CN207592631U - Double horn mouth process equipment - Google Patents

Double horn mouth process equipment Download PDF

Info

Publication number
CN207592631U
CN207592631U CN201721648286.XU CN201721648286U CN207592631U CN 207592631 U CN207592631 U CN 207592631U CN 201721648286 U CN201721648286 U CN 201721648286U CN 207592631 U CN207592631 U CN 207592631U
Authority
CN
China
Prior art keywords
punch
mouth
outside
process equipment
ontology
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721648286.XU
Other languages
Chinese (zh)
Inventor
孙文龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baiyun Automobile Oil Pipe Co Ltd
Original Assignee
Shanghai Baiyun Automobile Oil Pipe Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baiyun Automobile Oil Pipe Co Ltd filed Critical Shanghai Baiyun Automobile Oil Pipe Co Ltd
Priority to CN201721648286.XU priority Critical patent/CN207592631U/en
Application granted granted Critical
Publication of CN207592631U publication Critical patent/CN207592631U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Shaping Of Tube Ends By Bending Or Straightening (AREA)

Abstract

The utility model discloses a kind of double horn mouth process equipment, including:Pre- flaring punch, pre- to be flared punch ontology and pre- expansion mouth, pre- be flared in the right side of punch ontology at the position for the outer peripheral edge for being located at pre- expansion mouth is equipped with groove;End face punching press punch, including facing punch ontology and compressed part;Inside and outside flaring punch, the inside and outside flaring punch includes interior outer ram ontology and inside and outside expansion mouth, the inside and outside expansion mouth is set to the right side of the interior outer ram ontology, the shape of the outside wall surface of the inside and outside expansion mouth is identical with the internal face shape of the inside trumpet mouth of the tube body, and for being molded the outer horn mouth while end of the tube body is molded the inside trumpet mouth.The utility model can be processed with inside trumpet mouth and outer bell-mouthed connecting tube, the conical surface seal of connecting tube and cylinder body, the leakproofness and intensity being connect so as to improve connecting tube with cylinder body can be realized once the additional components with the conical surface without being welded in connecting tube.

Description

Double horn mouth process equipment
Technical field
The utility model is related to a kind of double horn mouth process equipments.
Background technology
Automobile engine oil pipe with cylinder body when connecting, it usually needs conical surface connection prevents the leakage of oil to ensure to seal. Traditional conical surface seal is welded using the part that machine adds and oil pipe, is then refilled and is fitted on cylinder body, however, being deposited using such technique In weld easy fracture, easy the defects of leaking.
Utility model content
The technical problems to be solved in the utility model is the connection in order to overcome oil pipe traditional in the prior art and cylinder body Mode leads to the defects of weld easy fracture, easily leakage, provides a kind of double horn mouth process equipment.
The utility model is to solve above-mentioned technical problem by following technical proposals:
A kind of double horn mouth process equipment, the double horn mouth process equipment are used for the processing of connecting tube, the connecting tube Including a tube body, the end of the tube body has an outer horn mouth and is folded to the outer bell-mouthed inside trumpet mouth;
The double horn mouth process equipment includes:
Pre- flaring punch, the pre- flaring punch includes pre- flaring punch ontology and pre- expansion mouth, the pre- expansion mouth are set The right side of the pre- flaring punch ontology is placed in, and is located at the pre- expansion mouth in the right side of the pre- flaring punch ontology Outer peripheral edge position at be equipped with groove, the groove surround and is adjacent to the outside wall surface of the pre- expansion mouth;
End face punching press punch, the end face punching press punch include facing punch ontology and compressed part, the compressed part setting In the right side of the facing punch ontology;
Inside and outside flaring punch, the inside and outside flaring punch include interior outer ram ontology and inside and outside expansion mouth, it is described in extend out Oral area is set to the right side of the interior outer ram ontology, the shape of the outside wall surface of the inside and outside expansion mouth and the tube body The internal face shape of inside trumpet mouth is identical, and for being molded institute while the end of the tube body is molded the inside trumpet mouth State outer horn mouth.
In the present solution, including the double horn of pre- flaring punch, end face punching press punch and inside and outside flaring punch by setting Mouth process equipment, can process with inside trumpet mouth and outer bell-mouthed connecting tube, have without welding one in connecting tube The additional components of the conical surface just can realize the conical surface seal of connecting tube and cylinder body, so as to improve connecting tube connect with cylinder body it is close Envelope property and intensity.
Preferably, the shape of the cross section of the groove is V-arrangement;
The shape of the outside wall surface of the pre- expansion mouth is cone, the axis of the pre- expansion mouth and the pre- flaring punch The axis of ontology is located along the same line, and the diameter of the pre- expansion mouth is turned left gradual increasing along the axial of the pre- expansion mouth from the right side Greatly.The machining accuracy of connecting tube can be improved in this way.
Preferably, the shape of the compressed part is cylinder, and the axis of the compressed part and the facing punch ontology Axis be located along the same line, the right side of the compressed part is plane.
Preferably, the end face punching press punch further includes end face positioning region, the left side of the end face positioning region is adjacent to The right side of the compressed part, the shape of the end face positioning region are cone, and the diameter of the end face positioning region is along the end The axial of face positioning region is turned left gradual increase from the right side;
The axis and the axis of the compressed part of the end face positioning region are located along the same line, and the end face positioning region Projection along axial direction to the compressed part of the facing punch ontology is located inside the compressed part, and positioned at the tube body Interior intracavitary.
In the present solution, the setting of end face positioning region can avoid connecting tube, its internal diameter becomes smaller in process.
Preferably, the shape of the outside wall surface of the inside and outside expansion mouth is cone, the axis of the inside and outside expansion mouth and institute The axis for stating interior outer ram ontology is located along the same line, the axial direction of the diameter of the inside and outside expansion mouth along the inside and outside expansion mouth It turns left gradual increase from the right side.
Preferably, the inside and outside flaring punch further includes inside and outside flaring positioning region, the left end of the inside and outside flaring positioning region Face is adjacent to the right side of the inside and outside expansion mouth, the axis of the axis and the inside and outside expansion mouth of the inside and outside flaring positioning region It is located along the same line, and the inside and outside flaring positioning region is along the axial direction of the interior outer ram ontology to expansion mouth inside and outside described Projection is located inside the inside and outside expansion mouth, and positioned at the interior intracavitary of the tube body.
In the present solution, the setting of inside and outside flaring positioning region can avoid connecting tube its internal diameter becomes smaller in process.
Preferably, the double horn mouth process equipment further includes:
Rack;
Guide rail, the guide rail extend along the length direction of the rack;
Punch holder, the punch holder are slidedly arranged on the guide rail;
Turntable, the turntable are rotationally connected with the punch holder, the pre- flaring punch, the end face punching press punch and institute State inside and outside flaring punch being provided at circumferentially spaced in the turntable, the pre- flaring punch, end face punching press punch along the turntable It is parallel with the length direction of the rack with the axis of inside and outside flaring punch.
In the present solution, turntable can be rotated relative to punch holder, so as to more rapidly replace three punches pair The punching press of connecting tube, so as to improve the processing efficiency of connecting tube.
Preferably, the double horn mouth process equipment further includes:
Punching mechanism, the punching mechanism are set to the rack, and the punch holder is set to the punching mechanism, and institute The pressing direction for stating punching mechanism is parallel with the length direction of the rack.
Preferably, the double horn mouth process equipment further includes:
Clamping mold, the clamping mold have for the receiving hole that wears connecting tube, and the receiving hole is along the folder The length direction of tight mold is through the clamping mold, and the axis of the receiving hole and the length direction of the rack are put down Row;
The clamping mold includes three clampings being detachably connected successively along the circumferential direction of the clamping mold, described in three Clamping is provided with a driving mechanism around the receiving hole is formed in each clamping, the driving mechanism is used to drive The corresponding clamping moving radially along the clamping mold, the driving mechanism may be contained within the rack.
In the present solution, clamping mold is arranged to include being detachably connected three clampings, and the axis and machine of receiving hole The length direction of frame is parallel, and a driving mechanism is provided in each clamping, can realize three clampings by driving mechanism in this way Assembly and disassembly, so as to fulfill the Quick-clamped of connecting tube, operation is time saving and energy saving, so as to improve the processing of connecting tube effect Rate, and driving mechanism is capable of providing a pretightning force to clamping, so as to ensure that clamping mold can reliably clamp connecting tube, keeps away Exempt from connecting tube opposite clamping mold when being flared and slide generation abrasion.
Preferably, the diameter of the receiving hole is smaller 0.05-0.1mm than the diameter of the tube body of the connecting tube;
The length of the clamping mold is 6-10 times of the diameter of the tube body of the connecting tube.It can ensure to connect in this way Pipe is more reliably clamped in the receiving hole of clamping mold, further avoids connecting tube opposite clamping when being flared Mold, which slides, generates abrasion.
On the basis of common knowledge of the art, above-mentioned each optimum condition, can arbitrarily combine to get the utility model respectively compared with Good example.
The positive effect of the utility model is:
The double horn mouth process equipment of the utility model, can process with inside trumpet mouth and outer bell-mouthed connection Pipe can realize the conical surface seal of connecting tube and cylinder body without being welded in connecting tube once the additional components with the conical surface, from And improve leakproofness and intensity that connecting tube is connect with cylinder body.
Description of the drawings
Fig. 1 is the main structure diagram of the double horn mouth process equipment of one embodiment of the utility model.
Fig. 2 is the overlooking the structure diagram of the double horn mouth process equipment of one embodiment of the utility model.
Fig. 3 is that the pre- flaring punch of the double horn mouth process equipment of one embodiment of the utility model processes the knot after connecting tube Structure schematic diagram.
Fig. 4 is after the end face punching press punch of the double horn mouth process equipment of one embodiment of the utility model processes connecting tube Structure diagram.
Fig. 5 is after the inside and outside flaring punch of the double horn mouth process equipment of one embodiment of the utility model processes connecting tube Structure diagram.
Fig. 6 is the side structure schematic view of the clamping mold of the double horn mouth process equipment of one embodiment of the utility model.
Fig. 7 is the decomposition texture schematic diagram of the clamping mold of the double horn mouth process equipment of one embodiment of the utility model.
Reference sign:
Connecting tube:1
Tube body:10
Outer horn mouth:11
Inside trumpet mouth:12
Expansion mouth:13
Choke:14
Flat part:15
Double horn mouth process equipment:2
Pre- flaring punch:20
Pre- flaring punch ontology:200
Pre- expansion mouth:201
Groove:202
End face punching press punch:21
Facing punch ontology:210
Compressed part:211
End face positioning region:212
Inside and outside flaring punch:22
Interior outer ram ontology:220
Inside and outside expansion mouth:221
Inside and outside flaring positioning region:222
Rack:23
Guide rail:24
Punch holder:25
Turntable:26
Punching mechanism:27
Clamping mold:28
Clamping:280
Receiving hole:281
Mounting blocks:29
Specific embodiment
The utility model is further illustrated below by the mode of embodiment, but be not therefore limited in the utility model Among the embodiment described range.
In the description of the present invention, it is to be appreciated that term " on ", " under ", "front", "rear", "left", "right", The orientation or position relationship of the instructions such as " vertical ", " level ", " top ", " bottom ", " interior ", " outer " be based on orientation shown in the drawings or Position relationship is for only for ease of description the utility model and simplifies description rather than instruction or imply signified device or member Part must have specific orientation, with specific azimuth configuration and operation, therefore it is not intended that limitation to the utility model.
Fig. 1-2 is illustrated a kind of structure diagram of double horn mouth process equipment 2 according to the implementation of the utility model one.Such as Shown in Fig. 1-2, double horn mouth process equipment 2 is used for the machine-shaping of connecting tube 1.As shown in figure 5, connecting tube 1 includes a pipe sheet Body 10, the end of tube body 10 have an outer horn mouth 11 and are folded to an inside trumpet mouth 12 of outer horn mouth 11.
As shown in Figs. 1-5, double horn mouth process equipment 2 includes pre- flaring punch 20, end face punching press punch 21 and interior extends out Mouth punch 22.Pre- flaring punch 20 includes pre- flaring punch ontology 200 and pre- expansion mouth 201.Pre- expansion mouth 201 is set to pre- It is flared the right side of punch ontology 200.And it is located at the outer peripheral edge of pre- expansion mouth 201 in the right side of pre- flaring punch ontology 200 Position at be equipped with groove 202, groove 202 surround and is adjacent to the outside wall surface of pre- expansion mouth 201.In the present embodiment, groove 202 use annular groove.
Wherein, the shape of the cross section of groove 202 is V-arrangement.Certainly, in other embodiments, the cross section of groove 202 Shape other shapes to concave, such as U-shaped etc. can also be used, herein not to protection scope of the present invention generate limit make With.
In addition, the shape of the outside wall surface of pre- expansion mouth 201 is cone.The axis of pre- expansion mouth 201 and pre- flaring punch The axis of ontology 200 is located along the same line, and the diameter of pre- expansion mouth 201 is turned left gradually along the axial of pre- expansion mouth 201 from the right side Increase.The machining accuracy of connecting tube 1 can be improved in this way.
In the present embodiment, tube body 10 of the pre- flaring punch 20 along the length direction stamping connection pipe 1 of rack 23 is utilized End when, because the setting of pre- expansion mouth 201 and groove 202 will form an expansion mouth 13 and one in the end of tube body 10 Choke 14, expansion mouth 13 and choke 14 are set gradually outward along the axis direction of tube body 10 from interior, and 13 He of expansion mouth The junction of choke 14 is extended radially out along tube body 10.
Such as Fig. 1-5, end face punching press punch 21 includes facing punch ontology 210 and compressed part 211.Compressed part 211 is set to The right side of facing punch ontology 210.The shape of compressed part 211 is cylindrical, and the axis of compressed part 211 and facing punch sheet The axis of body 210 is located along the same line, and the right side of compressed part 211 is plane.
In addition, end face punching press punch 21 further includes end face positioning region 212, the left side of end face positioning region 212 is adjacent to pressure The right side in tight portion 211.The shape of end face positioning region 212 is cone, and the diameter of end face positioning region 212 is along end face positioning region 212 axial is turned left gradual increase from the right side.The axis of end face positioning region 212 is located at same straight line with the axis of compressed part 211 On, and end face positioning region 212 is located at along the projection of axial direction to the compressed part 211 of facing punch ontology 210 inside compressed part 211, And positioned at the interior intracavitary of tube body 10.
In the present embodiment, there is 13 He of expansion mouth using the length direction punching press of end face punching press punch 21 along rack 23 During the end of the tube body 10 of choke 14, because the setting choke 14 of compressed part 211 is stamped and formed out a flat part 15, tablet The end face in portion 15 is plane, and flat part 15 is vertical with the axis of tube body 10.
Such as Fig. 1-5, inside and outside flaring punch 22 includes interior outer ram ontology 220 and inside and outside expansion mouth 221, inside and outside expansion mouth 221 are set to the right side of interior outer ram ontology 220.The shape of the outside wall surface of inside and outside expansion mouth 221 and the interior loudspeaker of tube body 10 The internal face shape of mouth 12 is identical, and for the outer loudspeaker of molding while the end of tube body 10 is molded inside trumpet mouth 12 Mouth 11.
In the present embodiment, there is expansion mouth 13 and tablet using the length direction of inside and outside flaring punch 22 along rack 23 During the end of the punching press tube body 10 in portion 15, because inside and outside expansion mouth 221 setting so that tube body 10 end be stamped and formed out in Horn mouth 12 and outer horn mouth 11, and inside trumpet mouth 12 fits in outer horn mouth 11, and the connecting tube 1 with double horn mouth is made, And the wall thickness of the end of tube body 10 is increased.
The double horn mouth for including pre- flaring punch 20, end face punching press punch 21 and inside and outside flaring punch 22 by setting is processed Equipment 2 can process the connecting tube 1 with inside trumpet mouth 12 and outer horn mouth 11, have without welding one in connecting tube 1 The additional components of the conical surface just can realize the conical surface seal of connecting tube 1 and cylinder body, be connect with cylinder body so as to improving connecting tube 1 Leakproofness and intensity.
Wherein, the shape of the outside wall surface of inside and outside expansion mouth 221 is cone, the axis of inside and outside expansion mouth 221 and inside and outside punching The axis of head ontology 220 is located along the same line, and the diameter of inside and outside expansion mouth 221 is past along the axial direction of inside and outside expansion mouth 221 from the right side Left gradually increase.
In addition, inside and outside flaring punch 22 further includes inside and outside flaring positioning region 222, the left side of inside and outside flaring positioning region 222 It is adjacent to the right side of inside and outside expansion mouth 221.The axis of the axis and inside and outside expansion mouth 221 of inside and outside flaring positioning region 222 is located at On same straight line, and inside and outside flaring positioning region 222 is along the axial direction of interior outer ram ontology 220 to the projection position of inside and outside expansion mouth 221 Inside inside and outside expansion mouth 221, and positioned at the interior intracavitary of tube body 10.The setting of inside and outside flaring positioning region 222 being capable of the company of avoiding Its internal diameter becomes smaller take over 1 in process.
As shown in Figs. 1-2, double horn mouth process equipment 2 further includes rack 23, guide rail 24, punch holder 25 and turntable 26.It leads Rail 24 extends along the length direction of rack 23.Punch holder 25 is slidedly arranged on guide rail 24, and turntable 26 is rotationally connected with punch holder 25.Pre-expansion Mouth punch 20, end face punching press punch 21 and inside and outside flaring being provided at circumferentially spaced in turntable 26 along turntable 26 of punch 22.And pre-expansion The axis of mouth punch 20, end face punching press punch 21 and inside and outside flaring punch 22 is parallel with the length direction of rack 23.Turntable 26 It can be rotated relative to punch holder 25, so as to more rapidly replace punching press of three punches to connecting tube 1, so as to carry The processing efficiency of high connecting tube 1.
In addition, double horn mouth process equipment 2 further includes punching mechanism 27.Punching mechanism 27 is set to rack 23.And punching press The pressing direction of mechanism 27 is parallel with the length direction of rack 23.Punch holder 25 is set to punching mechanism 27.In the present embodiment, Punching mechanism 27 uses cylinder, and the cylinder body of cylinder is fixed on rack 23, and punch holder 25 is fixed on the piston rod of cylinder.
In addition, double horn mouth process equipment 2 further includes clamping mold 28, clamping mold 28 has to wear connecting tube 1 A receiving hole 281, receiving hole 281 is along the length direction of clamping mold 28 through clamping mold 28, and the axis of receiving hole 281 Line is parallel with the length direction of rack 23.
Understood with reference to Fig. 6-7, clamping mold 28 includes be detachably connected successively along the circumferential direction of clamping mold 28 three A clamping 280, three clampings 280, which surround, is formed with receiving hole 281.A driving mechanism is provided in each clamping 280 (in figure It is not shown), for driving corresponding the moving radially along clamping mold 28 of clamping 280, driving mechanism may be contained within driving mechanism Rack 23.In the present embodiment, driving mechanism uses cylinder, and the cylinder body of cylinder is fixed on rack 23, and cylinder is fixed in clamping 280 Piston rod.And each clamping 280 is set to driving mechanism by a mounting blocks 29.
Clamping mold 28 is arranged to include being detachably connected three clampings 280, and the axis of receiving hole 281 and rack 23 Length direction it is parallel, be provided with a driving mechanism in each clamping 280, in this way can pass through driving mechanism realize three clampings 280 assembly and disassembly, so as to fulfill the Quick-clamped of connecting tube 1, operation is time saving and energy saving, so as to improve adding for connecting tube 1 Work efficiency rate, and driving mechanism is capable of providing a pretightning force to clamping 280, so as to ensure that clamping mold 28 can be reliably by connection Pipe 1 clamps, and the opposite clamping mold when being flared of connecting tube 1 is avoided to slide and generates abrasion.
Specifically, the diameter of receiving hole 281 is smaller 0.05-0.1mm than the diameter of the tube body 10 of connecting tube 1.Clamping mold 28 length is 6-10 times of the diameter of the tube body 10 of connecting tube 1.It can ensure that connecting tube 1 is more reliably clamped in this way Generation is slided in the receiving hole 281 of clamping mold 28, further avoiding the opposite clamping mold when being flared of connecting tube 1 Abrasion.
Although the foregoing describe specific embodiment of the present utility model, it will be appreciated by those of skill in the art that This is merely illustrative of, and the scope of protection of the utility model is defined by the appended claims.Those skilled in the art Under the premise of the principle and essence without departing substantially from the utility model, various changes or modifications can be made to these embodiments, But these change and modification each fall within the scope of protection of the utility model.

Claims (10)

1. a kind of double horn mouth process equipment, which is characterized in that the double horn mouth process equipment is used for the processing of connecting tube, institute It states connecting tube and includes a tube body, the end of the tube body has an outer horn mouth and is folded in described outer bell-mouthed one Horn mouth;
The double horn mouth process equipment includes:
Pre- flaring punch, the pre- flaring punch includes pre- flaring punch ontology and pre- expansion mouth, the pre- expansion mouth are set to The right side of the pre- flaring punch ontology, and it is located at the outer of the pre- expansion mouth in the right side of the pre- flaring punch ontology Groove is equipped at the position of periphery, the groove surround and is adjacent to the outside wall surface of the pre- expansion mouth;
End face punching press punch, the end face punching press punch include facing punch ontology and compressed part, and the compressed part is set to institute State the right side of facing punch ontology;
Inside and outside flaring punch, the inside and outside flaring punch include interior outer ram ontology and inside and outside expansion mouth, the inside and outside expansion mouth It is set to the right side of the interior outer ram ontology, the shape of outside wall surface of the inside and outside expansion mouth and the interior loudspeaker of the tube body The internal face shape of mouth is identical, and described outer for being molded while the end of the tube body is molded the inside trumpet mouth Horn mouth.
2. double horn mouth process equipment as described in claim 1, which is characterized in that the shape of the cross section of the groove is V Shape;
The shape of the outside wall surface of the pre- expansion mouth is cone, the axis of the pre- expansion mouth and the pre- flaring punch ontology Axis be located along the same line, the diameter of the pre- expansion mouth is turned left gradual increase along the axial of the pre- expansion mouth from the right side.
3. double horn mouth process equipment as described in claim 1, which is characterized in that the shape of the compressed part is cylinder, And the axis of the compressed part and the axis of the facing punch ontology are located along the same line, the right side of the compressed part is Plane.
4. double horn mouth process equipment as described in claim 1, which is characterized in that the end face punching press punch further includes end face Positioning region, the left side of the end face positioning region are adjacent to the right side of the compressed part, and the shape of the end face positioning region is Cone, the diameter of the end face positioning region are turned left gradual increase along the axial of the end face positioning region from the right side;
The axis and the axis of the compressed part of the end face positioning region are located along the same line, and the end face positioning region is along institute The projection for stating axial direction to the compressed part of facing punch ontology is located inside the compressed part, and positioned at the interior of the tube body Intracavitary.
5. double horn mouth process equipment as described in claim 1, which is characterized in that the shape of the outside wall surface of the inside and outside expansion mouth Shape is cone, and the axis of the axis and the interior outer ram ontology of the inside and outside expansion mouth is located along the same line, described interior The diameter of outer expansion mouth is turned left gradual increase along the axial of the inside and outside expansion mouth from the right side.
6. double horn mouth process equipment as described in claim 1, which is characterized in that the inside and outside flaring punch further includes inside and outside Be flared positioning region, the left side of the inside and outside flaring positioning region is adjacent to the right side of the inside and outside expansion mouth, it is described in extend out The axis of the axis and the inside and outside expansion mouth of mouthful positioning region is located along the same line, and the inside and outside positioning region that is flared is along described The projection of the axial direction of interior outer ram ontology to the inside and outside expansion mouth is located inside the inside and outside expansion mouth, and positioned at the pipe sheet The interior intracavitary of body.
7. double horn mouth process equipment as described in claim 1, which is characterized in that the double horn mouth process equipment also wraps It includes:
Rack;
Guide rail, the guide rail extend along the length direction of the rack;
Punch holder, the punch holder are slidedly arranged on the guide rail;
Turntable, the turntable are rotationally connected with the punch holder, the pre- flaring punch, the end face punching press punch and described interior Outer flaring punch is provided at circumferentially spaced along the turntable in the turntable, the pre- flaring punch, end face punching press punch and interior The axis of outer flaring punch is parallel with the length direction of the rack.
8. double horn mouth process equipment as claimed in claim 7, which is characterized in that the double horn mouth process equipment also wraps It includes:
Punching mechanism, the punching mechanism are set to the rack, and the punch holder is set to the punching mechanism, and the punching The pressing direction of press mechanism is parallel with the length direction of the rack.
9. double horn mouth process equipment as claimed in claim 7, which is characterized in that the double horn mouth process equipment also wraps It includes:
Clamping mold, the clamping mold have for the receiving hole that wears connecting tube, and the receiving hole is along the clamping die The length direction of tool is through the clamping mold, and the axis of the receiving hole is parallel with the length direction of the rack;
The clamping mold includes three clampings being detachably connected successively along the circumferential direction of the clamping mold, three clampings Around the receiving hole is formed with, a driving mechanism is provided in each clamping, the driving mechanism is corresponding for driving The clamping moving radially along the clamping mold, the driving mechanism may be contained within the rack.
10. double horn mouth process equipment as claimed in claim 9, which is characterized in that the diameter of the receiving hole is than the company The small 0.05-0.1mm of diameter for the tube body taken over;
The length of the clamping mold is 6-10 times of the diameter of the tube body of the connecting tube.
CN201721648286.XU 2017-11-30 2017-11-30 Double horn mouth process equipment Expired - Fee Related CN207592631U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721648286.XU CN207592631U (en) 2017-11-30 2017-11-30 Double horn mouth process equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721648286.XU CN207592631U (en) 2017-11-30 2017-11-30 Double horn mouth process equipment

Publications (1)

Publication Number Publication Date
CN207592631U true CN207592631U (en) 2018-07-10

Family

ID=62761932

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721648286.XU Expired - Fee Related CN207592631U (en) 2017-11-30 2017-11-30 Double horn mouth process equipment

Country Status (1)

Country Link
CN (1) CN207592631U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109201908A (en) * 2018-11-01 2019-01-15 珠海格力智能装备有限公司 Connecting pipe flaring system and connecting pipe production equipment with same
CN109909750A (en) * 2019-03-21 2019-06-21 苏州市威迪特工业设备有限公司 Whole-automatic coil pipe terminal
CN110394396A (en) * 2019-09-05 2019-11-01 常州神力电机股份有限公司 A kind of stator and rotor of wind power generator punching production punching press tooling
CN113478797A (en) * 2021-07-22 2021-10-08 临海伟星新型建材有限公司 High-precision automatic flanging equipment

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109201908A (en) * 2018-11-01 2019-01-15 珠海格力智能装备有限公司 Connecting pipe flaring system and connecting pipe production equipment with same
CN109201908B (en) * 2018-11-01 2024-04-02 珠海格力智能装备有限公司 Connecting pipe flaring system and connecting pipe production equipment with same
CN109909750A (en) * 2019-03-21 2019-06-21 苏州市威迪特工业设备有限公司 Whole-automatic coil pipe terminal
CN109909750B (en) * 2019-03-21 2024-02-23 苏州市威迪特工业设备有限公司 Full-automatic turntable pipe end machine
CN110394396A (en) * 2019-09-05 2019-11-01 常州神力电机股份有限公司 A kind of stator and rotor of wind power generator punching production punching press tooling
CN113478797A (en) * 2021-07-22 2021-10-08 临海伟星新型建材有限公司 High-precision automatic flanging equipment

Similar Documents

Publication Publication Date Title
CN207592631U (en) Double horn mouth process equipment
CN104259771B (en) A kind of forming technology of automobile engine exhaust system heat shield
CN106077300A (en) Automobile exhaust pipe hole-expansion punch
CN202207743U (en) Punch head
CN108817710A (en) A kind of thin-wall case laser welding clamping device and operating method
CN101288885A (en) Effective technique for increasing roundness of the flanging hole of the barrel
CN203471397U (en) Gear milling clamp of thin wall member
CN111496365B (en) Solid rocket engine shell assembly welding tool with embedded end cover
CN201900194U (en) Novel die structure for necking pipe fittings
CN206677011U (en) A kind of not reciprocity caliber shaped device of stainless steel
CN105618602A (en) Flaring device for thick-wall stainless steel pipe fitting
CN205185179U (en) Sealing unit's foamed plastic forming machine is fixed a position fast in area
CN108723217A (en) Pipe end clamping device and its clamping means on a kind of electric tube expander
CN107014119A (en) A kind of car air conditioner liquid storage cylinder and its manufacture method
CN108043969A (en) A kind of processing unit (plant) and processing method of gas turbine rectification cover wall
CN104096963B (en) A kind of steel pistons friction welding (FW) clamping and positioning method
CN208976653U (en) A kind of precise punching die
CN201637326U (en) Flanging seal head pipe box and shell-and-tube heat exchanger with same
CN205341676U (en) With be responsible for be connected be in charge of link forming die
CN206676939U (en) A kind of backward extrusion device of pipe fitting
CN206689656U (en) A kind of preceding spring hanger assembly welding clamp
CN220901679U (en) Muffler exhaust pipe locking device
CN210231249U (en) Titanium alloy flange mould convenient to unloading
CN109570273A (en) Automobile pipeline end cavetto tooling
CN213332934U (en) Flange conduit assembly

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180710

Termination date: 20191130

CF01 Termination of patent right due to non-payment of annual fee