CN207568184U - Biconial through-wall bolt casing - Google Patents
Biconial through-wall bolt casing Download PDFInfo
- Publication number
- CN207568184U CN207568184U CN201721619014.7U CN201721619014U CN207568184U CN 207568184 U CN207568184 U CN 207568184U CN 201721619014 U CN201721619014 U CN 201721619014U CN 207568184 U CN207568184 U CN 207568184U
- Authority
- CN
- China
- Prior art keywords
- casing
- sleeve
- biconial
- wall bolt
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
Biconial through-wall bolt casing described in the utility model includes first sleeve, the second casing.First sleeve and the second casing are the round platform with axially extending bore, and first sleeve and the second casing are coaxially arranged, and first sleeve, the second casing are detachably connected in upper end surface.The lower face of first sleeve and the second casing is equipped with dismounting bayonet.The utility model has the characteristics that convenient disassembly, reusable, long lifespan compared with existing through-wall bolt casing, so as to reduce the cost of building.
Description
Technical field
The utility model relates generally to a kind of biconial through-wall bolt casing.
Background technology
During present concrete works pouring construction, there are mainly two types of prick post wall screw casings:One, common column spiral shell through walls
Bolt casing, such column bolt sleeve length through walls are 3-4 meters, and construction site according to demand, manually cuts into 20-40 centimeters, holds
Easily leave the extra material that can not be used.When concrete slab wall column formwork for placing is installed, by will manually meet concrete slab
The common through-wall bolt casing of wall column size requirement carries out reinforcing use, and common through-wall bolt casing both ends need to add end cap.
It is easily damaged in casting concrete because common through-wall bolt casing strength is low after the completion of pouring, lead to common through-wall bolt set
Pipe can not be extracted.And both ends end cap need to be rejected manually, end cap can not recycle, and increase labour cost and material cost in this way;
Two, single taper through-wall bolt casing needs, with end cap, after the completion of concrete board wall pours, to need to make list using specific purpose tool
Taper through-wall bolt casing is detached, design in this way makes through-wall bolt casing cost by larger impact force with concrete wall
It is high, can recycle, but dismantle inconvenient, and assign the larger impact force of single taper through-wall bolt casing and make itself and concrete
The mode of wall separation causes single taper through-wall bolt Service Life of Casing shorter.
Therefore, it is necessary to design a kind of Novel bolt casing, have it is reusable, be not required to reprocessing can be used directly, just
In dismounting, service life is long the characteristics of, so as to reduce labour cost and material cost.
Utility model content
In order to solve the above technical problems, the utility model adopts the following technical solution:
Biconial through-wall bolt casing includes first sleeve, the second casing;The first sleeve, the second casing are tool
There is the round platform of axially extending bore, the first sleeve, the second casing are coaxially arranged, and first sleeve, the second casing are in upper end surface
It is detachably connected, the lower face of the first sleeve is equipped with the first dismounting bayonet, and the lower face of second casing is equipped with second
Dismantle bayonet.
It is using the advantageous effect of above-mentioned technical proposal:During wallboard is poured, both ensured that through-wall bolt was complete with cement
It separates entirely, and easy to disassemble, reduction engineering cost may be reused.
Preferably, the first sleeve is identical with the second casing length.
It is using the advantageous effect of above-mentioned technical proposal:The depth that first sleeve, the second casing are inserted into cement is the same, by the
Sleeve, that the second casing detaches required power with cement wall is relatively small.
Preferably, the upper surface of the first sleeve is equipped with annular protrusion, and the upper surface of second casing is equipped with annular
Groove, the annular protrusion and annular groove are mating.
It is using the advantageous effect of above-mentioned technical proposal:Can ensure first sleeve, the second casing is bonded can be very
The good cement that makes is separated with through-wall bolt, and can guarantee that first sleeve rotates rotation with the second casing under the assistance of electric tool
Go out.
Preferably, the first dismounting bayonet and the second dismounting bayonet are interior hexagonal groove.
It is using the advantageous effect of above-mentioned technical proposal:First dismounting bayonet and the second dismounting bayonet are interior hexagonal groove,
Convenient for being used cooperatively with existing extracting tool, ensure that extracting tool can easily make biconial through-wall bolt casing and wall
Separation.
Preferably, the first sleeve, the taper of the second casing are identical, and taper is 3 ° to 8 °.
It is using the advantageous effect of above-mentioned technical proposal:First sleeve, the taper of the second casing are identical, taper be 3 ° extremely
8 °, the area smaller that biconial through-wall bolt casing can be made to be contacted with wall makes biconial through-wall bolt casing so as to reduce
Required power is detached with wall, the abrasion of biconial through-wall bolt casing is reduced, increases its service life.
Preferably, the biconial through-wall bolt casing length range is in 20cm to 30cm.
It is using the advantageous effect of above-mentioned technical proposal:Biconial through-wall bolt casing length range in 20cm to 30cm,
While disclosure satisfy that the requirement that existing wall pours, quotient's molding batch production easy to produce.
Preferably, the lower face of the first sleeve is both provided with waterproof end cap, institute with the lower face of the second casing
Waterproof end cap is stated to be integrally formed with first sleeve or the second casing.
It is using the advantageous effect of above-mentioned technical proposal:Waterproof end cap is integrally formed with casing, reduces the purchase of waterproof end cap
Expense is bought, and easy to use.During pouring, biconial through-wall bolt casing has one end of waterproof end cap and the wallboard tight
It leans on, ensures that internal cement will not be excessive.
Description of the drawings
Fig. 1 is the front view of the utility model;
Fig. 2 is the front view of the utility model specific embodiment;
Fig. 3 is the side view of the utility model specific embodiment;
Fig. 4 is the internal structure chart of the utility model specific embodiment;
Fig. 5 is the internal structure chart of first sleeve in specific embodiment;
Fig. 6 is the internal structure chart of the second casing in specific embodiment.
Wherein, 1- biconials through-wall bolt casing, 2- first sleeves, 3- first dismantle bayonet, the first end caps of 4-, 5- annulars
Protrusion, 6- annular grooves, the second end caps of 7-, 8- second dismantle bayonet, the second casings of 9-.
Specific embodiment
The preferred embodiment of the utility model, cooperation schema are described as follows, and institute's accompanying drawings only provide reference and description, and
It is non-to be used for limiting the utility model.
The utility model provides a kind of biconial through-wall bolt casing 1, including 2 and second casing 9 of first sleeve.First set
Pipe 2, the second casing 9 are the round platform with axially extending bore.First sleeve 2, the second casing 9 are coaxially arranged, and first sleeve 2,
Second casing 9 is detachably connected in upper end surface, and the lower face of the first sleeve 2 is equipped with the first dismounting bayonet 3, and described second
The lower face of casing 9 is equipped with the second dismounting bayonet 8.During wallboard is poured, both ensured that through-wall bolt was completely separated with cement,
It is again easy to disassemble, reduction engineering cost may be reused.
First sleeve 2 is identical with the length of the second casing 9, and the upper surface of first sleeve 2 is equipped with annular protrusion 5, and described the
The upper surface of two casings 9 is equipped with annular groove 6, and the annular protrusion 5 and annular groove 6 are mating.It can ensure first set
Pipe 2, the second casing 9 are detachably connected, and can be good at that cement is made to separate with through-wall bolt, and can guarantee first sleeve 2 and
Two casings 9 are easy to disassemble.It is interior hexagonal groove that first dismounting bayonet 3 and second, which dismantles bayonet 8, can be matched with existing electric tool
It closes and uses, and can guarantee that 2 and second casing 9 of first sleeve rotates back-out under the assistance of electric tool.
First sleeve 2, the taper of the second casing 9 are identical, and taper is 3 ° to 8 °.It can make biconial through-wall bolt casing
The 1 area smaller contacted with wall makes biconial through-wall bolt casing 1 detach required power with wall so as to reduce, and reduces
The abrasion of biconial through-wall bolt casing 1, increases its service life.1 length range of biconial through-wall bolt casing in 20cm extremely
30cm.While meeting the requirement that existing wall pours, quotient's molding batch production easy to produce.The lower face of first sleeve 2 with
The lower face of second casing 9 is both provided with the first waterproof end cap 4 and the second waterproof end cap 7, the first waterproof end cap 4 and second
Waterproof end cap 7 is integrally formed with 2 and second casing 7 of first sleeve.The purchase cost of waterproof end cap is saved, in the mistake poured
Cheng Zhong, the first waterproof end cap 4 and the second waterproof end cap 7 are abutted with wallboard, ensure that internal cement will not be excessive.
Claims (7)
1. biconial through-wall bolt casing, which is characterized in that include first sleeve, the second casing;The first sleeve, second set
Pipe is the round platform with axially extending bore, and the first sleeve, the second casing are coaxially arranged, and first sleeve, the second casing exist
Upper end surface is detachably connected, and the lower face of the first sleeve is equipped with the first dismounting bayonet, the lower face of second casing
Equipped with the second dismounting bayonet.
2. biconial through-wall bolt casing according to claim 1, which is characterized in that the first sleeve and the second casing
Length is identical.
3. biconial through-wall bolt casing according to claim 1, which is characterized in that the upper surface of the first sleeve is set
There is annular protrusion, the upper surface of second casing is equipped with annular groove, and the annular protrusion and annular groove are mating.
4. biconial through-wall bolt casing according to claim 1, which is characterized in that the first dismounting bayonet and second
It is interior hexagonal groove to dismantle bayonet.
5. biconial through-wall bolt casing according to claim 1, which is characterized in that the first sleeve and the second casing
Taper it is identical, taper is 3 ° to 8 °.
6. biconial through-wall bolt casing according to claim 1, which is characterized in that the biconial through-wall bolt casing
Length range is in 20cm to 30cm.
7. biconial through-wall bolt casing according to claim 1, which is characterized in that the lower face of the first sleeve with
The lower face of second casing is both provided with waterproof end cap, and the waterproof end cap is integrated into first sleeve or the second casing
Type.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721619014.7U CN207568184U (en) | 2017-11-28 | 2017-11-28 | Biconial through-wall bolt casing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721619014.7U CN207568184U (en) | 2017-11-28 | 2017-11-28 | Biconial through-wall bolt casing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207568184U true CN207568184U (en) | 2018-07-03 |
Family
ID=62688798
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721619014.7U Expired - Fee Related CN207568184U (en) | 2017-11-28 | 2017-11-28 | Biconial through-wall bolt casing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207568184U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110080516A (en) * | 2019-06-11 | 2019-08-02 | 山东天齐置业集团股份有限公司 | Attachment type raise scaffold wall-attached supporting seat installation method |
CN111576879A (en) * | 2020-04-29 | 2020-08-25 | 中国十七冶集团有限公司 | Construction method for plugging screw hole of outer vertical face shear wall |
-
2017
- 2017-11-28 CN CN201721619014.7U patent/CN207568184U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110080516A (en) * | 2019-06-11 | 2019-08-02 | 山东天齐置业集团股份有限公司 | Attachment type raise scaffold wall-attached supporting seat installation method |
CN110080516B (en) * | 2019-06-11 | 2021-06-08 | 山东天齐置业集团股份有限公司 | Method for mounting wall-attached support of attached lifting scaffold |
CN111576879A (en) * | 2020-04-29 | 2020-08-25 | 中国十七冶集团有限公司 | Construction method for plugging screw hole of outer vertical face shear wall |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207568184U (en) | Biconial through-wall bolt casing | |
CN104493971A (en) | Artificial rock core casting mold with supporting mechanism | |
CN106088537A (en) | A kind of window auxiliary frame pre-embedded construction method | |
CN207240471U (en) | A kind of wallboard hanging piece device detachably reused | |
CN103147572A (en) | Complete water-stopping screw rod and mounting method | |
CN101832025B (en) | Sealing up screw | |
CN203846523U (en) | Combined tower crane foundation | |
CN208105676U (en) | A kind of shroud member | |
CN202689515U (en) | Embedded connecting device for concrete building scaffold | |
CN205426626U (en) | Novel anti compression moulding material of concrete tries mould | |
CN201447648U (en) | Resin concrete drainage ditch | |
CN204370564U (en) | Underfloor constructional column concrete pouring structure | |
CN203097289U (en) | Novel composite waterstop screw | |
CN208919473U (en) | A kind of hydraulic engineering waterpipe | |
CN207156062U (en) | A kind of construction material foaming mould | |
CN103967279A (en) | Auxiliary device for grouting of prefabricated concrete wall | |
CN201544180U (en) | Dismounting tool for sealing cover of isolation switch | |
CN205466709U (en) | Toper crab -bolt and knockout device | |
CN101691811A (en) | Recyclable wall conduit | |
CN205483731U (en) | Special shaping examination mould is measured to concrete permeation coefficient that permeates water | |
CN200979974Y (en) | A case-type wire and cable docking case | |
CN207974526U (en) | A kind of deformation joint template | |
CN203878602U (en) | Movable tower crane foundation | |
CN202391092U (en) | U-shaped anchor bolt fixing device of overhanging steel beam | |
CN204068023U (en) | Ground connection pricker assembling and disassembling device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180703 Termination date: 20191128 |
|
CF01 | Termination of patent right due to non-payment of annual fee |