CN207583081U - A kind of bridge construction guardrail with destruction-proof function - Google Patents

A kind of bridge construction guardrail with destruction-proof function Download PDF

Info

Publication number
CN207583081U
CN207583081U CN201721579505.3U CN201721579505U CN207583081U CN 207583081 U CN207583081 U CN 207583081U CN 201721579505 U CN201721579505 U CN 201721579505U CN 207583081 U CN207583081 U CN 207583081U
Authority
CN
China
Prior art keywords
fixedly connected
guardrail
fixing sleeve
bridge construction
destruction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721579505.3U
Other languages
Chinese (zh)
Inventor
杨丹丹
王定明
张贺玲
张振涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721579505.3U priority Critical patent/CN207583081U/en
Application granted granted Critical
Publication of CN207583081U publication Critical patent/CN207583081U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model is related to equipment for bridge construction technical fields, and disclose a kind of bridge construction guardrail with destruction-proof function, including heavy object box, the front of the heavy object box offers feed inlet and card slot respectively, and card slot is located at the right of feed inlet, the front and the side of cover board of the heavy object box are hinged, and the opposite side of the cover board is fixedly connected with the side being buckled, the top of the heavy object box is fixedly connected with the bottom of guardrail board, and the side of the guardrail board is fixedly connected with the side of link.The bridge construction guardrail with destruction-proof function, the positioning sleeve being fixedly connected by the first fixing sleeve that guardrail board front is fixedly connected with inserted link side, the locating rod of grafting in the second fixing sleeve and jack that cooperation guardrail board front is fixedly connected, inserted link side is inserted into the second fixing sleeve, locating rod is inserted into positioning sleeve again, external staff can be avoided to dismantle guardrail, achieve the effect that prevent external staff from dismantling guardrail.

Description

A kind of bridge construction guardrail with destruction-proof function
Technical field
The utility model is related to equipment for bridge construction technical field, specially a kind of bridge construction with destruction-proof function Use guardrail.
Background technology
Bridge construction is the process that bridge is built according to design content, refers mainly to bridge Construction Technology and construction organization, applies The contents such as work management, construction quality, bridge construction with fence be in bridge construction process, by construction site with it is external temporarily every The device left;It is required for using construction fence in bridge construction and maintenance process at present, and the group generally used now Box-like building fence since package assembly is simple, in use, is often destroyed by non-bridge construction personnel, is influenced Bridge construction is normally carried out.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of bridge construction shield with destruction-proof function Column has the advantages of preventing from destroying, solves the problems, such as to mention in above-mentioned background technology.
(2) technical solution
To realize the above-mentioned purpose for preventing from destroying, the utility model provides following technical solution:One kind has tamper-proof work( The bridge construction guardrail of energy, including heavy object box, the front of the heavy object box offers feed inlet and card slot, and slot respectively In the right of feed inlet, the front and the side of cover board of the heavy object box are hinged, the side of the opposite side and buckle of the cover board It is fixedly connected, the top of the heavy object box is fixedly connected with the bottom of guardrail board, the side of the guardrail board and the side of link It is fixedly connected, the opposite side of the guardrail board is fixedly connected with the side linked up with, front and the first fixing sleeve of the guardrail board The back side be fixedly connected, the surface of the inner wall of first fixing sleeve and inserted link is socketed, the side of the inserted link and first baffle Side be fixedly connected, the opposite side of the inserted link is fixedly connected with the side of positioning sleeve, and the front of the guardrail board is with second The back side of fixing sleeve is fixedly connected, and the second fixing sleeve is located at the left of the first fixing sleeve, and second fixing sleeve is by opening up The bottom grafting of jack and locating rod at the top of it, the top of the locating rod are fixedly connected with the bottom of second baffle, institute The back side for stating guardrail board is fixedly connected with the front of warning panel.
Preferably, the back side of the warning panel is equidistant is fixedly connected with reflecting strips, and the position of the hook and link is put down Row.
Preferably, the quantity of the hook is two, and two hook parallel distributions.
Preferably, the cover board is adapted with the size of feed inlet, and the locating rod is adapted with the size of positioning sleeve.
Preferably, the buckle is adapted with the size of card slot, and it is opposite with the position of card slot to be buckled.
Preferably, first fixing sleeve is identical with the size of the second fixing sleeve, and the first fixing sleeve and the second fixing sleeve Position it is parallel.
(3) advantageous effect
Compared with prior art, the utility model provides a kind of bridge construction guardrail with destruction-proof function, tool Standby following advantageous effect:
1st, should have the bridge construction guardrail of destruction-proof function, the first fixing sleeve being fixedly connected by guardrail board front The positioning sleeve being fixedly connected with inserted link side, grafting determines in the second fixing sleeve and jack that cooperation guardrail board front is fixedly connected Position bar, inserted link side is inserted into the second fixing sleeve, then locating rod is inserted into positioning sleeve, and external staff can be avoided to dismantle shield Column has achieved the effect that prevent external staff from dismantling guardrail.
It 2nd, should the bridge construction guardrail with destruction-proof function, the heavy object box being fixedly connected by guardrail board bottom and shield The link that breast board side is fixedly connected, the hook that cooperation guardrail board side is fixedly connected successively mount hook with link, can Multiple guardrail boards are connected together, ease of assembly, weight can be filled in heavy object box, ensure the stabilization of guardrail.
Description of the drawings
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the schematic rear view of the utility model structure.
In figure:1 heavy object box, 2 feed inlets, 3 card slots, 4 cover boards, 5 buckles, 6 guardrail boards, 7 links, 8 hooks, 9 first are fixed Set, 10 inserted links, 11 first baffles, 12 positioning sleeves, 13 second fixing sleeves, 14 jacks, 15 locating rods, 16 second baffles, 17 warnings Plate.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work All other embodiments obtained shall fall within the protection scope of the present invention.
Please refer to Fig.1-2, a kind of bridge construction guardrail with destruction-proof function, including heavy object box 1, heavy object box 1 Front offers feed inlet 2 and card slot 3 respectively, and card slot 3 is located at the right of feed inlet 2, front and the cover board 4 of heavy object box 1 Side is hinged, and cover board 4 is adapted with the size of feed inlet 2, and the opposite side of cover board 4 is fixedly connected with the side of buckle 5, buckle 5 It is adapted with the size of card slot 3, and buckle 5 is opposite with the position of card slot 3, the top and the bottom of guardrail board 6 of heavy object box 1 are fixed Connection, the side of guardrail board 6 are fixedly connected with the side of link 7, and the opposite side of guardrail board 6 is fixedly connected with the side of hook 8, Hook 8 is parallel with the position of link 7, and the quantity for linking up with 8 is two, and two 8 parallel distributions of hook, passes through 6 bottom of guardrail board The link 7 that the heavy object box 1 being fixedly connected is fixedly connected with 6 side of guardrail board, the hook 8 that 6 side of cooperation guardrail board is fixedly connected, Hook 8 is mounted with link 7, in use, successively hanging the hook 8 of a construction guardrail and the link 7 of another construction guardrail It is connected together, bridge construction guardrail is assembled, multiple guardrail boards 6 can be connected together, ease of assembly utilizes weight The feed inlet 2 that 1 front of case opens up can fill weight into heavy object box 1 from feed inlet 2, then cover board 4 is covered conjunction, can in heavy object box 1 To fill weight, ensure the stabilization of guardrail, and can prevent external non-construction personnel from carrying guardrail, the front and first of guardrail board 6 The back side of fixing sleeve 9 is fixedly connected, and the inner wall of the first fixing sleeve 9 is socketed with the surface of inserted link 10, the side of inserted link 10 and first The side of baffle 11 is fixedly connected, and the opposite side of inserted link 10 is fixedly connected with the side of positioning sleeve 12, the front and the of guardrail board 6 The back side of two fixing sleeves 13 is fixedly connected, and the second fixing sleeve 13 is located at the left of the first fixing sleeve 9, the first fixing sleeve 9 and The size of two fixing sleeves 13 is identical, and the first fixing sleeve 9 is parallel with the position of the second fixing sleeve 13, and the second fixing sleeve 13 is by opening The bottom grafting of the jack 14 and locating rod 15 at the top of it is located at, locating rod 15 is adapted with the size of positioning sleeve 12, locating rod 15 top is fixedly connected with the bottom of second baffle 16, and the back side of guardrail board 6 is fixedly connected with the front of warning panel 17, warning The back side of plate 17 is equidistant to be fixedly connected with reflecting strips, the first fixing sleeve 9 and inserted link 10 being fixedly connected by 6 front of guardrail board The positioning sleeve 12 that side is fixedly connected coordinates grafting in the second fixing sleeve 13 and jack 14 that 6 front of guardrail board is fixedly connected Locating rod 15, in use, 10 side of inserted link is inserted into the second fixing sleeve 13, then locating rod 15 is inserted into positioning sleeve 12, it is fixed Position bar 15 and positioning sleeve 12 play good fixed function, external staff can be avoided to dismantle guardrail, having reached prevents outside Personnel dismantle the effect of guardrail, the bridge construction protective fence, are skillfully constructed rationally, flexible and convenient to use, simplicity swift to operate, The package assembly of guardrail is strengthened, solves the problems, such as that existing building guardrail is easily destroyed by external non-construction personnel.
When in use, the extension being fixedly connected first with the heavy object box 1 that 6 bottom of guardrail board is fixedly connected with 6 side of guardrail board Ring 7, the hook 8 that 6 side of cooperation guardrail board is fixedly connected, the hook 8 of a guardrail and the link 7 of another guardrail are articulated in Together, bridge construction guardrail is assembled, recycles the first fixing sleeve 9 and inserted link 10 1 that 6 front of guardrail board is fixedly connected The positioning sleeve 12 that side is fixedly connected, grafting determines in the second fixing sleeve 13 and jack 14 that cooperation guardrail board 6 front is fixedly connected Position bar 15, inserted link 10 is inserted into the second fixing sleeve 13, then locating rod 15 is injected in positioning sleeve 12, prevent non-construction personnel from Guardrail is destroyed in outside.
In conclusion should bridge construction guardrail with destruction-proof function, the be fixedly connected by 6 front of guardrail board The positioning sleeve 12 that one fixing sleeve 9 is fixedly connected with 10 side of inserted link, the second fixing sleeve 13 that 6 front of cooperation guardrail board is fixedly connected With the locating rod 15 of grafting in jack 14,10 side of inserted link is inserted into the second fixing sleeve 13, then locating rod 15 is inserted into positioning In set 12, external staff can be avoided to dismantle guardrail, achieve the effect that prevent external staff from dismantling guardrail, pass through guardrail board 6 The link 7 that the heavy object box 1 that bottom is fixedly connected is fixedly connected with 6 side of guardrail board, the extension that 6 side of cooperation guardrail board is fixedly connected Hook 8 with link 7 is mounted, can connected together multiple guardrail boards 6, ease of assembly by hook 8 successively, can be in heavy object box 1 Weight is filled, ensures the stabilization of guardrail.
It should be noted that herein, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any this practical relationship or sequence.Moreover, term " comprising ", "comprising" or its any other variant are intended to Non-exclusive inclusion, so that process, method, article or equipment including a series of elements not only will including those Element, but also including other elements that are not explicitly listed or further include as this process, method, article or equipment Intrinsic element.
While there has been shown and described that the embodiment of the utility model, for the ordinary skill in the art, It is appreciated that can these embodiments be carried out with a variety of variations in the case of the principle and spirit for not departing from the utility model, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of bridge construction guardrail with destruction-proof function, including heavy object box (1), it is characterised in that:The heavy object box (1) front offers feed inlet (2) and card slot (3), and card slot (3) is positioned at the right of feed inlet (2), the heavy object box respectively (1) front and the side of cover board (4) is hinged, and the opposite side of the cover board (4) is fixedly connected with the side of buckle (5), described The top of heavy object box (1) is fixedly connected with the bottom of guardrail board (6), and the side and the side of link (7) of the guardrail board (6) are consolidated Fixed connection, the opposite side of the guardrail board (6) are fixedly connected with the side of hook (8), the front and first of the guardrail board (6) The back side of fixing sleeve (9) is fixedly connected, and the inner wall of first fixing sleeve (9) is socketed with the surface of inserted link (10), the inserted link (10) side is fixedly connected with the side of first baffle (11), the opposite side of the inserted link (10) and the side of positioning sleeve (12) It is fixedly connected, the front of the guardrail board (6) is fixedly connected, and the second fixing sleeve (13) position with the back side of the second fixing sleeve (13) In the left of the first fixing sleeve (9), second fixing sleeve (13) passes through the jack (14) and the locating rod that are opened at the top of it (15) bottom grafting, the top of the locating rod (15) are fixedly connected with the bottom of second baffle (16), the guardrail board (6) The back side be fixedly connected with the front of warning panel (17).
2. a kind of bridge construction guardrail with destruction-proof function according to claim 1, it is characterised in that:The police Show that the back side of plate (17) is equidistant and be fixedly connected with reflecting strips, the hook (8) is parallel with the position of link (7).
3. a kind of bridge construction guardrail with destruction-proof function according to claim 1, it is characterised in that:The extension The quantity of hook (8) is two, and two hook (8) parallel distributions.
4. a kind of bridge construction guardrail with destruction-proof function according to claim 1, it is characterised in that:The lid Plate (4) is adapted with the size of feed inlet (2), and the locating rod (15) is adapted with the size of positioning sleeve (12).
5. a kind of bridge construction guardrail with destruction-proof function according to claim 1, it is characterised in that:The card Button (5) is adapted with the size of card slot (3), and buckle (5) is opposite with the position of card slot (3).
6. a kind of bridge construction guardrail with destruction-proof function according to claim 1, it is characterised in that:Described One fixing sleeve (9) is identical with the size of the second fixing sleeve (13), and the first fixing sleeve (9) and the position of the second fixing sleeve (13) are put down Row.
CN201721579505.3U 2017-11-23 2017-11-23 A kind of bridge construction guardrail with destruction-proof function Expired - Fee Related CN207583081U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721579505.3U CN207583081U (en) 2017-11-23 2017-11-23 A kind of bridge construction guardrail with destruction-proof function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721579505.3U CN207583081U (en) 2017-11-23 2017-11-23 A kind of bridge construction guardrail with destruction-proof function

Publications (1)

Publication Number Publication Date
CN207583081U true CN207583081U (en) 2018-07-06

Family

ID=62732987

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721579505.3U Expired - Fee Related CN207583081U (en) 2017-11-23 2017-11-23 A kind of bridge construction guardrail with destruction-proof function

Country Status (1)

Country Link
CN (1) CN207583081U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110847694A (en) * 2019-10-22 2020-02-28 李文忠 A rail device that is used for on building site can fast assembly intelligent control
CN110965503A (en) * 2019-12-17 2020-04-07 江苏国强镀锌实业有限公司 Highway guardrail plate is with preventing block

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110847694A (en) * 2019-10-22 2020-02-28 李文忠 A rail device that is used for on building site can fast assembly intelligent control
CN110965503A (en) * 2019-12-17 2020-04-07 江苏国强镀锌实业有限公司 Highway guardrail plate is with preventing block

Similar Documents

Publication Publication Date Title
CN207583081U (en) A kind of bridge construction guardrail with destruction-proof function
CN205604300U (en) Apron device
CN206102076U (en) Concatenation formula supporter
CN204178468U (en) With the express box of Quick Response Code scanning
CN207878899U (en) A kind of fall arrest construction holder
CN108797353A (en) A kind of bridge construction protective device
CN105258570B (en) Combined shield
CN205894636U (en) Cage device for high-altitude welding operation of steel structure
CN205758074U (en) A kind of shelf with base
CN109005650A (en) A kind of anti-interference electronic communication device
CN207988539U (en) A kind of construction guardrail
CN209708529U (en) A kind of spliced LED display
CN206957253U (en) A kind of alloy safety net
CN207499389U (en) Outrigger protective device
CN207974544U (en) Outer wall template steel pipe storing unit
CN209171825U (en) Laminate support construction and its shelf for shelf
CN208871830U (en) A kind of air-conditioning system for being easily installed and safeguarding
CN206620972U (en) The convenient construction costs kit of one kind office
CN207186421U (en) A kind of universal showcase
CN207568319U (en) A kind of municipal construction protective fence
CN205466127U (en) Take combination formula longmen climbing frame of emergency exit
CN206516259U (en) A kind of gardens caution board
CN206189832U (en) Novel disk scaffold frame
CN207467938U (en) A kind of elevator and escalator installation maintenance protective fence
CN206107516U (en) Built on stilts frame of combination formula belt suitable for boats and ships

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180706

Termination date: 20181123