CN207583430U - Dell area goaf interstitital texture - Google Patents
Dell area goaf interstitital texture Download PDFInfo
- Publication number
- CN207583430U CN207583430U CN201721622323.XU CN201721622323U CN207583430U CN 207583430 U CN207583430 U CN 207583430U CN 201721622323 U CN201721622323 U CN 201721622323U CN 207583430 U CN207583430 U CN 207583430U
- Authority
- CN
- China
- Prior art keywords
- partition wall
- area
- dell
- goaf
- lower floor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model provides dell area goaf interstitital texture, it, which includes, is located at goaf and treats several partition walls between exploiting field, partition wall is made of upper strata partition wall and lower floor's partition wall, lower floor's partition wall is poured into a mould to be formed using mixed mud, upper strata partition wall is bound to be formed using pin and solid wood, pin is vertically fixed on lower floor's partition wall, and connection is bound by solid wood between adjacent pin;Fill area is formed between adjacent partition wall, fill area underfill has bottom, and bottom is formed by the abandoned mine place mat in dell area, bottom surface is filled with middle layer, middle layer is formed using the abandoned mine place mat in middle level hole area, and interlayer surfaces are filled with surface layer, and surface layer is formed using the abandoned mine place mat in surface layer hole area.After this programme, transportation cost is greatly saved, upper strata partition wall uses wooden structures, easily rots, be conducive to land reclamation.
Description
Technical field
The utility model is related to mining equiment technical fields, refer in particular to dell area goaf interstitital texture.
Background technology
Qu Doushi is filled out after mineral products have been dug, then be filled outside by vehicle drawing come filler in existing sky mining area,
And the abandoned mine of existing mining will also pull out, and cost is high.
Invention content
The purpose of the utility model is to overcome the deficiencies in the prior art, provide that a kind of transportation cost is low, changes conducive to soil
The dell area goaf interstitital texture made.
To achieve the above object, technical solution provided by the utility model is:Dell area goaf interstitital texture, it is wrapped
It includes and is located at goaf and treats several partition walls between exploiting field, partition wall is made of upper strata partition wall and lower floor's partition wall, lower floor's partition wall
It pours into a mould to be formed using mixed mud, upper strata partition wall is bound to be formed using pin and solid wood, and pin is vertically fixed on lower floor's partition wall,
Connection is bound by solid wood between adjacent pin;Fill area is formed between adjacent partition wall, fill area underfill has bottom, bottom
Floor is formed by the abandoned mine place mat in dell area, and bottom surface is filled with middle layer, and middle layer uses the abandoned mine place mat shape in middle level hole area
Into interlayer surfaces are filled with surface layer, and surface layer is formed using the abandoned mine place mat in surface layer hole area.
The abandoned mine gap location of the bottom is filled with water layer mortar, and the packed height of water layer mortar is 10-30cm.
To the horizontal-extending formation non-slip ramp in one or both sides at the top of lower floor's partition wall.
The utility model first in goaf and treats several partition walls between exploiting field, then after using the above scheme
The abandoned mine for treating exploiting field is sequentially filled, realizes that barren rock does not go out hole, has been greatly saved transportation cost, upper strata partition wall uses wooden knot
Structure easily rots, is conducive to land reclamation.
Description of the drawings
Fig. 1 is the overall structure diagram of the utility model.
Specific embodiment
With reference to all attached drawings, the utility model is described in further detail, and the preferred embodiment of the utility model is:Ginseng
See attached drawing 1, the dell area goaf interstitital texture described in the present embodiment, which includes, to be located at goaf and treat several between exploiting field
Partition wall 1, partition wall 1 are made of upper strata partition wall and lower floor's partition wall, and lower floor's partition wall is poured into a mould to be formed using mixed mud, at the top of lower floor's partition wall
Non-slip ramp 5 is formed to one or both sides are horizontal-extending, upper strata partition wall is bound to be formed using pin and solid wood, and pin is vertically solid
It is scheduled on lower floor's partition wall, connection is bound by solid wood between adjacent pin;Fill area, fill area are formed between adjacent partition wall 1
Underfill has bottom 2, and bottom 2 is formed by the abandoned mine place mat in dell area, and the abandoned mine gap location of bottom 2 is filled with water layer mortar,
The packed height of water layer mortar is 10cm, and 2 surface of bottom is filled with middle layer 3, and middle layer 3 uses the abandoned mine place mat in middle level hole area
It is formed, 3 surface of middle layer is filled with surface layer 4, and surface layer 4 is formed using the abandoned mine place mat in surface layer hole area.The present embodiment is being adopted first
It dead zone and treats several partition walls between exploiting field, is then sequentially filled the abandoned mine for treating exploiting field, realize that barren rock does not go out hole, greatly save
Transportation cost is saved, upper strata partition wall uses wooden structures, easily rots, be conducive to land reclamation.
The embodiment of the above is only the preferred embodiment of the utility model, and the reality of the utility model is not limited with this
Apply range, therefore the variation that all shape, principles according to the utility model are made, it should all cover in the scope of protection of the utility model
It is interior.
Claims (3)
1. dell area goaf interstitital texture, it, which includes, is located at goaf and treats several partition walls between exploiting field(1), it is special
Sign is:Partition wall(1)It is made of upper strata partition wall and lower floor's partition wall, lower floor's partition wall is poured into a mould to be formed using mixed mud, and upper strata partition wall is adopted
It is bound to be formed with pin and solid wood, pin is vertically fixed on lower floor's partition wall, and company is bound by solid wood between adjacent pin
It connects;Adjacent partition wall(1)Between form fill area, fill area underfill has bottom(2), bottom(2)It is spread by the abandoned mine in dell area
Pad is formed, bottom(2)Surface is filled with middle layer(3), middle layer(3)It is formed using the abandoned mine place mat in middle level hole area, middle layer
(3)Surface is filled with surface layer(4), surface layer(4)It is formed using the abandoned mine place mat in surface layer hole area.
2. dell area according to claim 1 goaf interstitital texture, it is characterised in that:Bottom(2)Abandoned mine gap location
Filled with water layer mortar, the packed height of water layer mortar is 10-30cm.
3. dell area according to claim 1 goaf interstitital texture, it is characterised in that:At the top of lower floor partition wall to side or
The horizontal-extending formation non-slip ramp in both sides(5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721622323.XU CN207583430U (en) | 2017-11-29 | 2017-11-29 | Dell area goaf interstitital texture |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721622323.XU CN207583430U (en) | 2017-11-29 | 2017-11-29 | Dell area goaf interstitital texture |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207583430U true CN207583430U (en) | 2018-07-06 |
Family
ID=62733956
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721622323.XU Expired - Fee Related CN207583430U (en) | 2017-11-29 | 2017-11-29 | Dell area goaf interstitital texture |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207583430U (en) |
-
2017
- 2017-11-29 CN CN201721622323.XU patent/CN207583430U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103498696B (en) | A kind of method from roadway in the roof grouting filling compacting goaf filling body | |
CN105696427B (en) | The construction method and its road structure of a kind of consolidation process newly built railway karst foundation | |
CN207062980U (en) | Mesh Retaining Wall | |
CN202718084U (en) | Composite foundation with flexible piles and drain boards combined | |
CN109235159A (en) | A kind of road structure and construction method for helping wide enlarging for runing high-speed railway | |
CN203729324U (en) | Anchor rod lattice type retaining wall structure | |
CN102995599A (en) | Anti-freeze anti-seepage water diversion treatment method of collapsible loess water-conveyance canal | |
CN205778903U (en) | A kind of soft-rock tunnel pucking preventing and treating device | |
CN202851027U (en) | Support system treating soft rock roadway floor heaves | |
CN104047210B (en) | Rail track roadbed | |
CN103437371A (en) | Construction method of water drainage uplift pile | |
CN208415273U (en) | Interstitital texture around subterranean tunnel | |
CN206815127U (en) | The soft interim sidewalk laying structure in base | |
CN106401609A (en) | Bottom plate pressure relief and reinforcement structure for controlling floor heave of deep roadway and construction method of bottom plate pressure relief and reinforcement structure | |
CN103572679B (en) | A kind of embankment structure and dam filling construction reducing bumping at bridge-head incidence | |
CN204753261U (en) | Light -duty road bed of a doublestage shelves structure | |
CN207583430U (en) | Dell area goaf interstitital texture | |
CN107190772A (en) | A kind of underground pipe gallery base configuration and its construction method | |
CN204803925U (en) | Railway subtracts vibration isolation and fills well structure | |
CN207672343U (en) | A kind of curb construction reducing railway subgrade surface width | |
CN109162741A (en) | The method in shield crossing piston air duct and piston air duct superstructure synchronous construction | |
CN209307786U (en) | A kind of road structure extended for runing high-speed railway side width | |
CN208870090U (en) | Waterproof construction outside a kind of hydrous fluids basement bottom board and exterior wall junction | |
CN204491320U (en) | Existing railway station roadbed light supporting structure on filled ground | |
CN204000472U (en) | Rail track roadbed |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180706 Termination date: 20201129 |