CN207536992U - A kind of cross combined type superimposed sheet suspender - Google Patents
A kind of cross combined type superimposed sheet suspender Download PDFInfo
- Publication number
- CN207536992U CN207536992U CN201721335574.XU CN201721335574U CN207536992U CN 207536992 U CN207536992 U CN 207536992U CN 201721335574 U CN201721335574 U CN 201721335574U CN 207536992 U CN207536992 U CN 207536992U
- Authority
- CN
- China
- Prior art keywords
- rectangular frame
- wire rope
- superimposed sheet
- steel wire
- longer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
Description
技术领域technical field
本实用新型公开一种吊具,涉及升降技术领域,具体的说是一种十字组合式叠合板吊具。The utility model discloses a hanger, which relates to the technical field of lifting, in particular to a cross-combined laminated plate hanger.
背景技术Background technique
叠合板是预制和现浇混凝土相结合的一种较好结构形式,叠合板具有现浇楼板的整体性好、刚度大、抗裂性好等优点。目前市场主要叠合板吊装工具大多为单层的U型吊具,每次吊装叠合板只能吊装一块,不利于加快叠合板的吊装进度,特别是在高层住宅施工时,由于施工高度高,塔吊运转速度慢,导致叠合板吊装时间长,严重影响工期进度。本实用新型提供一种十字组合式叠合板吊具,包括十字组合吊架,与现有叠合板吊具相比,十字组合式叠合板吊具具有功能性强、效率高、吊装方便,安全性好的优点。The laminated slab is a better structural form combining prefabricated and cast-in-place concrete. The laminated slab has the advantages of good integrity, high rigidity, and good crack resistance of the cast-in-place floor slab. At present, the main hoisting tools for laminated panels in the market are mostly single-layer U-shaped spreaders. Only one laminated panel can be hoisted each time, which is not conducive to speeding up the hoisting progress of laminated panels. Especially in the construction of high-rise residential buildings, due to the high construction height, the tower crane The running speed is slow, resulting in a long time for hoisting the laminated slab, which seriously affects the progress of the construction period. The utility model provides a cross-combined laminated slab hanger, which includes a cross-combined hanger. Compared with the existing laminated slab spreader, the cross-combined laminated slab hanger has strong functionality, high efficiency, convenient hoisting, and safety. good points.
实用新型内容Utility model content
本实用新型针对目前技术发展的需求和不足之处,提供一种十字组合式叠合板吊具, 与现有叠合板吊具相比,十字组合式叠合板吊具具有功能性强、效率高、吊装方便,安全性好的优点。The utility model aims at the needs and deficiencies of the current technical development, and provides a cross-combined laminated slab spreader. Compared with the existing laminated slab spreader, the cross-combined laminated slab spreader has strong functionality, high efficiency, The advantages of convenient hoisting and good safety.
一种十字组合式叠合板吊具,包括十字组合吊架,十字组合吊架包括互相穿插的第一矩形框架和第二矩形框架,在两个矩形框架各自的较长边框上开设通孔,第一矩形框架的较长边框通过通孔穿引固定钢丝绳,且两条较长边框上的钢丝绳成对对称分布,第二矩形框架的较长边框通过通孔穿引固定钢丝绳,且两条较长边框上的钢丝绳成对对称分布;钢丝绳上均安装滑轮,滑轮均连接钢丝绳挂钩,第二矩形框架的钢丝绳挂钩均长于第一矩形框架的钢丝绳挂钩;还在两个矩形框架各自的较长边框之间增设成对平行的横梁。增设横梁,进一步保障吊具的稳定性。A cross-combined laminated board hanger includes a cross-combined hanger, and the cross-combined hanger includes a first rectangular frame and a second rectangular frame interpenetrated with each other, and through holes are opened on the longer frames of the two rectangular frames. The longer frame of a rectangular frame passes through the through hole to fix the steel wire rope, and the steel wire ropes on the two longer frames are symmetrically distributed in pairs; the longer frame of the second rectangular frame passes through the through hole to fix the steel wire rope, and the two longer The wire ropes on the frame are symmetrically distributed in pairs; pulleys are installed on the wire ropes, and the pulleys are all connected with wire rope hooks, and the wire rope hooks of the second rectangular frame are longer than the wire rope hooks of the first rectangular frame; Add pairs of parallel beams between them. A beam is added to further ensure the stability of the spreader.
所述的吊具中第二矩形框架比第一矩形框架上的钢丝绳对数多。In the said hanger, the number of pairs of wire ropes on the second rectangular frame is more than that on the first rectangular frame.
所述的吊具中第二矩形框架与第一矩形框架上的横梁对数不同。The logarithms of beams on the second rectangular frame and the first rectangular frame in the spreader are different.
本实用新型与现有技术相比具有的有益效果是:Compared with the prior art, the utility model has the beneficial effects that:
本实用新型提供一种十字组合式叠合板吊具,包括十字组合吊架,吊架上穿钢丝绳,钢丝绳上均安装滑轮,滑轮均连接钢丝绳挂钩,可以根据施工现场实际情况,吊装叠合板,可以选择吊装1块或者同时吊装2块,提高了叠合板吊装的施工效率,加快施工进度;并且针对不同尺寸的叠合板,滑轮在钢丝绳上自由滑动,可以吊装不同尺寸的叠合板,不用更换吊具;而且本吊具使用时每个吊点的钢丝绳受力均匀,避免出现叠合板吊装时由于刚性大、受力不均匀导致叠合板出现裂缝或者断裂掉落的安全事故。The utility model provides a cross-combined laminated slab hanger, which includes a cross-combined hanger, on which a steel wire rope is worn, pulleys are installed on the steel wire rope, and the pulleys are connected with wire rope hooks, and the laminated slab can be hoisted according to the actual situation of the construction site Choose to hoist 1 piece or hoist 2 pieces at the same time, which improves the construction efficiency of the laminated slab hoisting and speeds up the construction progress; and for the laminated slabs of different sizes, the pulley slides freely on the wire rope, and the laminated slabs of different sizes can be hoisted without changing the spreader ; Moreover, when the spreader is used, the steel wire ropes at each lifting point are evenly stressed, avoiding safety accidents in which the laminated plates crack or break and fall due to high rigidity and uneven force when the laminated plates are hoisted.
附图说明Description of drawings
图1本实用新型立体结构示意图;Fig. 1 schematic diagram of the three-dimensional structure of the utility model;
图2是图1的俯视示意图。FIG. 2 is a schematic top view of FIG. 1 .
附图标记:Reference signs:
1第一矩形框架,2第二矩形框架,3第二矩形框架横梁,4第一矩形框架横梁,5钢丝绳,6滑轮,7钢丝绳挂钩,8叠合板。1. The first rectangular frame, 2. The second rectangular frame, 3. The second rectangular frame beam, 4. The first rectangular frame beam, 5. Steel wire rope, 6. Pulley, 7. Wire rope hook, 8. Laminated board.
具体实施方式Detailed ways
为使本实用新型的目的、技术方案和优点更加清楚明白,以下结合具体实施例,对本实用新型进一步详细说明。In order to make the purpose, technical solutions and advantages of the utility model clearer, the utility model will be further described in detail below in conjunction with specific embodiments.
实施例1Example 1
一种十字组合式叠合板吊具,包括十字组合吊架,十字组合吊架包括互相穿插的第一矩形框架1和第二矩形框架2,在两个矩形框架各自的较长边框上开设通孔,第一矩形框架1的两条较长边框通过通孔穿引固定2对钢丝绳5,这两对钢丝绳5一端穿引固定在较长边框的端点,另一端穿引固定在较长边框的中部位置,且钢丝绳5左右对称分布;A cross-combined laminated board hanger, including a cross-combined hanger, the cross-combined hanger includes a first rectangular frame 1 and a second rectangular frame 2 interspersed with each other, and through holes are opened on the respective longer frames of the two rectangular frames , the two longer frames of the first rectangular frame 1 are threaded and fixed with two pairs of steel wire ropes 5 through through holes, one end of the two pairs of steel wire ropes 5 is threaded and fixed at the endpoint of the longer frame, and the other end is threaded and fixed at the middle of the longer frame position, and the wire ropes 5 are symmetrically distributed;
同样第二矩形框架2的两条较长边框通过通孔穿引固定2对钢丝绳5,这两对钢丝绳5一端穿引固定在较长边框的端点,另一端穿引固定在较长边框的中部位置,且钢丝绳5左右对称分布;Similarly, the two longer frames of the second rectangular frame 2 pass through through holes to fix 2 pairs of steel wire ropes 5, and one end of these two pairs of steel wire ropes 5 is threaded and fixed at the endpoint of the longer frame, and the other end is threaded and fixed at the middle of the longer frame. position, and the wire ropes 5 are symmetrically distributed;
钢丝绳5上均安装滑轮6,滑轮6均连接钢丝绳挂钩7,第二矩形框架2的钢丝绳挂钩6均比第一矩形框架1的钢丝绳挂钩6长;Pulley 6 is all installed on the wire rope 5, and pulley 6 is all connected wire rope hook 7, and the wire rope hook 6 of the second rectangular frame 2 is all longer than the wire rope hook 6 of the first rectangular frame 1;
在第一矩形框架1上焊接一对平行的第一矩形框架横梁4,且两个第一矩形框架横梁4分别位于两个矩形框架穿插形成的四边形边框的外侧,A pair of parallel first rectangular frame beams 4 are welded on the first rectangular frame 1, and the two first rectangular frame beams 4 are respectively located outside the quadrilateral frame formed by interspersing the two rectangular frames,
在第二矩形框架2上焊接一对平行的第一矩形框架横梁3,且两个第二矩形框架横梁3分别位于两个矩形框架穿插形成的四边形边框的外侧。A pair of parallel first rectangular frame crossbeams 3 are welded on the second rectangular frame 2 , and the two second rectangular frame crossbeams 3 are respectively located outside the quadrilateral frame formed by the two rectangular frames interspersed.
实施例2Example 2
一种十字组合式叠合板吊具,包括十字组合吊架,十字组合吊架包括互相穿插的第一矩形框架1和第二矩形框架2,在两个矩形框架各自的较长边框上开设通孔,第一矩形框架1的两条较长边框通过通孔穿引固定2对钢丝绳5,这两对钢丝绳5一端穿引固定在较长边框的端点,另一端穿引固定在较长边框的中部位置,且钢丝绳5左右对称分布;A cross-combined laminated board hanger, including a cross-combined hanger, the cross-combined hanger includes a first rectangular frame 1 and a second rectangular frame 2 interspersed with each other, and through holes are opened on the respective longer frames of the two rectangular frames , the two longer frames of the first rectangular frame 1 are threaded and fixed with two pairs of steel wire ropes 5 through through holes, one end of the two pairs of steel wire ropes 5 is threaded and fixed at the endpoint of the longer frame, and the other end is threaded and fixed at the middle of the longer frame position, and the wire ropes 5 are symmetrically distributed;
第二矩形框架2的两条较长边框通过通孔穿引固定3对钢丝绳5,这三对钢丝绳5中有两对钢丝绳5的一端穿引固定在较长边框的端点,另一端穿引固定在较长边框的三分之一位置左右,剩下的一对穿引固定在较长边框的中部位置,且钢丝绳5左右对称分布;The two longer frames of the second rectangular frame 2 pass through through holes to fix three pairs of steel wire ropes 5, and among the three pairs of steel wire ropes 5, one end of two pairs of steel wire ropes 5 is threaded and fixed at the endpoint of the longer frame, and the other end is threaded and fixed. At about one-third of the longer frame, the remaining pair of threads are fixed at the middle of the longer frame, and the steel wire ropes 5 are distributed symmetrically;
钢丝绳5上均安装滑轮6,滑轮6均连接钢丝绳挂钩7,第二矩形框架2的钢丝绳挂钩6均比第一矩形框架1的钢丝绳挂钩6长;Pulley 6 is all installed on the wire rope 5, and pulley 6 is all connected wire rope hook 7, and the wire rope hook 6 of the second rectangular frame 2 is all longer than the wire rope hook 6 of the first rectangular frame 1;
在第一矩形框架1上焊接一对平行的第一矩形框架横梁4,且两个第一矩形框架横梁4分别位于两个矩形框架穿插形成的四边形边框的外侧,A pair of parallel first rectangular frame beams 4 are welded on the first rectangular frame 1, and the two first rectangular frame beams 4 are respectively located outside the quadrilateral frame formed by interspersing the two rectangular frames,
在第二矩形框架2上焊接两对平行的第一矩形框架横梁3,且两对第二矩形框架横梁3分别位于两个矩形框架穿插形成的四边形边框的外侧。Two pairs of parallel first rectangular frame crossbeams 3 are welded on the second rectangular frame 2, and the two pairs of second rectangular frame crossbeams 3 are respectively located outside the quadrilateral frame formed by the interspersed two rectangular frames.
上述实施例及实际应用中十字组合吊架及其上附属件,可使用16#槽钢焊接制作,钢丝绳可采用18钢丝绳等,第二矩形框架2的钢丝绳挂钩6可以均比第一矩形框架1的钢丝绳挂钩6长2-3米的距离等。In the above-mentioned embodiment and practical application, the cross combination hanger and its upper accessories can be made by welding 16# channel steel, and the steel wire rope can use 18 steel wire rope, etc. The distance of 6 long 2-3 meters of wire rope hooks etc.
本实用新型使用时先将第一矩形框架1上的钢丝绳挂钩6吊装上一块叠合板,起勾后调整角度,再利用第二矩形框架2的钢丝绳挂钩6吊装另一块叠合板,起勾后调整角度,起吊。When the utility model is in use, the steel wire rope hook 6 on the first rectangular frame 1 is hoisted on a laminated board, and the angle is adjusted after the hook is lifted, and another laminated board is hoisted by the steel wire rope hook 6 of the second rectangular frame 2, and adjusted after the hook is lifted. Angle, lift.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721335574.XU CN207536992U (en) | 2017-10-17 | 2017-10-17 | A kind of cross combined type superimposed sheet suspender |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721335574.XU CN207536992U (en) | 2017-10-17 | 2017-10-17 | A kind of cross combined type superimposed sheet suspender |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207536992U true CN207536992U (en) | 2018-06-26 |
Family
ID=62610525
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201721335574.XU Expired - Fee Related CN207536992U (en) | 2017-10-17 | 2017-10-17 | A kind of cross combined type superimposed sheet suspender |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207536992U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109083268A (en) * | 2018-10-29 | 2018-12-25 | 中国冶集团有限公司 | Narrow more barrier zone bilayer differing tilt angles vestibules once lift installation method |
| CN110422752A (en) * | 2019-07-25 | 2019-11-08 | 标龙建设集团有限公司 | A kind of prefabricated structural laminated plate series hoisting equipment and its hoisting method |
| CN111960249A (en) * | 2020-07-27 | 2020-11-20 | 中建科技集团有限公司 | Laminated slab lifting appliance and steel beam |
-
2017
- 2017-10-17 CN CN201721335574.XU patent/CN207536992U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109083268A (en) * | 2018-10-29 | 2018-12-25 | 中国冶集团有限公司 | Narrow more barrier zone bilayer differing tilt angles vestibules once lift installation method |
| CN110422752A (en) * | 2019-07-25 | 2019-11-08 | 标龙建设集团有限公司 | A kind of prefabricated structural laminated plate series hoisting equipment and its hoisting method |
| CN111960249A (en) * | 2020-07-27 | 2020-11-20 | 中建科技集团有限公司 | Laminated slab lifting appliance and steel beam |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN206580442U (en) | A kind of hanging apparatus suitable for Assembled Building gangboard prefabricated components | |
| CN206783109U (en) | A kind of steel bar girder prefabricated board lifting device | |
| CN209455933U (en) | A kind of spreader for lamination board hoisting | |
| CN209583387U (en) | Be used for adjustable hoist of assembled stair hoist and mount | |
| CN207891749U (en) | A steel box girder hanger | |
| CN211846850U (en) | Hoisting device for prefabricated building installation | |
| CN111847218A (en) | A kind of balance hanger for precast concrete composite slab bottom plate and its making method | |
| CN209988942U (en) | Assembled building superimposed sheet lifting device | |
| CN204778275U (en) | But balancing jack -up hoist | |
| CN203199883U (en) | Scissor type lifting tool for steel rail lifting | |
| CN208648585U (en) | A kind of assembled architecture dry wall lifting shoulder pole girder | |
| CN205275016U (en) | 2 centering hoist device of glomeration mode brickwork wall piece | |
| CN219009694U (en) | Hoisting device for box culvert | |
| CN108726358A (en) | A kind of towering concrete structure main reinforcement batch hanging apparatus and method | |
| CN107128794A (en) | Prefabricated superimposed sheet hanging method | |
| CN204752004U (en) | Novel become width of cloth formula bridge floor hoist | |
| CN204778268U (en) | A special lifting device for hoist and mount of large -tonnage precast box girder | |
| CN212050146U (en) | A self-leveling concrete prefabricated laminated board hanger | |
| CN203782503U (en) | Special copy lifting device related to steel rail lifting | |
| CN206359113U (en) | A kind of steel plate lifting balancing device | |
| CN210084714U (en) | Adjustable steel reinforcement cage hanger | |
| CN209143484U (en) | A kind of hanging apparatus | |
| CN207863502U (en) | A kind of Construction of Steel Structure life line bracket | |
| CN209778062U (en) | An extension spreader for hoisting steel pipe arch bridge lattice girders | |
| CN207090776U (en) | A kind of prefabricated part hanging instrument |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180626 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |