CN207597452U - A kind of experimental provision of detection of pier foundation static load - Google Patents

A kind of experimental provision of detection of pier foundation static load Download PDF

Info

Publication number
CN207597452U
CN207597452U CN201721406916.2U CN201721406916U CN207597452U CN 207597452 U CN207597452 U CN 207597452U CN 201721406916 U CN201721406916 U CN 201721406916U CN 207597452 U CN207597452 U CN 207597452U
Authority
CN
China
Prior art keywords
pile
girder
detection
static load
experimental provision
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721406916.2U
Other languages
Chinese (zh)
Inventor
卢曼曼
王仁明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721406916.2U priority Critical patent/CN207597452U/en
Application granted granted Critical
Publication of CN207597452U publication Critical patent/CN207597452U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The utility model discloses a kind of experimental provisions of detection of pier foundation static load, including anchoring pile and test pile, the side of the anchoring pile is equipped with fixing bracket, the upper end of the anchor cage is equipped with pull rod, the side of the test pile is equipped with datum line beam, the upper end of the test pile is equipped with bearing plate, the upper end of the bearing plate is equipped with jack, the top of the jack is equipped with stressed plate, the upper end of the stressed plate is equipped with girder, the outer surface of the girder is equipped with fixed strip, and the upper end of the girder is equipped with secondary beam, and the lower end of the secondary beam is equipped with baffle.A kind of experimental provision of detection of pier foundation static load described in the utility model; equipped with fixing bracket, fixed strip and baffle; what can more be consolidated supports anchoring pile; fixed strip can play the role of reinforcement protection to girder; it prevents girder from being ruptured in loading process, and can prevent secondary beam in operation process from rolling by setting baffle; different operating situation is applicable in, brings better prospect of the application.

Description

A kind of experimental provision of detection of pier foundation static load
Technical field
The utility model is related to civil construction field, more particularly to a kind of experimental provision of detection of pier foundation static load.
Background technology
Dead load test on pile foundation is to be used in the technology detected in engineering to bearing capacity of pile foundation.Determining that the single pile limit holds In terms of carrying power, it is presently the most accurate, the reliable method of inspection, as judging whether certain dynamic load method of inspection is ripe, Using the comparison error size of Static Load Test Results as foundation.Therefore, each Base foundation design processing specification is all single pile static load Experiment is included in top priority, so application of the experimental provision of detection of pier foundation static load in engineering is particularly important, it can be right The bearing capacity of pile foundation makes accurate judgement, and under normal circumstances, the performance data of dead load test on pile foundation, such as bearing capacity of single pile sinks Drop amount etc. is considered accurate, reliable, this has been that countless case histories proves, more the static load of pile foundation experiment of efficiently and accurately The invention of device is of great significance.
The experimental provision of existing detection of pier foundation static load when in use there are certain drawbacks, do not fix by the side of anchoring pile Stent, anchoring pile is fixed not enough securely, can shake anchoring pile when force ratio is larger, influence the measurement of device, do not have on girder There is fixed strip, the active force on operation middle girder is too big girder to be caused to rupture, and the lower end of secondary beam does not have baffle, secondary Beam may cause safety accident because of shaking at work, bring certain influence when in use, for this purpose, it is proposed that one The experimental provision of kind detection of pier foundation static load.
Utility model content
The main purpose of the utility model is that providing a kind of experimental provision of detection of pier foundation static load, can effectively solve to carry on the back The problems in scape technology.
To achieve the above object, the technical solution that the utility model is taken is:
A kind of experimental provision of detection of pier foundation static load, including anchoring pile and test pile, the side of the anchoring pile is installed with admittedly Fixed rack, the upper end of the anchoring pile are equipped with anchoring pile main reinforcement, and the upper end of the anchoring pile main reinforcement is installed with anchor cage, the anchor cage Upper end is equipped with pull rod, and the side of the test pile is equipped with datum line beam, and the outer surface of the test pile is equipped with displacement sensor, the test pile Upper end be equipped with bearing plate, the upper end of the bearing plate is equipped with jack, and the upper end of the jack is equipped with pressure sensor, institute The top for stating jack is equipped with stressed plate, and the upper end of the stressed plate is equipped with girder, and the outer surface of the girder is equipped with fixed strip, The upper end of the girder is equipped with secondary beam, and the lower end of the secondary beam is equipped with baffle, and the upper end of the pull rod is equipped with pillow, the pillow Upper end be installed with cushion block.
Preferably, the anchor cage is fixedly connected by pull rod with pillow, and the quantity of pull rod is two groups.
Preferably, the secondary beam is fixedly connected with baffle, and the quantity of baffle is two groups.
Preferably, the bearing plate is connect by jack with stressed plate interaction.
Preferably, the anchoring pile is fixedly connected by anchoring pile main reinforcement with anchor cage.
Compared with prior art, the utility model has the advantages that:The experimental provision of the detection of pier foundation static load leads to It crosses equipped with fixing bracket, what can more be consolidated supports anchoring pile, and in experimental provision operational process, fixing bracket can make anchor Stake is more firm firm, prevents anchoring pile from deviating, not only reduces the security risk of device, also reduces the mistake measured by device Difference, fixed strip can play reinforcement effect to girder, and under the action of jack, active force is larger with reaction force, passes through fixation Item fastens girder, prevents girder from being ruptured in loading process, avoids the damage of girder, and passes through setting baffle, prevents from testing Device secondary beam in operation process rolls, and whole device is simple, easy to operate, the effect used relative to traditional approach more It is good.
Description of the drawings
Fig. 1 is a kind of overall structure diagram of the experimental provision of detection of pier foundation static load of the utility model.
Fig. 2 is a kind of partial view of the experimental provision of detection of pier foundation static load of the utility model.
In figure:1st, anchoring pile;2nd, fixing bracket;3rd, anchoring pile main reinforcement;4th, anchor cage;5th, pull rod;6th, test pile;7th, datum line beam;8th, position Displacement sensor;9th, bearing plate;10th, jack;11st, pressure sensor;12nd, stressed plate;13rd, girder;14th, fixed strip;15th, it is secondary Beam;16th, baffle;17th, pillow;18th, cushion block.
Specific embodiment
To be easy to understand technical means, creative features, achievable purpose and effectiveness of the utility model, below With reference to specific embodiment, the utility model is expanded on further.
As shown in Figs. 1-2, a kind of experimental provision of detection of pier foundation static load, including anchoring pile 1 and test pile 6, the one of the anchoring pile 1 Side is installed with fixing bracket 2, and the upper end of the anchoring pile 1 is equipped with anchoring pile main reinforcement 3, and peace is fixed in the upper end of the anchoring pile main reinforcement 3 Equipped with anchor cage 4, the upper end of the anchor cage 4 is equipped with pull rod 5, and the side of the test pile 6 is equipped with datum line beam 7, the appearance of the test pile 6 Face is equipped with displacement sensor 8, and the upper end of the test pile 6 is equipped with bearing plate 9, and the upper end of the bearing plate 9 is equipped with jack 10, institute The upper end for stating jack 10 is equipped with pressure sensor 11, and the top of the jack 10 is equipped with stressed plate 12, the stressed plate 12 Upper end be equipped with girder 13, the outer surface of the girder 13 is equipped with fixed strip 14, and the upper end of the girder 13 is equipped with secondary beam 15, institute The lower end for stating secondary beam 15 is equipped with baffle 16, and the upper end of the pull rod 5 is equipped with pillow 17, and the upper end of the pillow 17 is installed with Cushion block 18.
Wherein, the anchor cage 4 is fixedly connected by pull rod 5 with pillow 17, and the quantity of pull rod 5 is two groups.
Wherein, the secondary beam 15 is fixedly connected with baffle 16, and the quantity of baffle 16 is two groups.
Wherein, the bearing plate 9 is connect by jack 10 with 12 interaction of stressed plate.
Wherein, the anchoring pile 1 is fixedly connected by anchoring pile main reinforcement 3 with anchor cage 4.
It should be noted that the utility model is a kind of experimental provision of detection of pier foundation static load, when in use, pass through setting Anchoring pile 1 fixes entire experimental provision, and the fixing bracket 2 of 1 side of anchoring pile plays fixed function to anchoring pile 1, is transported in experimental provision During row, fixing bracket 2 can make anchoring pile 1 more firm firm, prevent anchoring pile 1 from deviating, anchor cage main reinforcement 3 is to anchoring pile 1 and anchor Cage 4 is played a supporting role, and also provides a counter-force effect for test pile 6,4 upper end of anchor cage is provided with pull rod 5, in entire experimental provision During running, secondary beam 15 can move on pull rod 5, and secondary beam 15 provides counter-force effect, the benchmark on 6 side of test pile in moving process Beam 7 prevents test pile 6 from dropping to datum line beam 7 hereinafter, the pile crown of test pile 6 is equipped with displacement sensor 8, displacement sensor during declining 8 are capable of the variation that 6 position of test pile is recorded of sensitivity, by setting bearing plate 9 in 6 upper end of test pile, on the one hand make 6 stress of test pile More uniformly, on the other hand it is protection test pile 6, prevents from being stressed directly and be damaged, bearing plate 9 is equipped with jack 10, very heavy There is active force on top 10 to girder 13 upwards, meanwhile, to test pile 6, there are one reaction force, jack 10 by girder 13 for secondary beam 15 By setting stressed plate 12 that test pile 6 is made to be more uniformly stressed with girder 13 between girder 13, in jack 10 and stressed plate 12 Between pressure sensor 11 is installed, pressure sensor 11 can record the size of reaction force suffered by test pile 6, on girder 13 Fixed strip 14 can play girder 13 a protection fixed function, prevent 13 stress of girder from causing greatly very much to rupture, on girder 13 Secondary beam 15 be mainly test pile 6 provide reaction force, by 15 lower end of secondary beam set baffle 16, prevent secondary beam 15 worked Swung in journey and rock and causes safety accident, the pillow 17 of 5 upper end of pull rod fixes pull rod 5, by set cushion block 18 to pull rod 5 with The junction of pillow 17 is reinforced.The experimental provision of a kind of detection of pier foundation static load described in the utility model, equipped with fixed branch Frame 2, fixed strip 14 and baffle 16, what can more be consolidated supports anchoring pile 1, and fixed strip 14 can play girder 13 reinforcing and make With preventing girder 13 from being ruptured in loading process, and can prevent secondary beam 15 or so in operation from shaking by setting baffle 16 It shakes, is applicable in different operating situation, brings better prospect of the application.
The basic principle of the utility model and main feature and the advantages of the utility model has been shown and described above.One's own profession The technical staff of industry is it should be appreciated that the present utility model is not limited to the above embodiments, described in above embodiments and description Only illustrate the principle of the utility model, on the premise of not departing from the spirit and scope of the utility model, the utility model is also Various changes and modifications are had, these various changes and improvements fall within the scope of the claimed invention.The utility model Claimed range is defined by the appending claims and its equivalent thereof.

Claims (5)

1. a kind of experimental provision of detection of pier foundation static load, including anchoring pile(1)And test pile(6), it is characterised in that:The anchoring pile(1) Side be installed with fixing bracket(2), the anchoring pile(1)Upper end be equipped with anchoring pile main reinforcement(3), the anchoring pile main reinforcement(3) Upper end be installed with anchor cage(4), the anchor cage(4)Upper end be equipped with pull rod(5), the test pile(6)Side be equipped with base Quasi- beam(7), the test pile(6)Outer surface be equipped with displacement sensor(8), the test pile(6)Upper end be equipped with bearing plate(9), The bearing plate(9)Upper end be equipped with jack(10), the jack(10)Upper end be equipped with pressure sensor(11), it is described Jack(10)Top be equipped with stressed plate(12), the stressed plate(12)Upper end be equipped with girder(13), the girder(13) Outer surface be equipped with fixed strip(14), the girder(13)Upper end be equipped with secondary beam(15), the secondary beam(15)Lower end be equipped with Baffle(16), the pull rod(5)Upper end be equipped with pillow(17), the pillow(17)Upper end be installed with cushion block(18).
2. a kind of experimental provision of detection of pier foundation static load according to claim 1, it is characterised in that:The anchor cage(4)It is logical Cross pull rod(5)And pillow(17)It is fixedly connected, and pull rod(5)Quantity be four groups.
3. a kind of experimental provision of detection of pier foundation static load according to claim 1, it is characterised in that:The secondary beam(15)With Baffle(16)It is fixedly connected, and baffle(16)Quantity be two groups.
4. a kind of experimental provision of detection of pier foundation static load according to claim 1, it is characterised in that:The bearing plate(9) Pass through jack(10)With stressed plate(12)Flexible connection.
5. a kind of experimental provision of detection of pier foundation static load according to claim 1, it is characterised in that:The anchoring pile(1)It is logical Cross anchoring pile main reinforcement(3)With anchor cage(4)It is fixedly connected.
CN201721406916.2U 2017-10-30 2017-10-30 A kind of experimental provision of detection of pier foundation static load Expired - Fee Related CN207597452U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721406916.2U CN207597452U (en) 2017-10-30 2017-10-30 A kind of experimental provision of detection of pier foundation static load

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721406916.2U CN207597452U (en) 2017-10-30 2017-10-30 A kind of experimental provision of detection of pier foundation static load

Publications (1)

Publication Number Publication Date
CN207597452U true CN207597452U (en) 2018-07-10

Family

ID=62757351

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721406916.2U Expired - Fee Related CN207597452U (en) 2017-10-30 2017-10-30 A kind of experimental provision of detection of pier foundation static load

Country Status (1)

Country Link
CN (1) CN207597452U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109682684A (en) * 2018-12-24 2019-04-26 南华机电(太仓)有限公司 The test method of recessed light fixture
CN112962693A (en) * 2021-04-27 2021-06-15 重庆育才工程咨询监理有限公司 Pier stud basis settlement monitoring device
CN113252461A (en) * 2021-05-28 2021-08-13 江苏海通全过程工程咨询有限公司 Hydraulic force application device for pile foundation static load test and application method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109682684A (en) * 2018-12-24 2019-04-26 南华机电(太仓)有限公司 The test method of recessed light fixture
CN112962693A (en) * 2021-04-27 2021-06-15 重庆育才工程咨询监理有限公司 Pier stud basis settlement monitoring device
CN113252461A (en) * 2021-05-28 2021-08-13 江苏海通全过程工程咨询有限公司 Hydraulic force application device for pile foundation static load test and application method thereof

Similar Documents

Publication Publication Date Title
CN207597452U (en) A kind of experimental provision of detection of pier foundation static load
CN102051858B (en) Jack loading triangular truss hanging basket and load test construction method thereof
CN106644324A (en) Test device for light steel frame beam column node bearing test
CN107036915A (en) The experimental rig and method of FRP and Bond Performance Between Concrete are measured under a kind of Impact Load
Tian et al. Seismic behavior of K-shaped eccentrically braced frames with high-strength steel: Shaking table testing and FEM analysis
CN104975621B (en) A kind of many anchored end retaining wall indoor model test device and test method
CN110593953A (en) Device and method for testing impact resistance characteristic of roadway support system under simulated rock burst condition
Liu et al. Development and experimental validation of a steel plate shear wall with self-centering energy dissipation braces
CN101824801B (en) Non-in-situ prepressing method of self-anchored type support frame and self-anchored type support frame thereof
CN106940271A (en) One kind, which is built, uses spandrel girder loading test device
CN103837279A (en) Prestress anchoring structure tensioning force detecting system based on single-freedom-degree system
CN110485486A (en) A kind of pile foundation static load test detection structure and its detection method
Yang et al. Effect of soil-pile-structure interaction on seismic behaviour of nuclear power station via shaking table tests
CN103758161B (en) Pressure testing device and the pressure-measuring method of pile for prestressed pipe is measured with periphery pile tube component
CN206143824U (en) Pile foundation static test loading system
Twigden et al. Dynamic testing of post-tensioned rocking walls
Avgerinou et al. Full‐scale tests on used steel storage racks
Gilbertsen et al. Experimental study of small-scale R/C columns subjected to axial and shear force reversals
CN111965033A (en) Anti-floating anchor rod nondestructive testing equipment and construction method
CN112012253B (en) Split type fast loading method pile foundation detection device and method thereof
CN103115791A (en) Method and device for field performance detection of steel portal rigid-framed structures
Guo et al. Experimental investigation on hysteretic behavior of circular hollow steel tubular columns after lateral impacts
CN207036452U (en) A kind of traditional style construction steel frame structure bidirectional load test device
CN112012252B (en) Integrated fast-loading method pile foundation detection device and detection method thereof
CN115753338A (en) Composite bearing capacity test device and method based on power transmission tower anchor cable bearing platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180710

Termination date: 20181030