CN207535111U - One kind is for building to build brick processing unit (plant) by laying bricks or stones - Google Patents

One kind is for building to build brick processing unit (plant) by laying bricks or stones Download PDF

Info

Publication number
CN207535111U
CN207535111U CN201721315969.3U CN201721315969U CN207535111U CN 207535111 U CN207535111 U CN 207535111U CN 201721315969 U CN201721315969 U CN 201721315969U CN 207535111 U CN207535111 U CN 207535111U
Authority
CN
China
Prior art keywords
stones
laying bricks
brick
baffle
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721315969.3U
Other languages
Chinese (zh)
Inventor
沈渊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jingdong Building Development Co Ltd
Original Assignee
Shanghai Jingdong Building Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jingdong Building Development Co Ltd filed Critical Shanghai Jingdong Building Development Co Ltd
Priority to CN201721315969.3U priority Critical patent/CN207535111U/en
Application granted granted Critical
Publication of CN207535111U publication Critical patent/CN207535111U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Processing Of Stones Or Stones Resemblance Materials (AREA)

Abstract

The utility model, which provides, a kind of for building builds brick processing unit (plant) by laying bricks or stones, it is related to architectural engineering processing equipment field, including operation console and Jie Zhuan mechanisms, the top surface of operation console is provided at least two pieces of guide plates, be provided with baffle at the top of guide plate, operation console, baffle and at least two pieces of guide plates enclose for build by laying bricks or stones brick by processing channel, one end of processing channel is feed end, the other end of processing channel is discharge end, and Jie Zhuan mechanisms are rotationally connected with one end of the close discharge end of baffle.The present apparatus is provided with operation console and Jie Zhuan mechanisms, can carry out truncation to building brick by laying bricks or stones, and the brick shapes rule blocked out, make the wall body structure built by laying bricks or stones out more firm, more beautiful.The present apparatus is simple in structure, easy to operate, further, it is possible to improve construction efficiency under the premise of safe construction is ensured.

Description

One kind is for building to build brick processing unit (plant) by laying bricks or stones
Technical field
The utility model relates generally to architectural engineering processing equipment field, and brick is built by laying bricks or stones in particular to one kind is for building Processing unit (plant).
Background technology
In building masonry structure, it is its main load-bearing material to build brick by laying bricks or stones, now, relatively broad block is used in engineering Brick is built to include:Solid clay brick, solid concrete brick, Dinas brickes, flyash brick etc., these build brick by laying bricks or stones after firing, With very big strength and stiffness, main body load-carrying members can either be used as, and decorating structure can be used as.In existing construction work Under the conditions of skill, for building the building by laying bricks or stones substantially all using the method manually built by laying bricks or stones, since wall length differs, between puzzle joint indwelling of brick by laying bricks or stones Away from and the factors such as worker's qualification under the influence of, can inevitably encounter needs full sized brick being divided into fritter when built by laying bricks or stones, Workpeople is directly directly tapped with brick knife and builds brick by laying bricks or stones mostly, is divided into fritter.Since the brick of firing all has centainly hard Degree, so worker needs a hand-held brick, then a hand-held brick knife is firmly tapped with brick knife and builds brick by laying bricks or stones, is easy to hurt work in this way The palm of people, and the size of brick that such mode taps out, both depend on proficiency of workers, it is easy to make substantially The shape size for being unsatisfactory for requirement is tapped into brick, causes the waste of brick, while in this manner but also work The construction efficiency of people is affected to some extent.
Chinese patent, feeding masonry brick cutter (CN20144U), it includes cutter hub, the handle of a knife being connected with cutter hub, conveying Hose, it is characterised in that the end of the handle of a knife to handle of a knife root is equipped with a channel, and channel is equipped with manual switch;The channel Liquid feeding end be connected with conveying hose, be equipped with the liquid outlet of channel in the root of handle of a knife and in cutter hub side, liquid outlet shape is Arc shape, the section of handle of a knife is rectangle or circle.The device can improve the efficiency built by laying bricks or stones to a certain extent, but for brick Processing there is still a need for using manually tapping by the way of, influence construction efficiency, and be easy to cause the mistake that worker builds brick by laying bricks or stones in percussion It is injured in journey.
Utility model content
The purpose of this utility model is to provide it is a kind of it is for building build brick processing unit (plant) by laying bricks or stones, the problem of above-mentioned is made to obtain effectively Improve.
The utility model is realized in this way:
Based on above-mentioned purpose, the embodiment of the utility model provide it is a kind of it is for building build brick processing unit (plant) by laying bricks or stones, including behaviour Make platform and Jie Zhuan mechanisms, the top surface of the operation console is provided at least two pieces of guide plates, gear is provided at the top of the guide plate Plate, the operation console, the baffle and at least two pieces of guide plates enclose supply described in build by laying bricks or stones brick by processing channel, institute The one end for stating processing channel is feed end, and the other end of the processing channel is discharge end, and the Jie Zhuan mechanisms are rotationally connected with One end of the close discharge end of the baffle.
In the alternative embodiment of the utility model, the Jie Zhuan mechanisms include operating handle, ram and at least two Connecting rod, the top of the baffle are additionally provided with fixed block, and one end of the connecting rod is rotatablely connected with the fixed block, described The other end of connecting rod is connect with the side of the ram, and the handle is connect with the opposite side of the ram, the hammer It hits part and described build brick by laying bricks or stones for will protrude the discharge end and sever.
In the alternative embodiment of the utility model, two pieces of baffles are provided with arc positioned at one end of the feed end Shape face, and the arcwall face is located at the side close to each other of two pieces of baffles.
In the alternative embodiment of the utility model, the discharge end is provided with splicing plate, the splicing plate from it is described go out Expect that end extends to the direction far from the discharge end, and the splicing plate tilts down setting.
In the alternative embodiment of the utility model, one end far from the baffle of the operation console is provided at least four Root supporting leg, and four supporting legs are located at four angles of the operation console respectively, far from described in two of the discharge end Supporting leg is rear support leg, and one end far from the operation console of the rear support leg is provided with bogie plate.
Compared with prior art, the beneficial effects of the utility model are:
The embodiment of the utility model provide it is for building build brick processing unit (plant) by laying bricks or stones, there is provided operation console and Jie Zhuan mechanisms, Truncation can be carried out to building brick by laying bricks or stones, and the brick shapes rule blocked out, make the wall body structure built by laying bricks or stones out more firm, It is more beautiful.The present apparatus is simple in structure, easy to operate, further, it is possible to improve masonry project under the premise of safe construction is ensured Construction efficiency.
Description of the drawings
It, below will be to required in embodiment in order to illustrate more clearly of the technical solution of the utility model embodiment The attached drawing used is briefly described, it should be understood that the following drawings illustrates only some embodiments of the utility model, therefore not The restriction to range is should be considered as, for those of ordinary skill in the art, without creative efforts, It can also be obtained according to these attached drawings other relevant attached drawings.
Fig. 1 is the one of viewing angle constructions signal for building for building brick processing unit (plant) by laying bricks or stones that the utility model embodiment provides Figure;
Fig. 2 is another viewing angle constructions schematic diagram for building for building brick processing unit (plant) by laying bricks or stones of Fig. 1.
Icon:10- operation consoles;11- guide plates;12- baffles;120- arcwall faces;13- processing channels;14- feed ends;15- Discharge end;150- splicing plates;151- ribs;20- Jie Zhuan mechanisms;21- handles;22- rams;23- connecting rods;30- supporting legs; 31- rear support legs;32- bogie plates;40- builds brick by laying bricks or stones.
Specific embodiment
Purpose, technical scheme and advantage to make the utility model embodiment are clearer, new below in conjunction with this practicality Attached drawing in type embodiment, the technical scheme in the utility model embodiment is clearly and completely described, it is clear that is retouched The embodiment stated is the utility model part of the embodiment, instead of all the embodiments.Usually here described in attached drawing and The component of the utility model embodiment shown can be configured to arrange and design with a variety of different.Therefore, below to attached The detailed description of the embodiment of the utility model provided in figure is not intended to limit claimed the scope of the utility model, But it is merely representative of the selected embodiment of the utility model.
Embodiment
It please refers to shown in Fig. 1 and Fig. 2, the embodiment of the utility model provides a kind of brick 40 for building of building by laying bricks or stones and processes dress It puts, including operation console 10 and Jie Zhuan mechanisms 20, need to be processed builds 40 brick of brick by laying bricks or stones and can be placed on operation console 10 and carry out It blocks, the effect of Jie Zhuan mechanisms 20 is to directly act on brick, is blocked the length of brick as required.
The upper surface of operation console 10 is a smooth surface, reduces the friction built by laying bricks or stones between brick 40 and operation console 10, just It is processed in that will build brick 40 by laying bricks or stones and be pushed into suitable position.The top surface of operation console 10 is provided at least two pieces of guide plates 11, two pieces Guide plate 11 is mutually parallel, and guide plate 11 is fixedly connected with operation console 10, preferably, the molding that is connected to one here.
The top of guide plate 11 is provided with baffle 12, operation console 10, baffle 12 and at least two pieces of guide plates 11 enclose confession Build by laying bricks or stones brick 40 by processing channel 13, also, the cross sectional shape of processing channel 13 is the rectangle to match with building brick 40 by laying bricks or stones, And the width and height of processing channel 13 are all bigger than the width and height for building brick 40 by laying bricks or stones, so, processing channel 13 can also play Limiting and the effect being oriented to.One end of processing channel 13 is feed end 14, and the other end of processing channel 13 is discharge end 15, cuts brick Mechanism 20 is rotationally connected with one end of the close discharge end 15 of baffle 12.When being processed to building brick 40 by laying bricks or stones, brick is built by laying bricks or stones 40 enter processing channel 13 from feed end 14, then push to discharge end 15, can be set according to the needs of construction and build brick 40 by laying bricks or stones Protrude the length of discharge end 15.Discharge end 15 can will be protruded when being rotated from the top down around baffle 12 in Jie Zhuan mechanisms 20 Brick 40 is built by laying bricks or stones to block.
In the present embodiment, two block baffles 12 positioned at one end of feed end 14 are provided with arcwall face 120, and arcwall face 120 are located at the side close to each other of two block baffles 12, that is to say, that the width of feed end 14 is from 13 inward end of processing channel Direction gradually increase, can make to build by laying bricks or stones that brick 40 is more convenient to be pushed into from feed end 14 in processing channel 13.
In the present embodiment, Jie Zhuan mechanisms 20 include operating handle 21, ram 22 and at least two connecting rods 23, connection Bar 23 is for ram 22 to be connect with baffle 12, and the brick 40 of building by laying bricks or stones that ram 22 is used to protrude discharge end 15 blocks, handle 21 effect is the break-in operation that worker is facilitated to carry out brick, and handle 21 here is arranged to cylinder type, uses worker It is pleasant.Specifically, the top of baffle 12 is additionally provided with fixed block, one end and the fixed block of connecting rod 23 are rotatablely connected, even The other end of extension bar 23 is connect with the side of ram 22, and handle 21 is connect with the opposite side of ram 22.Ram 22 is set Into rectangular parallelepiped structure, and ram 22 is made of metal, has certain weight, and worker only needs when being operated Apply a small amount of pressure and can will build brick 40 by laying bricks or stones and block, operation is very convenient.Also, without using the present apparatus when It waits, Jie Zhuan mechanisms 20 can be turned to one end of feed end 14 and be placed on operation console 10, be convenient for storing and move.
In the present embodiment, discharge end 15 is provided with splicing plate 150, and splicing plate 150 is from discharge end 15 to far from discharge end 15 direction extension, and splicing plate 150 tilts down setting.The both sides of splicing plate 150 are provided with rib 151.Splicing plate 150 Effect is caught for the brick 40 of building by laying bricks or stones that will be blocked, prevent from blocking build by laying bricks or stones brick 40 directly fall on the ground break into pieces.
In the present embodiment, one end of the separate baffle 12 of operation console 10 is provided at least four supporting legs 30, supporting leg Operation console 10 is propped up certain altitude by 30, is convenient to worker and is operated.And four supporting legs 30 are respectively positioned at operation console 10 Four angles, two supporting legs 30 far from discharge end 15 is rear support legs 31, one end of the separate operation console 10 of rear support leg 31 It is provided with bogie plate 32.When in use, some weights can be placed on bogie plate 32, such as:Stone, brick etc. are born After putting weight on weight plate 32, whole device can be made more to stablize, it, can be with particularly when carrying out cutting brick operation Prevent the present apparatus from toppling.
The above descriptions are merely preferred embodiments of the present invention, is not intended to limit the utility model, for this For the technical staff in field, various modifications and changes may be made to the present invention.It is all in the spirit and principles of the utility model Within, any modification, equivalent replacement, improvement and so on should be included within the scope of protection of this utility model.

Claims (5)

1. one kind is for building to build brick processing unit (plant) by laying bricks or stones, which is characterized in that including operation console (10) and Jie Zhuan mechanisms (20), the behaviour The top surface for making platform (10) is provided at least two pieces of guide plates (11), and baffle (12), institute are provided at the top of the guide plate (11) State operation console (10), the baffle (12) and at least two pieces of guide plates (11) enclose for build by laying bricks or stones brick (40) by processing Channel (13), one end of the processing channel (13) is feed end (14), and the other end of the processing channel (13) is discharge end (15), the Jie Zhuan mechanisms (20) are rotationally connected with one end of the close discharge end (15) of the baffle (12).
2. for building brick processing unit (plant) is built by laying bricks or stones according to claim 1, which is characterized in that the Jie Zhuan mechanisms (20) include Operating handle (21), ram (22) and at least two connecting rods (23), the top of the baffle (12) are additionally provided with fixed block, One end of the connecting rod (23) is rotatablely connected with the fixed block, the other end and the ram of the connecting rod (23) (22) side connection, the handle (21) connect with the opposite side of the ram (22), and the ram (22) is for general The described of the discharge end (15) is protruded to build brick (40) by laying bricks or stones and sever.
3. for building brick processing unit (plant) is built by laying bricks or stones according to claim 1, which is characterized in that the position of two pieces of baffles (12) Arcwall face (120) is provided with, and the arcwall face (120) is positioned at two pieces of baffles (12) in one end of the feed end (14) Side close to each other.
4. for building brick processing unit (plant) is built by laying bricks or stones according to claim 1, which is characterized in that the discharge end (15) is provided with Splicing plate (150), the splicing plate (150) extend from the discharge end (15) to the direction far from the discharge end (15), and The splicing plate (150) tilts down setting.
For building build brick processing unit (plant) by laying bricks or stones 5. according to claim 1, which is characterized in that the operation console (10) it is separate One end of the baffle (12) is provided at least four supporting legs (30), and four supporting legs (30) are located at the behaviour respectively Make four angles of platform (10), two supporting legs (30) far from the discharge end (15) are rear support leg (31), after described One end far from the operation console (10) of supporting leg (31) is provided with bogie plate (32).
CN201721315969.3U 2017-10-12 2017-10-12 One kind is for building to build brick processing unit (plant) by laying bricks or stones Expired - Fee Related CN207535111U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721315969.3U CN207535111U (en) 2017-10-12 2017-10-12 One kind is for building to build brick processing unit (plant) by laying bricks or stones

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721315969.3U CN207535111U (en) 2017-10-12 2017-10-12 One kind is for building to build brick processing unit (plant) by laying bricks or stones

Publications (1)

Publication Number Publication Date
CN207535111U true CN207535111U (en) 2018-06-26

Family

ID=62610309

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721315969.3U Expired - Fee Related CN207535111U (en) 2017-10-12 2017-10-12 One kind is for building to build brick processing unit (plant) by laying bricks or stones

Country Status (1)

Country Link
CN (1) CN207535111U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111421672A (en) * 2020-05-29 2020-07-17 刘庆豪 Surplus limit remove device of glass handicraft

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111421672A (en) * 2020-05-29 2020-07-17 刘庆豪 Surplus limit remove device of glass handicraft
CN111421672B (en) * 2020-05-29 2022-04-12 明池玻璃股份有限公司 Surplus limit remove device of glass handicraft

Similar Documents

Publication Publication Date Title
US4256416A (en) Screed for leveling freshly poured concrete
CN207535111U (en) One kind is for building to build brick processing unit (plant) by laying bricks or stones
US20060016831A1 (en) Multiple tuckpointing tool and method disclosure
CN202155604U (en) Luggage case type multi-function sizing saw machine
CN207347590U (en) A kind of blast furnace iron mouth mud sleeve cleaning plant
CN206157280U (en) A cleaning device for spinneret
CN204583011U (en) One is convenient to feeding mixer
CN209245596U (en) A kind of building machinery support frame
CN207359381U (en) A kind of building wall ceramic tile cutter
CN209321843U (en) A kind of manufacture of cement cement promotion conveying equipment
GB2366827A (en) A detachable mortar board and a support arm for attachment to a scaffold pole
IE87362B1 (en) A cutting device
EP2301701B1 (en) Manual tile cutter for large sized tiles and accessory thereof
CN205369331U (en) Husky shovel of construction
CN211143643U (en) Spatula for construction of building outer wall
CN206427229U (en) Substitute the operation platform of scaffold in cabin
CN210125701U (en) Steel bar cutting machine
CN210025853U (en) Brick cutting tool
CN208415877U (en) A kind of floor roughening device
CN108035527A (en) A kind of crane for building
CN206667733U (en) A kind of U-shaped pre-buried ring of builder's jack back seat
CN216036681U (en) Novel heavy object extracting device
CN203129613U (en) Building trowel
CN205046863U (en) Building engineering is with instrument of paining musky coal
CN214978988U (en) Manual rupture instrument of stagnant water bolt

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180626

Termination date: 20181012

CF01 Termination of patent right due to non-payment of annual fee