CN207597285U - It is a kind of can draining in time water conservancy culvert - Google Patents
It is a kind of can draining in time water conservancy culvert Download PDFInfo
- Publication number
- CN207597285U CN207597285U CN201721034284.1U CN201721034284U CN207597285U CN 207597285 U CN207597285 U CN 207597285U CN 201721034284 U CN201721034284 U CN 201721034284U CN 207597285 U CN207597285 U CN 207597285U
- Authority
- CN
- China
- Prior art keywords
- rose box
- draining
- hole body
- water conservancy
- bungee
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model discloses it is a kind of can draining in time water conservancy culvert, including hole body, hook is installed on the inside of the body of hole, the bottom of hook is connected with bungee, the bottom of bungee is fixedly connected with Rose Box, and the bottom of Rose Box offers filter opening, and the bottom of Rose Box is equipped with connector, the bottom of side is equipped with sleeve in the body of hole, and the top movable of barrel bore is equipped with insulation board.The utility model is by setting bungee, Rose Box, filter opening, motor, sliding slot, driving gear, driven gear and cutting roller, motor starts to rotate, drive driving gear rotation, then driven gear rotation is driven, so as to drive two cutting roller rotations, cutting roller rotation, which is realized, blends rubbish, rubbish is leaked out after being blended by the filter opening of Rose Box bottom, so as to make drainage channel unimpeded, rubbish after being blended follows flow to be discharged together by weep hole, solve the problems, such as existing water conservancy culvert easily block and cannot timely draining.
Description
Technical field
The utility model is related to hydraulic engineering technical field, specially it is a kind of can draining in time water conservancy culvert.
Background technology
Culvert refers in highway engineering construction, does not block traffic in order to which highway is made to pass through water channel, under roadbed
The water draining pass (water passage) below road surface is built, can be allowed below Shui Cong highways and flowed through by this structure, is used for
Flood is drained across natural cheuch depression or is made across grade separation channel or field irrigation of the size road as people, animal and vehicle
For water channel;Culvert is mainly by barrel, basis, end and Ji Qiang etc.
Existing culvert is in drainage procedure, due to often carrying a large amount of house refuse and Other Waste in water, when
When flow flows through culvert, rubbish can be deposited in culvert, and rubbish will block culvert, influence culvert just once accumulating excessively
Normal draining, if culvert cannot timely draining, it is easy to culvert be made to be destroyed by rush of water.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provide it is a kind of can draining in time water conservancy culvert, solve existing
Have water conservancy culvert easily block and cannot timely draining the problem of.
(2) technical solution
To achieve the above object, the utility model provides following technical solution:It is a kind of can draining in time water conservancy culvert, packet
Hole body is included, hook is installed on the inside of the hole body, the bottom of the hook is connected with bungee, and the bottom of the bungee is consolidated
Surely Rose Box is connected with, the bottom of the Rose Box offers filter opening, and the bottom of the Rose Box is equipped with connector, the hole
The bottom of internal side is equipped with sleeve, and the top movable of the barrel bore is equipped with insulation board, and the bottom of the insulation board connects
Spring is connected to, the bottom of the spring is connected on the inner wall of sleeve, and the bottom of the barrel bore is electrically connected with and connector
The clamp being adapted, the left and right sides of the Rose Box offer sliding slot, and the right side opening of the hole body is equipped with groove, described recessed
Motor is installed, the output terminal of the motor is connected with driving gear, and the side of driving gear through sliding slot and extends in slot
To the inner cavity of Rose Box, the driving gear part in the Rose Box is engaged with driven gear, at the axle center of the driven gear
Cutting roller is plugged with, the left side of the cutting roller is plugged on through Rose Box and activity in the loose slot of cutting ferrule in the body of hole,
The bottom of the hole body offers weep hole.
Preferably, be mounted on buffer spring at left and right sides of the Rose Box bottom, the bottom of the hole body be equipped with
The buffer bar that buffer spring is adapted.
Preferably, the junction of the motor and groove is provided with beam.
Preferably, the outer surface of the bungee is socketed with stop collar, and the side of stop collar is welded on the inner wall of hole body
On.
Preferably, it is mounted on limited block at the top and bottom of the sliding slot.
(3) advantageous effect
The utility model provide it is a kind of can draining in time water conservancy culvert.Has following advantageous effect:
(1), the utility model is by setting bungee, Rose Box, filter opening, connector, sleeve, insulation board, spring, card
Head, motor, sliding slot, driving gear, driven gear and cutting roller after rubbish follows flow to flow into the body of hole, initially enter filtering
In case, as rubbish gradually increases in Rose Box, the weight of Rose Box also increases therewith, so as to which bungee be driven to be stretched,
Then Rose Box is made to glide on the inner wall of hole body, until making connector extruding insulation plate, insulation board is made further to squeeze bullet
Spring, so as to which insulation board be opened, connector continues to decline until contacting with clamp, and so as to make the circuit communication of motor, motor is opened
Begin to rotate, drive driving gear rotation, then drive driven gear rotation, so as to which two cutting rollers be driven to rotate, cutting roller turns
Dynamic realize blends rubbish, and rubbish is leaked out after being blended by the filter opening of Rose Box bottom, so as to make drainage channel unimpeded, quilt
Rubbish after blending follows flow to be discharged together by weep hole, so as to fulfill timely draining, solves existing water conservancy culvert
Easily block and cannot timely draining the problem of.
Description of the drawings
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the utility model tube-in-tube structure sectional view;
Fig. 3 is the utility model Rose Box structure diagram.
In figure:1 hole body, 2 hooks, 3 bungees, 4 Rose Boxes, 5 filter openings, 6 connectors, 7 sleeves, 8 insulation boards, 9 springs, 10
Clamp, 11 grooves, 12 motors, 13 sliding slots, 14 driving gears, 15 driven gears, 16 cutting rollers, 17 cutting ferrules, 18 weep holes, 19 are delayed
Rush spring, 20 buffer bars, 21 beams, 22 stop collars, 23 limited blocks.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out
It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work
All other embodiments obtained shall fall within the protection scope of the present invention.
As shown in Figs. 1-3, the utility model provides a kind of technical solution:It is a kind of can draining in time water conservancy culvert, including
Hole body 1, the inside of hole body 1 are equipped with hook 2, and the bottom for linking up with 2 is connected with bungee 3, and the outer surface socket of bungee 3 is limited
Position set 22, and the side of stop collar 22 is welded on the inner wall of hole body 1, is set stop collar 22, can be played limiting to bungee 3
Effect, prevent bungee 3 from rocking during draw high, the bottom of bungee 3 is fixedly connected with Rose Box 4, rubbish with
After being flowed into hole body 1 with flow, initially enter in Rose Box 4, as rubbish gradually increases in Rose Box 4, the weight of Rose Box 4
Amount also increases therewith, so as to which bungee 3 be driven to be stretched, Rose Box 4 is then made to glide on the inner wall of hole body 1,4 bottom of Rose Box
Buffer spring 19 is mounted at left and right sides of portion, the bottom of hole body 1 is equipped with the buffer bar 20 being adapted with buffer spring 19, passes through
Buffer spring 19 is used cooperatively with buffer bar 20, is prevented Rose Box 4 and the bottom of hole body 1 from the phenomenon that hard landing occur, is reduced
The abrasion of Rose Box 4, the bottom of Rose Box 4 offer filter opening 5, and the bottom of Rose Box 4 is equipped with connector 6,1 inside of hole body
Bottom is equipped with sleeve 7, and the top movable of 7 inner cavity of sleeve is equipped with insulation board 8, and the bottom of insulation board 8 is connected with spring 9, bullet
The bottom of spring 9 is connected on the inner wall of sleeve 7, and the bottom of 7 inner cavity of sleeve is electrically connected with the clamp 10 being adapted with connector 6,
The left and right sides of Rose Box 4 offers sliding slot 13, and the right side opening of hole body 1 is equipped with groove 11, motor 12 is equipped in groove 11,
The motor 12 is waterproof machine 12, and a complete closed circuit can be formed between connector 6, clamp 10 and motor 12 and is returned
Road, circuit diagram are not shown in the accompanying drawings, and circuit theory is the prior art, is not repeated herein, and Rose Box 4 glides until making
6 extruding insulation plate 8 of connector makes insulation board 8 further squeeze spring 9, so as to which insulation board 8 be opened, under connector 6 continues
Drop with clamp 10 until contact, and so as to make the circuit communication of motor 12, motor 12 and the junction of groove 11 are provided with beam
21, beam 21 is set, plays the role of damping, the output terminal of motor 12 is connected with driving gear 14, and driving gear 14
Side runs through sliding slot 13 and is extended to the over the inner cavity of filter box 4, and the top and bottom of sliding slot 13 are mounted on limited block 23, setting limit
Position block 23, can prevent Rose Box 4 during sliding up and down, with driving gear 14, driven gear 15 and cutting roller 16
It collides, 14 part of driving gear in Rose Box 4 is engaged with driven gear 15, and the side of driven gear 15 is movably connected in
On the inner wall of hole body 1, cutting roller 16 is plugged at the axle center of driven gear 15, the left side of cutting roller 16 through Rose Box 4 and is lived
Dynamic to be plugged in the loose slot of 1 internal cutting ferrule 17 of hole body, the bottom of hole body 1 offers weep hole 18, and motor 12 starts to rotate,
Driving gear 14 is driven to rotate, then driven gear 15 is driven to rotate, so as to which two cutting rollers 16 be driven to rotate, 16 turns of cutting roller
Dynamic realize blends rubbish, and rubbish is leaked out after being blended by the filter opening 5 of 4 bottom of Rose Box, so as to make drainage channel unimpeded,
Rubbish after being blended follows flow to be discharged together by weep hole 18, so as to fulfill timely draining, solves existing water conservancy
Culvert easily block and cannot timely draining the problem of, after rubbish in Rose Box 4 is drained, weight saving, at this time bungee 3 by
Restore in deformation, drive and slide and reset on Rose Box 4, similarly, spring 9 also promotes insulation board 8 to reset due to deformation recovery.
In use, after rubbish follows flow to flow into hole body 1, initially enter in Rose Box 4, with rubbish in Rose Box 4
Gradually increase, the weight of Rose Box 4 also increases therewith, so as to which bungee 3 be driven to be stretched, then makes Rose Box 4 in hole body 1
Inner wall on glide, until make 6 extruding insulation plate 8 of connector, insulation board 8 is made further to squeeze spring 9, so as to by insulation board
8 open, and connector 6 continues to decline until contacting with clamp 10, and so as to make the circuit communication of motor 12, motor 12 starts to rotate,
Driving gear 14 is driven to rotate, then driven gear 15 is driven to rotate, so as to which two cutting rollers 16 be driven to rotate, 16 turns of cutting roller
Dynamic realize blends rubbish, and rubbish is leaked out after being blended by the filter opening 5 of 4 bottom of Rose Box, so as to make drainage channel unimpeded,
Rubbish after being blended follows flow to be discharged together by weep hole 18, so as to fulfill timely draining, solves existing water conservancy
Culvert easily block and cannot timely draining the problem of.
It should be noted that the electric elements occurred in this article are electrically connected with extraneous main controller and 220V alternating currents, and
And main controller can be the conventionally known equipment that computer etc. plays control, herein, such as first and second or the like pass
It is that term is used merely to distinguish one entity or operation from another entity or operation, and not necessarily requires or secretly
Show that there are any actual relationship or orders between these entities or operation.Moreover, term " comprising ", "comprising" or
Any other variant thereof is intended to cover non-exclusive inclusion so that process, method, article including a series of elements or
Person's equipment not only includes those elements, but also including other elements that are not explicitly listed or further includes as this mistake
Journey, method, article or the intrinsic element of equipment.In the absence of more restrictions, by sentence "including a ..."
The element of restriction, it is not excluded that also there is in addition identical in the process, method, article or apparatus that includes the element will
Element.
While there has been shown and described that the embodiment of the utility model, for the ordinary skill in the art,
It is appreciated that can these embodiments be carried out with a variety of variations in the case of the principle and spirit for not departing from the utility model, repaiied
Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.
Claims (5)
1. it is a kind of can draining in time water conservancy culvert, including hole body (1), it is characterised in that:It is equipped on the inside of the hole body (1)
It links up with (2), the bottom of the hook (2) is connected with bungee (3), and the bottom of the bungee (3) is fixedly connected with Rose Box
(4), the bottom of the Rose Box (4) offers filter opening (5), and the bottom of the Rose Box (4) is equipped with connector (6), described
Bottom on the inside of hole body (1) is equipped with sleeve (7), and the top movable of sleeve (7) inner cavity is equipped with insulation board (8), described
The bottom of insulation board (8) is connected with spring (9), and the bottom of the spring (9) is connected on the inner wall of sleeve (7), the sleeve
(7) bottom of inner cavity is electrically connected with the clamp (10) being adapted with connector (6), and the left and right sides of the Rose Box (4) is opened
Equipped with sliding slot (13), the right side opening of the hole body (1) is equipped with groove (11), and motor (12), institute are equipped in the groove (11)
The output terminal for stating motor (12) is connected with driving gear (14), and the side of driving gear (14) through sliding slot (13) and extends to
The inner cavity of Rose Box (4), the driving gear (14) in the Rose Box (4) is partly engaged with driven gear (15), described driven
Cutting roller (16) is plugged at the axle center of gear (15), Rose Box (4) and activity grafting are run through in the left side of the cutting roller (16)
In the loose slot positioned at hole body (1) internal cutting ferrule (17), the bottom of the hole body (1) offers weep hole (18).
2. it is according to claim 1 it is a kind of can draining in time water conservancy culvert, it is characterised in that:Rose Box (4) bottom
Be mounted on buffer spring (19) at left and right sides of portion, the bottom of the hole body (1) be equipped be adapted with buffer spring (19) it is slow
Jumper bar (20).
3. it is according to claim 1 it is a kind of can draining in time water conservancy culvert, it is characterised in that:The motor (12) with it is recessed
The junction of slot (11) is provided with beam (21).
4. it is according to claim 1 it is a kind of can draining in time water conservancy culvert, it is characterised in that:The bungee (3)
Outer surface is socketed with stop collar (22), and the side of stop collar (22) is welded on the inner wall of hole body (1).
5. it is according to claim 1 it is a kind of can draining in time water conservancy culvert, it is characterised in that:The top of the sliding slot (13)
Portion and bottom are mounted on limited block (23).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721034284.1U CN207597285U (en) | 2017-08-17 | 2017-08-17 | It is a kind of can draining in time water conservancy culvert |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721034284.1U CN207597285U (en) | 2017-08-17 | 2017-08-17 | It is a kind of can draining in time water conservancy culvert |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207597285U true CN207597285U (en) | 2018-07-10 |
Family
ID=62753393
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721034284.1U Expired - Fee Related CN207597285U (en) | 2017-08-17 | 2017-08-17 | It is a kind of can draining in time water conservancy culvert |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207597285U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109706814A (en) * | 2018-12-28 | 2019-05-03 | 温州建源建设有限公司 | A kind of anti-ponding road |
CN111636317A (en) * | 2020-06-11 | 2020-09-08 | 惠安双婉装修设计中心 | Bridge engineering culvert structure |
-
2017
- 2017-08-17 CN CN201721034284.1U patent/CN207597285U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109706814A (en) * | 2018-12-28 | 2019-05-03 | 温州建源建设有限公司 | A kind of anti-ponding road |
CN111636317A (en) * | 2020-06-11 | 2020-09-08 | 惠安双婉装修设计中心 | Bridge engineering culvert structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207597285U (en) | It is a kind of can draining in time water conservancy culvert | |
CN206928411U (en) | A kind of draining and water storage device | |
CN206916568U (en) | A kind of highway drainage device | |
CN205495060U (en) | Small -size high -efficient sewage treatment device | |
CN203213271U (en) | Vertical rainwater perforated strainer | |
CN202970552U (en) | High-efficiency slag removing system for pile foundation engineering | |
CN201815152U (en) | Impurity sedimentation processing device for oil well work | |
CN214882932U (en) | Bridge drainage system | |
CN110644445A (en) | Water gate for automatically treating water surface garbage | |
CN206220060U (en) | A kind of garbage filtering device for hydraulic engineering | |
CN207591365U (en) | A kind of water conservancy filter device | |
CN204385710U (en) | Two-way opened enclosed blocks bleaching device | |
CN215518971U (en) | Rainwater flood control retaining treatment integrated equipment | |
CN215053825U (en) | Pipeline cleaning device for drainage engineering | |
CN103979671A (en) | T-stance mountain river water purification method | |
CN205296295U (en) | Incessant water supply system | |
CN201245457Y (en) | Recycling and reutilization apparatus for carwash water | |
CN207886790U (en) | A kind of cam control mud separating device | |
CN210140746U (en) | Water collection type precast concrete pavement | |
CN207419406U (en) | A kind of large-scale floater filtering device of gate | |
CN207478113U (en) | A kind of petroleum drilling fluid solid particulate filters of environmental protection remove equipment | |
CN203475502U (en) | Riverbed sediment draw-off device | |
CN205115238U (en) | Separation solid -liquid apparatus is used in pasture | |
CN113417264B (en) | Garbage cleaning equipment for environmental protection engineering | |
CN208235356U (en) | A kind of environmental protection combined type sand-protecting barrier |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180710 Termination date: 20180817 |