CN207537892U - Bridge construction fall arrest device - Google Patents
Bridge construction fall arrest device Download PDFInfo
- Publication number
- CN207537892U CN207537892U CN201721407155.2U CN201721407155U CN207537892U CN 207537892 U CN207537892 U CN 207537892U CN 201721407155 U CN201721407155 U CN 201721407155U CN 207537892 U CN207537892 U CN 207537892U
- Authority
- CN
- China
- Prior art keywords
- drawing article
- connecting cylinder
- hanging portion
- bridge
- hanging
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model belongs to personnel's transporting equipment field, specifically disclose a kind of bridge construction fall arrest device, including hanging basket, hanging basket is equipped with slidable connection in the first hanging portion of bridge guardrails of both sides and the second hanging portion, further include drawing article and connecting cylinder, drawing article is between the first hanging portion and the second hanging portion, drawing article one end is fixedly connected with the first hanging portion, the other end of drawing article has external screw thread, connecting cylinder is slidably connected on the guardrail of bridge, in connecting cylinder the internal thread with the external screw thread cooperation on drawing article is equipped with close to drawing article one end, in connecting cylinder several lozenges are equipped with close to drawing article one end, drawing article is equipped with several and matched wedge block of lozenges close to connecting cylinder side, wedge block is made of elastic component, it is fixed on connecting cylinder and climbs handrail.The present apparatus solves the prior art and results in operating personnel during hanging basket is jumped into, and there are problems that the security risk fallen from bridge.
Description
Technical field
The utility model belongs to personnel's transporting equipment field more particularly to a kind of fall arrest device of bridge construction.
Background technology
When carrying out attachment installation, decoration, finishing in the both sides of bridge when operations, need installation personnel being hoisted to bridge
Side carries out construction operation, can not be from ground or the water surface by personnel since bridge floor height is higher, and without excessively high lifting setting
Bridge floor is transported to crane system from bottom to top.Lifting device have to be taken to carry out handling, however existing skill to personnel from top to bottom
Lifting device in art is bulky, structure bulky, it is mobile get up it is very difficult, and jack laborious, can not make in lifting device
Safety is guaranteed by the staff in face.
Therefore, a kind of mobile construction hanging basket how is improved, during solving in the prior art due to constructing in bridge both sides
Since existing lifting device is bulky, structure bulky, it is mobile get up it is very difficult, and jack laborious, lifting device can not be made
The staff of the inside many disadvantages such as safety is guaranteed, it is real to be asked with becoming practitioner in the art's technology urgently to be resolved hurrily
Topic.
The patent document of Publication No. CN205857036U is authorized to disclose a kind of mobile construction hanging basket, the movable type
Construction hanging basket is applied in bridge construction, and the movable type construction hanging basket is suspended on the guardrail of the bridge both sides, the shifting
Dynamic formula construction hanging basket includes:Basket body, the space frame structure being welded by several metal strips;Packaged type hanging portion,
It is connect with the basket body, the basket body is installed on close to the side of bridge, for the basket body to be suspended on
The guardrail of the bridge both sides is so that the movable type construction hanging basket moves freely when constructing on the guardrail.The program is led to
It crosses on the guardrail that hanging basket is arranged on to bridge railing both sides, solves in the prior art that personnel's handling appliance is bulky, structure bulky
The problem of.But operating personnel help object because not climbing, cause operating personnel that can only jump into when entering hanging basket from bridge
In hanging basket.Operating personnel are caused during hanging basket is jumped into, there are problems that the security risk fallen from bridge.
Utility model content
The purpose of this utility model is to provide a kind of bridge construction fall arrest devices, are resulted in solving the prior art
There is the security risk fallen from bridge during hanging basket is jumped into operating personnel.
In order to achieve the above object, the base case of the utility model provides a kind of bridge construction fall arrest device, packet
Include hanging basket, hanging basket is equipped with slidable connection in the first hanging portion of bridge guardrails of both sides and the second hanging portion, further includes pulling
Part and connecting cylinder, between the first hanging portion and the second hanging portion, drawing article one end is fixed with the first hanging portion to be connected drawing article
It connects, the other end of drawing article has external screw thread, and connecting cylinder is slidably connected on the guardrail of bridge, close to drawing article one in connecting cylinder
End is equipped with the internal thread with the external screw thread cooperation on drawing article, is equipped with several lozenges close to drawing article one end in connecting cylinder,
Drawing article is equipped with several and matched wedge block of lozenges close to connecting cylinder side, and wedge block is made of elastic component, on connecting cylinder
It is fixed with and climbs handrail.
The principle of this base case is:For operating personnel when entering hanging basket, handrail is climbed in rotation rotates connecting cylinder, connects
During cylinder rotation, the external screw thread cooperation on the internal thread and drawing article inside connecting cylinder drives connecting cylinder to be moved to drawing article, connection
During cylinder is mobile, wedge block is relatively moved with lozenges, so as to be compacted wedge block.Because wedge block is elasticity
Part, wedge block deform during being compacted, and Bridge guardrail is held tightly, so as to which connecting cylinder to be fixed on to the guardrail of bridge
On, and then make to climb handrail and fix.At this point, operating personnel help and climb handrail and enter in hanging basket, avoid in a manner of jump into hanging basket
In caused by security risk.In addition, when wedge block holds Bridge guardrail tightly, hanging basket is made not move, so as to avoid blowing
When hanging basket is blown, influence operating personnel work.
The advantageous effect of this base case is:1. the present apparatus can avoid operating personnel from being caused during jumping into hanging basket
The problem of security risk fallen from bridge.
2. hanging basket is blown when can avoid blowing, influence operating personnel's work.
3. present apparatus result is simple, easily operated.
Prioritization scheme one:Guide cylinder is further included, guide cylinder is slidably connected on the guardrail of bridge, and guide cylinder is fixed on second
On hanging portion, connecting cylinder is slidably connected on guide cylinder.The setting of guide cylinder makes connecting cylinder more steady when moving, so as to make
Internal and external threads easily coordinate, member people's operation easy to operation.
Prioritization scheme two:Further including check lock lever, check lock lever one end, which is hinged on, climbs handrail close to the first hanging portion side, and first
Hanging portion top is equipped with card slot corresponding with another end position of check lock lever.Make to climb handrail position after check lock lever clamping card slot completely solid
Fixed, when preventing from personnel from helping climbing handrail and enter hanging basket, connecting cylinder reversing causes personnel to fall.
Prioritization scheme three:Connection sheet is further included, connection sheet one end is connect with drawing article, and the connection sheet other end connects with wedge block
It connects, connection sheet is made of spring steel.It is easily deformed because connection sheet cross-sectional area is small, reduces the connection of wedge block and drawing article
And it is easily deformed, is easier wedge block the guardrail side chain of bridge is tight.
Prioritization scheme four:The check lock lever is caught in the wedge shaped shape in one end of card slot.After check lock lever is caught in card slot, then in card slot
Corresponding wedge-shaped fixture block is inside squeezed into, makes structure more firm, personnel safety is further protected.
Description of the drawings
Fig. 1 is the structure diagram of the utility model embodiment bridge construction fall arrest device;
Fig. 2 is the enlarged drawing at A in Fig. 1.
Specific embodiment
The utility model is described in further detail below by specific embodiment:
Reference numeral in Figure of description includes:Handrail 3, the second hanging portion 4, hanging basket are climbed in guardrail 1, the first hanging portion 2
5th, drawing article 6, check lock lever 7, wedge block 8, connection sheet 9, connecting cylinder 10, guide cylinder 11.
Embodiment:Bridge construction fall arrest device in this programme, as depicted in figs. 1 and 2,5 upper top of hanging basket one
Slidable connection is formed in the first hanging portion 2 of bridge guardrails of both sides 1 and the second hanging portion 4.Drawing article 6 is cylindrical in shape, and is pulled
Part 6 is slidably connected on the guardrail 1 of bridge.For drawing article 6 between the first hanging portion 2 and the second hanging portion 4, drawing article 6 is left
End is welded with the first hanging portion 2, and the right end of drawing article 6 has external screw thread.
Guide cylinder 11 is set on the guardrail 1 of bridge, and can be slided on the guardrail 1 of bridge, and guide cylinder 11 is welded on
The left side of second hanging portion 4.Connecting cylinder 10 is set on guide cylinder 11, and can be slided on guide cylinder 11.A left side for connecting cylinder 10
End is internal integrally formed with the internal thread coordinated with the external screw thread on drawing article 6, and 10 left end of connecting cylinder is integrally formed with several wedges
Shape face, 6 right end of drawing article are welded with connection sheet 9 made of spring steel, 6 right end of drawing article by the connection of connection sheet 9 there are four with
The matched wedge block 8 of lozenges, wedge block 8 are uniformly distributed along guardrail 1 is circumferential, and wedge block 8 can be by rubber, nylon or spring steel
Elastic component is made, integrally formed with climbing handrail 3 on connecting cylinder 10.7 right end pin hole of check lock lever is hinged on the left side for climbing handrail 3, the
One hanging portion, 2 top is integrally formed with card slot corresponding with 7 left position of check lock lever, the wedge shaped shape of left end of check lock lever 7.
For operating personnel when entering hanging basket 5, handrail 3 is climbed in rotation rotates connecting cylinder 10, when connecting cylinder 10 rotates, connecting cylinder
Internal thread inside 10 coordinates with the external screw thread on drawing article 6, connecting cylinder 10 is driven to be moved to drawing article 6, connecting cylinder 10 moves
During, wedge block 8 is relatively moved with lozenges, so as to be compacted wedge block 8.Because wedge block 8 is elastic component,
Wedge block 8 deforms during being compacted, and Bridge guardrail 1 is held tightly, so as to which connecting cylinder 10 to be fixed on to the shield of bridge
On column 1, and check lock lever 7 is caught in card slot, squeezes into wedge-shaped fixture block, and then made to climb handrail 3 and fix.At this point, operating personnel help
It climbs handrail 3 to enter in hanging basket 5, avoid in a manner of jump into security risk caused by hanging basket 5.In addition, wedge block 8 is by bridge
When guardrail 1 is held tightly, hanging basket 5 is made not move, so as to avoid blowing when blows hanging basket 5, influences operating personnel's work.
Above-described is only the embodiment of the utility model, and the common sense such as well known concrete structure and characteristic are herein in scheme
It does not describe excessively.It should be pointed out that for those skilled in the art, in the premise for not departing from the utility model structure
Under, several modifications and improvements can also be made, these should also be considered as the scope of protection of the utility model, these are not all interfered with
The effect and practical applicability that the utility model is implemented.This application claims protection domain should be with the content of its claim
Subject to, the records such as specific embodiment in specification can be used for explaining the content of claim.
Claims (5)
1. bridge construction fall arrest device, including hanging basket, hanging basket is equipped with slidable connection the first of bridge guardrails of both sides
Hanging portion and the second hanging portion, which is characterized in that further include drawing article and connecting cylinder, drawing article is located at the first hanging portion and second
Between hanging portion, drawing article one end is fixedly connected with the first hanging portion, and the other end of drawing article has external screw thread, and connecting cylinder slides
It is connected on the guardrail of bridge, the internal thread with the external screw thread cooperation on drawing article is equipped with close to drawing article one end in connecting cylinder,
In connecting cylinder several and lozenges is equipped with close to connecting cylinder side close to several lozenges that are equipped with of drawing article one end, drawing article
The wedge block matched, wedge block are made of elastic component, are fixed on connecting cylinder and climb handrail.
2. bridge construction fall arrest device according to claim 1, it is characterised in that:Further include guide cylinder, guide cylinder
It is slidably connected on the guardrail of bridge, guide cylinder is fixed on the second hanging portion, and connecting cylinder is slidably connected on guide cylinder.
3. bridge construction fall arrest device according to claim 1, it is characterised in that:Further include check lock lever, check lock lever
One end, which is hinged on, climbs handrail close to the first hanging portion side, and the first hanging portion top is equipped with corresponding with another end position of check lock lever
Card slot.
4. bridge construction fall arrest device according to claim 1, it is characterised in that:Further include connection sheet, connection sheet
One end is connect with drawing article, and the connection sheet other end is connect with wedge block, and connection sheet is made of spring steel.
5. bridge construction fall arrest device according to claim 3, it is characterised in that:The check lock lever is caught in card slot
The wedge shaped shape in one end.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721407155.2U CN207537892U (en) | 2017-10-26 | 2017-10-26 | Bridge construction fall arrest device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721407155.2U CN207537892U (en) | 2017-10-26 | 2017-10-26 | Bridge construction fall arrest device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207537892U true CN207537892U (en) | 2018-06-26 |
Family
ID=62611322
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721407155.2U Expired - Fee Related CN207537892U (en) | 2017-10-26 | 2017-10-26 | Bridge construction fall arrest device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207537892U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109115198A (en) * | 2018-10-19 | 2019-01-01 | 重庆工程职业技术学院 | From protection total station |
CN109441083A (en) * | 2018-12-24 | 2019-03-08 | 蒿振侠 | A kind of wedge knot composite truss platform |
-
2017
- 2017-10-26 CN CN201721407155.2U patent/CN207537892U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109115198A (en) * | 2018-10-19 | 2019-01-01 | 重庆工程职业技术学院 | From protection total station |
CN109441083A (en) * | 2018-12-24 | 2019-03-08 | 蒿振侠 | A kind of wedge knot composite truss platform |
CN109441083B (en) * | 2018-12-24 | 2022-03-08 | 福州鼓楼纹英建筑工程有限责任公司 | Wedge-junction truss type combined platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2838259C (en) | Scaffold system | |
CN207537892U (en) | Bridge construction fall arrest device | |
CN204529038U (en) | Construction elevator floor passageway integral type turns over a door system | |
CN205348009U (en) | Hanging flower basket device of bridge construction | |
CN203969312U (en) | Climbing vertical ladder coupling type anti-drop safety gloves | |
CN106836785A (en) | Possesses the scaffold of rotary work ability | |
CN111441568A (en) | Hanging basket for high-altitude operation in building engineering | |
CN204112697U (en) | A kind of protector carrying raise scaffold turnover panel | |
CN110984555A (en) | Scaffold for elevator well | |
CN207144427U (en) | A kind of construction Anti-dropping rack | |
CN206290066U (en) | A kind of electric pole for being easy to climb | |
CN205575520U (en) | Installation device of super high -rise building elevator | |
CN205314595U (en) | Elevartor shaft protection frame | |
CN204663378U (en) | Climb rope ladder person catching device | |
CN214144628U (en) | Cage type ladder stand operating platform | |
CN108035530A (en) | A kind of inner wall of oil tank construction hanging basket | |
CN203795883U (en) | Safety protecting device with reserved holes | |
CN204283201U (en) | Tower room integrated communication base station and Anti-drop ladder thereof | |
CN205955639U (en) | Perpendicular anti -skidding cat ladder | |
CN206015532U (en) | A kind of security protection hanging cable for high pier construction | |
CN204252562U (en) | For the prior-warning device of overhanging unloading platform | |
CN203563158U (en) | Portable hand-operated monitor tester | |
CN204756311U (en) | Box generating set of silence with lift by crane with a cat ladder body structure | |
CN208899901U (en) | It is a kind of that the scaffold of protection can be provided for construction personnel | |
CN211815574U (en) | Hanging flower basket that safe removal was crawled removes ladder |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180626 Termination date: 20181026 |
|
CF01 | Termination of patent right due to non-payment of annual fee |