CN207567919U - The precast segment and prefabricated assembled storage pond of a kind of assembled storage pond - Google Patents

The precast segment and prefabricated assembled storage pond of a kind of assembled storage pond Download PDF

Info

Publication number
CN207567919U
CN207567919U CN201721424281.9U CN201721424281U CN207567919U CN 207567919 U CN207567919 U CN 207567919U CN 201721424281 U CN201721424281 U CN 201721424281U CN 207567919 U CN207567919 U CN 207567919U
Authority
CN
China
Prior art keywords
unit
assembled
storage pond
interconnection
side plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201721424281.9U
Other languages
Chinese (zh)
Inventor
刘肯林
周智勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Shengyu Smart Ecological Environmental Protection Co ltd
Original Assignee
Wuhan Shengyu Drainage Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Shengyu Drainage Systems Co Ltd filed Critical Wuhan Shengyu Drainage Systems Co Ltd
Priority to CN201721424281.9U priority Critical patent/CN207567919U/en
Application granted granted Critical
Publication of CN207567919U publication Critical patent/CN207567919U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

Precast segment and prefabricated assembled storage pond the utility model discloses a kind of assembled storage pond, the precast segment of assembled storage pond include angle unit, positive side unit, side unit and temporary location;Wherein, angle unit includes at least:First longitudinal direction channel and the first interconnection, the middle part of first longitudinal direction channel are communicated with one end of the first interconnection, one end closing of first longitudinal direction channel;Positive side unit includes at least:Second longitudinal direction channel and the second interconnection are communicated in the middle part of one end of the second interconnection and second longitudinal direction channel;Side unit includes at least:Third vertical passage and third interconnection, third interconnection intersects with third vertical passage to be communicated, one end closing of third vertical passage;Temporary location includes at least the 4th vertical passage and the 4th interconnection, and the 4th vertical passage, the 4th interconnection intersection communicate.Each unit of the utility model can be assembled into storage pond, can shorten the construction period, the pre- manufacturing of factory programsization, quality controllable.

Description

The precast segment and prefabricated assembled storage pond of a kind of assembled storage pond
Technical field
The utility model is related to water storage device fields, and in particular to the precast segment and prefabricated dress of a kind of assembled storage pond With formula storage pond.
Background technology
Storage pond has to the flow-rate adjustment of initial rainwater, confluence of rainwater and sewage rainwater and later stage rainwater, storage of shutting off, pretreatment Etc. functions, in engineering as water conservancy project structure may be arranged at cell, road, greening region, be mainly embedded in underground, be steel Tendon concrete structure, intensity and load must satisfy related specifications requirement, and antiseep and anti-odour.Pond body volume and embedded Depth is different regarding actual demands of engineering.
In practical implementation at this stage, storage pond construction is commonly carried out using cast-in-place mode, have with Lower defect:
(1) long construction period, security risk are higher.
(2) construction site is big by such environmental effects such as place, weather.
(3) different construction teams management level mixed causes quality control on construction difficulty larger.
In addition, also there is scheme of the part using prefabricated component assembling, but there are still Assembling complexity, prefabricated component type are numerous The defects of mostly and being difficult to meet personalized designs.
Invention content
For defect in the prior art, the purpose of this utility model is to provide a kind of the pre- of assembled storage pond Component processed, each unit of the precast segment can be assembled into storage pond, can shorten the construction period, the pre- manufacturing of factory programsization, matter Amount is controllable.
To achieve the above objectives, the technical scheme adopted by the utility model is that:
A kind of precast segment of assembled storage pond, including:Angle unit, positive side unit, side unit and temporary location;Its In,
The angle unit includes at least:First longitudinal direction channel and the first interconnection, in the first longitudinal direction channel Portion is communicated with one end of first interconnection, one end closing of the first longitudinal direction channel;
The positive side unit includes at least:Second longitudinal direction channel and the second interconnection, second interconnection It is communicated in the middle part of one end and the second longitudinal direction channel;
The side unit includes at least:Third vertical passage and third interconnection, the third interconnection with The third vertical passage intersection communicates, one end closing of the third vertical passage;
The temporary location includes at least the 4th vertical passage and the 4th interconnection, the 4th vertical passage, institute The 4th interconnection intersection is stated to communicate.
Based on the above technical solution, the angle unit further includes the first side plate of a pair being oppositely arranged and connection two First transverse slat of a described first side plate one end and the first top plate being arranged at the top of two first side plates, a pair described in The first longitudinal direction channel is set along the first side plate length direction between first side plate, on first transverse slat described in setting First interconnection;
The positive side unit further includes the second side plate of a pair being oppositely arranged and is arranged on two the second side plate tops Second top plate in portion sets the second longitudinal direction channel between a pair of second side plate along the second side plate length direction, Second interconnection is set on one of them described second side plate;
The side unit further includes a pair of of the third side plate being oppositely arranged and is arranged on two third side plate tops The third top plate in portion sets the third vertical passage between a pair of third side plate along the third side plate length direction, The third interconnection is set on one of them described third side plate;
The temporary location further includes the 4th side plate of a pair being oppositely arranged and is arranged on two the 4th side plate tops 4th top plate in portion is provided with the 4th vertical passage between a pair of 4th side plate, institute along the 4th side plate length direction The both ends open for stating the 4th interconnection is located on two the 4th side plates respectively.
Based on the above technical solution, the precast segment of the assembled storage pond further includes transition element;It is described Transition element includes the 5th side plate of a pair that is oppositely arranged and the 5th top plate being arranged at the top of two the 5th side plates, and one The 5th side plate length direction is provided with the 5th transition passage between the 5th side plate.
Based on the above technical solution, the precast segment of the assembled storage pond, which further includes, is used to form bottom wall simultaneously The foundation structure of the precast segment of multiple assembled storage ponds is installed;
Multiple grooves for installation, the angle unit, the positive side unit, the side are set in the foundation structure The assembling protrusion of setting and groove cooperation on unit, the temporary location and the transition element;Alternatively,
Multiple protrusions for installation, the angle unit, the positive side unit, the side are set in the foundation structure The assembling groove of setting and protrusion cooperation on unit, the temporary location and the transition element.
Based on the above technical solution, the angle unit, the positive side unit, the side unit, the centre Reinforcing rib for enhancing intensity and anti-pressure ability is set on the outer wall and/or inner wall of unit and the transition element.
Based on the above technical solution, the angle unit, the positive side unit, the side unit, the centre Joining place setting waterproof structure between unit and the installation place and/or adjacent cells of the transition element and the foundation structure It makes.
Based on the above technical solution, the bottom of the foundation structure is equipped with the pump hole for placing suction pump.
Based on the above technical solution, the angle unit, the positive side unit, the side unit, the centre Unit and the transition element pass through tongue and groove assembly.
A kind of prefabricated assembled storage pond, which is characterized in that by the prefabricated of assembled storage pond as described in claim 1 Parts assembling forms, and concrete condition is as follows:
When the assembled storage pond is a row multirow, by two angle units and at least one positive side unit Assembled, all positive side units are assembled into successively to be arranged on one side, and two angle units are assembled in the both ends of side row respectively;
All first longitudinal direction channels and the second longitudinal direction channel piece together the assembled storage pond jointly Circulation passage;
When the assembled storage pond is a line multiple row, by two angle units and at least one side unit Assembled, all side units are assembled into successively to be arranged on one side, and two angle units difference assembly are in side row Both ends;
All first interconnections and the third interconnection piece together the assembled storage pond jointly Circulation passage;
When the assembled storage pond is multiple lines and multiple rows, by at least two angle units, at least one positive side Unit, at least one side unit and at least one temporary location are assembled, and all first longitudinal directions are led to Road connects jointly with the second longitudinal direction channel, and all first interconnections and the third interconnection connect jointly Logical, all second interconnections connect jointly with the 4th interconnection, all third vertical passages and 4th vertical passage connects jointly.
A kind of prefabricated assembled storage pond, concrete condition are as follows:
When the transition element is connect with the positive side unit, second interconnection and the 5th transition passage Connection;
When the transition element is connect with the side unit, the third vertical passage and the 5th transition passage Connection;
When the transition element is connect with the temporary location, the 5th transition passage and the 4th vertical passage Or the 4th interconnection connection.
Compared with prior art, the utility model has the advantage of:
It is single that the assembled storage pond precast segment of the utility model includes angle unit, positive side unit, side unit and centre Member, each unit composite assembly form storage pond, and each unit simple structure, assembling is flexibly;Each assembled rigid unit separate operaton, quality Controllably.It is more specialized compared with cast-in-place mode, each unit is factory produced, can shorten the construction period, it is cost-effective;By place item Part, such environmental effects are small, and progress is controllable;The pre- manufacturing of factory programsization, it is quality controllable;Storage pond construction is mostly that deep basal pit is made Industry can largely reduce the activity duration at scene by prefabrication and assembly construction mode, reduce security risk.
Description of the drawings
Fig. 1 is the schematic layout pattern of the precast segment for the assembled storage pond that the utility model embodiment provides;
Fig. 2 is the overlooking the structure diagram for the angle unit that the utility model embodiment provides;
Fig. 3 is the horizontal section schematic diagram for the angle unit that the utility model embodiment provides;
Fig. 4 is the longitudinal profile schematic diagram for the angle unit that the utility model embodiment provides;
Fig. 5 is the overlooking the structure diagram for the positive side unit that the utility model embodiment provides;
Fig. 6 is the horizontal section schematic diagram for the positive side unit that the utility model embodiment provides;
Fig. 7 is the longitudinal profile schematic diagram for the positive side unit that the utility model embodiment provides;
Fig. 8 is the overlooking the structure diagram for the side unit that the utility model embodiment provides;
Fig. 9 is the overlooking the structure diagram for the temporary location that the utility model embodiment provides;
Figure 10 is the dimensional structure diagram for the temporary location that the utility model embodiment provides;
Figure 11 is the overlooking the structure diagram for the transition element that the utility model embodiment provides;
Figure 12 is the dimensional structure diagram for the transition element that the utility model embodiment provides;
Figure 13 is the horizontal section schematic diagram for the assembled storage pond that the utility model embodiment provides;
Figure 14 is the longitudinal profile schematic diagram for the assembled storage pond that the utility model embodiment provides.
In figure:1st, angle unit;10th, first longitudinal direction channel;11st, the first interconnection;12nd, the first side plate;13rd, first is horizontal Plate;14th, the first top plate;2nd, positive side unit;20th, second longitudinal direction channel;21st, the second interconnection;22nd, the second side plate;23rd, second Top plate;3rd, side unit;30th, third vertical passage;31st, third interconnection;32nd, third side plate;33rd, third top plate;4th, in Between unit;40th, the 4th vertical passage;41st, the 4th interconnection;42nd, the 4th side plate;43rd, the 4th top plate;5th, transition element;50、 5th transition passage;51st, the 5th side plate;52nd, the 5th top plate;6th, foundation structure;60th, pump hole.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawings and embodiments.
Referring to shown in Fig. 1 to 10, the utility model embodiment provides a kind of precast segment of assembled storage pond, packet It includes:Angle unit 1, positive side unit 2, side unit 3 and temporary location 4;Wherein, angle unit 1 includes at least:First longitudinal direction channel 10 And first interconnection 11, the middle part of first longitudinal direction channel 10 are communicated with one end of the first interconnection 11, first longitudinal direction is led to One end closing in road 10;Positive side unit 2 includes at least:20 and second interconnection 21 of second longitudinal direction channel, second is laterally logical The one end in road 21 is communicated with the middle part of second longitudinal direction channel 20;Side unit 3 includes at least:Third vertical passage 30 and third Interconnection 31, third interconnection 31 intersects with third vertical passage 30 to be communicated, one end closing of third vertical passage 30;In Between unit 4 include at least the 4th vertical passage 40 and the 4th interconnection 41, the 4th vertical passage 40, the 4th interconnection 41 Intersection communicates.
For the utility model using prefabricated above-mentioned a variety of unit splicings into storage pond, each unit of the precast segment can be with Storage pond is assembled into, can be shortened the construction period, the pre- manufacturing of factory programsization is quality controllable
In the present embodiment, angle unit 1 further includes two the first side plates 12 of the first side plate of a pair 12 being oppositely arranged and connection First transverse slat 13 of one end and the first top plate 14 for being arranged on two the first side plates, 12 top, edge between a pair of first side plate 12 First side plate, 12 length direction sets first longitudinal direction channel 10, and the first interconnection 11 is set on the first transverse slat 13;
Positive side unit 2 further includes the second side plate of a pair 22 being oppositely arranged and is arranged at the top of two the second side plates 22 Second top plate 23, along 22 length direction of the second side plate setting second longitudinal direction channel 20 between a pair of second side plate 22, one of them Second interconnection 21 is set on second side plate 22;
Side unit 3 further includes a pair of of the third side plate 32 being oppositely arranged and is arranged at the top of two third side plates 32 Third top plate 33, along 32 length direction of third side plate setting third vertical passage 30 between a pair of of third side plate 32, one of them Third interconnection 31 is set on third side plate 32;
Temporary location 4 further includes the 4th side plate 42 of a pair being oppositely arranged and is arranged at the top of two the 4th side plates 42 4th top plate 43 is provided with the 4th vertical passage 40 between a pair of 4th side plate 42 along 42 length direction of the 4th side plate, and the 4th is horizontal It is located on two the 4th side plates 42 respectively to the both ends open of channel 41.
The utility model, into storage pond, is made using prefabricated above-mentioned a variety of unit splicings by the roof and outer wall being spliced into For the periphery of storage pond, and the channel inside storage pond can realize that flow flows between each unit, structure it is simpler, it can be achieved that Batch production generation prefabricated components are more than, and can shorten the construction period, cost-effective.
It should be noted that as shown in Fig. 3,6, angle unit 1, positive side unit 2, side unit 3, temporary location 4 and mistake The assembly of a precast segment can be formed with itself by crossing unit 5, for component storage pond;
If two angle units 1 are combined according to modularity shown in Fig. 3, as shown in two positive side units 2 according to Fig. 6 Modularity be combined.
Specifically, the 4th interconnection 41 on temporary location 4 can be curved channel, the 4th vertical passage 40 is rectangular Channel.Preferably, for the ease of processing and improving the entire compression ability of unit and intensity, temporary location 4 includes transversely setting The body structure put hollows out inside body structure to form the 4th vertical passage 40, the both ends extension of the body structure along longitudinal direction There is arc arch structure, to form the entrance of the 4th interconnection.Preferably, the upper surface of arc arched door is equipped with and babinet knot The tablet reinforcing rib that structure is connected, so not only so that the upper surface of temporary location 4 is concordant, but also enhances its whole rigid.
The utility model, into storage pond, is used as by the roof and outer wall being spliced into and adjusted using prefabricated a variety of unit splicings The periphery of reservoir, and the channel inside storage pond can realize that flow flows between each unit, structure is simpler, it can be achieved that factory Metaplasia is more than into prefabricated components, can shorten the construction period, cost-effective.
Referring to shown in Figure 11 and Figure 12, based on the above technical solution, the precast segment of assembled storage pond also wraps Include transition element 5;
Transition element 5 include 5th side plate 51 of a pair that is oppositely arranged and be arranged at the top of two the 5th side plates 51 the Five top plates 52 are provided with the 5th transition passage 50 between a pair of 5th side plate 51 along 51 length direction of the 5th side plate.
Wherein, transition element 5 is optional dispensing unit, for adjustment unit row and/or the quantity of cell columns;Transition element 5 open up two the 5th transition passages 50 along longitudinal direction, the setting of side wall face closure transversely so that its in a lateral direction not with Adjacent unit connection, convenient for follow-up maintenance.
Preferably, it sets to enhance intensity and resistance to compression on the outer wall and/or inner wall of above-mentioned multiple prefabricated profiled units The reinforcing rib of ability.For example, shown in Figure 12,5 longitudinally disposed waling of transition element, transversely setting laterally adds Strengthening tendons.
Referring to shown in Figure 13 and Figure 14, based on the above technical solution, the precast segment of assembled storage pond also wraps Include the foundation structure 6 for being used to form bottom wall;
Multiple grooves for installation, angle unit 1, positive side unit 2, side unit 3, intermediate list are set in foundation structure 6 The assembling protrusion of setting and groove cooperation in member 4 and transition element 5;Or set in foundation structure 6 it is multiple for installation Protrusion, the assembling of setting and protrusion cooperation on angle unit 1, positive side unit 2, side unit 3, temporary location 4 and transition element 5 Groove;
In the present embodiment, each unit is integral prefabricated, is assembled without recombinant, only need to successively be assembled in foundation structure 6 each Unit greatly improves construction efficiency.
In the present embodiment, the inlet tube and outlet tube reserved opening of storage pond can be set to pond peripheral wall according to engineering actual demand On.Preferably, outlet pipe reserved opening is not less than water inlet pipe reserved opening.
Based on the above technical solution, angle unit 1, positive side unit 2, side unit 3, temporary location 4 and transition Reinforcing rib for enhancing intensity and anti-pressure ability is set on the outer wall and/or inner wall of unit 5.
Based on the above technical solution, angle unit 1, positive side unit 2, side unit 3, temporary location 4 and transition Joining place setting water proof structure between the installation place and/or adjacent cells of unit 5 and foundation structure 6.
Based on the above technical solution, the bottom of foundation structure 6 is equipped with the pump hole 60 for placing suction pump;
Pump hole 60, which can concentrate that the water quality in storage pond is handled or aspirated, to be transferred at watering equipment.
Based on the above technical solution, angle unit 1, positive side unit 2, side unit 3, temporary location 4 and transition Unit 5 is integral prefabricated molding.
Based on the above technical solution, each unit is assembled by two prefabricated profiled subdivisions;
Angle unit 1, positive side unit 2, side unit 3, temporary location 4 and transition element 5 pass through tongue and groove assembly;
Two subdivisions are symmetrical arranged and are assembled through tongue and groove, it is achieved thereby that assembling simply, convenient for the purpose of transhipment.
In the present embodiment, foundation structure 6 is cast-in-situ steel reinforced concrete.Before on-site consolidation construction, foundation structure should be by inspection It is qualified.Storage pond prefabricated components unit location and installation, hand fit's machinery should successively carry out line by line or by column since the unit of angle, Each unit should place smooth, firm, and piece is straight, uniform.After the completion of member unit mounting and adjusting, then carry out the waterproof structure of piece Make construction.
A kind of assembled storage pond, the precast segment by assembled storage pond is assembled, and concrete condition is as follows:
It is assembled by two angle units 1 and at least one positive side unit 2 when assembled storage pond is a row multirow, All positive side units 2 are assembled into successively to be arranged on one side, and two angle units 1 are assembled in the both ends of side row respectively;
All first longitudinal direction channels 10 and second longitudinal direction channel 20 piece together the circulation passage of assembled storage pond jointly;
It is assembled by two angle units 1 and at least one side unit 3 when assembled storage pond is a line multiple row, All sides unit 3 is assembled into successively to be arranged on one side, and two angle units 1 are assembled in the both ends of side row respectively;
The first all interconnections 11 and third interconnection 31 piece together the circulation passage of assembled storage pond jointly;
When assembled storage pond is multiple lines and multiple rows, by least two jiaos of units 1, at least one positive side unit 2, at least one A side unit 3 and at least one temporary location 4 are assembled, and all first longitudinal direction channels 10 and second longitudinal direction channel 20 are common With connection, the first all interconnections 11 connects jointly with third interconnection 31, the second all interconnection 21 and the Connection, all third vertical passages 30 connect four interconnections 41 jointly with the 4th vertical passage 40 jointly.
A kind of assembled storage pond, concrete condition are as follows:
When transition element 5 is connect with positive side unit 2, the second interconnection 21 is connected with the 5th transition passage 50;
When transition element 5 is connect with side unit 3, third vertical passage 30 is connected with the 5th transition passage 50;
When transition element 5 is connect with temporary location 4, the 5th transition passage 50 and the 4th vertical passage 40 or the 4th are lateral Channel 41 connects.
The utility model is not limited to the above embodiment, for those skilled in the art, not Under the premise of being detached from the utility model principle, several improvements and modifications can also be made, these improvements and modifications are also considered as this reality Within novel protection domain.The content not being described in detail in this specification belongs to well known to professional and technical personnel in the field The prior art.

Claims (10)

1. a kind of precast segment of assembled storage pond, which is characterized in that including:Angle unit (1), positive side unit (2), side are single First (3) and temporary location (4);Wherein,
The angle unit (1) includes at least:First longitudinal direction channel (10) and the first interconnection (11), the first longitudinal direction are led to The middle part in road (10) is communicated with one end of first interconnection (11), one end closing of the first longitudinal direction channel (10);
The positive side unit (2) includes at least:Second longitudinal direction channel (20) and the second interconnection (21), described second laterally It is communicated in the middle part of one end of channel (21) and the second longitudinal direction channel (20);
The side unit (3) includes at least:Third vertical passage (30) and third interconnection (31), the third are lateral Channel (31) intersects with the third vertical passage (30) to be communicated, one end closing of the third vertical passage (30);
The temporary location (4) is including at least the 4th vertical passage (40) and the 4th interconnection (41), the 4th longitudinal direction Channel (40), the 4th interconnection (41), which are intersected, to be communicated.
2. the precast segment of assembled storage pond as described in claim 1, it is characterised in that:The angle unit (1) further includes It first transverse slat (13) of two described first side plate (12) one end of the first side plate of a pair (12) for being oppositely arranged and connection and sets The first top plate (14) at the top of two first side plates (12) is put, along described first between a pair of first side plate (12) Side plate (12) length direction sets the first longitudinal direction channel (10), sets described first laterally to lead on first transverse slat (13) Road (11);
The positive side unit (2) further includes the second side plate of a pair (22) being oppositely arranged and is arranged on two second side plates (22) the second top plate (23) at the top of is set along the second side plate (22) length direction between a pair of second side plate (22) The second longitudinal direction channel (20) sets second interconnection (21) on one of them described second side plate (22);
The side unit (3) further includes a pair of of the third side plate (32) being oppositely arranged and is arranged on two third side plates (32) the third top plate (33) at the top of is set along third side plate (32) length direction between a pair of third side plate (32) The third vertical passage (30) sets the third interconnection (31) on one of them described third side plate (32);
The temporary location (4) further includes the 4th side plate (42) of a pair being oppositely arranged and is arranged on two the 4th side plates (42) the 4th top plate (43) at the top of is set along the 4th side plate (42) length direction between a pair of 4th side plate (42) There is the 4th vertical passage (40), the both ends open of the 4th interconnection (41) is located at two the 4th side plates (42) respectively On.
3. the precast segment of assembled storage pond as described in claim 1, it is characterised in that:
The precast segment of the assembled storage pond further includes transition element (5);The transition element (5) is including what is be oppositely arranged A pair of 5th side plate (51) and the 5th top plate (52) being arranged at the top of two the 5th side plates (51), a pair the described 5th The 5th side plate (51) length direction is provided with the 5th transition passage (50) between side plate (51).
4. the precast segment of assembled storage pond as claimed in claim 3, it is characterised in that:
The precast segment of the assembled storage pond, which further includes, to be used to form bottom wall and installs multiple assembled storage ponds The foundation structure (6) of precast segment;
Multiple grooves for installation, the angle unit (1), the positive side unit (2), institute are set on the foundation structure (6) It is convex to state setting and the assembling that the groove coordinates on side unit (3), the temporary location (4) and the transition element (5) Portion;Alternatively,
Multiple protrusions for installation, the angle unit (1), the positive side unit (2), institute are set on the foundation structure (6) It is recessed to state setting and the assembling that the protrusion coordinates on side unit (3), the temporary location (4) and the transition element (5) Slot.
5. the precast segment of assembled storage pond as claimed in claim 3, it is characterised in that:
The angle unit (1), the positive side unit (2), the side unit (3), the temporary location (4) and the transition Reinforcing rib for enhancing intensity and anti-pressure ability is set on the outer wall and/or inner wall of unit (5).
6. the precast segment of assembled storage pond as claimed in claim 4, it is characterised in that:
The angle unit (1), the positive side unit (2), the side unit (3), the temporary location (4) and the transition Joining place setting water proof structure between the installation place and/or adjacent cells of unit (5) and the foundation structure (6).
7. the precast segment of assembled storage pond as claimed in claim 4, it is characterised in that:The bottom of the foundation structure (6) Portion is equipped with cheats (60) for placing the pump of suction pump.
8. the precast segment of assembled storage pond as claimed in claim 3, it is characterised in that:The angle unit (1), it is described just Side unit (2), the side unit (3), the temporary location (4) and the transition element (5) pass through tongue and groove assembly.
9. a kind of prefabricated assembled storage pond, which is characterized in that by prefabricated group of assembled storage pond as described in claim 1 Part is assembled, and concrete condition is as follows:
When the assembled storage pond is a row multirow, by two angle units (1) and at least one positive side unit (2) assembled, all positive side units (2) are assembled into successively to be arranged on one side, and two angle units (1) are assembled in the side respectively The both ends of row;
All first longitudinal direction channels (10) and the second longitudinal direction channel (20) piece together the assembled and regulate and store jointly The circulation passage in pond;
When the assembled storage pond is a line multiple row, by two angle units (1) and at least one side unit (3) assembled, all side units (3) are assembled into successively to be arranged on one side, and two angle units (1) are assembled in institute respectively State the both ends of side row;
All first interconnections (11) and the third interconnection (31) piece together the assembled and regulate and store jointly The circulation passage in pond;
It is single by at least two angle units (1), at least one positive side when the assembled storage pond is multiple lines and multiple rows First (2), at least one side unit (3) and at least one temporary location (4) are assembled, and all described first Vertical passage (10) connects jointly with the second longitudinal direction channel (20), all first interconnections (11) and described Three interconnections (31) connect jointly, and all second interconnections (21) and the 4th interconnection (41) connect jointly Logical, all third vertical passages (30) connect jointly with the 4th vertical passage (40).
10. a kind of prefabricated assembled storage pond, which is characterized in that by the prefabricated of assembled storage pond as claimed in claim 3 Parts assembling forms, and concrete condition is as follows:
When the transition element (5) is connect with the positive side unit (2), second interconnection (21) and the 5th mistake Cross channel (50) connection;
When the transition element (5) is connect with the side unit (3), the third vertical passage (30) and the 5th mistake Cross channel (50) connection;
When the transition element (5) is connect with the temporary location (4), the 5th transition passage (50) is vertical with the described 4th It is connected to channel (40) or the 4th interconnection (41).
CN201721424281.9U 2017-10-31 2017-10-31 The precast segment and prefabricated assembled storage pond of a kind of assembled storage pond Withdrawn - After Issue CN207567919U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721424281.9U CN207567919U (en) 2017-10-31 2017-10-31 The precast segment and prefabricated assembled storage pond of a kind of assembled storage pond

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721424281.9U CN207567919U (en) 2017-10-31 2017-10-31 The precast segment and prefabricated assembled storage pond of a kind of assembled storage pond

Publications (1)

Publication Number Publication Date
CN207567919U true CN207567919U (en) 2018-07-03

Family

ID=62692620

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721424281.9U Withdrawn - After Issue CN207567919U (en) 2017-10-31 2017-10-31 The precast segment and prefabricated assembled storage pond of a kind of assembled storage pond

Country Status (1)

Country Link
CN (1) CN207567919U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107605025A (en) * 2017-10-31 2018-01-19 武汉圣禹排水系统有限公司 The precast segment and prefabricated assembled storage pond of a kind of assembled storage pond

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107605025A (en) * 2017-10-31 2018-01-19 武汉圣禹排水系统有限公司 The precast segment and prefabricated assembled storage pond of a kind of assembled storage pond
CN107605025B (en) * 2017-10-31 2024-03-26 武汉圣禹排水系统有限公司 Prefabricated subassembly and prefabricated assembled regulation pond of assembled regulation pond

Similar Documents

Publication Publication Date Title
CN106013221B (en) Four layers of class rectangle Urban Underground Complex
CN207567889U (en) Residential quarters Rainwater collection system
WO2020125602A1 (en) Deep water obtaining system and operating method therefor
CN207567919U (en) The precast segment and prefabricated assembled storage pond of a kind of assembled storage pond
CN112017522A (en) Tailing pond ecological restoration and soil erosion simulation experiment device
CN204849713U (en) Simple and easy distribution structure
CN107605025A (en) The precast segment and prefabricated assembled storage pond of a kind of assembled storage pond
CN203200668U (en) Automatic spraying and maintenance system for highway bridge precast beam field
CN207392166U (en) Dual-purpose dewatering outlet is arranged in a kind of U-shaped canal irrigation of assembled
CN207567920U (en) The precast segment and prefabricated assembled storage pond of a kind of assembled storage pond
CN109469099A (en) Assembled underground pipe gallery
CN207749628U (en) The precast segment of assembled storage pond and prefabricated assembled storage pond
CN206283942U (en) The vertical green wall system that a kind of prefabricated flower trough is formed
CN211921207U (en) Assembled revetment type constructed wetland system
CN207314285U (en) A kind of assembling type steel structure check gate
CN103306503A (en) Land-unoccupied and original ecological efficient agricultural residential building in new rural area
CN102677639A (en) Multifunctional combination intake tower structure for reservoir
CN207847166U (en) Container column and container roof tissue discharge structure
CN106711911A (en) Prefabricated assembly-type cable channel
CN209369023U (en) The connecting node of dry construction bilayer core plate thermal insulation concrete wallboard and floor
CN202577247U (en) Multifunctional combination intake tower structure for reservoir
CN206655300U (en) A kind of new combined seeping water discharging device
CN105890434A (en) Power plant circulating water cooling system and cooling method and application
CN207172375U (en) A kind of Double-layer water for precast concrete section of jurisdiction supports system
CN203256773U (en) Comprehensive urban underground pipe gallery with large-cross-section arched pre-stress

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: No. 509 Weihu Road, Shamao Street, Hannan District, Wuhan City, Hubei Province, 430000

Patentee after: Wuhan Shengyu Smart Ecological Environmental Protection Co.,Ltd.

Address before: 430000, No. 189, Minli North Road, Wuhan Economic and Technological Development Zone, Hubei Province

Patentee before: WUHAN SHENGYU DRAINAGE SYSTEM Co.,Ltd.

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20180703

Effective date of abandoning: 20240326

AV01 Patent right actively abandoned

Granted publication date: 20180703

Effective date of abandoning: 20240326