a particular orientation, with specific azimuth configuration and operation, therefore cannot understand For limitations of the present invention.In addition, term " first ", " second " etc. are used for description purposes only, and should not be understood as indicating Or it implies relative importance or implicitly indicates the quantity of indicated technical characteristic." first ", " second " etc. are defined as a result, Feature can explicitly or implicitly include one or more this feature.It is in the description of the present invention, unless another It is described, the meaning of " plurality " is two or more.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified Dress ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integrally Connection;It can be mechanical connection, can also be electrical connection;Can be directly connected, can also indirectly connected through an intermediary, It can be the connection inside two elements.For the ordinary skill in the art, on being understood by concrete condition State the concrete meaning of term in the present invention.
The utility model will be described in detail below with reference to the accompanying drawings and embodiments.
Refering to fig. 1~3, in the utility model embodiment, a kind of industrial waste gas purifying processing equipment, including purification tower 1, 1 bottom end of the purification tower is equipped with cistern 14, and 14 left side bottom end of the cistern is equipped with blow-off pipe 15, for ejection The particulate matter that water is dissolved precipitated after discharge, aqueduct 10,10 left end of the aqueduct are installed inside cistern 14 It is connected to 12 right end of water jet column, 10 middle part of aqueduct is equipped with primer pump 17, for the water in cistern 14 to be introduced into water spray It is sprayed in column 12, and then realizes the evolution to exhaust gas, fixed block 13, fixed block are installed inside the purification tower 1 Water jet column 12 is connected between 13,12 upper and lower ends of water jet column are equipped with water spout 11, the internal installation of about 1 purification tower There is a coiled pipe 6,6 lower end of coiled pipe is equipped with gas outlet 16 described in 6 lower end of the coiled pipe and lower end, for realizing coiled pipe The discharge of exhaust gas in 6,6 left end of coiled pipe are connected with air inlet pipe 5, and 5 left end of air inlet pipe is connected with flow valve 2, for waste gas stream Enter to the gas flow rate in coiled pipe 6 and be adjusted, 2 left end of flow valve is connected with flue gas leading 3,3 middle part installation of the flue gas leading There is air intake pump 4, the pressure entered in flue gas leading 3 for increasing exhaust gas, 6 right end of the coiled pipe is connected with muffler 9, returns 9 right end of tracheae is connected with recoil tube 18, and 18 left end of the recoil tube is connected with exhaust pipe 7, for the discharge of gas after purifying, instead 18 middle part of washing pipe is connected with return-air pump 8, for purified gas to be introduced into coiled pipe 6, in 1 front end of the purification tower Portion is connected with exhaust pipe 7.
A kind of industrial waste gas purifying processing equipment, in use, first under the action of air intake pump 4 by flue gas leading into Enter into flow valve 2, then entered in coiled pipe 6 by air inlet pipe 5 again, is then sprayed by gas outlet 16, then sprayed again It is sprayed under the action of the water that water nozzle 11 sprays, due to 16 design symmetrical above and below of gas outlet in two coiled pipes 6, ejection Gas phase mutually disturbs, and under the action of shower water, the effect of settling of particulate matter is more obvious, simultaneously because coiled pipe 6 is snakelike Design so that the speed entered in purification tower 1 is relatively small, to keep soluble gas and particulate matter better To precipitation, it is discharged into purified air by exhaust pipe 7, in entire purification process, there can be a part of solid particulate matter It is attached in coiled pipe 6, at this point, opening return-air pump 8, purified air is reversely punched into coiled pipe 6, to coiled pipe 6 In particle washed away, avoid blocking coiled pipe 6, greatly increase the reliability of entire purification system.The utility model, knot Structure is reasonable, novel in design, by equipped with water spout 11 and coiled pipe 6 between mutual cooperation, realize to the efficient of exhaust gas It washes away, the recoil tube 18 for greatly reducing the soluble gas and solid particulate matter in exhaust gas, while being equipped with also is realized and to snake Washing away inside shape pipe 6 avoids the blocking of coiled pipe 6, and reliability is high, meets the needs of industrial waste gas purifying processing.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Within the spirit and principle of utility model, any modification, equivalent replacement, improvement and so on should be included in the utility model Protection domain within.

Claims (6)

1. a kind of industrial waste gas purifying processing equipment, including purification tower (1), which is characterized in that purification tower (1) bottom end Equipped with cistern (14), aqueduct (10) is installed inside cistern (14), primer pump (17) is installed in the middle part of aqueduct (10), Fixed block (13) is installed inside the purification tower (1), water jet column (12), water jet column (12) are connected between fixed block (13) Upper and lower ends are equipped with water spout (11), and the purification tower (1) is internal up and down to be equipped with coiled pipe (6), coiled pipe (6) left end It is connected with air inlet pipe (5), air inlet pipe (5) left end is connected with flow valve (2), and flow valve (2) left end is connected with flue gas leading (3), institute It states coiled pipe (6) right end and is connected with muffler (9), muffler (9) right end is connected with recoil tube (18), the purification tower (1) Front center is connected with exhaust pipe (7).
2. a kind of industrial waste gas purifying processing equipment according to claim 1, which is characterized in that the recoil tube (18) is left End is connected with exhaust pipe (7), and return-air pump (8) is connected in the middle part of recoil tube (18).
3. a kind of industrial waste gas purifying processing equipment according to claim 1, which is characterized in that in the flue gas leading (3) Portion is equipped with air intake pump (4).
4. a kind of industrial waste gas purifying processing equipment according to claim 1, which is characterized in that the cistern (14) is left Side bottom end is equipped with blow-off pipe (15).
5. a kind of industrial waste gas purifying processing equipment according to claim 1, which is characterized in that coiled pipe described in upper end (6) coiled pipe (6) lower end described in lower end and lower end is equipped with gas outlet (16).
6. a kind of industrial waste gas purifying processing equipment according to claim 1, which is characterized in that the aqueduct (10) is left End is connected to water jet column (12) right end.
CN201721426986.4U 2017-10-31 2017-10-31 A kind of industrial waste gas purifying processing equipment Expired - Fee Related CN207605506U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721426986.4U CN207605506U (en) 2017-10-31 2017-10-31 A kind of industrial waste gas purifying processing equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721426986.4U CN207605506U (en) 2017-10-31 2017-10-31 A kind of industrial waste gas purifying processing equipment

Publications (1)

Publication Number Publication Date
CN207605506U true CN207605506U (en) 2018-07-13

Family

ID=62794735

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721426986.4U Expired - Fee Related CN207605506U (en) 2017-10-31 2017-10-31 A kind of industrial waste gas purifying processing equipment

Country Status (1)

Country Link
CN (1) CN207605506U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108771987A (en) * 2018-07-19 2018-11-09 苏州方舟环保科技有限公司 A kind of manufacturing equipment of high-concentration ozone water
CN112774390A (en) * 2020-12-17 2021-05-11 陈珊珊 Anti-blocking industrial waste gas desulfurization and denitrification treatment device
CN112915727A (en) * 2021-01-22 2021-06-08 四川利达华锐机械有限公司 Hinder and spray environmental protection equipment soon with adjustable structure of power

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108771987A (en) * 2018-07-19 2018-11-09 苏州方舟环保科技有限公司 A kind of manufacturing equipment of high-concentration ozone water
CN108771987B (en) * 2018-07-19 2023-11-10 苏州方舟环保科技有限公司 Manufacturing equipment for high-concentration ozone water
CN112774390A (en) * 2020-12-17 2021-05-11 陈珊珊 Anti-blocking industrial waste gas desulfurization and denitrification treatment device
CN112915727A (en) * 2021-01-22 2021-06-08 四川利达华锐机械有限公司 Hinder and spray environmental protection equipment soon with adjustable structure of power
CN112915727B (en) * 2021-01-22 2023-02-17 四川利达华锐机械有限公司 Hinder and spray environmental protection equipment soon with adjustable structure of power

Similar Documents

Publication Publication Date Title
CN105833646B (en) A kind of self-shield industrial waste gas scrubbing tower purifying processing device
CN207605506U (en) A kind of industrial waste gas purifying processing equipment
CN104028069A (en) Smoke washing device and smoke washing method
CN101024147B (en) Wast gas purifier
CN202606007U (en) Ammonia desulfurization and denitrification tower
CN206935083U (en) Industrial waste gas purifying processing system
CN205172695U (en) Automobile emission purification device
CN107088353A (en) Industrial waste gas purifying processing system
CN211913309U (en) Double-flow spray tower
CN205948626U (en) Denitration dust collector
CN104248899B (en) A kind of method of administering haze
CN202962190U (en) Welding dedusting and purifying device
CN210714814U (en) Marine engine tail gas efficient purification system based on seawater electrolysis and electrostatic spraying
CN204469526U (en) Flue gas cleaner
CN212492213U (en) Gas purification system
CN213375707U (en) Processing apparatus for exhaust purification
CN204952637U (en) Double tower SOx/NOx control equipment
CN109046024B (en) Ship tail gas denitration catalytic purification system
CN204933159U (en) Air deduster
CN210332244U (en) Exhaust gas treatment device
CN205227365U (en) Hot recovery processing device of high -efficient flue gas
CN110141924A (en) A kind of desulfurization tube bank bag dust collector and method
CN221801793U (en) Industrial waste gas combustion treatment equipment
CN204841381U (en) SOx/NOx control integration system
CN207024942U (en) The processing unit of waste gas in a kind of graphite production

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180713

Termination date: 20181031