CN207583384U - A kind of tunnel liner Steel Corrugated Pipes for Making assembly plate - Google Patents

A kind of tunnel liner Steel Corrugated Pipes for Making assembly plate Download PDF

Info

Publication number
CN207583384U
CN207583384U CN201721789374.1U CN201721789374U CN207583384U CN 207583384 U CN207583384 U CN 207583384U CN 201721789374 U CN201721789374 U CN 201721789374U CN 207583384 U CN207583384 U CN 207583384U
Authority
CN
China
Prior art keywords
hole
flange
plate ontology
assembled
assembled plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721789374.1U
Other languages
Chinese (zh)
Inventor
刘晟
刘霖
赵德鹏
闫峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HARBIN JINYANGGUANG PIPE INDUSTRY Co Ltd
Original Assignee
HARBIN JINYANGGUANG PIPE INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HARBIN JINYANGGUANG PIPE INDUSTRY Co Ltd filed Critical HARBIN JINYANGGUANG PIPE INDUSTRY Co Ltd
Priority to CN201721789374.1U priority Critical patent/CN207583384U/en
Application granted granted Critical
Publication of CN207583384U publication Critical patent/CN207583384U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

A kind of tunnel liner Steel Corrugated Pipes for Making assembly plate, it is related to municipal works field.The utility model solves the problem of existing ripple assembly plate is cumbersome there are working procedure, and building cycle is long, low construction efficiency, and there are attended operation axial between adjacent corrugations assembly plate is difficult in installation process, the problem of safety is low, and stability is poor, short life.The front and rear ends of the assembled plate ontology of the utility model are equipped with flange, multiple first through hole are uniformly opened up on flange in a manner of annular array, the left end of assembled plate ontology uniformly opens up multiple second through-holes along its length, affixed bolt on each second through-hole, the right end of assembled plate ontology is provided with connecting plate, multiple third through-holes are opened up on connecting plate, the multiple third through-hole is arranged in a one-to-one correspondence with the multiple second through-hole, has the rebound being obliquely installed between connecting plate and assembled plate ontology.The utility model is used for bridge reparation, tunnel Denver Nuggets supporting, highway culvert supporting and vertical shaft supporting.

Description

A kind of tunnel liner Steel Corrugated Pipes for Making assembly plate
Technical field
The utility model is related to municipal works field, more particularly to a kind of tunnel liner Steel Corrugated Pipes for Making assembly plate.
Background technology
Domestic existing steel assembly corrugated plating be mainly used for highway culvert, and is spelled under excavation type condition of construction Fill the product of installation.It is mainly used in grassroot project and has the situation of bigger work surface.It is spelled under excavation type condition of construction The assembled corrugated product of installation is filled, excavation pit is needed and carries out basement process, and uses and is successively backfilling and compacted from the bottom up, Working procedure is cumbersome, and building cycle is long, consumes a large amount of manpower and materials, and construction efficiency is relatively low.
Tunnel liner Steel Corrugated Pipes for Making assembly plate is mainly used in the building of no-dig technique, reconstruction project and grassroot project.Such as coal The driving channel of ore deposit needs to carry out supporting, traditional steel assembly plate in the case of this to the surrounding of channel during driving It can not construct, connect and install.And tunnel liner Steel Corrugated Pipes for Making assembly plate can completely solve the problems, such as this.The older mistake of bridge Accomplish has damage to be required for maintaining for unsafe bridge or drain pipeline structure, the lining tunnel in this way in the inside of bridge and pipeline Road liner Steel Corrugated Pipes for Making assembly plate, then carries out gap filling with concrete mortar, it is possible to form one completely with original structure Entirety, and provide good support force.And then achieve the purpose that maintenance and renovation.
In non-open type excavation project, existing non-open type excavates the product used, and ripple assembly plate is non-opening The product that formula excavation uses, is essentially all the supporting for tunneling channel, the distance between structural member and channel are very narrow, this ripple Plate when installation, do not allow easy to operate between axial bolts nut, and operate when is dangerous by connection.
In conclusion existing ripple assembly plate is cumbersome there are working procedure, building cycle is long, and low construction efficiency is asked Topic, and there are attended operation difficulty axial between adjacent corrugations assembly plate in installation process, safety is low, and stability is poor, the longevity Order the problem of short.
Utility model content
The purpose of this utility model is for, the building cycle cumbersome there are working procedure that solve existing ripple assembly plate The problem of length, low construction efficiency, and there are attended operation difficulty axial between adjacent corrugations assembly plate, safety in installation process Property low, the problem of stability is poor, short life, and then provide a kind of tunnel liner Steel Corrugated Pipes for Making assembly plate.
The technical solution of the utility model is:
A kind of tunnel liner Steel Corrugated Pipes for Making assembly plate, it includes assembled plate ontology, for radially connected flange and is used for The multiple bolts circumferentially connected, the assembly plate ontology are arc assembly plate, are equipped with along its length on assembled plate ontology upward The wave crest of protrusion and the trough to lower recess, the wave crest and the trough are staggered, and the front and rear ends of assembled plate ontology are equal Equipped with flange, flange is an integral structure with assembled plate ontology, uniformly opens up multiple first on flange in a manner of annular array Through-hole, the left end of assembled plate ontology uniformly open up multiple second through-holes along its length, one affixed on each second through-hole Bolt, the screw rod of bolt are radially directed toward the center of arc assembly plate, and the right end of assembled plate ontology is provided with connecting plate, even Multiple third through-holes are opened up on fishplate bar, the multiple third through-hole is arranged in a one-to-one correspondence with the multiple second through-hole, connecting plate There is the rebound being obliquely installed between assembled plate ontology, the rebound is integral type knot with connecting plate and assembled plate ontology Structure.
Further, straight panel is provided between assembled plate ontology and flange, straight panel is integrated with flange and assembled plate ontology Formula structure, the length of straight panel is L3, L3=47.5mm.
Further, the length of assembled plate ontology is L1, L1=500mm, on assembled plate ontology between two neighboring wave crest away from From for L2, L2=135mm.
Further, the arc length of assembled plate ontology is L6, L6=1570mm.
Further, the ripple of assembled plate ontology is sine wave.
Further, it is affixed by welding between assembled plate ontology and bolt.
Further, the first through hole on flange is alternately distributed on the wave crest and trough of assembled plate ontology, on flange First through hole is circular hole, square hole or waist-shaped hole.
Further, the width of flange is L4, L4=52.5mm.
Further, the centre-to-centre spacing on flange between two neighboring first through hole is L5, L5=157mm.
Further, the third through-hole on connecting plate is circular hole, square hole or waist-shaped hole.
The utility model has the following effects that compared with prior art:
1st, the utility model is the ripple assembly panel products used in non-open type excavation project, the left end of assembled plate ontology Affixed multiple bolts, two neighboring ripple assembly plate, only need to be by the right end connecting plates of assembled plate ontology when carrying out circumferential splicing On the adjacent assembled plate ontology of hole position alignment on bolt end, nut is tightened inside pipeline, connection can be completed.This practicality Novel operating is convenient, is particularly suitable for using in the very narrow non-open type excavation project of the distance between assembled plate and channel.
2nd, the utility model is used for bridge reparation, tunnel Denver Nuggets supporting, highway culvert supporting and vertical shaft supporting.This Utility model carries out gap filling after assembly is completed, using concrete mortar, and wherein concrete mortar has expansion effect, can incite somebody to action Gap is enriched, and there is no need to tamp, is directly tunneled from underground, has been saved the construction time, be effectively improved construction efficiency.
3rd, the utility model is the ripple assembly panel products used in non-open type excavation project, and two neighboring ripple is assembled Plate carry out radially splice when, using flanged Joining Technology, and the through-hole on flange be circular hole, square hole or waist-shaped hole, side Just alignment hole position, installation when, can operate inside pipeline, without exterior space, complete peace inside pipeline completely Dress, effectively extends inner space, does not need to open excavation construction, saved construction time and construction cost, effectively carry High construction efficiency, efficiency improve more than 60%.
4th, traditional non-open type excavates assembled plate when carrying out circumferential flange connection, and flange needs to be welded on the wave of plate Unrestrained end, welding capacity is bigger, and it is long to should be wave length, in the case where environmental requirement is increasingly strict, this production work Skill has a discharge of bigger welding polluted gas, and the flange at the assembled plate ontology both ends of the utility model and assembled plate sheet It is an integral structure between body, saves end welding procedure link, avoid the pollution to air, be conducive to holding for society Supervention exhibition.
5th, the utility model is simple in structure, easy for construction, can be with when inner space is not enough to enter Large Construction equipment It is carried completely using artificial and small instruments and tools, installation corrugated plating, and does not influence construction speed.
Description of the drawings
Fig. 1 is the front view of the utility model;Fig. 2 is the side view of Fig. 1;Fig. 3 is sectional views of the Fig. 1 at A-A;Fig. 4 It is sectional views of the Fig. 1 at B-B;Fig. 5 is the connection diagram of bolt and assembled plate ontology;Fig. 6 is ripple assembly sheet metal forming pipe The front view in road;Fig. 7 is sectional views of the Fig. 6 at C-C;Fig. 8 is the side view of Fig. 6;Fig. 9 is sectional views of the Fig. 8 at D-D; Figure 10 is the axonometric drawing of Fig. 6.
Specific embodiment
Specific embodiment one:Illustrate present embodiment with reference to Fig. 1, Fig. 2, Fig. 3, Fig. 5 to Fig. 9, the one of present embodiment Kind tunnel liner Steel Corrugated Pipes for Making assembly plate, it includes assembled plate ontology 1, for radially connected flange 2 and for circumferential connection Multiple bolts 3, the assembly plate ontology 1 is arc assembly plate, is equipped with what is raised up along its length on assembled plate ontology 1 Wave crest and the trough to lower recess, the wave crest and the trough are staggered, and the front and rear ends of assembled plate ontology 1 are equipped with Flange 2, flange 2 are an integral structure with assembled plate ontology 1, uniformly open up multiple first on flange 2 in a manner of annular array Through-hole 2-1, the left end of assembled plate ontology 1 uniformly open up multiple second through-hole 1-1 along its length, on each second through-hole 1-1 Affixed bolt 3, the screw rod of bolt 3 are radially directed toward the center of arc assembly plate, and the right end of assembled plate ontology 1 is set Connecting plate 4 is equipped with, multiple third through-holes, the multiple third through-hole and the multiple second through-hole 1-1 mono- are opened up on connecting plate 4 One is correspondingly arranged, and has the rebound 5 being obliquely installed between connecting plate 4 and assembled plate ontology 1, the rebound 5 and connecting plate 4 and Assembled plate ontology 1 is an integral structure.
Specific embodiment two:Illustrate present embodiment, the assembled plate ontology 1 and method of present embodiment with reference to Fig. 4 and Fig. 5 Straight panel 6 is provided between orchid 2, straight panel 6 is an integral structure with flange 2 and assembled plate ontology 1, and the length of straight panel 6 is L3, L3= 47.5mm.So set, using there is enough mechanically actuated spaces when being bolted between facilitating flange, mechanically actuated can carry High efficiency.Other compositions and connection relation are same as the specific embodiment one.
Specific embodiment three:Illustrate present embodiment with reference to Fig. 4, the length of the assembled plate ontology 1 of present embodiment is L1, L1=500mm, the distance on assembled plate ontology 1 between two neighboring wave crest are L2, L2=135mm.It is so set, two neighboring Distance between wave crest is that 135mm is optimum distance, is effectively improved the bearing stress and support strength of ripple assembly plate, is increased The service life of ripple assembly plate.Other compositions and connection relation are the same as one or two specific embodiments.
Specific embodiment four:Illustrate present embodiment with reference to Fig. 2, the arc length of the assembled plate ontology 1 of present embodiment is L6, L6=1570mm.So set, the integral multiple of the length can complete a diameter of 1.5 meters, and 2 meters, 2.5 meters, 3 meters, 3.5 meters, 4 Rice, 4.5 meters, 5 meters, 5.5 meters, 6 meters, 6.5 meters, 7 meters of annulus, fixed radian length facilitates the buying of raw material, foundation forms Versatility and a large amount of preprocessings demand.Other compositions and connection relation are identical with specific embodiment one, two or three.
Specific embodiment five:The present embodiment will be described with reference to Fig. 1, and the ripple of the assembled plate ontology 1 of present embodiment is Sine wave.So set, sine wave-shaped sheet is easy to process, production cost is reduced.Other compositions and connection relation and specific reality It is identical to apply mode one, two, three or four.
Specific embodiment six:Illustrate present embodiment with reference to Fig. 3, the assembled plate ontology 1 and bolt 3 of present embodiment it Between it is affixed by welding.So set, bolt 3 is pre-welded in a pre-installation on assembled plate ontology 1, two neighboring wave Line assembly plate, only need to be by the adjacent assembled plate sheet of hole position alignment on the right end connecting plate of assembled plate ontology when carrying out circumferential splicing Bolt end on body tightens nut inside pipeline and connection can be completed, easy for installation.Other compositions and connection relation and tool Body embodiment one, two, three, four or five are identical.
Specific embodiment seven:Illustrate present embodiment with reference to Fig. 2, the first through hole 2-1 on the flange 2 of present embodiment It is alternately distributed on the wave crest and trough of assembled plate ontology 1, the first through hole 2-1 on flange 2 is circular hole, square hole or waist-shaped hole. So set, first through hole 2-1 be alternately distributed on the wave crest and trough of assembled plate ontology 1, avoid maximum stress concentrate position The problem of putting, prevent screw hole by cracking after Stud Pull, reducing corrugated plating damage.It is other composition and connection relation with specifically Embodiment one, two, three, four, five or six are identical.
Specific embodiment eight:Illustrate present embodiment with reference to Fig. 4, the width of the flange 2 of present embodiment is L4, L4= 52.5mm.So set, two neighboring ripple assembly plate carry out radially splice when, using flanged Joining Technology, flange 2 Width be 52.5mm be optimum width, can ensure the radially connected intensity between ripple assembly plate.Other compositions and connection are closed System is identical with specific embodiment one, two, three, four, five, six or seven.
Specific embodiment nine:Illustrate present embodiment with reference to Fig. 2, two neighboring first on the flange 2 of present embodiment Centre-to-centre spacing between through-hole 2-1 is L5, L5=157mm.So set, the centre-to-centre spacing of the two neighboring first through hole 2-1 on flange 2 It is optimum distance for 157mm, can ensures the radially connected intensity between ripple assembly plate.It is other composition and connection relation with specifically Embodiment one, two, three, four, five, six, seven or eight are identical.
Specific embodiment ten:Illustrate present embodiment with reference to Fig. 3, the third through-hole on the connecting plate 4 of present embodiment For circular hole, square hole or waist-shaped hole.So set, facilitate alignment hole position, installation when, can operate inside pipeline, without Exterior space completes installation inside pipeline, effectively extends inner space, do not need to open excavation construction completely, saves Construction time and construction cost, are effectively improved construction efficiency.Other compositions and connection relation and specific embodiment one, 2nd, three, four, five, six, seven, eight or nine are identical.
Operation principle:
The utility model is used for bridge reparation, tunnel Denver Nuggets supporting, highway culvert supporting and vertical shaft supporting.
First, the circumferential splicing of two neighboring ripple assembly plate is carried out, by the hole position on assembled plate ontology right end connecting plate The bolt end of adjacent assembled plate ontology left end is directed at, nut is tightened inside pipeline, two neighboring ripple assembly plate can be completed Circumferential connection.The utility model is easy to operate, is particularly suitable for the very narrow non-open type of the distance between assembled plate and channel It is used in excavation project.
Then, the radial direction splicing of two neighboring ripple assembly plate is carried out, using flanged Joining Technology, and on flange Through-hole is circular hole, square hole or waist-shaped hole, facilitates alignment hole position, and installation when can operate inside pipeline, without outside Space completes installation inside pipeline, effectively extends inner space, do not need to open excavation construction, saved and applied completely Between working hour and construction cost.
Finally, after assembly is completed, gap filling is carried out using concrete mortar, concrete mortar has expansion effect, Gap can be enriched, there is no need to tamp, directly be tunneled from underground, saved the construction time, be effectively improved construction efficiency.

Claims (10)

1. a kind of tunnel liner Steel Corrugated Pipes for Making assembly plate, it is characterised in that:It includes assembled plate ontology (1), for radially connected Flange (2) and multiple bolts (3) for circumferentially connecting, the assembly plate ontology (1) be arc assembly plate, assembled plate ontology (1) wave crest to raise up and the trough to lower recess are equipped on along its length, the wave crest and the trough are staggered, The front and rear ends of assembled plate ontology (1) are equipped with flange (2), and flange (2) is an integral structure with assembled plate ontology (1), flange (2) multiple first through hole (2-1) are uniformly opened up in a manner of annular array, the left end of assembled plate ontology (1) is along its length Uniformly open up multiple second through-holes (1-1), affixed bolt (3) on each second through-hole (1-1), the screw rod of bolt (3) Radially it is directed toward the center of arc assembly plate, the right end of assembled plate ontology (1) is provided with connecting plate (4), on connecting plate (4) Multiple third through-holes are opened up, the multiple third through-hole is arranged in a one-to-one correspondence with the multiple second through-hole (1-1), connecting plate (4) there are the rebound (5) being obliquely installed, the rebound (5) and connecting plate (4) and assembled plate between assembled plate ontology (1) Ontology (1) is an integral structure.
2. a kind of tunnel liner Steel Corrugated Pipes for Making assembly plate according to claim 1, it is characterised in that:Assembled plate ontology (1) Straight panel (6) is provided between flange (2), straight panel (6) is an integral structure with flange (2) and assembled plate ontology (1), straight panel (6) length is L3, L3=47.5mm.
3. a kind of tunnel liner Steel Corrugated Pipes for Making assembly plate according to claim 1 or 2, it is characterised in that:Assembled plate ontology (1) length is L1, L1=500mm, the distance on assembled plate ontology (1) between two neighboring wave crest are L2, L2=135mm.
4. a kind of tunnel liner Steel Corrugated Pipes for Making assembly plate according to claim 3, it is characterised in that:Assembled plate ontology (1) Arc length be L6, L6=1570mm.
5. a kind of tunnel liner Steel Corrugated Pipes for Making assembly plate according to claim 4, it is characterised in that:Assembled plate ontology (1) Ripple be sine wave.
6. a kind of tunnel liner Steel Corrugated Pipes for Making assembly plate according to claim 1 or 5, it is characterised in that:Assembled plate ontology (1) it is affixed by welding between bolt (3).
7. a kind of tunnel liner Steel Corrugated Pipes for Making assembly plate according to claim 1, it is characterised in that:On flange (2) One through-hole (2-1) is alternately distributed on the wave crest and trough of assembled plate ontology (1), and the first through hole (2-1) on flange (2) is circle Hole, square hole or waist-shaped hole.
8. a kind of tunnel liner Steel Corrugated Pipes for Making assembly plate according to claim 7, it is characterised in that:The width of flange (2) For L4, L4=52.5mm.
9. a kind of tunnel liner Steel Corrugated Pipes for Making assembly plate according to claim 1 or 7, it is characterised in that:Phase on flange (2) Centre-to-centre spacing between adjacent two first through hole (2-1) is L5, L5=157mm.
10. a kind of tunnel liner Steel Corrugated Pipes for Making assembly plate according to claim 1, it is characterised in that:On connecting plate (4) Third through-hole is circular hole, square hole or waist-shaped hole.
CN201721789374.1U 2017-12-19 2017-12-19 A kind of tunnel liner Steel Corrugated Pipes for Making assembly plate Expired - Fee Related CN207583384U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721789374.1U CN207583384U (en) 2017-12-19 2017-12-19 A kind of tunnel liner Steel Corrugated Pipes for Making assembly plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721789374.1U CN207583384U (en) 2017-12-19 2017-12-19 A kind of tunnel liner Steel Corrugated Pipes for Making assembly plate

Publications (1)

Publication Number Publication Date
CN207583384U true CN207583384U (en) 2018-07-06

Family

ID=62739064

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721789374.1U Expired - Fee Related CN207583384U (en) 2017-12-19 2017-12-19 A kind of tunnel liner Steel Corrugated Pipes for Making assembly plate

Country Status (1)

Country Link
CN (1) CN207583384U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111926995A (en) * 2019-12-20 2020-11-13 上海华夏波纹钢研究院 Fast-assembling corrugated steel assembling plate
CN114278306A (en) * 2021-12-13 2022-04-05 中铁上海工程局集团市政环保工程有限公司 Micro pipe jacking operation working well supporting structure and construction process thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111926995A (en) * 2019-12-20 2020-11-13 上海华夏波纹钢研究院 Fast-assembling corrugated steel assembling plate
CN114278306A (en) * 2021-12-13 2022-04-05 中铁上海工程局集团市政环保工程有限公司 Micro pipe jacking operation working well supporting structure and construction process thereof

Similar Documents

Publication Publication Date Title
CN201459614U (en) Split type steel corrugated culvert pipe
CN207583384U (en) A kind of tunnel liner Steel Corrugated Pipes for Making assembly plate
CN105064400A (en) Urban comprehensive pipe rack of steel corrugated plate structure
CN104265306A (en) Municipal shield tunnel
CN205716040U (en) A kind of assembled corrugated steel composite steel-concrete piping lane
CN104131821A (en) Shield tunnel external groove sheathing groove structure and fixing method of shield tunnel external groove sheathing groove structure
CN109441490B (en) Quick-mounting and dismounting stacked shield modular steel support reinforcing structure
CN102877682A (en) Anticorrosion device of thermal power chimney and construction method for anticorrosion device
CN104455889A (en) Integrated underground pipe gallery with compensation device
CN205387716U (en) Communication tower pipe pile foundation
CN205954678U (en) Prefabricated utility tunnel hoisting point structure of assembled
CN204113295U (en) A kind of municipal shield tunnel
CN107700494B (en) Deep foundation pit steel pipe inner support prestress applying device
CN206591901U (en) The titanium steel inner cylinder that can be connected with flange
CN106480906B (en) Feed intake storehouse and the connection structure of standard block tube coupling and the pipe gallery of changes of section
CN211421160U (en) Assembled transmission line shaft tower basis
CN212563268U (en) Grid type steel-concrete combined roof pipe structure
CN211524871U (en) Mining variable cross-section air duct structure
CN204113300U (en) Municipal tunnel
CN207775933U (en) A kind of pipe gallery temporary plugging wall construction
CN202989788U (en) Inner supporting member for steel corrugated culvert
CN214301845U (en) Support type integrated pipe trench with embedded pipeline
CN111335139A (en) Temporary connection structure for steel pipe arch ring segments
CN201461702U (en) Circumferential and longitudinal segment fastener
CN216811704U (en) Assembled tunnel segment anti-deformation reinforcing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180706

Termination date: 20201219