CN207596326U - A kind of electric single beam crane connection between girder and carriage structure that can improve stability - Google Patents
A kind of electric single beam crane connection between girder and carriage structure that can improve stability Download PDFInfo
- Publication number
- CN207596326U CN207596326U CN201721754672.7U CN201721754672U CN207596326U CN 207596326 U CN207596326 U CN 207596326U CN 201721754672 U CN201721754672 U CN 201721754672U CN 207596326 U CN207596326 U CN 207596326U
- Authority
- CN
- China
- Prior art keywords
- girder
- carriage
- connecting plate
- end carriage
- connection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Leg Units, Guards, And Driving Tracks Of Cranes (AREA)
Abstract
The utility model discloses a kind of electric single beam crane connection between girder and carriage structures that can improve stability, and including end carriage, girder, connecting plate, bolt pair, positioning pin, girder is set on the end carriage;Connecting plate is set between the end carriage and girder;The connecting plate and girder are affixed;The middle part setting connecting hole and location hole of the upper surface of the end carriage;Bolt pair and positioning pin are set at the connecting hole and location hole of the end carriage between connecting plate.Girder is overlapped on end carriage by the utility model, enhances the stability and reliability of connection between girder and carriage.Main beam section height at connection between girder and carriage can ensure that the stability and reliability of connection between girder and carriage depending on the calculating of the tonnage and span of crane;The mounting process of girder and end carriage is good, reduces the set-up time, reduces the manufacture cost of crane.The utility model is compact-sized, and connection is reliable, can improve the stability of electric single beam crane connection between girder and carriage.
Description
Technical field
The utility model belongs to technical field of crane equipment, further belongs to electric single beam crane technical field, specifically
It is compact-sized to be related to one kind, connection is reliable, can improve the electric single beam crane connection between girder and carriage structure of stability.
Background technology
Crane is the handling equipment for mitigating heavy manual labor, improving operating efficiency, realizing safety in production.In state
In the substance production and logistics of the economic each department of the people, crane is mechanical as crucial process equipment or important auxiliary,
Using very extensive.Crane type is various, and electric single beam crane is that one of which is used in relatively broad workshop
Lifting equipment.Electric single beam crane has the characteristics that utilization of area rate is high, job area is big, manufacture cost is low, using ten
Divide extensive.Electric single beam crane, be it is a kind of by electric block member hangs under single girder, electric block component is completed
Rise the light and small bridge crane with trolley travelling function.The electric single beam crane of the prior art, has the following disadvantages:
1st, it is connected between girder and end carriage using end flanges, under normal circumstances, end carriage height 300mm~400mm, and lead
Depth of beam is 400mm~1500mm, and when the lifting capacity of crane is larger and span is larger, main depth of beam is higher, in order to
It connect, the height of the end point of girder must be reduced to holding depth of beam basically identical with end carriage, it is just easy to use in this way to connect
Fishplate bar connects.It is smaller with the connection area of end carriage since the height of girder end point is too small, cause junction stability poor, rise
Girder shakes greatly heavy-duty machine in the process of running, and electric block shakes therewith, influences to use.
2nd, manufacture craft is poor, when assembling girder with end carriage, needs after first the span of crane is adjusted, then will connection
Plate and Main Girder Welding, once connecting plate is finished with Main Girder Welding, the span of crane will be unable to adjust.
For this purpose, research and development are a kind of compact-sized, connection is reliable, can improve the electric single beam crane girder of stability with
End carriage connection structure is the key that solve the problems, such as this.
Utility model content
The purpose of this utility model is to provide a kind of compact-sized, connection is reliable, can improve the electric single-beam of stability
Crane girder and end carriage connection structure.
The purpose of this utility model is achieved in that including end carriage, girder, connecting plate, bolt pair, positioning pin, described
End carriage on girder is set;Connecting plate is set between the end carriage and girder;The connecting plate and girder are affixed;Institute
The middle part setting connecting hole and location hole of the upper surface for the end carriage stated;At the connecting hole and location hole of the end carriage and connecting plate
Between setting bolt pair and positioning pin.
Girder is overlapped on end carriage by the utility model, enhances the stability and reliability of connection between girder and carriage.
The lap-joint of girder and end carriage sets connecting plate, connecting plate and Main Girder Welding, and connecting hole and location hole are set on connecting plate.End carriage
The middle part setting connecting hole and location hole of upper surface, are connected between girder and end carriage by bolt pair.At connection between girder and carriage
Main beam section height can according to the tonnage and span of crane calculating depending on, ensure that the stability of connection between girder and carriage
And reliability.Meanwhile this solution process is good.
When girder and end carriage assemble, first connecting plate with end carriage with bolt good fortune is connected, girder is then placed in connection
On plate, after the span measurement of crane is adjusted, with positioning pin by connecting plate and end carriage pinning, connecting plate is then welded in master
Liang Shang.Girder is overlapped on end carriage by the utility model, the main beam section height at connection between girder and carriage can according to rise
Depending on the tonnage and span of heavy-duty machine calculate, the stability and reliability of connection between girder and carriage ensure that;The peace of girder and end carriage
Good manufacturability is filled, reduces the set-up time, reduces the manufacture cost of crane.The utility model is compact-sized, and connection is reliable,
The stability of electric single beam crane connection between girder and carriage can be improved.
Description of the drawings
Fig. 1 is the schematic front view of the utility model;
Fig. 2 is the schematic top plan view of Fig. 1;
Fig. 3 is former electric single beam crane connection between girder and carriage structure diagram;
Fig. 4 is the schematic top plan view of Fig. 3.
In figure:1- end carriages, 2- girders, 3- connecting plates, 4- bolt pairs, 5- positioning pins.
Specific embodiment
The utility model is described in further detail below in conjunction with the accompanying drawings, but the utility model is not limited in any way
System based on any transformation that the utility model training centre is made, each falls within scope of protection of the utility model.
As shown in figures 1-4, the utility model includes end carriage 1, and girder 2, connecting plate 3, bolt pair 4, positioning pin 5 is described
Girder 2 is set on end carriage 1;Connecting plate 3 is set between the end carriage 1 and girder 2;The connecting plate 3 is solid with girder 2
It connects;The middle part setting connecting hole and location hole of the upper surface of the end carriage 1;At the connecting hole and location hole of the end carriage 1
Bolt pair 4 and positioning pin 5 are set between connecting plate 3.
It is welded between the connecting plate 3 and girder 2.
The connecting plate 3 welds after the span of crane is adjusted with girder 2 again.
Connecting hole and location hole on the connecting plate 3 is corresponding with the connecting hole on end carriage 1 and location hole.
The thickness of the connecting plate 3 is 14mm~25mm.
The bolt pair 4 is high-strength bolt pair.
The quantity of the positioning pin 5 is 2~4, and is symmetrically arranged in the both sides of girder 2.
The positioning pin 5 is taper bolt.
The positioning pin 5 is taper pin with internal thread.
The operation principle and the course of work of the utility model:
Girder 2 is overlapped on end carriage 1 by the utility model, enhances stability that girder 2 connect with end carriage 1 and reliable
Property.Lap-joint's setting connecting plate 3 of girder 2 and end carriage 1, connecting plate 3 weld with girder 2, connecting hole are set on connecting plate 3 and is determined
Position hole.The middle part setting connecting hole and location hole of 1 upper surface of end carriage, are connected between girder 2 and end carriage 1 by bolt pair 4.Girder
2 with 2 profile height of girder of 1 junction of end carriage can depending on the calculating of the tonnage and span of crane, ensure that girder 2 with
The stability and reliability that end carriage 1 connects.Meanwhile this solution process is good.
When girder 2 and end carriage 1 assemble, first connecting plate 3 and the bolt pair 4 of end carriage 1 are connected, then put girder 2
It,, then will be even with positioning pin 5 by connecting plate 3 and 1 pinning of end carriage after the span measurement of crane is adjusted on connecting plate 3
Fishplate bar 3 is welded on girder 2.Girder 2 is overlapped on end carriage 1 by the utility model, and girder 2 and the girder 2 of 1 junction of end carriage are disconnected
Face height can ensure that stability that girder 2 connect with end carriage 1 and reliably depending on the calculating of the tonnage and span of crane
Property;Girder 2 and the mounting process of end carriage 1 are good, reduce the set-up time, reduce the manufacture cost of crane.
Claims (9)
1. a kind of electric single beam crane connection between girder and carriage structure that can improve stability, including end carriage(1), girder(2)、
Connecting plate(3), bolt pair(4), positioning pin(5), it is characterized in that:The end carriage(1)On girder is set(2);Described
End carriage(1)With girder(2)Between connecting plate is set(3);The connecting plate(3)With girder(2)It is affixed;The end carriage(1)
Upper surface middle part setting connecting hole and location hole;The end carriage(1)Connecting hole and location hole at and connecting plate(3)It
Between bolt pair is set(4)And positioning pin(5).
2. the electric single beam crane connection between girder and carriage structure according to claim 1 that can improve stability, special
Sign is:The connecting plate(3)With girder(2)Between weld.
3. the electric single beam crane connection between girder and carriage structure according to claim 1 that can improve stability, special
Sign is:The connecting plate(3)After the span of crane is adjusted again with girder(2)Welding.
4. the electric single beam crane connection between girder and carriage structure according to claim 1 that can improve stability, special
Sign is:The connecting plate(3)On connecting hole and location hole and end carriage(1)On connecting hole and location hole it is corresponding.
5. the electric single beam crane connection between girder and carriage structure according to claim 1 that can improve stability, special
Sign is:The connecting plate(3)Thickness be 14mm~25mm.
6. the electric single beam crane connection between girder and carriage structure according to claim 1 that can improve stability, special
Sign is:The bolt pair(4)For high-strength bolt pair.
7. the electric single beam crane connection between girder and carriage structure according to claim 1 that can improve stability, special
Sign is:The positioning pin(5)Quantity for 2~4, and be symmetrically arranged in girder(2)Both sides.
8. the electric single beam crane connection between girder and carriage structure according to claim 1 that can improve stability, special
Sign is:The positioning pin(5)For taper bolt.
9. the electric single beam crane connection between girder and carriage structure according to claim 1 that can improve stability, special
Sign is:The positioning pin(5)For taper pin with internal thread.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721754672.7U CN207596326U (en) | 2017-12-15 | 2017-12-15 | A kind of electric single beam crane connection between girder and carriage structure that can improve stability |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721754672.7U CN207596326U (en) | 2017-12-15 | 2017-12-15 | A kind of electric single beam crane connection between girder and carriage structure that can improve stability |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207596326U true CN207596326U (en) | 2018-07-10 |
Family
ID=62765819
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721754672.7U Active CN207596326U (en) | 2017-12-15 | 2017-12-15 | A kind of electric single beam crane connection between girder and carriage structure that can improve stability |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207596326U (en) |
-
2017
- 2017-12-15 CN CN201721754672.7U patent/CN207596326U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204201861U (en) | A kind of steel construction of boiler steel frame | |
CN103669924B (en) | A kind of substation framework square-section angle iron frame beam thread gripping-board novel joint structure | |
CN205294630U (en) | I -steel clamping frock | |
CN207596326U (en) | A kind of electric single beam crane connection between girder and carriage structure that can improve stability | |
CN204959965U (en) | A steel construction for building in frame | |
CN208329151U (en) | A kind of assemble welding formula steel construction | |
CN204714341U (en) | A kind of bridging crane main beam and end carriage connection structure | |
CN109956395A (en) | A kind of steel vestibule integrally promotes shackle structure | |
CN203361165U (en) | Supporting beam connection structure for building foundation pit support | |
CN202540273U (en) | Support for inclined stay bar | |
CN207293949U (en) | Containment type node list girder based on trapezium structure face | |
CN201024038Y (en) | Suspension girder for two trolleys synchronous hoisting | |
CN206384724U (en) | The split crane span structure of bridge crane six | |
CN203889915U (en) | Hoist trolley frame device | |
CN2931430Y (en) | Crossbeam | |
CN201105946Y (en) | Main girder of single-beam crane | |
CN202450693U (en) | Novel steel truss | |
CN215716564U (en) | Inside concatenation steel column of diaphragm wall under low headroom condition | |
CN204823744U (en) | Crane end beam end plate welded structure | |
CN204847843U (en) | Hoist traveling carriage bearing structure | |
CN203889919U (en) | Hoist trolley frame device with joint box | |
CN203371213U (en) | Wide plate extension turnover tool | |
CN214141266U (en) | Circular tube structure crane | |
CN204474143U (en) | The connection structure of a kind of mono beam crane in bridge type box type girder and end carriage | |
CN202594630U (en) | Bridge crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |