CN207537869U - Cable way bridge abutment - Google Patents

Cable way bridge abutment Download PDF

Info

Publication number
CN207537869U
CN207537869U CN201720545830.1U CN201720545830U CN207537869U CN 207537869 U CN207537869 U CN 207537869U CN 201720545830 U CN201720545830 U CN 201720545830U CN 207537869 U CN207537869 U CN 207537869U
Authority
CN
China
Prior art keywords
cable
anchor
main rope
slab
plinth material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720545830.1U
Other languages
Chinese (zh)
Inventor
杜洪亮
傅支黔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Chengdu Engineering Co Ltd
Original Assignee
PowerChina Chengdu Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Chengdu Engineering Co Ltd filed Critical PowerChina Chengdu Engineering Co Ltd
Priority to CN201720545830.1U priority Critical patent/CN207537869U/en
Application granted granted Critical
Publication of CN207537869U publication Critical patent/CN207537869U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model is related to a kind of cable way bridge abutments, belong to science of bridge building field.The utility model includes anchor slab and plinth material, plinth material is set on the inside of anchor slab, the cable saddle for being laid with main rope is provided at the top of plinth material, connection adjuster is provided with after the pile warp cable saddle of main rope end, main rope end after connecting adjuster by connecting anchor cable, anchor cable is turned to by anchor slab, and simply supported slab is laid between cable saddle top at the top of anchor slab.The form design of the abutment of cable way bridge into freely-supported harden structure, so as to reduce is excavated, mitigates the destruction to environment, the stress for making anchor cable definitely, facilitates the routine inspection to anchor cable and adjusts rope by the utility model;Main rope span can be also reduced, save material and reduces difficulty of construction.

Description

Cable way bridge abutment
Technical field
The utility model is related to a kind of cable way bridge abutments, belong to science of bridge building field.
Background technology
Modern cable way bridge is a kind of temporary bridge girder construction form widely used in large-scale construction project, the vehicle of cable way bridge Load passes to main bearing rope by floorings, and main rope transmits the force to the anchorage for being anchored in two sides, and anchorage is primarily subjected to draw Power.Common anchorage form is alley, anchoring pile, anchor pole and hybrid anchorage etc..Abutment (plinth material) is set between anchorage and main rope, Pulley is set on abutment to realize that main rope turns to and undertake vertical force.
Cable way bridge needs abutment to realize being connected for the steering of vertical supporting, main rope and bridge floor and two sides.Main rope and anchorage Between should there are enough spaces for the connection of anchor cable and main rope and to adjust rope.At present frequently with method mainly abutment with Anchor hole is excavated between anchor cable, gravelly soil is backfilled after anchor cable and anchor cable are provided with main rope connector.
Prior art excavated volume is larger more serious to ecological disruption;Backfill compactness in anchor hole is relatively difficult to guarantee, and easily causes anchor hole Top roadbed settlement;The gravelly soil of backfill can cause to damage to anchor cable;The frictional force of anchor cable and gravelly soil is not easy to be quantized, from And its influence to main rope sag is not easy to estimate;The vehicular load that anchor cable in anchor hole is born after being wrapped up by gravelly soil can not essence Really consider;Cable way bridge is difficult to carry out routine examination to anchor cable in anchor hole after putting into operation;Cable way bridge across footpath is larger simultaneously.
Utility model content
Technical problem to be solved in the utility model is:There is provided a kind of cable way bridge abutment, it is possible to reduce excavate, mitigation pair The destruction of environment, the stress for making anchor cable definitely, facilitate the routine inspection to anchor cable and adjust rope.
Technical solution is used by the utility model to solve above-mentioned technical problem:Cable way bridge abutment, including anchor slab and Plinth material, plinth material are set on the inside of anchor slab, and the cable saddle for being laid with main rope is provided at the top of plinth material, is set after the pile warp cable saddle of main rope end Have connection adjuster, by connecting anchor cable after connecting adjuster, anchor cable is turned to by anchor slab for main rope end, at the top of anchor slab with Simply supported slab is laid between at the top of cable saddle.
It is further:The freely-supported board support being adapted with simply supported slab is provided at the top of anchor slab.
It is further:Cable saddle includes pulley bracket plate and pulley, after pulley bracket plate height and main rope are by pulley Apical side height is consistent;One end that simply supported slab is located at plinth material is layed at the top of pulley bracket plate and main rope.
The utility model be applied to cable way bridge specific process step be:Plinth material is poured, and cable saddle component is installed, pulley branch Frame plate height is consistent by the apical side height after pulley with main rope;
Anchor slab is poured into a mould, freely-supported board support is set above anchor slab;
Main rope, anchor cable, connection adjuster and bridge deck structure are installed;
Simply supported slab is welded using the materials such as I-steel group;
It is laid with simply supported slab.
The beneficial effects of the utility model are:By the form design of the abutment of cable way bridge into freely-supported harden structure, so as to reduce It excavates, mitigates the destruction to environment, the stress for making anchor cable definitely, facilitates the routine inspection to anchor cable and adjusts rope;Can also it subtract Few main rope span saves material and reduces difficulty of construction.
Description of the drawings
Fig. 1 is the elevation of the utility model;
Fig. 2 is the plan view of the utility model;
Fig. 3 is the mounting vertical plane figure of cable saddle;
Fig. 4 is the partial enlarged view of cable saddle in Fig. 3;
It is marked in figure:1- anchor slabs, 2- plinth material, 3- main ropes, 4- cable saddles, 5- connections adjuster, 6- anchor cables, 7- simply supported slabs, 8- Pulley bracket plate, 9- pulleys, 10- railings.
Specific embodiment
The utility model is described in further detail below in conjunction with the accompanying drawings.
As shown in Figure 1 to 4, the utility model includes anchor slab 1 and plinth material 2, and plinth material 2 is set on 1 inside of anchor slab, and plinth material 2 pushes up Portion is provided with the cable saddle 4 for being laid with main rope 3, connection adjuster 5 is provided with after 3 end pile warp cable saddle 4 of main rope, main rope end leads to Anchor cable 6 is connected after crossing connection adjuster 5, anchor cable 6 is turned to by anchor slab 1, and 1 top of anchor slab and cable saddle are laid between 4 top Simply supported slab 7.
Stablize for convenience of installation and holding structure, 1 top of anchor slab is provided with the freely-supported board support being adapted with simply supported slab 7. Simply supported slab 7 can be used the materials group such as I-steel and be welded into.
For the work for making simply supported slab 7 more reliable, 8 height of pulley bracket plate and the main rope 3 of cable saddle 4 pass through the top surface after pulley It is highly consistent;One end that simply supported slab 7 is located at plinth material 2 is layed in 3 top of pulley bracket plate 8 and main rope.

Claims (2)

1. cable way bridge abutment, including anchor slab (1) and plinth material (2), plinth material (2) is set on the inside of anchor slab (1) at the top of plinth material (2) It is useful for being laid with the cable saddle (4) of main rope (3), connection adjuster (5), main rope end is provided with after main rope (3) end pile warp cable saddle (4) Portion connects anchor cable (6) afterwards by connecting adjuster (5), and anchor cable (6) is turned to by anchor slab (1), it is characterised in that:Anchor slab (1) it is laid with simply supported slab (7) between top and cable saddle (4) top;Cable saddle (4) includes pulley bracket plate (8) and pulley (9), pulley Supporting plate (8) is highly consistent by the apical side height after pulley with main rope (3);Simply supported slab (7) is spread positioned at one end of plinth material (2) At the top of pulley bracket plate (8) and main rope (3).
2. cable way bridge abutment as described in claim 1, it is characterised in that:It is provided at the top of anchor slab (1) and is mutually fitted with simply supported slab (7) The freely-supported board support matched.
CN201720545830.1U 2017-05-16 2017-05-16 Cable way bridge abutment Active CN207537869U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720545830.1U CN207537869U (en) 2017-05-16 2017-05-16 Cable way bridge abutment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720545830.1U CN207537869U (en) 2017-05-16 2017-05-16 Cable way bridge abutment

Publications (1)

Publication Number Publication Date
CN207537869U true CN207537869U (en) 2018-06-26

Family

ID=62607267

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720545830.1U Active CN207537869U (en) 2017-05-16 2017-05-16 Cable way bridge abutment

Country Status (1)

Country Link
CN (1) CN207537869U (en)

Similar Documents

Publication Publication Date Title
CN104294753B (en) A kind of hollow pier stud syndeton of bridge prefabrication and construction
CN107030874A (en) Precast lattice beam for slope reinforcement and preparation method thereof and construction method
KR200411341Y1 (en) The elevated bridge
CN109972517A (en) A kind of construction method of steel reinforced concrete bondbeam cable-stayed bridge main-beam
CN206859235U (en) For the edge slope structure after the precast lattice beam of slope reinforcement and reinforcing
CN106968164B (en) Cable way bridge abutment
CN108342982B (en) Self-anchoring structure at bearing cable beam end of cable crane of cable stayed bridge of mixed composite beam
CN108487297B (en) Construction method for erecting steel support in half-cover excavation construction of subway station
JP2013204399A (en) Construction method of piled marine structure and piled marine structure
KR20150057581A (en) Level adjusting apparatus for precast slab and precast slab construction method using therewith
CN110184948A (en) A kind of Bridge beam construction method
CN204112525U (en) Band perps precast shear wall structure in strong concrete precast frame
CN104480915B (en) A kind of anti-rail hydraulic climbing formwork for high gradient slope concreting
CN105714819A (en) Novel prestressed anchor cable outer anchor head multiple protection device and fixing method thereof
CN106930315A (en) A kind of moving tower crane foundation structure and construction method
CN207537869U (en) Cable way bridge abutment
JP2011174241A (en) Method for laying floor slab onto bridge girder
KR101160186B1 (en) Pile slab construction technique for railroad land subsidence reduction
CN104032676A (en) Self-anchored bridge abutment structure of horizontally-pulling rope bridge steel wire rope
CN108221954B (en) Easy-to-detach prefabricated underground diaphragm wall, lifting appliance and construction method
CN116677061A (en) Municipal rainwater and sewage inspection well integrated prefabricated installation device and construction method thereof
CN103147469B (en) Vertical compression-resistance static load test method for foundation pile of high-rise building
CN212270945U (en) Existing railway line foundation pit supporting system
CN204311418U (en) A kind of anti-rail hydraulic climbing formwork for high gradient slope concreting
CN108506032B (en) Construction method of large-volume top longitudinal beam in pilot tunnel