CN206143824U - Pile foundation static test loading system - Google Patents
Pile foundation static test loading system Download PDFInfo
- Publication number
- CN206143824U CN206143824U CN201621181249.8U CN201621181249U CN206143824U CN 206143824 U CN206143824 U CN 206143824U CN 201621181249 U CN201621181249 U CN 201621181249U CN 206143824 U CN206143824 U CN 206143824U
- Authority
- CN
- China
- Prior art keywords
- anchor
- pile foundation
- pile
- steel
- loading system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model relates to a pile foundation static test loading system. The base is including testing pile, hydraulic jack is settled at testing pile's top surface center, the levelling of the upper and lower use leveling steel sheet of hydraulic jack, and hydraulic jack's top is supported in the center of carrier bar bottom surface, and testing pile's top surface installation percentage table sets up the anchor beam on the carrier bar, and mooring anchor backing plate on the anchor beam, steel strand wires anchor end fix on the anchor backing plate through the P anchor on, the pre -buried steel sheet on put more energy into structural steel frame and the cushion cap welds, uses two center hole jack to carry out steel strand stretching. Compared with the prior art, pile foundation static test loading system set up anchor end on steel strand stretching end, the anchor beam through setting up on the cushion cap, bear by the cushion cap the reaction force of pile foundation static load is direct, can show improvement pile foundation static test efficiency and performance accuracy, and easy operation, the construction is quick, the structure is reliable, economy is practiced thrift, can provide the new method for pile foundation static test's in the actual engineering load.
Description
Technical field
This utility model belongs to pile foundation detection field, it particularly relates to arrive a kind of dead load test on pile foundation loading system
System.
Background technology
Dead load test on pile foundation is it is determined that in terms of ultimate bearing capacity of single pile, be presently the most accurate, reliable detection method.With
The extensive application of the increasing year by year of infrastructure construction scale, particularly drilled pile in engineering, the static load of pile foundation of China is made
Detection technique enters a brand-new developing period.
In dead load test on pile foundation, act on the load in stake and typically provided by counterforce device, the easy-to-use degree of counterforce device
Directly affect the process and result of test.Preloading counterforce device the most frequently used at present is to arrange a load-bearing in stake top with girder steel to put down
Platform, heap weight on platform, by the jack being placed on pile crown, by platform, progressively item rises, so as to exert a force to pile body, preloading
Weight can be drawn materials conveniently from sand pocket, concrete precast block etc., simple to operate, it is not necessary to too big input.But dress
High labor intensive, long construction period when bag, load-bearing, loading and unloading, are affected that larger (sandbag can increase lotus after drenching with rain by weather
Carry), cause that test efficiency is relatively low, precision is not high.
The content of the invention
To solve above-mentioned technical problem, this utility model provides a kind of big, little by external interference with tonnage is carried
Dead load test on pile foundation loading system.
A kind of dead load test on pile foundation loading system described in the utility model, the loading system includes test pile 1, leveling
Steel plate 2, hydraulic jack 3, dial gauge 4, carrier bar 5, anchor beam 6, anchor plate 7, P anchors 8, steel strand wires 9, structural steel frame 10 of putting more energy into,
Centre-hole jack 11, pre-embedded steel slab 12 and cushion cap 13;The hydraulic jack 3 is distinguished by the leveling steel plate 2 of its above and below
It is connected with the bottom center of carrier beam 5 and the end face center of test pile 1;The both sides of the hydraulic jack 3 are also separately installed with dial gauge 4;
5 two ends are respectively provided with anchor beam 6 on the carrier bar;Anchor plate 7 is fixed with the anchor beam 6, the top of backing plate 7 is provided with P anchors 8;
The upper anchored end of the steel strand wires 9 is fixed on anchor plate 7 by P anchors 8;It is pre- on put more energy into structural steel frame 10 and the cushion cap 13
Bury steel plate 12 to be fixedly connected;The lower stretching end of the steel strand wires 9 is connected with centre-hole jack 11, and the centre-hole jack 11 is consolidated
Surely it is located at and puts more energy in structural steel frame 10.
A kind of dead load test on pile foundation loading system described in the utility model, structural steel frame 10 and the pre-embedded steel slab of putting more energy into
12 welding.
A kind of dead load test on pile foundation loading system described in the utility model, the lower stretching end of the steel strand wires 9 and Liang Tai
Centre-hole jack 11 connects.
When in use, can carry out in accordance with the following steps:(1) pre-embedded steel slab, pre-buried steel are installed in advance during bearing platform construction
Plate is combined reliable with cushion cap;(2) structural steel frame of putting more energy into is welded to connect with pre-embedded steel slab, put more energy into structural steel frame position and steel strand wires position
Put consistent;(3) leveling steel plate, hydraulic jack and dial gauge are installed successively in test pile top;(4) after carrier bar is in place, anchor beam
It is welded to connect with carrier bar;(5) anchor plate is fixed on anchor beam, steel strand anchoring end is anchored on anchor plate by P;
(6) steel strand wires are penetrated after centre-hole jack, carry out pre- tensioning to steel strand wires in place.
Compared with prior art, dead load test on pile foundation loading system described in the utility model on cushion cap by arranging steel
Anchored end is set on twisted wire stretching end, anchor beam, the counteracting force of static load of pile foundation is directly undertaken by cushion cap, with carrying tonnage
Greatly, by external interference it is little the advantages of, can significantly improve dead load test on pile foundation efficiency and constructing operation precision, and it is simple to operate,
Construction is quick, structure is reliable, economy, can provide a kind of new method for the loading of Practical Project pile foundation static test.
Description of the drawings
Fig. 1:Dead load test on pile foundation loading system figure;Fig. 2:Anchor beam is connected horizontal partial enlarged drawing with carrier bar;1- is tested
Stake, 2- leveling steel plates, 3- hydraulic jacks, 4- dial gauges, 5- carrier bars, 6- anchor beams, 7- anchor plates, 8-P anchors, 9- steel strand wires,
10- puts more energy into structural steel frame, 11- centre-hole jacks, 12- pre-embedded steel slabs, 13- cushion caps.
Specific embodiment
Dead load test on pile foundation described in the utility model loading is described further with reference to specific embodiment, but
It is that protection domain of the present utility model is not limited to this.
Embodiment 1
A kind of dead load test on pile foundation loading system, the loading system includes test pile 1, leveling steel plate 2, hydraulic jack
3rd, dial gauge 4, carrier bar 5, anchor beam 6, anchor plate 7, P anchors 8, steel strand wires 9, structural steel frame 10 of putting more energy into, centre-hole jack 11, pre-
Bury steel plate 12 and cushion cap 13;The hydraulic jack 3 by the leveling steel plate 2 of its above and below respectively with the bottom center of carrier beam 5 and
The end face center of test pile 1 connects;The both sides of the hydraulic jack 3 are also separately installed with dial gauge 4;5 two ends on the carrier bar
It is respectively provided with anchor beam 6;Anchor plate 7 is fixed with the anchor beam 6, the top of backing plate 7 is provided with P anchors 8;The upper anchor of the steel strand wires 9
Fixed end is fixed on anchor plate 7 by P anchors 8;The structural steel frame 10 of putting more energy into is welded with the pre-embedded steel slab 12 on cushion cap 13;It is described
The lower stretching end of steel strand wires 9 carries out one-end tension using two centre-hole jacks 11, and the centre-hole jack 11 is fixed and is located at
Put more energy in structural steel frame 10.
When in use, can carry out in accordance with the following steps:(1) pre-embedded steel slab, pre-buried steel are installed in advance during bearing platform construction
Plate is combined reliable with cushion cap;(2) structural steel frame of putting more energy into is welded to connect with pre-embedded steel slab, put more energy into structural steel frame position and steel strand wires position
Put consistent;(3) leveling steel plate, hydraulic jack and dial gauge are installed successively in test pile top;(4) after carrier bar is in place, anchor beam
It is welded to connect with carrier bar;(5) anchor plate is fixed on anchor beam, steel strand anchoring end is anchored on anchor plate by P;
(6) steel strand wires are penetrated after centre-hole jack, carry out pre- tensioning to steel strand wires in place.
Compared with prior art, dead load test on pile foundation loading system described in the utility model on cushion cap by arranging steel
Anchored end is set on twisted wire stretching end, anchor beam, the counteracting force of static load of pile foundation is directly undertaken by cushion cap, with carrying tonnage
Greatly, by external interference it is little the advantages of, can significantly improve dead load test on pile foundation efficiency and constructing operation precision, and it is simple to operate,
Construction is quick, structure is reliable, economy, can provide new method for the loading of Practical Project pile foundation static test.
Claims (3)
1. a kind of dead load test on pile foundation loading system, it is characterised in that the loading system includes test pile (1), leveling steel plate
(2), hydraulic jack (3), dial gauge (4), carrier bar (5), anchor beam (6), anchor plate (7), P anchors (8), steel strand wires (9), put more energy into
Structural steel frame (10), centre-hole jack (11), pre-embedded steel slab (12) and cushion cap (13);The hydraulic jack (3) is by it
The leveling steel plate (2) of above and below is connected respectively with carrier beam (5) bottom center and test pile (1) end face center;Hydraulic jack
(3) both sides are also separately installed with dial gauge (4);Carrier bar (5) two ends are respectively provided with anchor beam (6);Anchor beam is fixed with anchor pad on (6)
Plate (7), backing plate (7) top is provided with P anchors (8);The upper anchored end of steel strand wires (9) is fixed on anchor plate (7) by P anchors (8);
Structural steel frame (10) of putting more energy into is fixedly connected with the pre-embedded steel slab (12) on cushion cap (13);The lower stretching end of the steel strand wires (9) with
Centre-hole jack (11) connects, and centre-hole jack (11) fixation is located in structural steel frame of putting more energy into (10).
2. dead load test on pile foundation loading system according to claim 1, it is characterised in that the structural steel frame of putting more energy into (10)
With pre-embedded steel slab (12) welding.
3. dead load test on pile foundation loading system according to claim 1, it is characterised in that lower of the steel strand wires (9)
Pull end is connected with two centre-hole jacks (11).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621181249.8U CN206143824U (en) | 2016-11-02 | 2016-11-02 | Pile foundation static test loading system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621181249.8U CN206143824U (en) | 2016-11-02 | 2016-11-02 | Pile foundation static test loading system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206143824U true CN206143824U (en) | 2017-05-03 |
Family
ID=58624088
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621181249.8U Expired - Fee Related CN206143824U (en) | 2016-11-02 | 2016-11-02 | Pile foundation static test loading system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206143824U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107447796A (en) * | 2017-08-11 | 2017-12-08 | 中国港湾工程有限责任公司 | Static load test pile counter force system |
CN108930267A (en) * | 2018-08-02 | 2018-12-04 | 陕西建工机械施工集团有限公司 | A kind of anchor pile structure and single pile bearing capacity device |
CN111811942A (en) * | 2020-08-07 | 2020-10-23 | 中国建筑第八工程局有限公司 | Static load test equipment and method for electromechanical system support |
-
2016
- 2016-11-02 CN CN201621181249.8U patent/CN206143824U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107447796A (en) * | 2017-08-11 | 2017-12-08 | 中国港湾工程有限责任公司 | Static load test pile counter force system |
CN108930267A (en) * | 2018-08-02 | 2018-12-04 | 陕西建工机械施工集团有限公司 | A kind of anchor pile structure and single pile bearing capacity device |
CN111811942A (en) * | 2020-08-07 | 2020-10-23 | 中国建筑第八工程局有限公司 | Static load test equipment and method for electromechanical system support |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206512764U (en) | A kind of horizontally loading test system for applying vertical load in stake top | |
CN206146751U (en) | A loading device for monospar static test | |
CN102051858B (en) | Jack loading triangular truss hanging basket and load test construction method thereof | |
CN206143824U (en) | Pile foundation static test loading system | |
CN202881856U (en) | Concrete pouring support prepressing device | |
CN204738324U (en) | Clump of piles basis single pile vertical bearing capacity detecting system | |
CN206189478U (en) | Horizontal pile foundation single pile horizontal load test device | |
CN204849607U (en) | A continuous beam string basket pre -compaction device for bridge construction | |
CN111535374B (en) | Pile foundation torsion resistance, tension torsion resistance and compression torsion resistance detection system and method | |
CN101824801B (en) | Non-in-situ prepressing method of self-anchored type support frame and self-anchored type support frame thereof | |
CN206095814U (en) | Monospar static test loading system | |
CN201310102Y (en) | Static load test conversion beam | |
CN205676784U (en) | Bracket reverse drawing loads prepressing device | |
CN201671059U (en) | Self-anchored bracket | |
CN210376011U (en) | Large-area on-site direct shear test equipment | |
CN201901847U (en) | Jack loading triangular truss hanging basket | |
CN205223871U (en) | Suspension bridge bridge tower overarm brace pre -compaction device | |
CN213114737U (en) | Device for single-pile vertical uplift test | |
CN210151795U (en) | Novel high bearing platform single pile horizontal static load test device | |
CN109235275A (en) | A kind of tooling suitable for the extra heavy 0# block bracket precompressed of high-block bridge degree continuous rigid frame | |
CN213239481U (en) | Precast beam static load test device | |
CN214328534U (en) | 0# block bracket pre-pressing device of continuous rigid frame bridge | |
CN201770940U (en) | Mounting structure for lower load bearing plate of steel box tower with spatial variable cross section | |
CN107664602A (en) | A kind of mechanical load formula Experiments of Machanics system and application method | |
CN113567254A (en) | Structural plane-containing rock shear creep-impact testing machine under constant normal stiffness condition and testing method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |