CN207583435U - 一种隧道二衬拱顶防脱空预警装置 - Google Patents
一种隧道二衬拱顶防脱空预警装置 Download PDFInfo
- Publication number
- CN207583435U CN207583435U CN201721727330.6U CN201721727330U CN207583435U CN 207583435 U CN207583435 U CN 207583435U CN 201721727330 U CN201721727330 U CN 201721727330U CN 207583435 U CN207583435 U CN 207583435U
- Authority
- CN
- China
- Prior art keywords
- sensor
- vault
- splash guard
- lining
- mould
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009826 distribution Methods 0.000 claims abstract description 15
- 238000005476 soldering Methods 0.000 claims abstract description 5
- 210000004243 sweat Anatomy 0.000 claims abstract description 5
- 239000004567 concrete Substances 0.000 abstract description 14
- 238000000034 method Methods 0.000 abstract description 6
- 229910000831 Steel Inorganic materials 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- 238000005266 casting Methods 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000012544 monitoring process Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 208000027418 Wounds and injury Diseases 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000005286 illumination Methods 0.000 description 1
- 230000006698 induction Effects 0.000 description 1
- 208000014674 injury Diseases 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 230000009347 mechanical transmission Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
本实用新型涉及一种隧道二衬拱顶防脱空预警装置,包括设置在每模二衬拱顶防水板上的至少一个传感器,所述传感器信号端口通过网线与对应的信号灯连接,所述信号灯与提供电力的配电箱连接,所述传感器的传动杆上设置有防水板一,所述传感器通过设置于其底部的防水板二与每模二衬拱顶防水板热熔焊接,所述传感器为微动开关传感器,所述传感器为四个,且均布在每模二衬拱顶防水板上,所述配电箱为三级配电箱;此装置可以很好的节约人工费用、可以在二衬拱顶混凝土浇筑过程中能够及时监控混凝土是否浇筑密实,有效避免二衬拱顶混凝土灌注不密实存在的脱空和空洞现象。
Description
技术领域
本实用新型涉及隧道施工领域,特别涉及一种隧道二衬拱顶防脱空预警装置。
背景技术
随着社会经济的发展以及工程设计水平的提高,在交通、水利、国防等领域中,隧道的建筑结构形式已经被广泛的采用,二次衬砌是隧道施工中的一个重要环节,二次衬砌是指在隧道已经进行初期支护的条件下,用混凝土等材料修建的内层衬砌,以达到加固支护、优化路线防排水系统、美化外观、方便设置通讯、照明、监测等设施的作用,目前,国内隧道二衬混凝土浇筑过程中普遍缺乏有效的监控手段,现今隧道拱顶混凝土浇筑密实情况检查有两种方式:一是人工在二衬台车端头拱顶处肉眼观察,二是在二衬台车拱顶预留竖向钢管检查混凝土冲顶情况。两者方法都存在的缺点:需要定时安排人员观察,耗费人工,且作业空间狭小,对人身可能造成潜在伤害,需根据二衬厚度加工对应长度的无缝钢管,耗时耗力耗材料,钢管安装时与拱顶二衬钢筋位置冲突,不好调整,可操作性不大,钢管无法取出进行重复使用,且影响二衬整体外观。
实用新型内容
本实用新型的目的在于提供一种节约人工费用、可以在二衬拱顶混凝土浇筑过程中能够及时监控混凝土是否浇筑密实,有效避免二衬拱顶混凝土灌注不密实存在的脱空和空洞现象的预警装置。
为实现以上目的,本实用新型采用的技术方案为:一种隧道二衬拱顶防脱空预警装置,包括设置在每模二衬拱顶防水板上的至少一个传感器,所述传感器信号端口通过网线与对应的信号灯连接,所述信号灯与提供电力的配电箱连接,所述传感器的传动杆上设置有防水板一,所述传感器通过设置于其底部的防水板二与每模二衬拱顶防水板热熔焊接。
所述传感器为微动开关传感器。
所述传感器为四个,且均布在每模二衬拱顶防水板上。
所述配电箱为三级配电箱。
通过在每模二衬拱顶防水板上设置至少一个传感器,所述传感器信号端口通过网线与对应的信号灯连接,所述信号灯与提供电力的配电箱连接,所述传感器的传动杆上设置有防水板一,可以增大传感器感应范围,所述传感器通过设置于其底部的防水板二与每模二衬拱顶防水板热熔焊接,用隧道二衬台车开始二衬混凝土的浇筑,浇筑过程随着二衬混凝土浇筑面上升,混凝土触及隧道拱顶防水板上的传感器的传动杆上的防水板一,传感器产生报警信号,并通过网线传给信号灯,信号灯点亮,说明二衬拱顶混凝土浇筑密实。此装置可以很好的节约人工费用、可以在二衬拱顶混凝土浇筑过程中能够及时监控混凝土是否浇筑密实,有效避免二衬拱顶混凝土灌注不密实存在的脱空和空洞现象。
附图说明
图1是本实用新型的结构图。
具体实施方式
下面结合图1,对本实用新型做进一步详细叙述。
一种隧道二衬拱顶防脱空预警装置,包括设置在每模二衬拱顶防水板上的至少一个传感器10,所述传感器10信号端口通过网线12与对应的信号灯11连接,所述信号灯11与提供电力的配电箱13连接,所述传感器10的传动杆14上设置有防水板一15,所述传感器10通过设置于其底部的防水板二16与每模二衬拱顶防水板热熔焊接。
通过在每模二衬拱顶防水板上设置至少一个传感器10,所述传感器10信号端口通过网线12与对应的信号灯11连接,所述信号灯11与提供电力的配电箱13连接,所述传感器10的传动杆14上设置有防水板一15,可以增大传感器10感应范围,所述传感器10通过设置于其底部的防水板二16与每模二衬拱顶防水板热熔焊接,用隧道二衬台车开始二衬混凝土的浇筑,浇筑过程随着二衬混凝土浇筑面上升,混凝土触及隧道拱顶防水板上的传感器10的传动杆14上的防水板一15,传感器10产生报警信号,并通过网线12传给信号灯11,信号灯11点亮,说明二衬拱顶混凝土浇筑密实。此装置可以很好的节约人工费用、可以在二衬拱顶混凝土浇筑过程中能够及时监控混凝土是否浇筑密实,有效避免二衬拱顶混凝土灌注不密实存在的脱空和空洞现象。
所述传感器10为微动开关传感器。微动开关传感器10为机械传动元件工作,稳定性好、安装方便、重量轻。
所述传感器10为四个,且均布在每模二衬拱顶防水板上。可以对隧道二衬拱顶大范围防脱空预警。
所述配电箱13为三级配电箱。采用三级配电箱安全且便宜。
以上所述实施方式仅仅是对本实用新型的优选实施方式进行描述,并非对本实用新型的范围进行限定,在不脱离本实用新型设计精神的前提下,本领域普通技术人员对本实用新型的技术方案作出的各种变形和改进,均应落入本实用新型的权利要求书确定的保护范围内。
Claims (4)
1.一种隧道二衬拱顶防脱空预警装置,其特征在于:包括设置在每模二衬拱顶防水板上的至少一个传感器(10),所述传感器(10)信号端口通过网线(12)与对应的信号灯(11)连接,所述信号灯(11)与提供电力的配电箱(13)连接,所述传感器(10)的传动杆(14)上设置有防水板一(15),所述传感器(10)通过设置于其底部的防水板二(16)与每模二衬拱顶防水板热熔焊接。
2.根据权利要求1所述的一种隧道二衬拱顶防脱空预警装置,其特征在于:所述传感器(10)为微动开关传感器。
3.根据权利要求1所述的一种隧道二衬拱顶防脱空预警装置,其特征在于:所述传感器(10)为四个,且均布在每模二衬拱顶防水板上。
4.根据权利要求1所述的一种隧道二衬拱顶防脱空预警装置,其特征在于:所述配电箱(13)为三级配电箱。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721727330.6U CN207583435U (zh) | 2017-12-12 | 2017-12-12 | 一种隧道二衬拱顶防脱空预警装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721727330.6U CN207583435U (zh) | 2017-12-12 | 2017-12-12 | 一种隧道二衬拱顶防脱空预警装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207583435U true CN207583435U (zh) | 2018-07-06 |
Family
ID=62737588
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721727330.6U Expired - Fee Related CN207583435U (zh) | 2017-12-12 | 2017-12-12 | 一种隧道二衬拱顶防脱空预警装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207583435U (zh) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109441543A (zh) * | 2018-11-28 | 2019-03-08 | 中铁工程装备集团有限公司 | 模板台车用隧道拱顶空洞预警装置 |
CN109751084A (zh) * | 2018-12-28 | 2019-05-14 | 中铁隧道集团四处有限公司 | 隧道拱顶防空洞报警方法 |
CN110045094A (zh) * | 2019-03-01 | 2019-07-23 | 山东高速工程检测有限公司 | 一种预防隧道二衬拱顶脱空的检测装置及检测方法 |
CN110617083A (zh) * | 2019-10-12 | 2019-12-27 | 重庆建工建筑产业技术研究院有限公司 | 一种隧道衬砌混凝土密实度实时智能监控报警施工方法 |
CN111024778A (zh) * | 2018-10-10 | 2020-04-17 | 中铁一局集团有限公司 | 一种隧道二衬预防空洞检测系统及其运行控制方法 |
CN111140256A (zh) * | 2020-01-06 | 2020-05-12 | 中铁五局集团第二工程有限责任公司 | 一种隧道二衬混凝土浇筑液位监视器施工方法 |
CN111912966A (zh) * | 2020-07-15 | 2020-11-10 | 中交一公局厦门工程有限公司 | 一种二衬拱顶密贴监测仪及其在二衬混凝土中的应用方法 |
CN112523780A (zh) * | 2020-12-01 | 2021-03-19 | 中铁十二局集团有限公司 | 软岩隧道衬砌拱顶防脱空主动监测施工工法 |
CN113833525A (zh) * | 2020-06-08 | 2021-12-24 | 福建省瑞亿机械制造有限公司 | 隧道二衬混泥土浇注防空防爆报警系统 |
-
2017
- 2017-12-12 CN CN201721727330.6U patent/CN207583435U/zh not_active Expired - Fee Related
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111024778A (zh) * | 2018-10-10 | 2020-04-17 | 中铁一局集团有限公司 | 一种隧道二衬预防空洞检测系统及其运行控制方法 |
CN109441543A (zh) * | 2018-11-28 | 2019-03-08 | 中铁工程装备集团有限公司 | 模板台车用隧道拱顶空洞预警装置 |
CN109751084A (zh) * | 2018-12-28 | 2019-05-14 | 中铁隧道集团四处有限公司 | 隧道拱顶防空洞报警方法 |
CN109751084B (zh) * | 2018-12-28 | 2020-07-31 | 中铁隧道局集团建设有限公司 | 隧道拱顶防空洞报警方法 |
CN110045094A (zh) * | 2019-03-01 | 2019-07-23 | 山东高速工程检测有限公司 | 一种预防隧道二衬拱顶脱空的检测装置及检测方法 |
CN110617083A (zh) * | 2019-10-12 | 2019-12-27 | 重庆建工建筑产业技术研究院有限公司 | 一种隧道衬砌混凝土密实度实时智能监控报警施工方法 |
CN111140256A (zh) * | 2020-01-06 | 2020-05-12 | 中铁五局集团第二工程有限责任公司 | 一种隧道二衬混凝土浇筑液位监视器施工方法 |
CN113833525A (zh) * | 2020-06-08 | 2021-12-24 | 福建省瑞亿机械制造有限公司 | 隧道二衬混泥土浇注防空防爆报警系统 |
CN111912966A (zh) * | 2020-07-15 | 2020-11-10 | 中交一公局厦门工程有限公司 | 一种二衬拱顶密贴监测仪及其在二衬混凝土中的应用方法 |
CN112523780A (zh) * | 2020-12-01 | 2021-03-19 | 中铁十二局集团有限公司 | 软岩隧道衬砌拱顶防脱空主动监测施工工法 |
CN112523780B (zh) * | 2020-12-01 | 2022-11-29 | 中铁十二局集团有限公司 | 软岩隧道衬砌拱顶防脱空主动监测施工工法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207583435U (zh) | 一种隧道二衬拱顶防脱空预警装置 | |
CN107939416A (zh) | 一种防止隧道拱顶混凝土脱空的预警方法 | |
CN209723052U (zh) | 地下室外墙后浇带装配式预制板超前止水回填结构 | |
CN108149706A (zh) | 一种现浇暗梁及叠合板拼接的预制装配式综合管廊及其施工方法 | |
CN205530344U (zh) | 一种分体式无模浇筑地下综合管廊 | |
CN206956671U (zh) | 一种堆石混凝土专用预制模板系统 | |
CN106759478B (zh) | 一种预制管廊施工方法 | |
CN109914644A (zh) | 一种装配式保温砌体墙及其制作方法 | |
CN207812508U (zh) | 地下室外墙后浇带模板支设装置 | |
CN105822068B (zh) | 高温环境下的超长薄壁混凝土墙浇筑和养护方法 | |
CN210395437U (zh) | 一种具有自修复功能的综合管廊及其预制管 | |
CN204151824U (zh) | 一种玻璃钢地下综合管网共同沟 | |
CN112855218A (zh) | 一种隧道二次衬砌混凝土灌注智能化监测系统 | |
CN207646755U (zh) | 立体式综合管廊 | |
CN207846241U (zh) | 整体装配叠合箱涵 | |
CN208293744U (zh) | 预制混凝土管状整体式污水处理池 | |
CN208235584U (zh) | 环型装配式叠合管廊 | |
CN103696483B (zh) | 一种智能型多功能综合下水管道 | |
CN200968056Y (zh) | 滑升模板 | |
CN207017296U (zh) | 城市综合管廊底板浇筑用底模 | |
CN203296071U (zh) | 一种带安全防坠网的检查井 | |
CN210775496U (zh) | 一种用于隧道二衬混凝土浇筑施工预防脱空的检测装置 | |
CN209509022U (zh) | 一种提高空间利用率的综合管廊空间释放系统 | |
CN207526109U (zh) | 贯穿于楼板的垂直立管周围堵洞装置 | |
CN106703196B (zh) | 内环式钢管再生块体混凝土装配结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180706 |
|
CF01 | Termination of patent right due to non-payment of annual fee |