CN207568291U - A kind of communication tower fastening positioning rigging pilotage nail - Google Patents
A kind of communication tower fastening positioning rigging pilotage nail Download PDFInfo
- Publication number
- CN207568291U CN207568291U CN201721347918.9U CN201721347918U CN207568291U CN 207568291 U CN207568291 U CN 207568291U CN 201721347918 U CN201721347918 U CN 201721347918U CN 207568291 U CN207568291 U CN 207568291U
- Authority
- CN
- China
- Prior art keywords
- main body
- connecting seat
- reinforcement
- body connecting
- communication tower
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Butt Welding And Welding Of Specific Article (AREA)
Abstract
The utility model is related to communication tower structural member technical field more particularly to a kind of communication tower fastening positioning rigging pilotage nails.The technical solution adopted in the utility model is:Including main body connecting seat, the left and right sides of main body connecting seat is symmetrical arc-shaped structure, the width in the centre position of main body connecting seat is more than the width of the right and left, the front-rear direction in main body connecting seat centre position is respectively equipped with a symmetrical connection circular arc, two connection circular arcs are linked together with two arc-shaped structures by connecting plane respectively, angle between the connection plane of arc-shaped structure leftward position is into 35 degree, and the angle between the connection plane of arc-shaped structure front position is into 145 degree.The utility model has the advantages that:In a manner that multistage is assembled together with communication tower welding structural element assembly connection, it is then made firmly to become an overall structure with communication tower by welding, the fastness for making them is more preferable, and safety is more reliable when in use.
Description
Technical field
The utility model is related to communication tower structural member technical field more particularly to a kind of fastening positioning rigging pilotages of communication tower
Nail.
Background technology
Communication tower belongs to one kind of signal transmitting tower, is also signal transmitting tower or signal tower, and major function supports signal, is
Signal transmitting antenna supports, for moving, unicom, telecommunications, the communication sections such as traffic global position system (GPS).With section
The continuous development of technology, the communications field have also obtained quick development, in order to make communication overlay area wider, signal of communication money
Source is stronger, needs to set a variety of communication tower structures in different environment.The volume of communication tower is bigger, passes through weldering in production
The mode connect assembles, and is then finally made up of complete communication tower structure the combination connecting mode of multiple units again.
Utility model content
The purpose of this utility model is to provide a kind of communication tower fastening positioning rigging pilotage nail, it is in a manner that multistage is assembled
Together with communication tower welding structural element assembly connection, it is then made firmly to become one with communication tower by welding
Overall structure by rational structure design, enables during welding it be connect with the weldment of communication tower even closer, so as to make
Fastness after welding is more preferable, also makes welding process more convenient, and progress bonding accuracy more direct than traditional approach is more remembered, welds
Effect is more preferable, efficiency also higher.
The technical solution of the utility model is as follows:
A kind of communication tower fastening positioning rigging pilotage nail, it is characterised in that:Including main body connecting seat, the main body connecting seat
The left and right sides is symmetrical arc-shaped structure, and the width in the centre position of the main body connecting seat is more than the width of the right and left
Degree, the front-rear direction in the main body connecting seat centre position are respectively equipped with a symmetrical connection circular arc, two connection circles
Arc is linked together with two arc-shaped structures by connecting plane respectively, the connection of the arc-shaped structure leftward position
Angle between plane is into 35 degree, and angle between the connection plane of the arc-shaped structure front position is into 145 degree, the master
Body connecting seat lower face center is equipped with cylinder-shaped body assembles post, and the main body assembles post is connect with the main body connecting seat
Position be equipped with cylindrical reinforcement connecting pole, the bottom centre position of the main body assembles post is equipped with cylindrical assembling positioning column,
The diameter of the assembling positioning column is less than the diameter of the main body assembles post, and the main body connecting seat upper surface left and right sides is respectively
If there are one cylindrical weld reinforced hole, two reinforcement of weld holes are located at the left and right sides of the main body assembles post respectively,
The lower end position in the reinforcement of weld hole is equipped with cylinder and reversely reinforces slot, and the reversed depth for reinforcing slot is that the welding adds
The half of solid hole depth, the main body connecting seat upper periphery position are equipped with reinforcement of weld groove of same size, the welding
It reinforces groove to communicate with the lateral surface of the main body connecting seat, the reinforcement of weld groove is located at the outer of the reinforcement of weld hole
Side.
Further, the depth of the reinforcement of weld groove is identical with the height for reinforcing connecting pole.
Further, the depth of the reinforcement of weld groove is 1/3rd of the main body connecting seat thickness.
Further, the length of the main body assembles post is assemble positioning column length 3 times.
The beneficial effects of the utility model:
The utility model together with communication tower welding structural element assembly connection, then passes through in a manner that multistage is assembled
The mode of welding makes it firmly become an overall structure with communication tower, and the fastness for making them is more preferable, when in use safety
Property is more reliable.
Description of the drawings
Fig. 1 is the dimensional structure diagram of the utility model;
Fig. 2 is the front schematic view of the utility model;
Fig. 3 is the leftschematic diagram of the utility model;
Fig. 4 is the schematic top plan view of the utility model;
Fig. 5 is the elevational schematic view of the utility model;
Fig. 6 is the dimensional structure diagram of the utility model second direction;
In figure:1st, main body connecting seat, 2, main body assembles post, 3, reinforce connecting pole, 4, assembling positioning column, 5, reinforcement of weld
Hole, 6, reversely reinforce slot, 7, reinforcement of weld groove.
Specific embodiment
As shown in Figures 1 to 6, a kind of communication tower fastening positioning rigging pilotage nail, its overall construction intensity is more preferable, applies
It can make the fastness of communication tower more preferable on communication tower, be more convenient in production.It using multistage assemble by the way of and communication tower
Welding structural element assembly connection together, then makes it firmly become an entirety knot with communication tower by welding
Structure by rational structure design, enables during welding it be connect with the weldment of communication tower even closer, after making welding
Fastness it is more preferable, also make welding process more convenient, it is more direct than traditional approach progress bonding accuracy more remember that welding effect is more
It is good, efficiency also higher.It includes main body connecting seat 1, and the left and right sides of the main body connecting seat 1 is symmetrical arc-shaped knot
Structure is more convenient, it is easier to process, and the being completely embedded property when coordinating with communication tower is more preferable, then is welded in production
Leakproofness afterwards is more reliable.The width in the centre position of the main body connecting seat 1 is more than the width of the right and left, can make centre
The bonding strength of position is more preferable.The front-rear direction in 1 centre position of main body connecting seat is respectively equipped with a symmetrical connection circle
Arc, symmetrical structure can make it more convenient in use.Two connection circular arcs and two arc-shaped structures
Linked together respectively by connecting plane, the angle between the connection plane of the arc-shaped structure leftward position into 35 degree,
Angle between the connection plane of the arc-shaped structure front position makes overall construction intensity more preferable, makes connection strong into 145 degree
Solidity is more reliable.The 1 lower face center of main body connecting seat is equipped with cylinder-shaped body assembles post 2, it is welded with communication tower
The location hole of structure is assembled together, and enables the welded position of communication tower more accurate, makes positional precision during welding
More preferably.The position that the main body assembles post 2 is connect with the main body connecting seat 1 is equipped with cylindrical reinforcement connecting pole 3, and main body is filled
Certain reinforcement effect is played with column 2.The bottom centre position of the main body assembles post 2 is equipped with cylindrical assembling positioning column 4, it
Wear to the other end of communication tower location hole, in this way can when the other end is welded fastness it is more preferable.The assembling positioning column 4
Diameter be less than the main body assembles post 2 diameter, 1 upper surface of main body connecting seat is respectively arranged on the left side and the right side a cylinder
Shape reinforcement of weld hole 5, by carrying out reinforcing welding in this position and communication tower, the fastness for making welding is more secure.Two
A reinforcement of weld hole 5 is located at the left and right sides of the main body assembles post 2, the lower end position in the reinforcement of weld hole 5 respectively
Slot 6 is reversely reinforced equipped with cylindrical, when being welded, welding, which uses first flow under the action of high temperature, reversely reinforces slot 6
In, in this way after reinforcement of weld hole 5 has been welded, the inside connectivity robustness for making it is more preferable.It is described it is reversed reinforce slot 6 depth be
The half of 5 depth of reinforcement of weld hole, it is recessed that the 1 upper periphery position of main body connecting seat is equipped with reinforcement of weld of same size
Slot 7, the reinforcement of weld groove 7 are communicated with the lateral surface of the main body connecting seat 1, and the reinforcement of weld groove 7 is located at described
The outside in reinforcement of weld hole 5, after when being welded, reinforcement of weld groove 7 may insure welding, welding position will not protrude knot
The surface of component, the planarization for making welding position is more preferable, is also the further guarantee to welding fastness in this way.
Preferably, the depth of the reinforcement of weld groove 7 is identical with the height for reinforcing connecting pole 3, make structure
Overall stability is more preferable, and safety is relatively reliable when in use.
Preferably, the depth of the reinforcement of weld groove 7 is 1/3rd of 1 thickness of main body connecting seat, it is described
The length of main body assembles post 2 is 3 times of assembling 4 length of positioning column, makes the structure connectivity of part in itself more preferable, structure sheet
The intensity higher of body, the reliability when carrying out positioning welding are more secure.
The above is the preferred embodiment of the utility model, it is noted that for the ordinary skill of the art
For personnel, under the premise of principle described in the utility model is not departed from, several improvement or replacement can also be made, these improvement
Or it replaces and also should be regarded as the scope of protection of the utility model.
Claims (4)
1. a kind of communication tower fastening positioning rigging pilotage nail, it is characterised in that:Including main body connecting seat (1), the main body connecting seat
(1) the left and right sides is symmetrical arc-shaped structure, and the width in the centre position of the main body connecting seat (1) is more than left and right
The width on both sides, the front-rear direction in main body connecting seat (1) centre position are respectively equipped with a symmetrical connection circular arc, two
The connection circular arc is linked together with two arc-shaped structures by connecting plane respectively, on the left of the arc-shaped structure
Angle between the connection plane of position into 35 degree, angle between the connection plane of the arc-shaped structure front position into
145 degree, main body connecting seat (1) the lower face center is equipped with cylinder-shaped body assembles post (2), the main body assembles post
(2) position being connect with the main body connecting seat (1) is equipped with cylindrical reinforcement connecting pole (3), the bottom of the main body assembles post (2)
Portion center is equipped with cylindrical assembling positioning column (4), and the diameter of the assembling positioning column (4) is less than the main body assembles post
(2) diameter, main body connecting seat (1) upper surface are respectively arranged on the left side and the right side a cylindrical weld reinforced hole (5), two
The reinforcement of weld hole (5) is located at the left and right sides of the main body assembles post (2), the lower end of the reinforcement of weld hole (5) respectively
Position is equipped with cylindrical reversely reinforcing slot (6), and the reversed depth for reinforcing slot (6) is reinforcement of weld hole (5) depth
Half, main body connecting seat (1) the upper periphery position are equipped with reinforcement of weld groove (7) of same size, the reinforcement of weld
Groove (7) is communicated with the lateral surface of the main body connecting seat (1), and the reinforcement of weld groove (7) is positioned at the reinforcement of weld hole
(5) outside.
2. a kind of communication tower fastening positioning rigging pilotage nail according to claim 1, it is characterised in that:The reinforcement of weld is recessed
The depth of slot (7) is identical with the height of the reinforcing connecting pole (3).
3. a kind of communication tower fastening positioning rigging pilotage nail according to claim 1, it is characterised in that:The reinforcement of weld is recessed
The depth of slot (7) is 1/3rd of main body connecting seat (1) thickness.
4. a kind of communication tower fastening positioning rigging pilotage nail according to claim 1, it is characterised in that:The main body assembles post
(2) length is 3 times of described assembling positioning column (4) length.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721347918.9U CN207568291U (en) | 2017-10-18 | 2017-10-18 | A kind of communication tower fastening positioning rigging pilotage nail |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721347918.9U CN207568291U (en) | 2017-10-18 | 2017-10-18 | A kind of communication tower fastening positioning rigging pilotage nail |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207568291U true CN207568291U (en) | 2018-07-03 |
Family
ID=62695552
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721347918.9U Expired - Fee Related CN207568291U (en) | 2017-10-18 | 2017-10-18 | A kind of communication tower fastening positioning rigging pilotage nail |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207568291U (en) |
-
2017
- 2017-10-18 CN CN201721347918.9U patent/CN207568291U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103161223A (en) | Anti-pulling embedded-type gate-type steel frame steel-joint column foot and construction method thereof | |
CN207568291U (en) | A kind of communication tower fastening positioning rigging pilotage nail | |
CN202577609U (en) | Hinged joint of reinforced concrete frame structure and reinforced steel support | |
CN206693403U (en) | A kind of steel core concrete column and connected mode | |
CN205857147U (en) | A kind of FRP composite and coral concrete foundation structure system | |
CN106181190A (en) | A kind of tank filler tube weld jig for fork truck | |
CN207934904U (en) | A kind of connection structure for double-deck lining cutting duct pieces of shield tunnel and liner | |
CN202945602U (en) | Tubular pile fast-connecting joint | |
CN203462651U (en) | Insertion directly-embedded type steel truss connecting structure | |
CN202324198U (en) | Anti-pulling embedded fixed column base for portal-rigid frame | |
CN205134738U (en) | Precast concrete post | |
CN207568292U (en) | A kind of communication tower top connects support element | |
CN203361469U (en) | Butting structure of box type columns or box type beams | |
CN209125219U (en) | A kind of guardrail connection calibration seat peculiar to vessel | |
CN207960101U (en) | A kind of convenient connection supporting rack of communication tower | |
CN207829208U (en) | A kind of connection structure of the prefabricated steel tube shear horizontal joint with otic placode | |
CN106121038A (en) | A kind of prestressing force cable body anchorage ball node | |
CN207274680U (en) | Straddle type monorail vehicle and its end column | |
CN207568290U (en) | A kind of communication tower consolidates support connection member | |
CN207564428U (en) | A kind of communication tower top solder fastening tool hammer | |
CN205530679U (en) | Assembled circular steel tube truss passes through node mutually | |
CN209129453U (en) | A kind of communication tower stabilization protective connecting plate | |
CN202509489U (en) | Prefabricated concrete pile end head plate facilitating connection of piles | |
CN204690736U (en) | There is the preformed pile of end connecting | |
CN204238115U (en) | A kind of combined structure of hybrid beam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180703 Termination date: 20211018 |