CN207553100U - A kind of underwater concrete pile foundation cutting arrangement - Google Patents

A kind of underwater concrete pile foundation cutting arrangement Download PDF

Info

Publication number
CN207553100U
CN207553100U CN201721490173.1U CN201721490173U CN207553100U CN 207553100 U CN207553100 U CN 207553100U CN 201721490173 U CN201721490173 U CN 201721490173U CN 207553100 U CN207553100 U CN 207553100U
Authority
CN
China
Prior art keywords
directive wheel
underwater
linkage section
stent
connecting shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721490173.1U
Other languages
Chinese (zh)
Inventor
潘鸿宝
杨光值
赵晓帆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING FAYAN ENGINEERING TECHNOLOGY Co Ltd
Original Assignee
BEIJING FAYAN ENGINEERING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING FAYAN ENGINEERING TECHNOLOGY Co Ltd filed Critical BEIJING FAYAN ENGINEERING TECHNOLOGY Co Ltd
Priority to CN201721490173.1U priority Critical patent/CN207553100U/en
Application granted granted Critical
Publication of CN207553100U publication Critical patent/CN207553100U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model provides a kind of underwater concrete pile foundation cutting arrangement, it is underwater to be equipped with the adjustable cuff being set in outside concrete pipe base to be cut, on the fixed stent under water of adjustable cuff, underwater stent is equipped with underwater guide wheel group, diamond rope saw is installed in underwater guide wheel group, diamond rope saw is embraced and is located at outside concrete pipe base to be cut, it is placed through guide wheel group respectively and driving wheel forms closed loop, the drive shaft of driving wheel driving machine, driving wheel is under the action of driving machine, diamond rope saw operating is driven, underwater concrete pipe base to be cut is cut.Underwater concrete pile foundation cutting arrangement not only realizes the purpose of drilling concrete pipe base under water, also provides practicable constructing device for quick, drilling precision and the good drilling underwater concrete works technology of integrality.

Description

A kind of underwater concrete pile foundation cutting arrangement
Technical field
The utility model is related to concrete pipe base drilling field more particularly to a kind of underwater concrete pile foundation cutting arrangements.
Background technology
With being constantly progressive for social development, some are long neglected and in disrepair, bearing capacity cannot meet over strait, the river of requirement Bridge is needed to remove or be rebuild.After the superstructure of these bridges is removed, underwater concrete-pile gene is left by underwater Execution conditions limitation is usually removed more difficult.
Conventional underwater concrete pile foundation demolition method has following two:
Using underwater blasting method:Allowing diver's dive first, then blast hole drilling, finally places explosive to appropriate location, profit The instantaneous pressure generated with explosion crushes concrete pipe base, reaches dismounting purpose.
Using cofferdam draining crush method:First using steel sheet pile is beaten to pile foundation to be removed progress cofferdam, after water is drained, make Manually or small-sized machine dismantling concrete pile foundation.There are shortcomings for underwater blasting method:This method has some potential safety problems, and explosion The residue of generation can be deposited in river, cause the pollution of river;There are shortcomings for cofferdam drainage:This method long construction period expends big Manpower financial capacity is measured, and it is complicated to construct, a large amount of dust can be generated by, which crushing, pollutes, also not environmentally.
Invention content
In order to overcome above-mentioned deficiency of the prior art, the utility model provides a kind of underwater concrete pile foundation drilling dress It puts, including:The operating platform being arranged on the water surface, operating platform are equipped with horizontal support and longitudinal carrier;Horizontal support and vertical It is connected to stent in right-angled intersection, the bottom end of longitudinal carrier is fixedly connected with operating platform;
Horizontal support is equipped with guide wheel group;Driving wheel is placed on longitudinal carrier, and the position set in horizontal support and The top of connecting portion between longitudinal carrier;
It is underwater to be equipped with the adjustable cuff being set in outside concrete pipe base to be cut, the fixed stent under water of adjustable cuff On, underwater stent is equipped with underwater guide wheel group, and diamond rope saw is installed in underwater guide wheel group, and diamond rope saw is embraced to be located at and be treated It cuts outside concrete pipe base, is placed through guide wheel group respectively and driving wheel forms closed loop, the drive shaft of driving wheel driving machine is main Driving wheel drives diamond rope saw operating under the action of driving machine, and underwater concrete pipe base to be cut is cut.
Preferably, horizontal support is equipped with the first connecting shaft, the second connecting shaft, third connecting shaft and the fourth connecting shaft; First connecting shaft, the second connecting shaft, third connecting shaft and the fourth connecting shaft interval are laid on horizontal support;
First connecting shaft and the second connecting shaft are arranged on the side of connecting portion between horizontal support and longitudinal carrier, and third connects Spindle and the fourth connecting shaft are arranged on the opposite side of connecting portion between horizontal support and longitudinal carrier;
Guide wheel group includes:First directive wheel, the second directive wheel, third directive wheel and the 4th directive wheel;
First connecting shaft passes through the first directive wheel center, and is rotatablely connected with the first directive wheel;
Second connecting shaft passes through the second directive wheel center, and is rotatablely connected with the second directive wheel;
Third connecting shaft passes through third directive wheel center, and is rotatablely connected with third directive wheel;
The fourth connecting shaft passes through the 4th directive wheel center, and is rotatablely connected with the 4th directive wheel.
Preferably, adjustable cuff is equipped with the first cuff semi-ring and the second cuff semi-ring;
The one end of first cuff semi-ring is equipped with the first linkage section, and the other end of the first cuff semi-ring is equipped with the second connection Section;Pin hole is respectively equipped on first linkage section and the second linkage section;
The one end of second cuff semi-ring is equipped with third linkage section, and the other end of the second cuff semi-ring is equipped with the 4th connection Section;Pin hole is respectively equipped on third linkage section and the 4th linkage section;
The pin hole of first linkage section is adapted with the pin hole of third linkage section, is connected by axis pin, the pin of the second linkage section The pin hole of tetra- linkage sections of Kong Yu is adapted, and is connected by axis pin, by adjusting between the first linkage section and third linkage section Spacing and the spacing adjusted between the second linkage section and the 4th linkage section adjust adjustable cuff to concrete pipe base to be cut Enclasping force.
Preferably, underwater stent includes:Submerged level stent;
Submerged level branch is provided with first crossbeam, second cross beam, third crossbeam and the 4th crossbeam;
First crossbeam, second cross beam, third crossbeam and the 4th crossbeam are sequentially connected and surround squarely, are erected to be cut Outside cutting concrete pile foundation;
First linkage section is respectively equipped with first crossbeam connecting hole with third linkage section;
Second linkage section and the 4th linkage section are respectively equipped with second cross beam connecting hole;
The first crossbeam connecting hole that first crossbeam sequentially passes through the first linkage section is connected with the first crossbeam of third linkage section Hole;
Third crossbeam sequentially passes through the second cross beam connection of the second cross beam connecting hole and the 4th linkage section of the second linkage section Hole.
Preferably, underwater stent further includes:First level guiding trestle, the second horizontally-guided stent, first is vertically directed Stent and second it is vertically directed stent;
First is vertically directed stent one end connect with the 4th crossbeam, and first, which is vertically directed the stent other end, is connected with the first water Lower horizontal guide sheave;First level guiding trestle one end is vertically directed stent with first and connect, and first level guiding trestle is another End is connected with the first underwater vertical directive wheel;
Second is vertically directed stent one end connect with second cross beam, and second, which is vertically directed the stent other end, is connected with the second water Lower horizontal guide sheave;Second horizontally-guided stent one end is vertically directed stent with second and connect, and the second horizontally-guided stent is another End is connected with the second underwater vertical directive wheel.
Preferably, diamond rope saw is embraced and is located at outside concrete pipe base to be cut, and diamond rope saw one end sequentially passes through the One submerged level directive wheel, the first underwater vertical directive wheel, third directive wheel, the 4th directive wheel, driving wheel, the first directive wheel, Second directive wheel, the second underwater vertical directive wheel, the second submerged level directive wheel, and connect with the diamond rope saw other end, gold Hard rock rope saw-shaped is into a closed loop.
Preferably, anti-skid washer is equipped between adjustable cuff and concrete pipe base to be cut.
Preferably, driving machine uses E-1812A/DSM-10A type driving machines.
Preferably, the first directive wheel, the second directive wheel, third directive wheel, the 4th directive wheel and driving wheel are in same In perpendicular.
As can be seen from the above technical solutions, the utility model has the following advantages:
It is underwater to be equipped with the adjustable cuff being set in outside concrete pipe base to be cut, the fixed stent under water of adjustable cuff On, underwater stent is equipped with underwater guide wheel group, and diamond rope saw is installed in underwater guide wheel group, and diamond rope saw is embraced to be located at and be treated It cuts outside concrete pipe base, is placed through guide wheel group respectively and driving wheel forms closed loop, the drive shaft of driving wheel driving machine is main Driving wheel drives diamond rope saw operating under the action of driving machine, and underwater concrete pipe base to be cut is cut.It is underwater mixed Solidifying soil pile foundation cutting arrangement not only realizes the purpose of drilling concrete pipe base under water, also for quick, drilling precision and completely The good drilling underwater concrete works technology of property provides out a set of practicable constructing device and construction method.
Description of the drawings
In order to illustrate more clearly of the technical solution of the utility model, attached drawing needed in description will be made below Simply introduce, it should be apparent that, the accompanying drawings in the following description is only some embodiments of the utility model, for this field For those of ordinary skill, without creative efforts, other attached drawings are can also be obtained according to these attached drawings.
Fig. 1 is underwater concrete pile foundation cutting arrangement overall structure diagram.
Specific embodiment
Purpose of utility model, feature, advantage to enable the utility model is more apparent and understandable, below will fortune With specific embodiment and attached drawing, the technical solution of the utility model protection is clearly and completely described, it is clear that below The described embodiments are only a part of the embodiments of the utility model, and not all embodiment.Based on the reality in this patent Example is applied, all other embodiment that those of ordinary skill in the art are obtained without making creative work all belongs to In the range of this patent protection.
The present embodiment provides a kind of underwater concrete pile foundation cutting arrangement, as shown in Figure 1, including:It is arranged on the water surface Operating platform 13, operating platform 13 are equipped with horizontal support 2 and longitudinal carrier 8;Horizontal support 2 and longitudinal carrier 8 are handed in cross Fork connection, the bottom end of longitudinal carrier 8 is fixedly connected with operating platform 13;
Horizontal support 2 is equipped with guide wheel group;Driving wheel 1 is placed on longitudinal carrier 8, and the position set is in horizontal support The top of connecting portion between 2 and longitudinal carrier 8;
Underwater to be equipped with the adjustable cuff 6 being set in outside concrete pipe base 12 to be cut, adjustable cuff 6 is fixed to be propped up under water On frame, underwater stent is equipped with underwater guide wheel group, is installed with diamond rope saw 3 in underwater guide wheel group, diamond rope saw 3, which is embraced, to be set Outside concrete pipe base 12 to be cut, it is placed through guide wheel group respectively and driving wheel 1 forms closed loop, 1 driving machine of driving wheel Drive shaft, driving wheel 1 drive diamond rope saw 3 to operate under the action of driving machine, to underwater concrete pipe base 12 to be cut into Row cutting.Anti-skid washer is equipped between adjustable cuff 6 and concrete pipe base to be cut 12.Play anti-skidding effect.
Horizontal support 2 is equipped with the first connecting shaft, the second connecting shaft, third connecting shaft and the fourth connecting shaft;First connects Spindle, the second connecting shaft, third connecting shaft and the fourth connecting shaft interval are laid on horizontal support 2;First connecting shaft and Two connecting shafts are arranged on the side of connecting portion between horizontal support 2 and longitudinal carrier 8, third connecting shaft and the fourth connecting shaft setting The opposite side of connecting portion between horizontal support 2 and longitudinal carrier 8;Guide wheel group includes:First directive wheel 21, the second directive wheel 22,23 and the 4th directive wheel 24 of third directive wheel;First connecting shaft pass through 21 center of the first directive wheel, and with the first directive wheel 21 rotation connections;Second connecting shaft passes through 22 center of the second directive wheel, and is rotatablely connected with the second directive wheel 22;Third connecting shaft It is rotatablely connected across 23 center of third directive wheel, and with third directive wheel 23;The fourth connecting shaft passes through 24 center of the 4th directive wheel, And it is rotatablely connected with the 4th directive wheel 24.First directive wheel 21, the second directive wheel 22,23 and the 4th directive wheel of third directive wheel 24 can guide the cut direction of diamond rope saw 3, ensure that the position of cutting is stablized.
In the present embodiment, adjustable cuff 6 is equipped with the first cuff semi-ring 15 and the second cuff semi-ring 16;
The one end of first cuff semi-ring 15 is equipped with the first linkage section 17, and the other end of the first cuff semi-ring 15 is equipped with the Two linkage sections 18;Pin hole is respectively equipped on first linkage section 17 and the second linkage section 18;The one end of second cuff semi-ring 16 is set There is third linkage section 19, the other end of the second cuff semi-ring 16 is equipped with the 4th linkage section 20;Third linkage section 19 and the 4th connects It connects and is respectively equipped with pin hole in section 20;The pin hole of first linkage section 17 is adapted with the pin hole of third linkage section 19, is connected by axis pin It connects, the pin hole of the second linkage section 18 is adapted with the pin hole of the 4th linkage section 20, is connected by axis pin, by adjusting the first connection The spacing between spacing and the second linkage section 18 of adjusting and the 4th linkage section 20 between section 17 and third linkage section 19 is adjusted Adjustable cuff 6 is to the enclasping force of concrete pipe base 12 to be cut.Suitable enclasping force is adjusted, can be played to concrete to be cut When pile foundation 12 is cut, it can ensure that cutting is accurate, cutting is easy to operation.
In the present embodiment, underwater stent includes:Submerged level stent;Submerged level branch is provided with first crossbeam 31, and second Crossbeam 32,33 and the 4th crossbeam 34 of third crossbeam;
First crossbeam 31, second cross beam 32,33 and the 4th crossbeam 34 of third crossbeam are sequentially connected and surround squarely, frame It is located at outside concrete pipe base 12 to be cut;First linkage section 17 is respectively equipped with first crossbeam connecting hole with third linkage section 19; Second linkage section 18 and the 4th linkage section 20 are respectively equipped with second cross beam connecting hole;First crossbeam 31 sequentially passes through the first linkage section 17 first crossbeam connecting hole and the first crossbeam connecting hole of third linkage section 19;Third crossbeam 33 sequentially passes through the second linkage section 18 second cross beam connecting hole and the second cross beam connecting hole of the 4th linkage section 20.
Underwater stent further includes:First level guiding trestle 36, the second horizontally-guided stent, first is vertically directed stent 35 And second be vertically directed stent;First is vertically directed 35 one end of stent connect with the 4th crossbeam 34, and first is vertically directed stent 35 other ends are connected with the first submerged level directive wheel 5;36 one end of first level guiding trestle and first is vertically directed stent 35 Connection, 36 other end of first level guiding trestle are connected with the first underwater vertical directive wheel 4;
Second is vertically directed stent one end connect with second cross beam 32, and second, which is vertically directed the stent other end, is connected with second Submerged level directive wheel;Second horizontally-guided stent one end is vertically directed stent with second and connect, and the second horizontally-guided stent is another One end is connected with the second underwater vertical directive wheel.
In the present embodiment, diamond rope saw 3, which is embraced, to be located at outside concrete pipe base 12 to be cut, 3 one end of diamond rope saw according to It is secondary to pass through the first submerged level directive wheel 5, the first underwater vertical directive wheel 4, third directive wheel 23, the 4th directive wheel 24, active Wheel 1, the first directive wheel 21, the second directive wheel 22, the second underwater vertical directive wheel, the second submerged level directive wheel, and and Buddha's warrior attendant Stone rope saws the connection of 3 other ends, and diamond rope saw 3 forms a closed loop.Driving machine uses E-1812A/DSM-10A type driving machines.The One directive wheel 21, the second directive wheel 22, third directive wheel 23, the 4th directive wheel 24 and driving wheel 1 are in same perpendicular It is interior.Diamond rope saw 3 cuts concrete pipe base 12 to be cut under the driving of driving machine.
The installation and application of underwater concrete pile foundation cutting arrangement, includes the following steps:
Step 1:The selection of equipment and equipment;According to the stake diameter of underwater concrete pile foundation and drilling depth and diamond rope saw Technology requirement, select suitable auxiliary machine tool, prepare associated materials;
Step 2:Suitable adjustable cuff 6 is selected according to the stake diameter of pile foundation, cuff cannot be in direct contact with concrete surface, be Increase friction, pads anti-skid washer, gasket width should be slightly bigger than cuff width, and cuff application bolt is tightened between the two;
Step 3:After the cuff installation of step 2, underwater stent is installed;
Step 4:Underwater submerged level directive wheel 5 is installed on the submerged level stent formed in step 3 and underwater vertical is led To wheel 4;
Step 5:Diamond rope saw 3 is installed, diamond rope saw 3 is made to combine closely with each directive wheel;
Step 6:Test drilling is carried out to concrete pipe base to cut, and treats that diamond rope saw is no longer acutely shaken;
Step 7:Drilling concrete pipe base is until be kept completely separate;
Step 8:The separation block obtained to the step 7 is lifted by crane barge;
Step 9:Dregs after drilling is removed;
So far, underwater concrete pile foundation drilling construction is finished.
Underwater concrete pile foundation cutting arrangement uses diamond-wire saw drilling technique, includes the following steps:
The selection of 1 equipment and equipment:According to be easily installed in the construction process, move need reasonably select power drive Equipment;According to label and diamond rope saw drilling the technology requirement for treating drilling concrete, suitable auxiliary machine tool is selected;According to height The needs of quick drilling are imitated, select the formula of suitable cutting arrangement and its diamond rope;
The installation and fixation of 2 equipment:The installation fixation of equipment has to comply with relevant regulations, it is ensured that fixed, Bu Hui Offset is generated during drilling;
3 determining drilling operating process and drilling parameter value:Drilling process includes pre-cut and normal drilling, in the normal brill During cutting, when drilling encounters abnormal conditions, according to three kinds of drilling states, pre-cut drilling, normal drilling and abnormal brill are determined The drilling parameter value cut, in the appropriate adjustment of each drilling;
4 drillings are constructed:Drilling construction is carried out according to the drilling operating process that step 3 determines;
5 drilling offset measurements:In step 4 drilling work progress, offset principle is surveyed according to weight, uses drilling total powerstation The offset dimensions of accurately measure drilling rope axis are wanted to judge whether drilling concrete drilling position meets quality It asks;
6 drillings are rectified a deviation:When the offset dimensions that drilling rope axis is measured in step 5 exceed allowed band, implement correction;
7 drilling concrete pipe bases are edited and recorded:After drilling is constructed, drilling chart is drawn, to drilling concrete pipe base Length and width are described and retain main positions with characteristic image photo;
The inspection and examination of 8 drilling quality:After drilling is constructed, liver mass inspection and examination, and archive of signing.
In the above method, power drive device described in 1 selects to drive with the E-1812A/DSM-10A types hydraulic pressure of electric drive Ejector half diamond-wire saw, the auxiliary machine tool include underwater concrete pile foundation drilling integral support and sharp formula diamond Rope.
In the above method, the parameter value of drilling pre-cut described in 3 is:Pressure 10MPa, 5~6m/s of linear velocity;It is described normal The parameter value of drilling is:18~22MPa of pressure, 18~20m/s of linear velocity;It is described exception drilling parameter value be:Pressure 1~ 5MPa, 2~3m/s of revolution.
In the above method, including it is following step by step:
1st, pre-cut drilling:Using light pressure, mode of operation at a slow speed, stop drilling after rope is without any shake, perform 5 Hes 6, drilling can be continued by meeting the requirements;
2nd, normal drilling:Adjust to normal drilling parameter value, normal drilling carried out to concrete pipe base, when drilling encounter it is different Step by step 3 are then performed during reason condition;
3rd, abnormal drilling:Light pressure, the mode of operation of slow-speed are taken, slowly rotary driving wheel, can not such as restore normal condition It should stop drilling immediately to operate and analyze reason, take measures after solving abnormal conditions, then continue to execute step by step 2.
In the above method, the process of the drilling offset measurement includes:Ensure that drilling rope, driving wheel, directive wheel are in In same vertical straight line, while ensure that driving wheel guide rail is in plumbness with drilling cradle top surface platform, it at this moment can be accurately Measure the offset dimensions of diamond rope axis.
In the above method, the method that the drilling correction uses is:Size and required relevant amounts are calculated before correction, Drilling driving wheel frame bottom size and verticality are adjusted, implements correction.
Each embodiment is described by the way of progressive in this specification, the highlights of each of the examples are with other The difference of embodiment, identical similar portion refers to mutually between each embodiment.
Term " first " in the specification and claims of the utility model and above-mentioned attached drawing, " second ", " third " " 4th " etc., for distinguishing similar object, specific sequence or precedence is described without being used for if there is being.It should Understand that the data that use in this way can be interchanged in the appropriate case, it can be with so as to the embodiment of the utility model described herein Sequence other than those for illustrating or describing herein is implemented.In addition, term " comprising " and " having " and their times What is deformed, it is intended that covers non-exclusive include.
The foregoing description of the disclosed embodiments enables professional and technical personnel in the field to realize or new using this practicality Type.A variety of modifications of these embodiments will be apparent for those skilled in the art, determine herein The General Principle of justice can be realized in other embodiments without departing from the spirit or scope of the present utility model.Cause This, the utility model is not intended to be limited to the embodiments shown herein, and is to fit to and principles disclosed herein The most wide range consistent with features of novelty.

Claims (9)

1. a kind of underwater concrete pile foundation cutting arrangement, which is characterized in that including:The operating platform (13) being arranged on the water surface, Operating platform (13) is equipped with horizontal support (2) and longitudinal carrier (8);Horizontal support (2) and longitudinal carrier (8) are in right-angled intersection Connection, the bottom end of longitudinal carrier (8) is fixedly connected with operating platform (13);
Horizontal support (2) is equipped with guide wheel group;Driving wheel (1) is placed on longitudinal carrier (8), and the position set is in lateral branch The top of connecting portion between frame (2) and longitudinal carrier (8);
Underwater be equipped with is set in the external adjustable cuff (6) of concrete pipe base to be cut (12), and adjustable cuff (6) is fixed under water On stent, underwater stent is equipped with underwater guide wheel group, and diamond rope saw (3), diamond rope saw are installed in underwater guide wheel group (3) it embraces and is located at concrete pipe base to be cut (12) outside, be placed through guide wheel group respectively and driving wheel (1) forms closed loop, actively The drive shaft of (1) driving machine is taken turns, driving wheel (1) drives diamond rope saw (3) to operate, to treating under water under the action of driving machine Cutting concrete pipe base (12) is cut.
2. underwater concrete pile foundation cutting arrangement according to claim 1, which is characterized in that
Horizontal support (2) is equipped with the first connecting shaft, the second connecting shaft, third connecting shaft and the fourth connecting shaft;First connection Axis, the second connecting shaft, third connecting shaft and the fourth connecting shaft interval are laid on horizontal support (2);
First connecting shaft and the second connecting shaft are arranged on the side of connecting portion between horizontal support (2) and longitudinal carrier (8), third Connecting shaft and the fourth connecting shaft are arranged on the opposite side of connecting portion between horizontal support (2) and longitudinal carrier (8);
Guide wheel group includes:First directive wheel (21), the second directive wheel (22), third directive wheel (23) and the 4th directive wheel (24);
First connecting shaft passes through the first directive wheel (21) center, and is rotatablely connected with the first directive wheel (21);
Second connecting shaft passes through the second directive wheel (22) center, and is rotatablely connected with the second directive wheel (22);
Third connecting shaft passes through third directive wheel (23) center, and is rotatablely connected with third directive wheel (23);
The fourth connecting shaft passes through the 4th directive wheel (24) center, and is rotatablely connected with the 4th directive wheel (24).
3. underwater concrete pile foundation cutting arrangement according to claim 2, which is characterized in that
Adjustable cuff (6) is equipped with the first cuff semi-ring (15) and the second cuff semi-ring (16);
The one end of first cuff semi-ring (15) is equipped with the first linkage section (17), and the other end of the first cuff semi-ring (15) is equipped with Second linkage section (18);Pin hole is respectively equipped on first linkage section (17) and the second linkage section (18);
The one end of second cuff semi-ring (16) is equipped with third linkage section (19), and the other end of the second cuff semi-ring (16) is equipped with 4th linkage section (20);Pin hole is respectively equipped on third linkage section (19) and the 4th linkage section (20);
The pin hole of first linkage section (17) is adapted with the pin hole of third linkage section (19), is connected by axis pin, the second linkage section (18) pin hole is adapted with the pin hole of the 4th linkage section (20), is connected by axis pin, by adjust the first linkage section (17) with The spacing between spacing and the second linkage section of adjusting (18) and the 4th linkage section (20) between third linkage section (19) is adjusted Adjustable cuff (6) is to the enclasping force of concrete pipe base to be cut (12).
4. underwater concrete pile foundation cutting arrangement according to claim 3, which is characterized in that
Underwater stent includes:Submerged level stent;
Submerged level branch is provided with first crossbeam (31), second cross beam (32), third crossbeam (33) and the 4th crossbeam (34);
First crossbeam (31), second cross beam (32), third crossbeam (33) and the 4th crossbeam (34) is sequentially connected and the side of being encircled into It is external to be erected at concrete pipe base to be cut (12) for shape;
First linkage section (17) is respectively equipped with first crossbeam connecting hole with third linkage section (19);
Second linkage section (18) is respectively equipped with second cross beam connecting hole with the 4th linkage section (20);
First crossbeam (31) sequentially pass through the first linkage section (17) first crossbeam connecting hole and third linkage section (19) first Crossbeam connecting hole;
Third crossbeam (33) sequentially pass through the second linkage section (18) second cross beam connecting hole and the 4th linkage section (20) second Crossbeam connecting hole.
5. underwater concrete pile foundation cutting arrangement according to claim 4, which is characterized in that
Underwater stent further includes:First level guiding trestle (36), the second horizontally-guided stent, first is vertically directed stent (35) And second be vertically directed stent;
First is vertically directed stent (35) one end connect with the 4th crossbeam (34), and first is vertically directed the connection of stent (35) other end There is the first submerged level directive wheel (5);First level guiding trestle (36) one end is vertically directed stent (35) with first and connect, the One horizontally-guided stent (36) other end is connected with the first underwater vertical directive wheel (4);
Second is vertically directed stent one end connect with second cross beam (32), and second, which is vertically directed the stent other end, is connected with the second water Lower horizontal guide sheave;Second horizontally-guided stent one end is vertically directed stent with second and connect, and the second horizontally-guided stent is another End is connected with the second underwater vertical directive wheel.
6. underwater concrete pile foundation cutting arrangement according to claim 5, which is characterized in that
Diamond rope saw (3), which is embraced, is located at concrete pipe base to be cut (12) outside, and diamond rope saw (3) one end sequentially passes through first Submerged level directive wheel (5), the first underwater vertical directive wheel (4), third directive wheel (23), the 4th directive wheel (24), driving wheel (1), the first directive wheel (21), the second directive wheel (22), the second underwater vertical directive wheel, the second submerged level directive wheel, and with Diamond rope saw (3) other end connects, and diamond rope saw (3) forms a closed loop.
7. underwater concrete pile foundation cutting arrangement according to claim 1, which is characterized in that
Anti-skid washer is equipped between adjustable cuff (6) and concrete pipe base to be cut (12).
8. underwater concrete pile foundation cutting arrangement according to claim 1, which is characterized in that
Driving machine uses E-1812A/DSM-10A type driving machines.
9. underwater concrete pile foundation cutting arrangement according to claim 4, which is characterized in that
First directive wheel (21), the second directive wheel (22), third directive wheel (23), the 4th directive wheel (24) and driving wheel (1) In same perpendicular.
CN201721490173.1U 2017-11-09 2017-11-09 A kind of underwater concrete pile foundation cutting arrangement Active CN207553100U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721490173.1U CN207553100U (en) 2017-11-09 2017-11-09 A kind of underwater concrete pile foundation cutting arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721490173.1U CN207553100U (en) 2017-11-09 2017-11-09 A kind of underwater concrete pile foundation cutting arrangement

Publications (1)

Publication Number Publication Date
CN207553100U true CN207553100U (en) 2018-06-29

Family

ID=62682737

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721490173.1U Active CN207553100U (en) 2017-11-09 2017-11-09 A kind of underwater concrete pile foundation cutting arrangement

Country Status (1)

Country Link
CN (1) CN207553100U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110424280A (en) * 2019-08-14 2019-11-08 广东省水利水电第三工程局有限公司 Cushion cap cutter device and ship for cutting cushion cap
CN113089670A (en) * 2021-05-26 2021-07-09 山东交通学院 Underwater cutting device for maintaining old bridge pile foundation
CN113843899A (en) * 2021-10-20 2021-12-28 中南大学 Method and system for separating abandoned buildings adjacent to existing underwater buildings
CN114908672A (en) * 2022-05-13 2022-08-16 广东省源天工程有限公司 Underwater directional cutting equipment for concrete removal and cutting method thereof
CN115075271A (en) * 2022-07-08 2022-09-20 四川公路桥梁建设集团有限公司 Underwater dismantling method for steel-concrete structure of steel cofferdam
CN110424280B (en) * 2019-08-14 2024-05-31 广东省水利水电第三工程局有限公司 Bearing platform cutting device and ship for cutting bearing platform

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110424280A (en) * 2019-08-14 2019-11-08 广东省水利水电第三工程局有限公司 Cushion cap cutter device and ship for cutting cushion cap
CN110424280B (en) * 2019-08-14 2024-05-31 广东省水利水电第三工程局有限公司 Bearing platform cutting device and ship for cutting bearing platform
CN113089670A (en) * 2021-05-26 2021-07-09 山东交通学院 Underwater cutting device for maintaining old bridge pile foundation
CN113843899A (en) * 2021-10-20 2021-12-28 中南大学 Method and system for separating abandoned buildings adjacent to existing underwater buildings
CN113843899B (en) * 2021-10-20 2024-02-20 中南大学 Separation method for abandoned buildings adjacent to existing buildings underwater
CN114908672A (en) * 2022-05-13 2022-08-16 广东省源天工程有限公司 Underwater directional cutting equipment for concrete removal and cutting method thereof
CN114908672B (en) * 2022-05-13 2024-01-19 射阳县润洋混凝土工程有限公司 Underwater directional cutting equipment for concrete cutting and cutting method thereof
CN115075271A (en) * 2022-07-08 2022-09-20 四川公路桥梁建设集团有限公司 Underwater dismantling method for steel-concrete structure of steel cofferdam

Similar Documents

Publication Publication Date Title
CN207553100U (en) A kind of underwater concrete pile foundation cutting arrangement
CN111535308B (en) Full-length steel sleeve construction device and construction method thereof
CN103266603A (en) Construction method for pre-drilling hole-forming base-expanding and grouting of prestressed concrete special-shaped pile
CN107503344A (en) The construction method of turnover type merogenesis steel pile casting retaining wall manually digging hole filling pile
CN108755665B (en) Construction method of surrounding and drilling integrated platform
CN107724383A (en) Rotary digging cast-in-place pile construction method
CN101736755A (en) Clean water hole pile foundation constructing method
CN104929133A (en) Deep foundation pit Larsen steel sheet pile bottom sloping support construction method
CN207314322U (en) A kind of guide frame for the construction of Larsen steel sheet pile circular cofferdam
CN112049123A (en) Construction method of steel reinforced concrete secant pile and arc-shaped protective tool
CN105200994A (en) Construction method for reserved shield crossing composite foundation pit support device
CN113106965A (en) Construction device and method for undisturbed breaking of steel strand diaphragm wall of temporary subway structure
CN106284366A (en) External pulling type Larsen steel sheet pile reinforcement means
CN211333866U (en) High-speed railway beam-making pedestal suitable for unfavorable geology
CN108005134B (en) Construction method of rope saw cutting type inclination correcting building
CN109441138A (en) To the method that punches of existing prestressed structure plate
CN114775671A (en) Large-diameter precast tubular pile construction method under complex geology
CN100535583C (en) Project pile underwater concrete sampler and sampling method in construction
CN204112334U (en) Reserved shield crossing combined type foundation pit exterior-protected device
CN206289633U (en) A kind of foundation ditch flexible supporting structure
CN111335305A (en) Double-casing zero-friction static load detection construction method based on uplift pile
CN103452087B (en) Bias is vibrated and is set up steelframe platform construction engineering method
CN218346220U (en) Combined water retaining cofferdam
CN216737128U (en) Steel stand hoisting accessory
CN109208628A (en) One kind being directed to the cast-in-place concrete foundation of weak soil property and construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant